d2 Load Bearing System

This document provides instructions for assembling and using the Doka load-bearing tower d2 formwork system. Key points include: 1. The system allows for different ground plans, heights, floor shapes, and loads through its adjustable design. 2. Assembly begins by laying out the tower components horizontally and connecting them. Towers are then erected vertically by hand or forklift. 3. Safety precautions must be followed during all phases, including anchoring the towers properly and using back-stays/bracing as needed based on the design. 4. Only Doka components can be used for repairs, and the entire system must be inspected before each use.

Uploaded by

Murat CK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
485 views60 pages

d2 Load Bearing System

This document provides instructions for assembling and using the Doka load-bearing tower d2 formwork system. Key points include: 1. The system allows for different ground plans, heights, floor shapes, and loads through its adjustable design. 2. Assembly begins by laying out the tower components horizontally and connecting them. Towers are then erected vertically by hand or forklift. 3. Safety precautions must be followed during all phases, including anchoring the towers properly and using back-stays/bracing as needed based on the design. 4. Only Doka components can be used for repairs, and the entire system must be inspected before each use.

Uploaded by

Murat CK
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 60

02/2011 User information

999734002 en-GB Method statement

Load-bearing tower d2

The Formwork Experts


Introduction User information Load-bearing tower d2

Introduction

© by Doka Industrie GmbH, A-3300 Amstetten

2 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Introduction

Contents
4 Introduction
4 Elementary safety warnings
6 Doka services

8 System description
10 System overview
13 d2 in detail
14 Practical examples
16 Adapts to different ground plans, heights,
floor shapes and loads

18 Assembly instructions
19 Horizontal assembly
22 Assembling towers in the upright by hand
24 Assembling towers in the upright by forklift
truck

27 Repositioning
28 Repositioning using wheel units
30 Lifting by crane
32 Lifting by forklift truck

34 General remarks
34 Anchoring on the structure
36 Back-stays/shoring supports for the load-bea-
ring towers
40 Adapting to the building layout
42 Inclination adjustment
45 Steel primary beams
46 Transporting, stacking and storing

50 Structural design

53 Component overview

999734002 - 02/2011 3
The Formwork Experts
Introduction User information Load-bearing tower d2

Elementary safety warnings


Introduction

User target groups Planning


● This User Information booklet (Method Statement) is ● Provide safe workplaces for those using the form-
aimed at everyone who will be working with the Doka work (e.g. for when it is being erected/dismantled,
product or system it describes. It contains informa- modified or repositioned etc). It must be possible to
tion on the standard design for setting up this sys- get to and from these workplaces via safe access
tem, and on correct, compliant utilisation of the sys- routes!
tem. ● If you are considering any deviation from the
● All persons working with the product described details and instructions given in this booklet, or
herein must be familiar with the contents of this man- any application which goes beyond those
ual and with all the safety instructions it contains. described in the booklet, then revised static cal-
● Persons who are incapable of reading and under- culations must be produced for checking, as well
standing this booklet, or who can do so only with dif- as supplementary assembly instructions.
ficulty, must be instructed and trained by the cus-
tomer. Rules applying during all phases of
● The customer is to ensure that the information mate-
rials provided by Doka (e.g. User Information book- the assignment:
lets, Instructions for Assembly and Use, Operating ● The customer must ensure that this product is
Instruction manuals, plans etc.) are available to all erected and dismantled, reset and generally used for
users, and that they have been made aware of them its intended purpose under the direction and super-
and have easy access to them at the usage location. vision of suitably skilled persons with the authority to
● In the relevant technical documentation and form- issue instructions.
work utilisation plans, Doka shows the workplace These persons' mental and physical capacity must
safety precautions that are necessary in order to use not in any way be impaired by alcohol, medicines or
the Doka products safely in the usage situations drugs.
shown. ● Doka products are technical working appliances
In all cases, users are obliged to ensure compliance which are intended for industrial/commercial use
with national OH&S (occupational health and safety) only, always in accordance with the respective Doka
rules throughout the entire project and to take appro- User Information booklets or other technical docu-
priate additional or alternative workplace safety pre- mentation authored by Doka.
cautions where necessary.
● The stability of all components and units must be
ensured during all phases of the construction work!
Hazard assessment ● The functional/technical instructions, safety warn-
ings and loading data must all be strictly observed
● The customer is responsible for drawing up, docu- and complied with. Failure to do so can cause acci-
menting, implementing and continually updating a
dents and severe (even life-threatening) damage to
hazard assessment at every job-site. health, as well as very great material damage.
This document serves as the basis for the site-spe-
cific hazard assessment, and for the instructions ● Fire-sources are not permitted anywhere near the
given to users on how to prepare and utilise the sys- formwork. Heating appliances are only allowed if
tem. It does not substitute for these, however. properly and expertly used, and set up a safe dis-
tance away from the formwork.
● The work must take account of the weather condi-
Remarks on this document tions (e.g. risk of slippage). In extreme weather,
● This User Information booklet can also be used as a steps must be taken in good time to safeguard the
generic method statement or incorporated with a equipment, and the immediate vicinity of the equip-
site-specific method statement. ment, and to protect employees.
● Many of the illustrations in this booklet show the ● All connections must be checked regularly to ensure
situation during formwork assembly and are that they still fit properly and are functioning cor-
therefore not always complete from the safety rectly.
point of view. It is very important to check all screw-type connec-
tions and wedge-clamped joins whenever the con-
Any safety accessories not shown in these illustra- struction operations require (particularly after excep-
tions must still be used by the customer, in accord- tional events such as storms), and to tighten them if
ance with the applicable rules and regulations. necessary.
● Further safety instructions, especially warnings,
will be found in the individual sections of this
document!

4 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Introduction

Assembly Regulations; industrial safety


● The equipment/system must be inspected by the ● Always observe all industrial safety regulations and
customer before use, to ensure that it is in suitable other safety rules applying to the application and uti-
condition. Steps must be taken to rule out the use of lisation of our products in the country and/or region
any components that are damaged, deformed, or in which you are operating.
weakened due to wear, corrosion or rot.
Instruction as required by EN 13374:
● Combining our formwork systems with those of other
● If a person or object falls against, or into, the edge
manufacturers could be dangerous, risking damage protection system and/or any of its accessories, the
to both health and property. If you intend to combine
edge protection component affected may only con-
different systems, please contact Doka for advice
tinue in use after it has been inspected and passed
first.
by an expert.
● The assembly work must be carried out by suitably
qualified employees of the client's.
● It is not permitted to modify Doka products; any such Maintenance
modifications constitute a safety risk. ● Only original Doka components may be used as
spare parts. Repairs may only be carried out by the
Erecting the formwork manufacturer or authorised facilities.

● Doka products and systems must be set up in such


a way that all loads acting upon them are safely Symbols used
transferred! The following symbols are used in this booklet:

Pouring
● Do not exceed the permitted fresh-concrete pres-
☞ Important note
Failure to observe this may lead to malfunc-
tion or damage.
sures. Excessively high pouring rates lead to form-
work overload, cause greater deflection and risk
causing breakage.
CAUTION / WARNING / DANGER
Failure to observe this may lead to material
Striking the formwork damage, and to injury to health which may
range up to the severe or even life-threaten-
● Do not strike the formwork until the concrete has
ing.
reached sufficient strength and the person in charge
has given the order for the formwork to be struck!
● When striking the formwork, never use the crane to
break concrete cohesion. Use suitable tools such as Instruction
timber wedges, special pry-bars or system features This symbol indicates that actions need to be
such as Framax stripping corners. taken by the user.
● When striking the formwork, do not endanger the
stability of any part of the structure, or of any scaf-
folding, platforms or formwork that is still in place! Sight-check
Indicates that you need to do a sight-check
Transporting, stacking and storing to make sure that necessary actions have
been carried out.
● Observe all regulations applying to the handling of
formwork and scaffolding. In addition, the Doka
slinging means must be used - this is a mandatory Tip
requirement.
Points out useful practical tips.
● Remove any loose parts or fix them in place so that
they cannot be dislodged or fall free!
● All components must be stored safely, following all
the special Doka instructions given in the relevant Reference
sections of this User Information booklet!
Refers to other documents and materials.

Miscellaneous
We reserve the right to make alterations in the interests
of technical progress.

999734002 - 02/2011 5
The Formwork Experts
Introduction User information Load-bearing tower d2

Doka services
Support in every phase of the
project
Doka offers a broad spectrum of services, all with a sin-
gle aim: to help you succeed on the site.
Every project is unique. Nevertheless, there is one
thing that all construction projects have in common –
and that is a basic structure with five phases. We at
Doka know our clients' varying requirements. With our
consulting, planning and other services, we help you
achieve effective implementation of your formwork
assignment using our formwork products – in every one
of these phases.

1 2 3
Project development phase Tendering phase Operations scheduling phase

Taking well-founded decisions Optimising the preliminary work Controlled, regular forming oper-
thanks to professional advice and with Doka as an experienced part- ations, for greater efficiency
consulting ner resulting from realistically calculated
formwork concepts

Find precisely the right formwork Draw up potentially winning bids, by Plan cost-effectively right from the
solutions, with the aid of ● basing them on realistically calcu- outset, thanks to
● help with the bid invitation lated guideline prices ● detailed offers
● in-depth analysis of the initial sit- ● making the right formwork ● determination of the commission-
uation choices ing quantities
● objective evaluation of the plan- ● having an optimum time-calcula- ● co-ordination of lead-times and
ning, execution, and time-risks tion basis handover deadlines

6 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Introduction

The advantages for you


thanks to professional advice and
consulting
4 5 ● Cost savings and time gains
When we advise and support you
right from the word "go", we can
(Shell) construction phase (Shell) completion phase make sure that the right formwork
systems are chosen and then
used as planned. This lets you
achieve optimum utilisation of the
formwork equipment, and effec-
tive forming operations because
your workflows will be correct.

● Maximised workplace safety


The advice and support we can
give you in how to use the equip-
ment correctly, and as planned,
leads to greater safety on the job.

● Transparency
Optimum resource utilisation Seeing things through to a posi- Because our services and costs
with assistance from the Doka tive conclusion are completely transparent, there
Formwork Experts with professional support is no need for improvisation dur-
ing the project – and no unpleas-
ant surprises at the end of it.

● Reduced close-out costs


Workflow optimisation, thanks to Doka Services are a byword for
Our professional advice on the
● thorough utilisation planning transparency and efficiency here,
selection, quality and correct use
● internationally experienced offering
of the equipment helps you avoid
project technicians ● jointly handled return of rented damage, and minimise wear-and-
● appropriate transport logistics formwork tear.
● on-site support ● professional dismantling
● efficient cleaning and recondition-
ing using special equipment

999734002 - 02/2011 7
The Formwork Experts
System description User information Load-bearing tower d2

System description
System description

Doka d2 - the strong, economical


load-bearing tower made of steel
Sturdy galvanised steel frames, in three different
heights, are the basis of this highly economical load-
bearing tower, designed for highly varied areas of use.
High load-bearing capacity, quick and easy assembly
using only a small number of separate system compo-
nents and connectors, and great versatility - these are
the outstanding characteristics of d2.
Wherever high loads occur, in either the building-con-
struction or civil-engineering fields, this load-bearing
tower is the ideal solution.

The tried-and-tested load-bearing tower


● with lightweight components (frames up to h=1.20 m
can be manhandled)
● ergonomical: easy-to-handle parts

... speeds up work


● the small number of system components makes for
easier handling and means that no time is wasted
searching for parts
● simple stacking of the basic frames
● no tools are needed for assembling the towers

... provides optimum safety Site: Flyover at Rheinfelden customs zone on Swiss/German border

● high capacity of up to 60 kN per leg


● high stability, due to its 1.52 m wide frames Areas of use
● climbing rungs are integrated in the frames, enabling The Load-bearing tower d2 is ideal:
them to be used as a ladder. ● as falsework for use in bridge-building, where high
(May not be used in this way in the UK. A separate loads occur and where great stability is called for in
ladder is required here). that horizontal forces such as wind loads have to be
safely transferred
... is flexible ● in the building construction field, e.g. for administra-
tion buildings and multistorey car-park decks, where
● the inter-frame spacing can be varied (from 1.00 m large-area tableform units reduce forming-times
to 2.50 m), for optimum utilisation of the frames'
load-bearing capacity ● in the industrial and power-station construction field,
as a load-bearing tower for all manner of applications
● different frame heights - 0.90 m, 1.20 m and 1.80 m
- for rough height adjustment in 30 cm increments:
0.90, 1.20 and 1.80 m Doka stair tower d2-225
● fine adjustment by means of screw-jack U-heads The Doka stair tower d2-225 is made up of 1.20m high
and feet frames and a small number of special accessories.
● can be used in conjunction with floor props and Quick to erect, the stair tower provides "high-level"
Dokaflex safety and lets the site crew get quickly to their work-
places.
... is economical Follow the directions in the "Doka stair tower
● The tower units are quick and easy to assemble: d2-225" User Information!
- either on their sides or in the upright
- for tall towers, tower units can be pre-assembled
on their sides, and then simply stacked by crane
- scaffold planking units make it easy to erect and
dismantle the tower and superstructure
● with special wheel units, complete tableforms can
quickly be wheeled to their next location

8 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 System description

Site: Communications Tower, Kuwait

999734002 - 02/2011 9
The Formwork Experts
System description User information Load-bearing tower d2

System overview
Basic design concept The d2 system components
Head units (A)
4-way screw-jack
Screw jack U-head U-head D
A head

Top height-adjustment screwjacks for load-


Rotatable, but with no
bearing towers. For holding the superstruc-
height adjustment.
ture and adjusting its height.
B
For holding the pri-
For holding the pri-
May be used with mary beams (e.g.
mary beams (e.g.
either one or two WS10 steel walings
steel walings, steel
Doka H20 beams. or double H20
girders).
beams).
The primary beams
are fixed so that they
cannot tip over.

Basic frames d2 (B)


Basic frame d2 1.80m Basic frame d2 1.20m Basic frame d2 0.90m

b
9734-203-01
a

a ... Inter-frame spacing = 100 / 125 / 152 / 175 / 200 / 225 / 250 cm
b ... Frame width = 152 cm
A Head unit
B Basic frame d2
C Brace d2
D Base unit

10 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 System description

Braces d2 (A) Base units (D)


Horizontal Diagonal brace Diagonal brace Diagonal brace Heavy duty screw jack 70
Screw jack foot
brace 9 12 18 + Split nut B

Horizontal con- Diagonal stiff- Diagonal stiff- Diagonal stiff- Bottom height-adjustment spindle for load-bearing towers.
nection brace ening brace ening brace ening brace The Split nut B can be swung
between the between the between the between the apart, meaning that it does not
basic frames. Basic frames Basic frames Basic frames need to be turned through the full
0.90m. 1.20m. 1.80m. length of the threaded
Is also used as spindle.
a horizontal
diagonal for all
types of basic
frame.
Slot-in bracing crosses made of tubular steel, for mounting between
the frames.
Identified by:
● Embossed marking (G) e.g. 18.250 (diagonal brace)
- 18 = frame height 1.80 m
- 250 = inter-frame spacing 250 cm
● Embossed marking (G) e.g. 250 (horizontal brace)
- 250 = inter-frame spacing 250 cm
As an alternative to the Braces d2, diagonal crosses
from the Doka load-bearing tower Staxo can also be
used here.

☞ Important note:
● The diagonal crosses cannot be used in
cases where the frames are spaced 100 cm
apart, as the crosses would foul the cross-
bars of the frames.
● Do not mix diagonal crosses and diagonal
braces on the same load-bearing tower.
● It is not possible to use diagonal crosses to
erect quadratic tower frames where the
frames of each section are placed at 90° to
those of the previous section (see "Quadratic
tower frames").
● In levels in which assembly battens are
mounted, horizontal bracing with "Diagonal
braces 12" or with diagonal crosses is no
longer needed. This only applies, of course,
if the assembly battens are left in place in this
"storey" until the very end of the assignment
(assembly, pouring etc.).

999734002 - 02/2011 11
The Formwork Experts
System description User information Load-bearing tower d2

12 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 System description

d2 in detail
Basic frame d2 Safety catch
● tried-and-tested interconnection system (captive)
● secures the diagonal and horizontal braces
● two defined positions (closed – open)

Closed Open

9758-228-01

Connecting the couplers


a
Interconnection system on d2 load-bearing
B
towers
● Easy, safe interconnection using the couplers and
spring-locked connecting pins 16 mm.
1) Fix the coupler (A) in the top frame (C) , using the
A
Spring-locked connecting pin 16 mm (B) .
2) Place this frame on top of the one below it. a
3) Secure it with a Spring-locked connecting pin
16 mm.

9718-234-01
C
a ... max. 16 cm (exception: where tubes are being connected for
constructional design purposes)
B
A Transition swivel coupler 48/60mm or Transition angle coupler
48/60mm
B Swivel coupler 48mm or Normal coupler 48mm

A Climbing rungs and access openings


● integral climbing rungs
(May not be used in this way in the UK. A separate
ladder is required here).
● extra "handles" to pick the frame up by
● convenient climb-through access opening

9718-218-01

999734002 - 02/2011 13
The Formwork Experts
System description User information Load-bearing tower d2

Practical examples
Tableforms and tower frames are both assembled from
the same system components. Tower frames
With a load-bearing capacity of up to 60 kN per leg, d2
Tableform units is an extremely strong loadbearing tower system.
● For repetitive use, the load-bearing tower can be It safely withstands horizontal forces such as wind
assembled into complete table-forms. loads.
The wide frames make for high stability right from the
word "go".

Combined with Dokaflex


For downstand beams, the load-bearing towers and
beam-forming supports can be combined very effec-
tively with Dokaflex.
9734-226-01

Edge floor-beam The Universal dismantling tool makes it easier


to turn the Split nut B - even when it is under
D
higher loads.

E
A B

9734-278-01

A Load-bearing tower
B Dokaflex
C Beam forming support 20
D Handrail post T 1.80m (optionally with Toeboard holder T
1.80m), Handrail clamp S or Handrail post 1.50m
E Lashing strap 5.00m
F Doka Express anchor 16x125mm and Doka coil 16mm

Site: Jamea Mosque Project, Riyadh

14 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 System description

In this way, even complex structures can be formed


Shoring load-bearing structures using mostly standard parts - at lower cost.
On bridges, culverts and industrial structures, the load-
bearing tower and Doka large-area formwork Top 50
together make an ideal combination.

Falsework beneath arched bridge

9734-227-01

Typical cross-section - Falsework beneath super-


structure formwork

9734-228-01

Site: School building, Birch

999734002 - 02/2011 15
The Formwork Experts
System description User information Load-bearing tower d2

Adapts to different ground plans, heights, floor shapes and loads


The different sizes of diagonal brace for each height of In this way, only as much material is used as is really
frame enable the frames to be spaced close together or needed.
further apart, depending on the load.

e.g.: Heavy loads - frames spaced close together e.g.: Light loads - frames spaced further apart

9734-221-01
9734-217-01

Plan view Plan view

9734-218-01 9734-222-01

Quadratic tower frames


For quadratic tower frames, the frames of each section
☞ It is not possible to use diagonal crosses to
erect quadratic tower frames where the frames
of each section are placed at 90° to those of the
(i.e. "storey") can be placed at 90° to those of the pre- previous section.
vious section. This saves Horizontal braces 152, and The centre-to-centre spacing of the frame tubes
so is a very economical method. is 152 cm.
This makes it impossible to use diagonal
braces 150.

9734-279-01

16 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 System description

Height adjustment on single-storey towers

● The 3 different heights of frame (0.90 m, 1.20 m and Note:


1.80 m) enable coarse adjustment to within 30 cm. For towers consisting of one section only, the min. val-
● Fine adjustment, to the last mm, is then made using ues LK and LF given in Tables B and C for the head and
screw-jack head/feet. base units respectively will often not be reached.
Reason: The lengths of the head and base units add
System dimensions up to a larger dimension than the height of the frame.
These constraint points have already been allowed for
on multi-storey towers in the operational height data given in Table A (in the
section headed "Height ranges and materials sched-
Table B: Head zone ule").
Screw jack U-head and 4-
U-head D
way screw-jack head
Close-up: Cut-away view of frame tube

Frames in the top section


1.80 / 1.20 / 0.90m 1.80 / 1.20 / 0.90m
LK max. 35.0 1.6
LK min. 7.8 1.6
Values in cm
Min. values with no formwork-striking play

Table C: Base zone


Heavy duty screw jack 70 +
Screw jack foot
Split nut B

Frames in the bottom section


1.80 / 1.20 / 0.90m 1.80m 1.20m 0.90m
LF max. 35.0 70.0 70.0 70.0
LF min. 8.2 8.7 8.7 24.7
Values in cm
Min. values with no formwork-striking play

Note:
Where the bottom section is assembled from 0.90 m
frames, be sure to allow for LF min. when using Heavy
duty screw jacks 70!

999734002 - 02/2011 17
The Formwork Experts
Assembly instructions User information Load-bearing tower d2

Assembly
Assembly instructions

Approaches to assembling the d2 load-bearing tower

Horizontal assembly
Assembling in the upright
Standard set-up
9734-268-01

9734-251-01

By forklift truck By hand

9734-251-01
98003-101

18 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Assembly instructions

Horizontal assembly
Preliminary remark:
● The terms "vertical" and "horizontal" (e.g. referring to Erecting the first storey
the diagonal braces) are always used here with ref- ➤ Having regard to the instructions given above, place
erence to their installation situation in the finished, the tower frames on their sides on timber supports
upright tower. (min. 4cm high).
● The job of erecting the load-bearing tower begins
with the bottom (i.e. first) "storey". Bracing the frames in the vertical

☞ General remarks:
● Make sure that the frames are the right way
round! Otherwise, the safety catches (A) for
➤ Join the frames together with diagonal braces (F)
and horizontal braces (H) .

the horizontal diagonal braces will not work


when the crane lifts the tower into the
upright.

Right:

When the safety catch is open, it remains in a horizontal


position.

Wrong: Plan-bracing the frames (in the horizontal)


Basic rule:
Horizontal diagonal braces d2 12.xxx are required:
● at intervals of every two sections - beginning with
the first section.

➤ Slot a diagonal brace (K) onto the gravity latches of


the horizontal frame tube and secure it.

If the frame is the wrong way round, the safety catch


drops from the open position to point downwards.
In this case, turn the frame round!

● Slide the diagonal or horizontal brace onto


the safety-catch bolt and immediately secure
it with the safety catch.
● During assembly and dismantling, no
mechanical strains (e.g. from knocks and
impact) are allowed on the components.

➤ Push in and secure the base units. See the section


headed "Lifting by crane".

999734002 - 02/2011 19
The Formwork Experts
Assembly instructions User information Load-bearing tower d2

Erecting further storeys Lifting into the upright by crane


➤ Check before attaching the crane suspension tackle:
Note:
Do not pre-assemble units any higher than 10 m. ● All the spring-locked connecting pins must
have been fitted (to link the frames).
➤ Insert the couplers (L) into the frames that you are ● All safety catches must be closed.
about to add, and secure them with Spring-locked ● All base units must be secured.
connecting pins 16 mm.

☞ Max. extension length of the base units when


the tower is being lifted into the upright: 35 cm!

Lifting into the upright


➤ Attach the crane suspension tackle to the frames of
the top "storey" and lift the entire tower into the
upright.

➤ Add the next frame and connect it to the frame below


with Spring-locked connecting pins 16 mm.

➤ Fit and secure diagonal and horizontal braces in the


same way as in the first section.

9734-268-01

9734-269-01

When the tower is standing in the upright,


check once again to make sure that all the
safety catches are closed.

20 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Assembly instructions

Detaching the crane suspension tackle near


ground level: Dismantling
This method must not be used for placing the To dismantle, perform the above steps in reverse order.
tower back on its side!
Items needed: ☞ Do not open the safety catches too soon! Wait
until immediately before you remove the brace.
● 3 x Scaffolding tube 48.3mm (G)
- Minimum length:
Inter-frame space + 1.00 m
● 6 x normal or swivel couplers, 48mm (H)
➤ Attach the scaffolding tubes:
- one between the bottom frames
- two between the top frames
➤ Attach two cables, chains or lifting straps to
the bottom scaffold tube.
➤ Lead the cables, chains or lifting straps along
the outside of the tower and between the top
scaffold tubes.

H
G
b
9734-268-01

a ... min. 0.5 m


b ... max. 0.2 m
After the tower has been lifted into the upright,
the cables, chains or lifting straps are detached
by a crewman working from ground level.

The Fix-De-Fix 3150kg remote uncoupling


system makes it possible to detach slinging
chains by remote-control from ground level.
Follow the directions in the Operating Instruc-
tions!

999734002 - 02/2011 21
The Formwork Experts
Assembly instructions User information Load-bearing tower d2

Assembling towers in the upright by hand


☞ Important note:
● Erect the load-bearing tower in the vertical
➤ Join the frames together with diagonal braces (F)
and horizontal braces (H) .
on ground that is statically capable of sup-
porting the load.
● If the load-bearing tower is over 6 m high,
back-stay it or combine it with other towers.
e.g. with Heavy duty screw jack 70 and 4-way screw-
jack head. F

☞ General remarks:
● The gravity latches of the frame must always
point upwards. H

✔ ✗9758-226-01
9734-248-01

Erecting the second storey


● Slide the diagonal or horizontal brace onto
the safety-catch bolt and immediately secure Stacking the frames
it with the safety catch. ➤ Place a scaffold planking unit (G) on the finished
"storey".
➤ Insert the couplers (L) into the frames that you are
about to add, and secure them with Spring-locked
connecting pins 16 mm.
➤ Add the next frame and connect it to the frame below
with Spring-locked connecting pins 16 mm.
9758-227-01

● During assembly and dismantling, no


mechanical strains (e.g. from knocks and
impact) are allowed on the components.

Erecting the first storey


➤ Place a Split nut B (A) on the Heavy duty screw jack
70 (B) , push the two halves together and secure it L
with the spring locking pin.
Make sure that the spring locking pin (C)
points downwards when it is secured.
➤ Insert the Heavy duty screw jacks 70 into the frames. G

C
9734-249-01

B B

9734-247-01

22 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Assembly instructions

Bracing the frames in the vertical Head zone


➤ Fit and secure diagonal braces (F) and horizontal
braces (H) in the same way as in the first section. Fitting 4-way screw-jack heads or Screw jack
U-heads
➤ Insert the 4-way screw-jack head (J)
H

J
F

9734-250-01

Erecting further storeys


➤ Place the scaffold planking units 1 storey higher up.
➤ Add further frames in the same way as for the 2nd
section, and brace them in the vertical with diagonal
braces.

Plan-bracing the frames (in the horizontal)


Basic rule: 9734-252-01

Horizontal diagonal braces d2 12.xxx are required:


Always place the primary beams (single or double
● at intervals of every two sections - beginning with formwork beams) centrally.
the first section.
On the Screw-jack U-head, too, it is also possible to
twist the head so as to hold single beams centrally.
➤ Slot a diagonal brace (K) onto the gravity latches of
the horizontal frame tube and secure it.

9716-215-01

WARNING
➤ Where the primary beams cantilever out a
long way, protect them against being lifted
out or tipped over (e.g. with a tie-back, by
nailing board-plates over the beam joins, or
by fastening the beams to the screwjack
head-unit).

K ☞ Important note:
➤ When lifting and repositioning the entire
tower unit (or pre-assembled sub-units) by
crane: Follow the instructions in the section
headed "Lifting by crane"!

Dismantling
9734-251-01 To dismantle, perform the above steps in reverse order.

☞ Do not open the safety catches too soon! Wait


until immediately before you remove the brace.

999734002 - 02/2011 23
The Formwork Experts
Assembly instructions User information Load-bearing tower d2

Assembling towers in the upright by forklift truck


Forklift shifting device TG Max. heights of load-bearing towers
The Forklift shifting device TG may only be used for
with superstructure without superstructure
erecting, dismantling and transporting Doka load-bear-
ing towers Staxo, Staxo 100 and d2.
Follow the directions in the Operating Instruc-
tions!

c
c

b
E

d
F

d
Tr745-200-05
B

When being travelled When being lifted


a max. 7.20 m max. 9.00 m
b max. 9.00 m max. 12.60 m
c max. 5.40 m max. 9.00 m
d max. 3.60 m max. 3.60 m
92807-201-01

G Requirements for fork-lift trucks or telescop-


H ing stacker trucks
● Min. load carrying capacity: 4000 kg
C D
● Driver protection roof
● Centre-to-centre distance of the fork prongs:
A 850 mm

Items needed: WARNING


Item Designation Q'ty ➤ It is forbidden to use forklift or telescoping
(A) Forklift shifting device TG 1 stacker trucks to erect/dismantle or transport
(B) Multi-purpose walings WS10 Top50 2.00m 2 load-bearing towers without a Forklift shift-
(C) Connecting pins 10cm 4 ing device TG.
(D) Spring cotters 6mm 4 ➤ It is not permitted to use non-enclosed
(E) Scaffolding tubes 48.3mm 1.00m 2 (open) fork extensions.
(F) Screw-on couplers 48mm 50 4
(G) Scaffolding tube 48.3mm 2.00m 1
92807-207-01 92807-208-01
(H) Swivel couplers 48mm 2 B
A
Operating cord, site-provided (optional) 1

WARNING
➤ While load-bearing towers are being erected
or dismantled, lifted or lowered: It is forbid-
den to walk or stand beneath suspended A Box-style fork extension
loads. B Open fork extension

Max. load: ● Permitted types of fork extension:


- box-style fork extensions 1)
● when using box-style fork extensions: 1000 kg
- telescopic fork prongs
● when using telescopic fork prongs: 600 kg
● Min. fork length:
Distance between the frames of the load-bearing
tower + 400 mm
● Max. fork width: 195 mm
● Max. fork height: 71 mm

1) observe the following manufacturer data:


● load carrying capacity of the fork extension
● required length of the fork prongs

24 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Assembly instructions

Travelling the towerframe units

☞ Important points to remember when wheel-


ing load-bearing towers:
● As well as the fork-lift driver, a specially
trained watchman must also be on hand dur-
ing all lifting, assembly and travelling opera-
tions:
● max. inclination of trackway: 2%.
● The floor must be stable, firm and sufficiently
smooth (e.g. concrete).

Assembling the towerframe units

☞ ➤ For details of how to assemble and join


together the individual "towerframe storeys",
see "Assembling towers in the upright"!
➤ Build each storey at ground level.
➤ Use a forklift truck to stack the towerframe storeys
into a single towerframe unit.

Tr745-200-05

Dismantling
To dismantle, perform the above steps in reverse order.

☞ Important note:
Always only dismantle the bottom "storey" of
the towerframe unit.

999734002 - 02/2011 25
The Formwork Experts
Assembly instructions User information Load-bearing tower d2

26 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Repositioning

Repositioning
Repositioning

Different ways of repositioning

Using traveller units: By crane By forklift truck

Transport winches Shifting carriage TG

98003-298-01 98003-296-01 98003-299-01 98003-300-01

999734002 - 02/2011 27
The Formwork Experts
Repositioning User information Load-bearing tower d2

Repositioning using wheel units


Completely assembled tableforms can be wheeled to
their next location, quickly and easily, using wheel Modular system (with winches)
units.
Optimum adaptability to on-site requirements.
The following different types of wheel unit are available
There is a choice of 2 types of winch and 2 types of
for this. The crane is only needed when the tower has
wheel.
to be lifted up to the next storey.
All types of wheel unit can perform the following func- Max. load:
tions: 1000 kg per Winch 70
● Lifting (lifting height 70 cm) with solid-tyre wheel
● Wheeling 1500 kg per Winch 125
● Lining-and-levelling
(lifting height 125 cm) with Heavy-duty wheel 15 kN
● Lowering

Example with Winch 70:


☞ ● The floor must be stable, firm and sufficiently
smooth (e.g. concrete).

Follow the directions in the Operating Instruc-


tions!

➤ Clamp the winch to the frame of the load-bearing


tower, using the "Frame for Staxo/d2 winch".
➤ Secure the foot-pieces to prevent them dropping out.
See the section headed "Lifting by crane".

B
h

9734-290-01 A
b

b
D

Wheel-unit variants: C
● Shifting carriage TG
● Modular system (with winches)


9734-205-01
Important note:
When repositioning load-bearing towers that Equipment needed for one shifting unit
include standard superstructures, remember: Item Designation N° of items
Ratio w:h = max. 1:3, with 'w' being the narrow- A Winch 70 or 125 4
est side. B Frame for Staxo/d2 winch 4
C Solid-tyre wheel or Heavy-duty wheel 15kN 4
Custom constructions must be statically veri-
D Double wheeled transporter 4
fied!

28 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Repositioning

Accessory for transporting the winches when Shifting carriage TG


empty: This is an easy-to-operate, manual hydraulic lifting car-
The Double-wheeled transporter (A) is bolted into riage for shifting light to medium-weight tableform units.
the connecting sockets on the wheel flange and makes As well as making the tableforms easier to move
it easier to wheel the (empty) wheel units. around, it also makes it easier to erect and strike the
formwork.
● Hydraulic, for near-effortless lifting.
● Tables can be "inched" down slowly with handle-
control.
● 3 guide-rolls, for maximum manoeuvrability.
● With an overall width of only 82 cm, the carriage can
pass easily through any doorway when empty.
A
Max. load per Shifting carriage TG 1000 kg


9716-220-01
● The floor must be stable, firm and sufficiently
smooth (e.g. concrete).
● Max. gradient of floor: 5 %.
● Max. configuration that can be transported
using 2 Shifting carriages TG: Tables with 3
cross-frames per storey and a max. height of
5.0 m.

Follow the directions in the Operating Instruc-


tions!

➤ Push the Shifting carriage TG (A) up against the


front and rear faces of the tableform - the slot-in lift-
ing profile (B) reaches under the bottom crossbar of
the frame.
➤ Secure the foot-pieces to prevent them dropping out.
See the section headed "Lifting by crane".

Equipment needed for one shifting unit


Item Designation N° of items
A Shifting carriage TG 2

999734002 - 02/2011 29
The Formwork Experts
Repositioning User information Load-bearing tower d2

Lifting by crane
Where the tableforms are to be repositioned in the ver-
tical, i.e. crane-lifted, they must be fitted with a Lifting Connect the superstructure to the head units
rod 15.0 and Retaining plate 15.0 , which make it easy ➤ e.g. with Locking rod 15.0 (D) , Clamping plate (E)
to attach the transfer cables. and Wing nut 15.0 (F) .
Max. load: On Screw jack U-head On 4-way screw-jack head
1000 kg per Lifting rod 15.0 - where the load is applied
centrally

Assembly instructions
➤ Mount the Lifting rod 15.0 (A) and Retaining plate
15.0 (B) .
5.1 5.1
Only possible with Clamping
A plate a = 28 cm (2002 models
onward)

Secure the head units so that they cannot be


9720-276-01
lifted out
➤ Slot the fixing-handle (G) into the cross-bar of the
frame.
B

Use a 20 mm diam. bit to drill the hole through


the form-ply. It can later be filled with a Univer-
sal plug R20/25.

Follow the directions in the Operating Instruc-


tions!

Preparations
WARNING
Secure the base units to prevent them drop-
Danger from loose and unsecured parts.
ping out: On Screw jack foot (H) and Heavy
➤ Observe the following points before lifting!
duty screw jack 70 or 130 using Split nut B
Connect superstructure components together ➤ Slot the fixing-handle (I) into the cross-bar of the
frame.
➤ e.g. connect the primary and secondary beams to
rafter plates, and nail on the form-ply.

30 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Repositioning

Secure the base units to prevent them drop- Shifting the table in skeleton construction
ping out: On Heavy duty screw jack 70 or 130 ➤ Take the load off the table by turning the threaded
using split nut, art.n°582640 (as manufactured spindles.
up until end of '96) ➤ Clamp on the wheel-units.
➤ First take the weight off the Heavy duty screw jack 70 ➤ Push in and secure the base units.
(e.g. with wheel units), then open the split nut.
➤ Push the Heavy duty screw jack 70 (J) into the frame
and secure it with a Spring-locked connecting pin 16
mm (K) .

9734-232-01

9734-238-01 ➤ Using the wheel-units, lower the table, and wheel it


J out as far as the stop (M) .
➤ Remove the front wheel-units.
The split nut can be swung apart, meaning that it ➤ Screw the Lifting rod 15.0 into the previously
does not need to be turned through the full length of mounted Retaining plate 15.0.
the threaded spindle. During lifting, the split-nut can ➤ Attach the crane sling to the Lifting rod 15.0, then
be placed around one of the cross-bars of the frame raise the crane until the front legs are just off the
and fixed in place. floor.

Link the frames in a crane-handling-safe man-


ner
➤ Check whether all the Spring-locked connecting pins
16 mm (A) are bolted in.

A M

9734-233-01

➤ Push the table outwards until only the innermost legs


are still over the floor.
A
➤ Mount more lifting rods and attach crane slings.
➤ Use a pulley-type adjuster (N) to shorten the rear
cables until the table is suspended in the horizontal.
9734-239-01
➤ Manoeuvre the table all the way out with the crane,
then lift it to the next storey.
Repositioning operation N
➤ Attach the crane sling to the Lifting rods 15.0 and lift
the tableform to its next location. Spread-angle β
max. 30°.

9734-234-01

While the tableform is being lifted, there must


NOT be any loose parts, tools or
other items on the tableform!
999734002 - 02/2011 31
The Formwork Experts
Repositioning User information Load-bearing tower d2

Lifting by forklift truck


Forklift shifting device TG
For product information on the Forklift shifting device
TG and the requirements in respect of the forklift truck,
see "Assembling towers in the upright by forklift truck".
Follow the directions in the Operating Instruc-
tions!

Max. heights of load-bearing towers

with superstructure without superstructure


c
c

b
a

d
d

Tr745-200-05

When being travelled When being lifted


a max. 7.20 m max. 9.00 m
b max. 9.00 m max. 12.60 m
c max. 5.40 m max. 9.00 m
d max. 3.60 m max. 3.60 m

Travelling the towerframe units

☞ Important points to remember when wheel-


ing load-bearing towers:
● As well as the fork-lift driver, a specially
trained watchman must also be on hand dur-
ing all lifting, assembly and travelling opera-
tions:
● max. inclination of trackway: 2%.
● The floor must be stable, firm and sufficiently
smooth (e.g. concrete).

32 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Repositioning

999734002 - 02/2011 33
The Formwork Experts
General remarks User information Load-bearing tower d2

Anchoring on the structure


General remarks

With "Anchoring shoe for stair Design of the anchoring levels


tower" The load-bearing tower is connected to the "Anchoring
shoe for stair tower" by scaffolding tubes and couplers.

☞ When designing units assembled from tubes


and couplers, all applicable standards and reg-
ulations must be observed, in particular
EN 12812 "Falsework", EN 39 "Loose steel
tubes for tube and coupler scaffolds" and EN 74
"Couplers, spigot pins and baseplates for use in
falsework and scaffolds".

Permissible force transmission for each "Anchoring


shoe for stair tower": 12 kN in all directions
Applies when fastened with Cone screw B 7cm and
Universal climbing cone 15.0 or two dowels.

Methods for fixing in concrete:


● By using a Cone screw B 7cm to fix the anchoring
shoe to an existing suspension point prepared with
Universal climbing cones 15.0 (diameter of hole in
anchoring shoe = 32 mm). Hardwood shim (essen-
tial for ensuring a firm fit) prevents damage to the A Scaffolding tube 48.3mm (L min = distance from structure)
concrete (scratch marks). B Scaffolding tube 48.3mm (L = variable)
This fixing method is only possible with anchoring C Scaffolding tube 48.3mm (L = variable)
shoes manufactured from 05/2009 onwards. D Anchoring shoe for stair tower
● With one or two dowels (diameter of hole in anchor- E Swivel coupler 48mm
ing shoe = 18 mm). F Normal coupler 48mm
G Transition swivel coupler 48/60mm
Required load-bearing capacity of the dowels H Horizontal diagonal brace
used:
● Tensile force: min. 14.0 kN
● Shear force: min. 4.0 kN
e.g. Hilti HST M16 - in uncracked B30 concrete, or
equivalent products from other manufacturers. Follow
the manufacturer's applicable fitting instructions!

34 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Vertical distance between the anchoring


levels
● At least every 8.0 m;
● near junctions (frame-joins)

☞ At the level of the anchoring point, the load-


bearing tower must be stiffened with a horizon-
tal diagonal brace (H) .

☞ ● The actual design of the anchoring levels,


and the maximum permitted distances from
the structure, must be reviewed separately
for each project.
● Adjacent load-bearing towers must be
braced to one another as statically required,
in a similar way to when towers are anchored
to the structure.

999734002 - 02/2011 35
The Formwork Experts
General remarks User information Load-bearing tower d2

Back-stays/shoring supports for the load-bearing towers


H
Back-stay on the superstructure D E F

Back-stay for load-bearing towers A


For transferring planned horizontal loads e.g. wind V C
loads, concrete loads or in custom applications (e.g. on
inclined load-bearing towers or for high load-bearing
capacities).

☞ Important note:
Lashing straps are not suitable for transferring B
planned horizontal loads.
78.

C C
0

9734-275-01

H ... Horizontal force


a

V ... Resulting vertical force from H


A ... Back-stay/shoring force
X B Load-bearing tower
C Bracing for load-bearing towers
D Multi-purpose waling
E Connecting pin 10cm
F Spring cotter 5mm
41.

C
0

X Tie-rod 15.0 (not included in scope of supply)


Length = 'a' minus 119 cm
This leaves a 17 cm adjustment range available

Bores in spindle unit and "Shoe (complete)"


☞ Important note:
● Screw the tie-rods all the way in to the rod
a connectors of the back-stay (i.e. until they
A
are fully engaged)!
b
● When calculating the leg loads, allow for the
c additional forces imposed by the back-stay!
b
b
● With high loads and long back-stays, watch
B
out for any elongation of the back-stay!
Tr845-203-02
a
a ... diam. 21 mm
b ... diam. 27 mm
c ... diam. 35 mm
A Spindle unit
B Shoe (complete)

36 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Anchored with Doka Express anchor 16x125mm


A
Note:
The "Shoe (complete)" (A) must be turned by 180° in
R Z the horizontal.

Q
R Z

Q
9734-287-02

A ... Back-stay force


Q ... Shear force (corresponds to horizontal force H)
R ... Resulting anchor force
Z ... Anchor tensile force

Back-stay force Ak = 30 kN 9734-287-01


Anchor force [kN] Zk Qk = Hk Rk
α 30° a) 18.2 26.0 31.7
α 45° a) 27.6 21.2 34.8
Permissible back-stay force Ak [kN]
In new con- In C20/25
α 60° a) 44.8 15.0 47.2
crete concrete
α = 30° 9.0 16.1
Back-stay force Ak = 40 kN
α = 45° 8.1 14.6
Anchor force [kN] Zk Qk = Hk Rk
α = 60° 6.0 10.8
α 30° a) 24.3 34.6 42.3
α 45° a) 36.8 28.3 46.4 Follow the directions in the "Doka Express
α 60° c) 59.7 20.0 62.9 anchor 16x125mm" Installation Instructions!
Back-stay force Ak = 50 kN
Anchor force [kN] Zk Qk = Hk Rk
α 30° b) 30.4 43.3 52.9
α 45° b) 46.0 35.4 58.0
α 60° c) 74.6 25.0 78.7
Examples of anchor points in uncracked C 25/30 concrete:
a) HILTI heavy duty anchor HSL M20
b) HILTI self-undercutting anchor HDA-T-M16
c) HILTI self-undercutting anchor HDA-P-M20, with an extra 50x10

washer with a diam. 22 mm hole


or equivalent products from other manufacturers.
Follow the manufacturer's applicable fitting instructions.

CAUTION
➤ The "Back-stay for load-bearing towers"
must not be dismounted until it is certain that
there is sufficient stability for the load-bear-
ing tower.

999734002 - 02/2011 37
The Formwork Experts
General remarks User information Load-bearing tower d2

Bracing waling connector WS10 Close-up


The Bracing waling connector WS10 is used for bracing C C
load-bearing towers erected on ground which has suffi- A B E
cient load-bearing capacity but in which it is not possi-
ble to fix tension anchoring.
B
It is also possible to brace several load-bearing towers
to one another to transfer the horizontal loads jointly. C
D
Bracing individual towers in the bracing-strut and
frame planes H
H G

G G F
9734-292-02

A Bracing waling connector WS10


B Multi-purpose waling WS10 Top50 2.25m
C Tie-rod 15.0mm galvanised ...m
D Super-plate 15.0
E Bracing for load-bearing towers – without "Shoe (complete)"
F Eye-lug anchor 15.0 without tie-rod
G Connecting pin 10cm and Spring cotter 5mm
H Extra safeguard against slippage (end-stop) with Connecting pin
10cm and Spring cotter 5mm

Note:
The "Bracing for load-bearing towers"is attached to the
multi-purpose waling directly by means of a "Spindle
unit", without a "Shoe (complete)".

Permissible bracing force [kN]


Bolted on through the upper bore Bolted on through the lower bore
(diam. 21 mm) of the Spindle unit (diam. 27 mm) of the Spindle unit
50.0 40.0

9734-292-01

A
A
Note: Tr845-204-02
Tr845-204-01
Separate towers may also be braced in the frame plane
or bracing-strut plane only.

A Spindle unit

Bracing waling connector WS10

Permitted tensile force: 50 kN

➤ When calculating the leg loads on the Load-


bearing tower, allow for the additional forces
from the bracing!

38 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Shoring to the superstructure Loading capacity data for Eurex 60 550 (com-
For transferring planned horizontal loads e.g. wind
pressive force)*
loads, concrete loads or in custom applications (e.g. on
inclined load-bearing towers or for high load-bearing - when used as a shoring & plumbing accessory
capacities). 35
30
H

Permitted load [kN]


25
D
20
15
A V
10
5
9745-101
0
3 4 5 6 7 8 9 10 11 12 13 14

Length extended [m]


B * 15 kN tensile force at any extension length
A
30 kN tensile force at any extension length and when anchored with
2 dowels

Follow the directions in the "Eurex 60 550" User


Information!

C Temporary back-stays directly on


9734-276-01
the load-bearing tower, for site-erec-
tion
H ... Horizontal force
V ... Resulting vertical force from H
A ... Back-stay/shoring force
A Staxo or d2 load-bearing tower
☞ Important note:
Only suitable for use during erection of the
load-bearing tower, but not for transferring
B Plumbing strut Eurex 60 550 planned horizontal loads.
C Plumbing strut shoe Eurex 60
D Prop head Eurex 60 Top50 B A
C

Required load-bearing capacity of the dowels


used:
D
Min. 17 kN in any direction when 2 dowels are used.

Follow the manufacturer's applicable fitting instruc-


tions.
E

CAUTION
➤ The plumbing strut must not be dismounted
until it is certain that there is sufficient stabil-
ity for the load-bearing tower.
9734-286-01

A Scaffolding tube 48.3mm (with drilled hole ∅17mm)


B Normal coupler 48mm
C Spindle connecting plate T
D Back-stay for load-bearing towers
E Tie-rod 15.0mm

999734002 - 02/2011 39
The Formwork Experts
General remarks User information Load-bearing tower d2

Adapting to the building layout


with Eurex 60 550 floor props Product description
● The perfect complement to all Doka load-bearing
Follow the directions in the "Eurex 60 550" User towers.
Information!
● Transfers loads economically, also in confined
spaces.
● Extension range: 3.50 to 5.50 m
● For even greater heights, the prop can be length-
ened to 7.50 m or 11.0 m. In this case, allow for the
reduction in capacity as shown in the diagram!
● Meets "DIB" - German Institute of Building Technol-
ogy - approvals criteria.
● Special aluminium profile tubes give the prop its low
weight of only 47.0 kg.

9745-211-01

● Can be telescoped in 10 cm increments, with contin-


uous fine adjustment.
● All parts are captively integrated - telescopic tube
has anti-dropout safeguard.

Permitted capacity: 60 kN at any extension length


from 3.50 to 5.50 m.
If the prop is lengthened, allow for the reduction in
capacity as shown in the diagram!

Load-bearing capacity data for Eurex 60 550

- when used as a floor prop

60

50
Max. load [kN]

40

30

20

10
9745-100
0
3 4 5 6 7 8 9 10 11 12

Length extended [m]

9745-200-01

40 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Holding primary beams Holding Eurex 60 550 floor props upright dur-
ing erection
U-head Eurex 60 for steel girders Four-way head Eurex 60 for sin-
(e.g. WS10), squared timbers or gle or double formwork beams H Removable folding tripod 1.20m
formwork beams H20 20

9745-201-01
9745-201-01

Assembly instructions
➤ Place the U-head or four-way head on the prop and
fix with spring-steel stirrup.

98003-315-01
9745-212-01

Bracing A Floor prop Eurex 60 550


B Removable folding tripod 1.20m
Swivel couplers Eurex 60 can be fixed at any height on
the outer tube. This means that bracing tubes can be
attached wherever needed. Plumbing strut for pre-cast members
Examples:
● between prop and load-bearing tower frame
● between two or more props
A
● to facilitate erection of the prop (as a "handle" for
workers to hold onto)

B
9745-203-01

A B

A Floor prop Eurex 60 550


B Swivel coupler Eurex 60
C Scaffolding tube 48.3mm
9703-256-01

A Floor prop Eurex 60 550


B Plumbing strut 340 or 540 for pre-cast members

999734002 - 02/2011 41
The Formwork Experts
General remarks User information Load-bearing tower d2

Inclination adjustment
If the superstructure or the ground are inclined at an
angle of 1% or more, slope compensation must be using Staxo wedge support WS10
provided.
Used with timber wedges, this component provides
angle adjustment to floor-slab constructions with a
using Wedges for screw-jack ..... % max. inclination of 45°.
These prefabricated birch plywood wedges make it Bolted into the multipurpose waling or steel waling, this
possible to stand load-bearing towers in the perpendic- wedge support prevents the timber wedges slipping
ular on surfaces with various inclinations, even when and ensures that the loads are safely transferred.
utilising the full leg load.

CAUTION
☞ This type of connection is no substitute for extra
structural design measures such as back-
stays.
Excessively steep wedges may slip away!
➤ Maximum inclination: 20%! View without superstructure

For this reason, wedges must NOT be placed


on top of one another in an attempt to compen-
sate for inclinations that are greater than 20%.

Inclined superstructures
Securing the superstructure at angles of over 12%:
➤ Connect the head-plate to the longitudinal beam a ... min. 15 cm
(e.g. with Locking rod 15.0/33cm and Super-plate
15.0 or Angle anchor plate 12/18) A Staxo wedge support WS10
B Timber wedge, project-specific
C Multi-purpose waling or Steel waling WS10 Top50
D Nailed connection
B


C
The grain of the timber wedges must always be
in the vertical!
A
Note:
If the legs of the load-bearing tower have to be located
outside the pattern of drilled holes in the multi-purpose
9703-255-01 waling or steel waling, then a suitable 20 mm diam.
hole must be drilled in the web of the waling.
A Wedge for screw-jack ..... %
B Locking rod 15.0/33cm
C Super-plate 15.0
using an M20 hexagonal bolt
In this case, the superstructure rests on e.g. an
Inclined ground surface M20x240 hexagonal bolt (A) . This bolt is inserted
through the recessed opening in the Screw jack U-head
and is secured with a self-locking M20 hexagon nut.

CAUTION
➤ Maximum inclination: 8%!

9703-254-01

D Wedge for screw-jack ..... %

A
9716-292-01

42 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

with "Swivel bearing plates for Assembly


Screw jack U-head" Multi-purpose waling centrally clamped on the
Swivel bearing plate for Screw jack U-head:
➤ Insert a "Locking rod 15.0 330mm" through one of
the side holes (diam. 18 mm) on the Swivel bearing
plate for Screw jack U-head.
➤ Using the nuts & bolts etc. supplied with the product,
fix the "Swivel bearing plate for Screw jack U-head"
to the "Screw jack U-head" or "Heavy duty screw
jack 70 top" (spanner size 17 mm).
➤ Place the multi-purpose waling on the "Swivel bear-
Rotatable in all directions, the Swivel bearing plate for
ing plate for Screw jack U-head".
Screw jack U-head has been designed for use with slab
supports where the superstructure slopes on both ➤ Screw a Super-plate 15.0 onto the Locking rod 15.0
sides. and tighten it.
On projects where the superstructure slopes on one
side only, the solutions shown above are preferable.
The Swivel bearing plate for Screw jack U-head is only F
allowed to be used in conjunction with the Screw jack
U-head or Heavy duty screw jack 70 top. E
D

Note:
When assessing the oblique bending, always consult
the Statical Calculation Dept.!
A

☞ The following structural-design limitations


must be taken into account:
● "Swivel bearing plate for Screw jack U-head"
G
B

on screwjack head unit only: 25% load


reduction C
● Swivel bearing plate for Screw jack U-head
on both screwjack head and base units: 40%
load reduction 9734-288-01

● Maximum inclination of superstructure: 18% A Swivel bearing plate for Screw jack U-head
● Permitted overall inclination (in both the lon- B Screw jack U-head or Heavy duty screw jack 70 top
gitudinal and transverse directions): 18% C Staxo 100 frame
● From an overall inclination of 12%: Super- D Multi-purpose waling
structure must be secured! E Super-plate 15.0
● Allow for the oblique bending on the primary F Locking rod 15.0 330mm
beam! G Nuts, bolts etc.
● When calculating the extension lengths of
the head and base units, always allow for the
extra height of the Swivel bearing plate for
Screw jack U-head (92 mm).

☞ The following geometrical limitations must


be taken into account:
● Maximum widths of walings / beams (see the
section headed "Steel primary beams").
● Additional height of the Swivel bearing plate
for Screw jack U-head (92 mm).
● Different foot/U-head extension lengths
caused by inclined superstructures.

999734002 - 02/2011 43
The Formwork Experts
General remarks User information Load-bearing tower d2

IPB structural steel section clamped on its side on


the Swivel bearing plate for Screw jack U-head:
➤ Using the nuts & bolts etc. supplied with the product,
fix the "Swivel bearing plate for Screw jack U-head"
to the "Screw jack U-head" or "Heavy duty screw
jack 70 top" (spanner size 17 mm).
➤ Place the IPB structural steel section on the "Swivel
bearing plate for Screw jack U-head".
➤ From below, insert "Locking rods 15.0 330mm"
through the punched-out holes on the bent edge of
the "Swivel bearing plate for Screw jack U-head".
➤ Place a "Clamping plate for U-head" over the Lock-
ing rods 15.0 and screw it down tightly with hexagon
nuts 15.0.

J
I
H

G
B

9734-289-01

A Swivel bearing plate for Screw jack U-head


B Screw jack U-head or Heavy duty screw jack 70 top
C Staxo 100 frame
F Locking rod 15.0 330mm
G Nuts, bolts etc.
H IPB structural steel section
I Clamping plate for U-head
J Hexagon nut 15.0

To prevent the Multi-purpose walings tipping


over while an unattached superstructure is
being mounted, it is advisable – even where the
overall inclination is less than 12 % (in both the
longitudinal and transverse directions) – to
attach 2 Doka H20 beams (K) to each Multi-
purpose waling using Flange-clamps H20 (L) .

L
9734-291-01

44 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Steel primary beams


The following tables will be helpful to you when you are
planning load-bearing tower superstructures consisting
of steel primary beams and Screw jack U-heads, Heavy
duty screw jacks 70 top or Swivel bearing plates for
Screw jack U-head.

Usage conditions for Doka series walings

Tr777-200-01 Tr777-201-01

Width x Secured centrally


Unsecured
Doka series walings height (necessary from 12%)
Max. width = 165 mm
[mm] Max. width = 165 mm
Multi-purpose waling WS10
153 x 100 Yes Yes
Top50
Multi-purpose waling WU12
163 x 120 Yes Yes
Top50
Facade waling WU14 172 x 140 Yes 1) Yes 1)
Multi-purpose waling SL-1
183 x 160 Yes 1) Yes 1)
WU16
System beam SL-1 226 x 240 No No
1) Hardwood support (A) needed.
The bevelled edges prevent it resting in the curved radius zone.
This results in a max. available width of 188 mm.

Tr770-201-03

Usage conditions for various I-section girders

Tr777-202-01 Tr777-203-01

Width x Secured at side


Unsecured
Selection of I-girders height (necessary from 12%)
Max. width = 165 mm
[mm] Max. width = 150 mm
I 380 149 x 380 Yes Yes
I 425 163 x 425 Yes No
IPE 300 150 x 300 Yes Yes
IPE 330 160 x 330 Yes No
IPBI 140 140 x 133 Yes Yes
IPBI 160 160 x 152 Yes No
IPB 140 140 x 140 Yes Yes
IPB 160 160 x 160 Yes No

999734002 - 02/2011 45
The Formwork Experts
General remarks User information Load-bearing tower d2

Transporting, stacking and storing


Utilise the benefits of Doka multi-trip packaging Using Doka skeleton transport boxes
on your site. 1.70x0.80m as transport devices
Multi-trip packaging such as containers, stacking pal-
lets and skeleton transport boxes keep everything in Lifting by crane
place on the site, minimise time wasted searching for
parts, and streamline the storage and transport of sys- ➤ Only lift the boxes when their sidewalls are
tem components, small items and accessories. closed!

Doka skeleton transport box


1.70x0.80m ☞ ● Multi-trip packaging items may only be lifted
one at a time.
● Use a suitable lifting chain. (Do not exceed
the permitted load capacity). e.g: Doka 4-
part chain 3.20m.
● Spread-angle β max. 30°!

9234-203-01

Repositioning by forklift truck or pallet stacking


truck
The forks can be inserted under either the broadside or
Storage and transport devices for small items: the narrowside of the containers.
● durable
● stackable
Suitable transport appliances:
● crane
● pallet stacking truck
● forklift truck
To make the "Doka skeleton transport box" easier to
load and unload, one of its sidewalls can be opened.

Max. load: 700 kg


Permitted imposed load: 3150 kg

☞ ● Multi-trip packaging items that each contain


very different loads must be stacked with the
heaviest ones at the bottom and the lightest
ones at the top!
● Rating plate must be in place and clearly leg-
ible

Using Doka skeleton transport boxes


1.70x0.80m as storage units

Max. n° of boxes on top of one another


Outdoors (on the site) Indoors
Floor gradient up to 3% Floor gradient up to 1%
2 5
It is not allowed to stack empty
pallets on top of one another!

46 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Doka multi-trip transport box Using Doka multi-trip transport boxes as stor-
age units
1.20x0.80m galv.
Max. n° of boxes on top of one another
Outdoors (on the site) Indoors
Floor gradient up to 3% Floor gradient up to 1%
3 6
It is not allowed to stack empty
pallets on top of one another!

Using Doka multi-trip transport boxes as


transport devices
Lifting by crane

Storage and transport devices for small items:


☞ ● Multi-trip packaging items may only be lifted
one at a time.
● Use a suitable lifting chain. (Do not exceed
● durable the permitted load capacity). e.g: Doka 4-
● stackable part chain 3.20m.
Suitable transport appliances: ● Spread-angle β max. 30°!
● crane
● pallet stacking truck
● forklift truck

Max. load: 1500 kg


Permitted imposed load: 7900 kg

☞ ● Multi-trip packaging items that each contain


very different loads must be stacked with the
heaviest ones at the bottom and the lightest
ones at the top!
● Rating plate must be in place and clearly leg-
ible
9206-202-01

Multi-trip transport box partition


Different items in the Multi-trip transport box can be Repositioning by forklift truck or pallet stacking
kept separate with the Multi-trip transport box partitions truck
1.20m or 0.80m. The forks can be inserted under either the broadside or
the narrowside of the containers.

A
Tr755-200-02

A Slide-bolt for fixing the partition

Possible ways of dividing the box


Multi-trip transport
Lengthways Crossways
box partition
1.20m max. 3 partitions —
0.80m — max. 3 partitions

Tr755-200-04 Tr755-200-05

999734002 - 02/2011 47
The Formwork Experts
General remarks User information Load-bearing tower d2

Doka stacking pallet 1.55x0.85m and Using Doka stacking pallets as transport
devices
1.20x0.80m
Storage and transport devices for long items: Lifting by crane
● durable
● stackable ☞ ● Multi-trip packaging items may only be lifted
one at a time.
● Use a suitable lifting chain. (Do not exceed
Suitable transport appliances:
the permitted load capacity). e.g: Doka 4-
● crane part chain 3.20m.
● pallet stacking truck ● Load the items centrically.
● forklift truck ● Fasten the load to the stacking pallet so that
The Bolt-on caster set B turns the stacking pallet into a it cannot slide or tip out.
fast and manoeuvrable transport trolley. ● When lifting stacking pallets to which Bolt-on
castor sets B have been attached, you must
Follow the directions in the "Bolt-on castor set
also follow the directions in these Operating
B" Operating Instructions!
Instructions!
● Spread-angle β max. 30°!

= =
a
92815-224-01

Max. load: 1100 kg a


Permitted imposed load: 5900 kg Doka stacking pallet 1.55x0.85m max. 4.0 m
Doka stacking pallet 1.20x0.80m max. 3.0 m

☞ ● Multi-trip packaging items that each contain


very different loads must be stacked with the
heaviest ones at the bottom and the lightest
Repositioning by forklift truck or pallet stacking
truck
ones at the top!
● Rating plate must be in place and clearly leg-
ible
☞ ● Load the items centrically.
● Fasten the load to the stacking pallet so that
it cannot slide or tip out.

Using Doka stacking pallets as storage units

Max. n° of boxes on top of one another


Outdoors (on the site) Indoors
Floor gradient up to 3% Floor gradient up to 1%
2 6
It is not allowed to stack empty
pallets on top of one another!

☞ ● How to use with bolt-on caster set:


Always apply the fixing brake when the con-
tainer is "parked".
When Doka stacking pallets are stacked, the
bottom pallet must NOT be one with a bolt-on
caster set mounted to it.

48 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 General remarks

Doka accessory box Doka accessory box as transport devices


Storage and transport devices for small items: Lifting by crane
● durable
● stackable
Suitable transport appliances:
☞ ● Multi-trip packaging items may only be lifted
one at a time.
● Use a suitable lifting chain. (Do not exceed
● crane the permitted load capacity). e.g: Doka 4-
part chain 3.20m.
● pallet stacking truck
● When lifting stacking pallets to which Bolt-on
● forklift truck
castor sets B have been attached, you must
The Doka accessory box is the tidy, easy-to-find way of also follow the directions in these Operating
storing and stacking all interconnection and form-tie Instructions!
components. ● Spread-angle β max. 30°!
The Bolt-on caster set B turns the stacking pallet into a
fast and manoeuvrable transport trolley.
Follow the directions in the "Bolt-on castor set
B" Operating Instructions!

92816-206-01

Repositioning by forklift truck or pallet stacking


truck
The forks can be inserted under either the broadside or
the narrowside of the containers.

Bolt-on castor set B


The Bolt-on caster set B turns the stacking pallet into a
fast and manoeuvrable transport trolley.
Max. load: 1000 kg
Suitable for drive-through access openings > 90 cm.
Permitted imposed load: 5530 kg

☞ ● Multi-trip packaging items that each contain


very different loads must be stacked with the
heaviest ones at the bottom and the lightest
ones at the top!
● Rating plate must be in place and clearly leg-
ible
The Bolt-on caster set B can be mounted to the follow-
Doka accessory box as storage units ing multi-trip packaging items:
● Doka accessory box
Max. n° of boxes on top of one another ● Doka stacking pallets
Outdoors (on the site) Indoors
Floor gradient up to 3% Floor gradient up to 1% Follow the directions in the Operating Instruc-
3 6 tions!
It is not allowed to stack empty
pallets on top of one another!

☞ ● How to use with bolt-on caster set:


Always apply the fixing brake when the con-
tainer is "parked".
When Doka accessory boxes are stacked,
the bottom box must NOT be one with a bolt-
on castor set mounted to it.

999734002 - 02/2011 49
The Formwork Experts
Structural design User information Load-bearing tower d2

Structural design
Structural design

Height ranges and materials sched-


ule
Use the appropriate size of diagonal cross -12.100 to
12.250, or 18.100 bis 18.250 - as dictated by the height
of frame and the inter-frame spacing required (1.0 m,
1.52 m, 1.75 m, 2.0 m or 2.25 m or 2.5 m).

☞ ● The minimum values "hmin." given in


Table A are only applicable if the biggest
possible frame is always used in the base
storey.
● The lowering distance of 6 cm is already
allowed for in Table A!

Table A
Variant A Variant B Variant C Basic items
Heavy duty screw jacks 70 + Split nuts B

Heavy duty screw jacks 70 + Split nuts B

Spring-locked connecting pins 16 mm


Fixed height of frame Fh [m]

4-way screw-jack heads

4-way screw-jack heads

Diagonal braces 12.xxx

Diagonal braces 18.xxx

Horizontal braces 1521)


or Screw jack U-heads

or Screw jack U-heads

Diagonal braces 9.xxx

Horizontal braces xxx


Basic frames 0.90m

Basic frames 1.20m

Basic frames 1.80m


9703-001

Screw jack feet

9703-001
9703-001
U-heads D

Couplers
Operational Operational Operational
height h [m] height h [m] height h [m]
min. - max. min. - max. min. - max.
0.90 1.44 - 1.60 4 4 1.76 - 1.95 4 4 1.17 - 1.62 4 4 2 - - 2 1 - 4 4 - -
1.20 1.44 - 1.90 4 4 1.76 - 2.25 4 4 1.36 - 1.92 4 4 - 2 - - 3 - 4 4 - -
1.80 2.02 - 2.50 4 4 2.02 - 2.85 4 4 1.96 - 2.52 4 4 - - 2 - 1 2 4 4 - -
1.80 2.02 - 2.50 4 4 2.19 - 2.85 4 4 2.12 - 2.52 4 4 4 - - 4 1 - 6 4 4 8
2.10 2.32 - 2.80 4 4 2.32 - 3.15 4 4 2.26 - 2.82 4 4 2 2 - 2 3 - 6 4 4 8
2.40 2.62 - 3.10 4 4 2.62 - 3.45 4 4 2.56 - 3.12 4 4 - 4 - - 5 - 6 4 4 8
2.70 2.92 - 3.40 4 4 2.92 - 3.75 4 4 2.86 - 3.42 4 4 2 - 2 2 1 2 6 4 4 8
3.00 3.22 - 3.70 4 4 3.22 - 4.05 4 4 3.16 - 3.72 4 4 - 2 2 - 3 2 6 4 4 8
3.30 3.52 - 4.00 4 4 3.52 - 4.35 4 4 3.46 - 4.02 4 4 2 4 - 2 6 - 8 4 8 16
3.60 3.82 - 4.30 4 4 3.82 - 4.65 4 4 3.76 - 4.32 4 4 - - 4 - 1 4 6 4 4 8
3.90 4.12 - 4.60 4 4 4.12 - 4.95 4 4 4.06 - 4.62 4 4 2 2 2 2 4 2 8 4 8 16
4.20 4.42 - 4.90 4 4 4.42 - 5.25 4 4 4.36 - 4.92 4 4 - 4 2 - 6 2 8 4 8 16
4.50 4.72 - 5.20 4 4 4.72 - 5.55 4 4 4.66 - 5.22 4 4 2 - 4 2 2 4 8 4 8 16
4.80 5.02 - 5.50 4 4 5.02 - 5.85 4 4 4.96 - 5.52 4 4 - 2 4 - 4 4 8 4 8 16
5.10 5.32 - 5.80 4 4 5.32 -6.15 4 4 5.26 - 5.82 4 4 2 4 2 2 6 2 10 4 12 24
5.40 5.62 - 6.10 4 4 5.62 - 6.45 4 4 5.56 - 6.12 4 4 - - 6 - 2 6 8 4 8 16
5.70 5.92 - 6.40 4 4 5.92 - 6.75 4 4 5.86 - 6.42 4 4 2 2 4 2 4 4 10 4 12 24
6.00 6.22 - 6.70 4 4 6.22 - 7.05 4 4 6.16 - 6.72 4 4 - 4 4 - 6 4 10 4 12 24
6.30 6.52 - 7.00 4 4 6.52 - 7.35 4 4 6.46 - 7.02 4 4 2 - 6 2 2 6 10 4 12 24
6.60 6.82 - 7.30 4 4 6.82 - 7.65 4 4 6.76 - 7.32 4 4 - 2 6 - 4 6 10 4 12 24
6.90 7.12 - 7.60 4 4 7.12 - 7.95 4 4 7.06 - 7.62 4 4 2 4 4 2 7 4 12 4 16 32
7.20 7.42 - 7.90 4 4 7.42 - 8.25 4 4 7.36 - 7.92 4 4 - - 8 - 2 8 10 4 12 24
7.50 7.72 - 8.20 4 4 7.72 - 8.55 4 4 7.66 - 8.22 4 4 2 2 6 2 5 6 12 4 16 32
7.80 8.02 - 8.50 4 4 8.02 - 8.85 4 4 7.96 - 8.52 4 4 - 4 6 - 7 6 12 4 16 32
8.10 8.32 - 8.80 4 4 8.32 - 9.15 4 4 8.26 - 8.82 4 4 2 - 8 2 3 8 12 4 16 32
8.40 8.62 - 9.10 4 4 8.62 - 9.45 4 4 8.56 - 9.12 4 4 - 2 8 - 5 8 12 4 16 32
8.70 8.92 - 9.40 4 4 8.92 - 9.75 4 4 8.86 - 9.42 4 4 2 4 6 2 7 6 14 4 20 40
9.00 9.22 - 9.70 4 4 9.22 - 10.05 4 4 9.16 - 9.72 4 4 - - 10 - 3 10 12 4 16 32
9.30 9.52 - 10.00 4 4 9.52 - 10.35 4 4 9.46 - 10.02 4 4 2 2 8 2 5 8 14 4 20 40
1)The values in this column only apply to quadratic tower frames with the frames of each section placed at 90° to those of the previous section. In
this case, the column "Horizontal brace xxx" is no longer relevant and should be ignored.

50 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Structural design

Load-bearing tower d2 held at top Single-storey, with 1.80m frame


F F F F
V V V V
Max. 5 storeys, with any combination of the

K
L
1.80/1.20/0.90 m frames, or single-storey with
1.20 m frames

9734-262-01
● Bottom height adjustment:
- Heavy duty screw jack 70 or Screw jack foot
● Top height adjustment:
a b
- Screw jack U-head, 4-way screw-jack head or U-

F
L
head placed directly on frame Also allows for wind-loads acting on the load-bearing tower
a ... 1.0 - 2.5 m
F F F F b ... 1.5 m
V V V V

K
L
70

60

Permitted leg load Fv (effective resistance) [kN]


50
A
9734-259-01

40
L

B
30
a b
Also allows for wind-loads acting on the load-bearing tower
a ... 1.0 - 2.5 m 20
b ... 1.5 m

70 10

9734-101
60 0
Permitted leg load Fv (effective resistance) [kN]

0 10 20 30 35
A
Screw-jack U-head extension length LK [cm]
50
A LF 35 cm
B B LF 70 cm
40

It is a good idea to distribute the extension


30 lengths of the screw-jacks in such a way that
the "heads" are not extended as far as the
"feet". In this way, a higher max. leg load can be
20 obtained (see diagrams).

10

9734-100
0
0 10 20 30 35

Length LK by which Screw-jack U-head is extended [cm]

A LF 35 cm
B LF 70 cm

999734002 - 02/2011 51
The Formwork Experts
Structural design User information Load-bearing tower d2

Free standing load-bearing tower d2


● Bottom height adjustment:
- Heavy duty screw jack 70 or Screw jack foot
● Top height adjustment:
- Screw jack U-head, 4-way screw-jack head or U-
head placed directly on frame

Permitted vertical load FV per leg: 57.6 kN Permitted


horizontal load FH per leg: 1.15 kN

Also allows for wind-loads acting on the load-bearing tower


a ... 1.5 - 2.5 m
b ... 1.5 m
h ... max. 8.0 m
LK max 25 cm
LF max 35 cm

Site: School building, Birch

Site: PTT administration building, Schlieren, Switzerland

52 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Component overview

[kg] Article n° [kg] Article n°


Component
Doka
Load-bearing
Load-bearing
overview
tower Systems
d2

Basic frame d2 0.90m 21.0 582703000 Diagonal cross 9.150 5.2 582773000
Basic frame d2 1.20m 24.1 582701000 Diagonal cross 9.165 5.7 582627000
Basic frame d2 1.80m 32.8 582702000 Diagonal cross 9.175 6.1 582334000
Grundrahmen d2 Diagonal cross 9.200 6.6 582774000
Galvanised Diagonal cross 9.250 7.7 582775000
Diagonal cross 12.150 5.7 582612000
Diagonal cross 12.165 6.1 582628000
Diagonal cross 12.175 6.3 582335000
Diagonal cross 12.200 6.9 582614000
Diagonal cross 12.250 8.3 582616000
Diagonal cross 18.150 6.9 582622000
Diagonal cross 18.165 7.3 582629000
Diagonal cross 18.175 7.8 582336000
Diagonal cross 18.200 7.8 582624000
Diagonal cross 18.250 9.1 582626000
Diagonalkreuz
Galvanised
Delivery condition: folded closed

Coupler 0.57 582527000


Kupplungsstück
Galvanised
Height: 27 cm

Spring locked connecting pin 16mm 0.25 582528000


Federbolzen 16mm
Galvanised 4-way screw-jack head 10.4 582638000
Length: 15 cm Vierwegkopfspindel
Galvanised
Height: 86 cm
Horizontal brace d2 100 1.6 582730000
Horizontal brace d2 125 1.9 582731000
Horizontal brace d2 152 2.3 582732000
Horizontal brace d2 175 2.7 582733000
Horizontal brace d2 200 3.0 582734000
Horizontal brace d2 225 3.4 582735000
Horizontal brace d2 250 3.8 582736000
Horizontalstrebe d2
Galvanised
Screw jack U-head 9.2 582636000
Kopfspindel
Galvanised
Height: 74 cm

Diagonal brace d2 9.100 2.0 582740000


Diagonal brace d2 9.125 2.2 582741000
Diagonal brace d2 9.152 2.6 582742000
Diagonal brace d2 9.175 3.0 582743000
Diagonal brace d2 9.200 3.3 582744000 Heavy duty screw jack 70 top 9.2 582327000
Lastspindel 70 oben
Diagonal brace d2 9.225 5.9 582745000
Diagonal brace d2 9.250 6.8 582746000 Height: 106 cm
Diagonal brace d2 12.100 2.2 582712000
Diagonal brace d2 12.125 2.5 582713000
Diagonal brace d2 12.152 2.9 582714000
Diagonal brace d2 12.175 3.1 582715000
Diagonal brace d2 12.200 3.5 582716000
Diagonal brace d2 12.225 6.0 582717000
Diagonal brace d2 12.250 6.7 582718000
Diagonal brace d2 18.100 3.0 582720000
Diagonal brace d2 18.125 3.3 582721000
Diagonal brace d2 18.152 5.8 582722000
Diagonal brace d2 18.175 6.1 582723000
Diagonal brace d2 18.200 6.4 582724000 U-head D 6.7 582709000
Diagonal brace d2 18.225 6.9 582725000 Gabelkopf D
Diagonal brace d2 18.250 7.4 582726000 Galvanised
Diagonalstrebe d2 Length: 20 cm
Galvanised Width: 22 cm
Height: 37 cm

Clamping plate for U-head 2.0 502709030


Klemmplatte für Gabelkopf
Galvanised
Length: 24 cm
Width: 9 cm

999734002 - 02/2011 53
The Formwork Experts
Component overview User information Load-bearing tower d2

[kg] Article n° [kg] Article n°

Wing nut 15.0 0.31 581961000 Heavy duty screw jack 130 13.0 582711000
Flügelmutter 15,0 Lastspindel 130
Galvanised Galvanised
Length: 10 cm Height: 173 cm
Height: 5 cm
Width-across: 27 mm

Locking rod 15.0 330mm 0.48 582641000


Quetschteil 15,0
Galvanised
Width-across: 24 mm

Dokamatic table Staxo spindle connector 3.9 582347000


Staxo-Spindelanschluss Dokamatic-Tisch
Galvanised
Length: 20.7 cm
Split nut B 2.0 582634000
Spannmutter B
Galvanised

Wedge for screw jack ..... % 0.46 176071000


Spindelkeil ..... %
Length: 20 cm
Width: 16 cm
Universal dismantling tool 3.7 582768000
Universal-Lösewerkzeug
Galvanised
Staxo wedge support WS10 8.7 582796000
Staxo-Keilauflager WS10 Length: 75.5 cm
Galvanised
Length: 31 cm
Width: 15 cm
Height: 23 cm

Scaffold planking 60/150cm 13.6 582307500


Swivel bearing plate for screw jack U-head 5.2 582799000 Scaffold planking 60/175cm 15.5 582332500
Gelenkaufsatz Kopfspindel Scaffold planking 60/200cm 17.8 582308500
Galvanised Scaffold planking 60/250cm 22.2 582309500
Length: 20.8 cm Scaffold planking 60/300cm 26.2 582310500
Gerüstbelag
Width: 15.0 cm Aluminium
Height: 14.4 cm

Screw jack foot 9.0 582637000


Fußspindel
Galvanised
Height: 69 cm

Scaffold planking 60/150cm with manhole 13.8 582312500


Scaffold planking 60/175cm with manhole 15.5 582333500
Scaffold planking 60/200cm with manhole 17.7 582313500
Scaffold planking 60/250cm with manhole 20.8 582314500
Scaffold planking 60/300cm with manhole 26.3 582315500
Gerüstbelag mit Durchstieg
Heavy duty screw jack 70 8.8 582639000 Aluminium
Lastspindel 70
Galvanised
Height: 101 cm

Scaffold planking 30/100cm 7.4 582231000


Scaffold planking 30/200cm 13.5 582234000
Scaffold planking 30/250cm 16.4 582235000
Scaffold planking 30/300cm 19.5 582236000
Gerüstbelag
Galvanised

54 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Component overview

[kg] Article n° [kg] Article n°

Assembly batten 40/100cm 4.2 582630000 Pin coupling 60mm 1.0 582546000
Assembly batten 40/200cm 7.5 582632000 Zapfenkupplung 60mm
Assembly batten 40/250cm 9.7 582633000 Galvanised
Montagebelag Width-across: 22 mm
Aluminium

Brace stirrup 8 2.7 582751000


Spannbügel 8
Scaffold tube 48.3mm 1.00m 3.6 682014000 Galvanised
Scaffold tube 48.3mm 1.50m 5.4 682015000 Width: 19 cm
Scaffold tube 48.3mm 2.00m 7.2 682016000
Height: 46 cm
Scaffold tube 48.3mm 2.50m 9.0 682017000
Scaffold tube 48.3mm 3.00m 10.8 682018000 Width-across: 30 mm
Scaffold tube 48.3mm 3.50m 12.6 682019000
Scaffold tube 48.3mm 4.00m 14.4 682021000
Scaffold tube 48.3mm 4.50m 16.2 682022000
Scaffold tube 48.3mm 5.00m 18.0 682023000 Rafter plate right 0.09 582521000
Scaffold tube 48.3mm 5.50m 19.8 682024000 Rafter plate left 0.09 582522000
Sparrenpfettenanker
Scaffold tube 48.3mm 6.00m 21.6 682025000
Scaffold tube 48.3mm .....m 3.6 682001000 Galvanised
Gerüstrohr 48,3mm Length: 17 cm
Galvanised

Handrail post 1.50m 12.4 582754000


Geländer 1,50m
Galvanised

Screw-on coupler 48mm 50 0.84 682002000


Screw-on coupler 48mm 95 0.88 586013000
Anschraubkupplung
Galvanised
Width-across: 22 mm

Handrail clamp S 11.5 580470000


Schutzgeländerzwinge S
Galvanised
Swivel coupler 48mm 1.5 582560000 Height: 123 - 171 cm
Drehkupplung 48mm
Galvanised
Width-across: 22 mm

Normal coupler 48mm 1.2 682004000


Normalkupplung 48mm
Galvanised
Width-across: 22 mm Handrail post T 1.80m 17.7 584373000
Einschubgeländer T 1,80m
Galvanised

Transition swivel coupler 48/60mm 1.5 582561000


Übergangsdrehkupplung 48/60mm
Galvanised
Width-across: 22 mm

Transition angle coupler 48/60mm 1.6 582562000


Übergangsnormalkupplung 48/60mm Toeboard holder T 1.80m 0.53 584392000
Fußwehrhalter T 1,80m
Galvanised
Galvanised
Width-across: 22 mm
Height: 13.5 cm

Scaffold tube connection 0.27 584375000


Gerüstrohranschluss
Galvanised
Height: 7 cm

999734002 - 02/2011 55
The Formwork Experts
Component overview User information Load-bearing tower d2

[kg] Article n° [kg] Article n°

Lifting rod 15.0 1.9 586074000 Staxo/d2 adapter frame 14.1 582781000
Umsetzstab 15,0 Staxo/d2-Adapter
Painted blue Painted blue
Height: 57 cm Length: 37 cm
Follow the directions in the "Operat- Width: 36 cm
ing Instructions"! Height: 36 cm

Solid tire wheel 34.5 582573000


Vollelastikrad
Retaining plate 15.0 1.8 586073000 Painted blue
Jochplatte 15,0 Height: 45 cm
Galvanised
Length: 17 cm
Width: 12 cm
Height: 11 cm
Heavy duty wheel 15kN 33.0 582575000
Bracing for load-bearing towers 11.6 582795000 Schwerlastrad 15kN
Abspannung für Traggerüste Painted blue
Galvanised Height: 41 cm
Painted blue

Double wheeled transporter 5.0 582558000


Zweirad-Transportroller
Painted blue
Width: 57 cm

Bracing waling connector WS10 2.7 582756000


Abspann-Riegelverbinder WS10
Galvanised
Length: 46.7 cm Shifting carriage TG 168.0 582778000
Hubwagen TG
Galvanised
Length: 99 cm
Width: 152 cm
Height: 148 cm
Spindle connecting plate T 3.1 584371000
Spindellasche T Follow the directions in the "Operat-
Galvanised ing Instructions"!
Width: 20 cm
Height: 25 cm

Universal plug R20/25 0.003 588180000


Kombi Ankerstopfen R20/25
Blue
Fork lift shifting device TG 83.0 582797000
Diameter: 3 cm Umsetzgerät TG für Stapler
Galvanised
Length: 60 cm
Winch 70 31.0 582779000 Width: 113 cm
Zahnstangenwinde 70 Height: 52 cm
Painted blue
Follow the directions in the "Operat-
Height: 126 cm ing Instructions"!
Follow the directions in the "Operat-
ing Instructions"!

Multi-purpose waling WS10 Top50 2.00m 38.9 580007000


Mehrzweckriegel WS10 Top50 2,00m
Painted blue

Winch 125 63.8 582780000


Zahnstangenwinde 125
Painted blue
Height: 189 cm
Follow the directions in the "Operat-
ing Instructions"!
Connecting pin 10cm 0.34 580201000
Verbindungsbolzen 10cm
Galvanised
Length: 14 cm

56 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Component overview

[kg] Article n° [kg] Article n°

Spring cotter 5mm 0.05 580204000 4-way head Eurex 60 4.5 582655000
Federvorstecker 5mm Vierwegkopf Eurex 60
Galvanised Galvanised
Length: 13 cm Length: 25 cm
Width: 21 cm
Height: 21 cm

Fix-De-Fix remote uncoupling system 3150kg 27.0 586014000


Abhängeautomat Fix-De-Fix 3150kg
Follow the directions in the "Operat-
ing Instructions"!
Plumbing strut Eurex 60 550 42.5 582658000
Justierstütze Eurex 60 550
Powder-coated, blue
Aluminium
Length: 343 - 553 cm

Doka floor prop Eurex 60 550 47.0 582650000


Doka-Deckenstütze Eurex 60 550
Aluminium
Length: 345 - 555 cm

Prop head Eurex 60 Top50 7.1 582665000


Stützenkopf Eurex 60 Top50
Galvanised
Height: 50 cm

Extension Eurex 60 2.00m 21.3 582651000 Connector Eurex 60 3.9 582657000


Verlängerung Eurex 60 2,00m Verbindungsstück Eurex 60
Powder-coated, blue Galvanised
Aluminium Length: 15 cm
Length: 250 cm Width: 15 cm
Height: 30 cm

Plumbing strut shoe Eurex 60 8.5 582660000


Justierstützenfuß Eurex 60
Galvanised
Length: 31 cm
Width: 12 cm
Height: 33 cm

Swivel coupler 48mm Eurex 60 1.0 582654000


Coupler Eurex 60 8.6 582652000 Drehkupplung 48mm Eurex 60
Kupplungsstück Eurex 60 Galvanised
Aluminium Width-across: 22 mm
Length: 100 cm
Diameter: 12.8 cm

U-head Eurex 60 2.9 582656000


Gabelkopf Eurex 60
Galvanised
Length: 22 cm
Width: 20 cm
Height: 12 cm

999734002 - 02/2011 57
The Formwork Experts
Component overview User information Load-bearing tower d2

[kg] Article n° [kg] Article n°

Plumbing strut 340 for precast members 18.2 588296000 Stair tower d2-225
Justierstütze 340 für Fertigteile
Galvanised
Stair bracket 225 right 24.6 582681000
Length: 190 - 341 cm Stair bracket 225 left 24.6 582682000
Treppenlauf 225
Galvanised
Length: 263 cm
Height: 111 cm

Plumbing strut 540 for precast members 33.3 588297000 Pin 7x60mm 0.02 582683000
Justierstütze 540 für Fertigteile Steckbolzen 7x60mm
Galvanised Galvanised
Length: 309 - 550 cm

Inner handrailing 225 5.7 582685000


Innenholm 225
Galvanised
Height: 111 cm

Intermediate railing 225 5.7 582686000


Removable folding tripod 1.20m 20.7 586145000 Zwischengeländer 225
Stützbein 1,20m Galvanised
Galvanised
Length: 87 cm
Height: 120 cm
Height: 114 cm
Delivery condition: folded closed

Lashing strap 5.00m 2.8 586018000


Zurrgurt 5,00m Connection angle 225 6.0 582687000
Yellow Anschlusswinkel 225
Galvanised
Height: 116 cm

Doka express anchor 16x125mm 0.31 588631000


Doka-Expressanker 16x125mm
Galvanised
Length: 18 cm
Follow fitting instructions! Railing board 15x160cm 4.0 183011000
Geländerdiele 15x160cm
Varnished yellow

Doka coil 16mm 0.009 588633000


Doka-Coil 16mm
Galvanised
Diameter: 1.6 cm
Tread board 35mm 30x60cm 3.0 183010000
Trittbrett 35mm 30x60cm
Varnished yellow

58 999734002 - 02/2011
The Formwork Experts
User information Load-bearing tower d2 Component overview

[kg] Article n° [kg] Article n°

Anchoring shoe for stair tower 3.4 582680000 Doka stacking pallet 1.20x0.80m 39.5 583016000
Ankerschuh für Treppenturm Doka-Stapelpalette 1,20x0,80m
Galvanised Galvanised
Length: 22 cm Height: 77 cm
Width: 12 cm Follow the directions in the "Operat-
Height: 22 cm ing Instructions"!

Cone screw B 7cm 0.86 581444000


Konusschraube B 7cm
red
Length: 10 cm
Diameter: 7 cm Doka accessory box 106.4 583010000
Width-across: 50 mm Doka-Kleinteilebox
Timber parts varnished yellow
Steel parts galvanised
Multi-trip packaging Length: 154 cm
Width: 83 cm
Doka skeleton transport box 1.70x0.80m 87.0 583012000 Height: 77 cm
Doka-Gitterbox 1,70x0,80m Follow the directions in the "Operat-
Galvanised ing Instructions"!
Height: 113 cm
Follow the directions in the "Operat-
ing Instructions"!

Bolt-on castor set B 33.6 586168000


Anklemm-Radsatz B
Painted blue

Doka multi-trip transport box 1.20x0.80m 75.0 583011000


Doka-Mehrwegcontainer 1,20x0,80m
Galvanised
Height: 78 cm
Follow the directions in the "Operat-
ing Instructions"!

Multi-trip transport box partition 0.80m 3.7 583018000


Multi-trip transport box partition 1.20m 5.5 583017000
Mehrwegcontainer Unterteilung
Timber parts varnished yellow
Steel parts galvanised

Doka stacking pallet 1.55x0.85m 42.0 586151000


Doka-Stapelpalette 1,55x0,85m
Galvanised
Height: 77 cm
Follow the directions in the "Operat-
ing Instructions"!

999734002 - 02/2011 59
The Formwork Experts
Doka load-bearing tower d2 - the safe and sure way of
carrying your floor-slab loads.
Flexible, economical and strong, this Doka load-bearing tower gives stability to every structure -
when it comes to the costing calculations, too.
You can either rent, lease or purchase the Doka load-bearing tower d2.
At any of the Doka branches in your region.
Why not give us a call?

The Doka Group's central plant at Amstetten, Austria

Doka international
Certified to Doka GmbH
ISO 9001 Josef Umdasch Platz 1, A 3300 Amstetten, Austria
Tel.: +43 (0)7472 605-0, Fax: +43 (0)7472 64430
E-Mail: [email protected]
Internet: www.doka.com

Algeria Japan Qatar Tunisia Other subsidiaries and


SARL Doka Algérie Doka Japan K.K. Doka Qatar WLL Doka Tunisia Ltd. representatives:
24 A Route de la Rassauta Miwanoyama 744-6 Nagareyama-shi 2nd Gate, Light Industrial Area Bureau de Liaison
Bordj-El-Kifane, BP 170, 16120 Alger 270-175 Chiba-Ken Mesaieed, Qatar Zone Industrielle, Rue d l‘usine
Le Kram 2015 Tunis Angola Kazakhstan
Telephone: +213 (0)21 21 27 26 Telephone: +81 (0)471 78 8808 Telephone: +974 44500628
Telefax: +974 44500608 Telephone: +216 (0)71 977 350 Azerbaijan Latvia
Telefax: +213 (0)21 21 28 98 Telefax: +81 (0)471 78 8812
E-Mail: [email protected] Telefax: +216 (0)71 977 856
E-Mail: [email protected] E-Mail: [email protected] Bahrain Lithuania
E-Mail: [email protected]
www.dokajapan.co.jp Belgium Luxembourg
Canada Saudi Arabia
Doka Canada Ltd./Ltée
Turkey Belarus Marocco
Korea Doka Formwork Technology
5404 - 36th Street S.E. Mahmoud Othman & Sons LLC Doka Kalip-Iskele
Doka Korea Ltd. Sanayi ve Ticaret A.S. Bosnia and Mexico
Calgary AB T2C 1P1 Rm.N.220, Doosan Venture Digm Bldg., P.O. Box 7620 Güzeller Org. San. Bölgesi Herzegovina Netherlands
Telephone: +1 403 243-6629 126-1 Pyeongchon-Dong, Dongan-Gu, Jeddah 21472
431-755 Anyang City, Gyeonggi-Do Inönü Mah. Nazarbayev Sok. No:19 Brazil New Zealand
Telefax: +1 403 243-6787 Telephone: +966 0)2 669 10 08
Telephone: +82 31 478 3700 41400 Gebze, Kocaeli
E-Mail: [email protected] Telefax: +966 (0)2 664 86 25 Bulgaria Oman
Telefax: +82 31 478 3701 Telephone: +90 262 751 50 66
E-Mail: [email protected] Chile Panama
China E-Mail: [email protected] Telefax: +90 262 751 50 05
Doka Formwork (Shanghai) Co. Ltd. Singapore E-Mail: [email protected] Croatia Poland
Bldg. 2, No.3883 Yuanjiang Road Kuwait Doka Formwork Pte. Ltd. United Arab Emirates Czech Republic Portugal
Minhang District Doka Kuwait 9 Gul Circle Doka Gulf FZE Denmark Romania
Shanghai 201109 Div. of Riham Gen. Trad.& Cont. Co. Singapore 629565 P.O. Box 61407
Telephone: +86 21 6090 0899 Telephone: +65 6897 7737 Egypt Russia
P.O. Box 2217 Salmiyah Jebel Ali Free Zone, Dubai
Telefax: +86 21 6090 1099 22023 Kuwait Telefax: +65 6897 8606 Telephone: +971 (0)4 870 8700 Estonia Senegal
E-Mail: [email protected] Telephone: + 965 2 4822 462 E-Mail: [email protected] Telefax: +971 (0)4 870 8702 Finland Serbia
Telefax: +965 2 4822 472 E-Mail: [email protected] France Slovakia
India E-Mail: [email protected] South Africa
Doka India Pvt. Ltd. Doka South Africa (Pty) Ltd. United Kingdom Germany Slovenia
Hiranandani Business Park Lebanon Johannesburg Branch Doka UK Formwork Technologies Ltd Greece Spain
Sentinel Bldg 2nd Floor Doka Branch Lebanon CA Brand Bldg, 2 Sebasa Road Monchelsea Farm, Heath Road
Hungary Switzerland
Commercial Premises No 201&202 Sodeco Square, Block C / 9th floor Chloorkop Ext.10 Boughton Monchelsea
Powai, Mumbai - 400 076 Beirut Kempton Park 1619 Maidstone, Kent, ME17 4JD Iceland Taiwan
Telephone: +91 22 402 64435 Telephone: +961 (0)1 612569 Telephone: +27 (0)11 310 9709 Telephone: +44 (0)1622 74 90 50 Iran Thailand
Telefax: +91 22 402 64436 Telefax: +961 (0)1 612570 Telefax: +27 (0)11 310 9711 Telefax: +44 (0)1622 74 90 33 Italy Ukraine
E-Mail: [email protected] E-Mail: [email protected] E-Mail: [email protected] E-Mail [email protected]
Jordan Vietnam
Ireland Norway Sweden USA
Doka Ireland Formwork Techn. Ltd. Doka Norge AS Doka Sverige AB Doka USA, Ltd.
Monasterboice, Drogheda Heggstadmoen 4 214 Gates Road
Kurödsvägen 20 Little Ferry, NJ 07643
County Louth N 7080 Heimdal S 451 55 Uddevalla Telephone: +1 201 329-7839
Telephone: +353 (0)41 686 1620 Telephone: +47 72 89 38 10 Telephone: +46 (0)10 45 16 300 Telefax: +1 201 641-6254
Telefax: +353 (0)41 686 1525 Telefax:n +47 72 89 38 11 Telefax: +46 (0)10 45 16 309 E-Mail: [email protected]
E-Mail: [email protected] E-Mail: [email protected] E-Mail: [email protected] Internet: www.dokausa.com

The Formwork Experts 999734002 - 02/2011