0% found this document useful (0 votes)
45 views4 pages

Nipa Project Report 7

The Project Work Report summarizes minor setbacks on two road projects - the Aron Sowa Road Project and the Bosavi Road Project in Nipa. On the Aron Sowa Road Project, a group of boys from Nemda threatened and assaulted the operator and spotter of a machine, demanding an improvement payment be settled. This caused damage to the machine mirror. Additionally, the hose of a stockpile machine was cut by a drunk man from Herep, forcing it to stop working. For the Bosavi Road Project, the road from Pimaka to Inu High School Junction is in poor condition, posing a risk of machines toppling in large potholes. Recomm

Uploaded by

Israel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views4 pages

Nipa Project Report 7

The Project Work Report summarizes minor setbacks on two road projects - the Aron Sowa Road Project and the Bosavi Road Project in Nipa. On the Aron Sowa Road Project, a group of boys from Nemda threatened and assaulted the operator and spotter of a machine, demanding an improvement payment be settled. This caused damage to the machine mirror. Additionally, the hose of a stockpile machine was cut by a drunk man from Herep, forcing it to stop working. For the Bosavi Road Project, the road from Pimaka to Inu High School Junction is in poor condition, posing a risk of machines toppling in large potholes. Recomm

Uploaded by

Israel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Date: 28/06/2023

Attention to: General Manager & Managing Director


Cc: Administration Manager

Subject: Project Work Report that causes minor setback – Aron Sowa Road Project &
Bosavi Road Project (Nipa)
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

1. Damage Report Summary & Minor Set Back


Date: 20/06/2023
After finishing clearing & grubbing, we were moving Komati PC210 from Nemda back to Hindit for Gravelling.
However, while the machine was on its way, the operator (Davis James) and the spotter (Gibson Alice) we held at
gunpoint at Nipa station, were threatened & bitten by a group of boys from Nemda.

In the report for Ferman Muds Lol (Nemda community rep) and Kelly Hembe (PRO), he stated that the boys want
their improvement payment to be settled from Somar Ipa – Nipa Station/Nembi. Despite explaining the process to
them that these things will take time, they were ignorant and went ahead to take matters into their hands.
Furthermore, he stated that some of the guys are politically motivated.

The improvement payment is revised and evaluated by the evaluator Peter Vagi.

Figure 1 Security boys got hurt while trying to intervene


MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Figure 2 Machine Mirror got Broken

2. Stock Pile
 Stockpile continues and stopped working on 22/062023.
 The machine hose was cut by a drunk head from Herep a couple of weeks back and on that day it
burst causing the machine to cease work.
 The hose is brought to Hagen to be fixed.
 Machine: Hyundai 210-7
 Location: Pulim 3, Quarry

Figure 3 Machine Stockpile


MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Figure 4 Damage Hose

3. Bosavi Project.
 The road from Pimaka to Inu High School Junction is in very bad condition.
 We only rely on the floater for the IPZ Limited truck to move the Dozer from Kaso – Waro station.
 The risk is other trucks are too low and the machine can topple over when manoeuvring over the huge potholes.

4. Recommendations/Request
 Requesting to Move one of the excavators from Kaso to Pulim 3 for gravelling and/or pavement.
 Requesting to move one of the excavator machines to commence work in Herep.

Respectfully,
Project Engineer.