Frame Connection To Steel Substrate Through Buck D: Roof Plan Upper
Frame Connection To Steel Substrate Through Buck D: Roof Plan Upper
Frame Connection To Steel Substrate Through Buck D: Roof Plan Upper
20049
FINAL TRUSS ENGINEERING REACTIONS AND UPLIFTS IN EXCESS OF 3000#
MUST BE SUBMITTED PRIOR TO FINAL APPROVAL, PERMANENT TRUSS single truss or
BRACING TO BE BY TRUSS ENGINEER OF RECORD. ARCHITECT'S LAYOUT TO girder
BE USED FOR UPLIFT AND TRUSS / STRAP INSTALLATION
5/8" FIRE CODE GYPSUM
TYP. ALUM WINDOW BOARD EACH SIDE
OR DOOR. JAMB DRAFT STOP NOTE
tel: 561.672.7124
www.intelae.com
FLOOR FINISHES = 20 PSF
DUCTWORK = 4 PSF
CEILINGS = 2 PSF
1x P.T. WOOD NON STRUCTURAL BUCK LIVE (30 PSF) OCCUPANCY LIVE = 30 PSF
STEEL EL. 10'2" T.O.B. ELEVATION CHANGE
SUBSTRATE EL. 12'2" T.O.PL. BEAM SCHEDULE T.O.B. = TOP OF BEAM T.O.PL. =
TOP OF PLATE
SEE ARCH PLANS FOR EXTERIOR SIZE REINFORCING
MARK #3 STIRRUP OR HOOPS REMARK
AND INTERIOR FINISHES W D TOP MID BOT
T8 8" 12" 2 #5 - 2 #5 NONE REQUIRED TYPICAL 8" TIE-BEAM
1/4" PER FOOT SLOPE TOP CORD
T 12 12" 12" 3 #5 - 3 #5 NONE REQUIRED TYPICAL 12" TIE-BEAM
PCL 8" 8" (1) #5 GROUT SOLID PRECAST CONCRTE LINTEL W/ T 8 ABOVE TYPICAL
1. FOR ALL CONDITIONS IN WHICH A PRE-CAST LINTEL IS INSTALLED ABOVE A MASONRY OPENING (AS DESIGNATED IN THE
FRAME CONNECTION TO STEEL ABOVE SCHEDULE), CONTRACTOR SHALL GROUT SOLID ALL CELLS ABOVE THE OPENING. NO ADDITIONAL REBAR IS
REQUIRED.
2. STIRRUPS ARE ONLY SPECIFIED WHERE REQUIRED FOR STRENGTH. STIRRUPS MAY BE PLACED, AT THE CONTRACTORS
48"
POURED CONCRETE
ROOF
WOOD JOIST
DRAIN
2X6@24" O.C.
ATTACHING TO :
- WOOD RAFTERS OR TRUSSES :HANGER STUDS
MUST TRAVEL FURTHER UP TO SIDELAP THE
WOOD MEMBER. USE (3) #10 STAGGERED WOOD SCREWS
- UNDERSIDE OF CONCRETE SLAB :
(2) 1/4" x 2-1/4" TAPCONS
- UNDERSIDE OF ANY PRE-STRESSED SYSTEM SUCH 1/4" DROP PER FOOT
AS HOLLOWCORE (4) HILTI X-DNI (0.145" DIAMETER)
WITH 3/4" MAXIMUM EMBEDMENT .
- UNDERSIDE OF HOLLOW LIGHT GAGE STEEL :
(4) #10 SELF DRILLING SCREWS (# 3 POINT)
-UNDERSIDE OF HOLLOW LIGHT GAGE STEEL : 2/24/2021
©2019 - AA26002874
SCUPPER
AT HIGH POINT
OF ROOF
ALL STEEL TO BE
REVISIONS
GALVANIZED
G-90 3-5/8 STUDS
DATE
+ ENERGY
(2) #10 SELF DRILLING
SCREWS (#3 POINT)
5/8" P.T. PLYWOOD OR DENSGLASS ATTACHMENT
TO STEEL STUDS SHALL BE WITH:
ARCHITECTURE
#10 SELF DRILLING SCREWS WITH #3 POINT @ 6" O/C. 1
A19
EXTERIOR APPLICATIONS : GRID SPACING TO BE @24" x 16"O/C , 20 GA
INTERIOR APPLICATIONS : GRID SPACING TO BE @24" O/C , 20 GA