Item No.

Item Description Unit

201.01 Clearing and grubbing ha

21.05 Removal and grabbing of large trees and tree stumps No


Bill No. 3 – Drainage
“Scope This Division covers all work in connection with the excavation and construction of open
drains, subsoil (Sub surface) drainage and banks and dykes at the locations and to the sizes,
shapes, grades and dimensions as shown on the drawings or as directed by the engineer, and
the test flushing of subsoil drains.
It also covers the cleaning of open drains and the repairing of subsoil (Sub surface) drainage.
In special circumstances this work may be executed outside the road reserve.
It also covers the clearing of existing culverts, including amongst others the removal of all
undesirable materials that have accumulated in and around Inlet and outlet structures and in
the barrels of the culverts. [ERA 2002]”

Item No. Item Description Unit


31.01 Drains

32.01 Excavations;

32.01a(iv) Soft material irrespective of depth m3


32.01(b) excavation of hard material irrespective of depth m3

32.02 Backfilling

32.02(a) Using excavated material m3

32.02(b) Using imported selected granular material m3

32.03 Concrete pipe culverts

32.03(ii)(1) Concrete pipe on Class B bedding, nominal diameter 760mm Lm


32.03(ii)(2) Concrete pipe on Class B bedding, nominal diameter 910mm Lm

32.03(ii)(3) Concrete pipe on Class B bedding, nominal diameter 1060mm Lm

32.03(ii)(4) Concrete pipe on Class B bedding, nominal diameter 1220mm Lm

Cocrete curb Lm

Masonry gutter with a cross section of (0.8*0.85) Lm


32.07 Cast Insitu concrete and formwork

32.07(b) Class C concrete including formworks m3

32.07(g) Class A concrete including formworks m3

32.1 Steel reinforcement

32.10(b) High tensile steel reinforcement in Culverts (Grade 60) ton

34(01) Stone Pitching

34.01(b)(II) Grouted Rubble Pavedwaterway m3


34.02 Riprap

(a) Packed Riprap m3

34.03 Stone Masonary Walls


34.03(a) Dry stone masonary walls m3

34.03(b) Cement mortared stone walls, Class ‘B’ m3


Bill No. 4 – Earthworks
This Division covers all work in connection with the preparation of the road bed, prior to the construction of the embankment

Item No. Item Description Unit

41.01 Removal of unsuitable material

(b) In layer thickness exceeding 200mm (6km hauling distance) m3

41.03(b) Road Bed Preparation Compaction to 93% of modified AASHTOdensity m2


42.01 Cut and Borrow to Fill :

42.01a(ii) Cut and borrow to fill, compaction to 95% AASHTO T-180 m3

42.01(c) Rock (hard) to fill m3

42.03 Cut to Spoil  material obtained from:

42.03(a) Common (normal) Excavation (1km Spoil dits.) m3

42.03(b) Intermediate Excavation (1km Spoil dits.) m3

42.03(c) Rock (hard) Excavation m3

44.05 Improved subgrade


44.05(a) Improved Subgrade G20 (Mat. From 6Km ) m3

44.05(b) Improved Subgrade G7 (Mat. From 1Km ) m3

45.01 Furrow ditch lm


Bill No. 5 – Subbase, Roadbase and Gravel Wearing Course
“5101 SCOPE
This Division covers the specification of materials for, and the construction of, sub-base pavement layers including the in-situ r

Item No. Item Description Unit

5400 GRANULAR COURSES

51.01(a)i Gravel subbase layer, 97% MDD, AASHTO T-180 (Material from 6km) m3
Crushed Aggregate Base course compacted to 98% of modified AASHTO
52.01(b)I density (Material from 10km) m3
Bill No. 6 – Bituminous Surfacing
“6101 SCOPE
This Division covers the application of a bituminous prime coat to a prepared pavement layer. [ERA 2002]”

Item Description Unit

6000 BITUMINOUS SURFACING

6100 Bituminous prime coat

61.01 Prime coat

(a) MC-30 cutback bitumen m2

6400 Bituminous Road Bases and Surfacing

surface treament m2
64.02 50mm Asphaltic surfacing with (penetration grade 60/70  bitumen

(a) Continous grading (medium) m2

6700 surfacing of Bridge deck


Bill 7 – RIGID (CONCRETE) PAVEMENT
“7101 SCOPE
This Division covers the construction of a surface course of Portland cement concrete, with or without reinforcement, and incl
Bill No. 8 – Structures
“8101 SCOPE
This Division provides specifications for the construction of foundations for structures including bridges, retaining walls, box an

Item Description Unit

8000 STRUCTURES

81.02 Excavation for Structures


(a) Excavation of soft material situated in the following successive ranges:

Irrespective of Depth m3

(b) Excavation of hard (rock) material irrespective of depth m3

81.05 Backfilling to Excavation

(a) Using excavated material m3

(b)i imported granular material m3

(b)ii hand laid rock fill material between wing walls m3


(b)iii hand laid Riprap on exposed face of backfill m3

82.02 Formwork for indicated class of finish

(a) conecrete footing of abutments and wing walls

i conecrete footing of abutments and wing walls m2

ii soffit of concrete deck slab m2

(b) Cast Insitu concrete and formwork


i side walks in main slab,Visible part of girder,on abutment m2

83.01 Steel reinforcement for structure

(a) (i) Mild steel bars (Grade 300) ton

(b) (ii) High yield stress steel bars (Grade 420)   ton

84.01 Cast in situ concrete


(a) Class C-30 in all superstructure parts, abutument & wing wall
(a) foundations and walklways m3

(b) (b) Class C-20 in abutument &wingwalls footing pads m3

87.03 Bearings

(c) Elastomer Bearing No.

87.07 Concrete parapets lm

87.19 Drainage pipes and weep holes


(a) Drainage pipes (20 cm internal dia pvc) m/No

89.01 Stone Masonry Walls

(a) Cement-mortared stone masonry walls (Class B) m3


Bill No. 9 – Ancillary Works
“9101 SCOPE
This Division covers the construction of gabion walls and aprons for the construction of
retaining walls, lining of channels, revetments, and other anti-erosion structures in accordance with the details shown in the C

Item Description Unit

9000 ANCILLARY WORKS

91.01 Gabions

91.01(a) (a) Gabion boxes 1m by 1m cube with galvanized wire mesh m3


92.01 Delineators, markers and kilometer posts

(a) Delineator posts/guidepost, reinforced concrete no.

(c) Kilometer posts, cement concrete no.

Sign faces with painted background, symbols, lettering and borders in


Engineering grade retro-reflective material with signboard constructed
94.01 from:
94.01(a)i Sign face with area not exceeding 2.0 sq.m fixed on post no.

Sign face with area exceeding 2.0 sq.m but not exceeds 10 sq.m fixed on
94.01(a)ii post no.

94.02 Sign supports:

94.02(a) Sign Support/Sign post, Class ‘A’ concrete no.

94.03 Road Sign Footing  

94.03 (a) Excavation for footing of Sign Support m3


94.03 (b) Backfilling for footing of Sign Support m3

94.03 (c) Class ‘A’ concrete for footing of road sign support m3

9500 Road Traffic Markings and Road Studs

95.01(a) i White unbroken 10cm line Km.

95.01(a) ii white broken (2.5m dash, 7.5m gap) 10cm line Km.

95.01(b) Yellow unbroken 10cm line Km.

9900 SIDEWALK
99.01(a) Concrete tiles of 50mm thick including the necessary jointing works  m2
Search for...
Recent Posts

vacancy(District Valuator (Maker/Checker))


vacancy(Senior Construction Project Manager)

vacancy(ሲቪል መሃንዲስ)
INVITATION FOR BID(ብሄራዊ ግልፅ ጨረታ ማስታወቂያ)
vacancy(Traffic Engineer)
vacancy(Project Coordinator)
vacancy(Material Engineer)
vacancy(Customer Support Engineer)
vacancy(Engineer Trainee)
 Rate

   21,887.82

     1,000.00

Rate

23.11
155.64

87.15

170.55

2,194.74
2,450.47

2,922.94

3,845.81

276.74

1,640.77
2,352.68

2,800.37

24,369.77

289.81

237.82
650.00 

986.85

construction of the embankments or capping layers, and the preparation of the sub-grade prior to the construction of the pavement layer

Rate

64.24

21.77
78.24

233.06

39.96

84

170.56
130.13

115.13

27.74

ment layers including the in-situ recycling of existing pavements. [ERA 2002]”

Rate

             170.86
            469.19

. [ERA 2002]”

Unit Rate (ETB)

41.56

107.58
289.09

r without reinforcement, and includes, inter alia, the specifications for materials, the placing and compacting of concrete, applying the sur

ng bridges, retaining walls, box and slab culverts etc. It provides in particular specifications for excavation, and back filling and for the cons

Unit Rate (ETB)


135.67

303.34

124.59

175.73

237.82
237.82
589.72

29,629.46

26,479.46
4,408.31

3,103.73

10,323.15

1,778.96
500

1,109.66

ce with the details shown in the Contract.”

Unit Rate (ETB)

942.94
258.99

258.99
693.35

8320.2

636.61

23.11
170.55

2,477.73

5,459.44

3,546.81

5,459.44
123.89
struction of the pavement layers. [ERA 2002]”
ng of concrete, applying the surface texture, and constructing the joints. [ERA 2002]”

and back filling and for the construction of the foundation it self as well as the pile capping slabs or the caisson cover slabs. [ERA 200]”