Audit Corrective Action Plan 2023 For The Contractor For January 2023 Audi Findings

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Rev. No.

Date: 30 January
00 2023 CORRECTIVE ACTION PLAN

Document No.
YVD-QAM-MNG-004 Audit Report Corrective Action Plan Page 1 of 2

Findings Control Measure Responsible Action Date Actual Date


Person
Substandard practice employees were noted Employees and Supervisor to ensure that working at SA Khiba/ John Dodo 31/01/2023 31/01/2023
removing old water proofing membrane by heights taken as a high risk all necessary precaution
throwing from the top concrete top roof measure shall be take by securing the bottom area and
bottom area not secured. place the spotter, Re-training via toolbox talk will be
conducted with the team.
Employees observed working at heights not Training needs analysis to will be implement and ensure SA Khiba and John 07/02/2023
adhering to fall protection plan, No that working at heights training is done and completed by Dodo
comptency in place. all who will be working at heights.
Loose tiles removed noted placed All loose material or tools shall be placed safely or Site Supervisor and 01/02/2023 02/02/2023
haphazardly on the edge of the floor ramp secured to prevent them from falling and causing injuries John Dodo
with a possibility of falling. to other employees at the bottom area, Retraining via
toolbox talk.
Cigarette buds noted in exhibition centre, Retraining via Smoking Policy and remind employees not John Dodo 02/02/2023 07/02/2023
proofs that employees are smoking in the to smoke in the building smoke only on designated
building. areas.
Poor housekeeping of ceiling material with Proper housekeeping to be conducted continuously and Site Supervisor John 08/02/2023
protruding nails noted at exhibition centre. ensure no protruding nails on materials that is removed. Dodo
Retraining via toolbox talk. Waste will be barricaded and
remove often on site.
Poor Housekeng of Old Water Roof Poor housekeeping shall be conducted continuously on A Khiba 07/02/2023 Continuously
Membrane and rubble noted all over on site. site and barricade waste and removed more often.
Rev. No. Date: 30 January
00 2023 CORRECTIVE ACTION PLAN

Document No.
YVD-QAM-MNG-004 Audit Report Corrective Action Plan Page 2 of 2