0% found this document useful (0 votes)
47 views6 pages

Gjkku

The document is a bill of quantities and rebar schedule for a construction project. It includes a table listing various rebar sizes, their lengths, weights, and total quantities. It also includes a rebar table with 33 entries listing the bar mark, diameter, code, cut length, number of pieces, and total length for each rebar shape used in the project. The total calculated length of rebar to be used is over 15,000 meters.

Uploaded by

Nur Isnaini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views6 pages

Gjkku

The document is a bill of quantities and rebar schedule for a construction project. It includes a table listing various rebar sizes, their lengths, weights, and total quantities. It also includes a rebar table with 33 entries listing the bar mark, diameter, code, cut length, number of pieces, and total length for each rebar shape used in the project. The total calculated length of rebar to be used is over 15,000 meters.

Uploaded by

Nur Isnaini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

BILL OF QUANTITIES REBAR TABLE

REBAR SCHEDULE

SR. NO BAR SIZE LENGTH(M) WEIGHT(MTON)


SHAPE SHAPE TOTAL LENGTH WWW.CSIBERKELEY.COM
SR. NO. BAR MARK DIA. DIM-A(M) CUT LENGTH(M) NUMBERS TOTAL LENGTH(M) SR. NO. BAR MARK DIA. CODE CUT LENGTH (M) NUMBERS (M)
CODE
1 10 194.800 0.12
1 MK-1 50 11 10.020 85 851.380
1 MK-1 50 11 9.280 10.020 85 851.380
2 12 2064.120 1.83
2 MK-2 50 00 5.740 8 45.860

2 MK-2 50 00 5.740 5.740 8 45.860 3 MK-3 25 11 8.860 354 3139.300


3 16 2673.920 4.22

4 MK-4 25 13 6.560 253 1660.940


4 18 1337.340 2.67 3 MK-3 25 11 8.520 8.860 354 3139.300
5 MK-5 16 00 5.720 68 389.080

5 25 5220.240 20.11 4 MK-4 25 13 6.100 6.560 253 1660.940 6 MK-6 16 00 5.140 69 354.580

7 MK-7 12 11 5.580 222 1237.560


6 50 1091.740 16.83 5 MK-5 16 00 5.760 5.720 68 389.080
8 MK-8 12 00 5.280 36 189.900

7 TOTAL 45.78 9 MK-9 12 00 4.560 36 163.980


6 MK-6 16 00 5.140 5.140 69 354.580
10 MK-10 12 00 4.760 40 190.580

7 MK-7 12 11 5.400 5.580 222 1237.560 11 MK-11 50 11 8.840 22 194.500

12 MK-12 25 00 5.960 8 47.660


8 MK-8 12 00 5.300 5.280 36 189.900
13 MK-13 25 00 5.400 9 48.600

14 MK-14 25 00 5.240 33 172.780


9 MK-9 12 00 4.560 4.560 36 163.980

15 MK-15 10 00 6.800 4 27.160

10 MK-10 12 00 4.760 4.760 40 190.580 16 MK-16 10 00 3.960 1 3.960

17 MK-17 10 00 5.800 3 17.360


11 MK-11 50 11 8.100 8.840 22 194.500
18 MK-18 16 11 8.600 6 51.620

12 MK-12 25 00 6.020 5.960 8 47.660 19 MK-19 16 00 7.340 4 29.360

20 MK-20 10 00 4.280 16 68.500


13 MK-13 25 00 5.400 5.400 9 48.600
21 MK-21 10 00 3.800 4 15.220

22 MK-22 16 11 6.960 154 1071.360


14 MK-14 25 00 5.300 5.240 33 172.780
23 MK-23 16 00 8.960 74 663.040

15 MK-15 10 00 6.800 6.800 4 27.160 24 MK-24 12 11 4.560 32 145.820

25 MK-25 12 00 3.780 36 136.320


16 MK-16 10 00 3.960 3.960 1 3.960
26 MK-26 18 13 7.120 59 420.580

17 MK-17 10 00 5.800 5.800 3 17.360 27 MK-27 18 13 6.020 19 114.200

28 MK-28 18 00 9.080 36 326.880


18 MK-18 16 11 8.380 8.600 6 51.620
29 MK-29 18 00 6.720 17 114.140

30 MK-30 18 13 5.920 40 237.020


19 MK-19 16 00 7.340 7.340 4 29.360
31 MK-31 16 11 4.600 14 64.440

20 MK-20 10 00 4.300 4.280 16 68.500 32 MK-32 16 00 3.880 13 50.420 NO DESCRIPTION DATE

33 MK-33 18 00 6.560 19 124.520


21 MK-21 10 00 3.800 3.800 4 15.220
34 MK-34 25 13 7.460 11 82.140

22 MK-22 16 11 6.740 6.960 154 1071.360 35 MK-35 25 13 6.260 11 68.820

36 MK-36 10 00 4.540 4 18.160


23 MK-23 16 00 8.960 8.960 74 663.040
37 MK-37 10 00 3.700 2 7.400

38 MK-38 10 00 3.320 2 6.640


24 MK-24 12 11 4.380 4.560 32 145.820
39 MK-39 10 00 7.600 4 30.400

25 MK-25 12 00 3.780 3.780 36 136.320

26 MK-26 18 13 6.800 7.120 59 420.580

27 MK-27 18 13 5.680 6.020 19 114.200


DRAWING

28 MK-28 18 00 9.080 9.080 36 326.880

29 MK-29 18 00 6.720 6.720 17 114.140


DRAWING2

30 MK-30 18 13 5.600 5.920 40 237.020

STRUCTURE
31 MK-31 16 11 4.380 4.600 14 64.440

32 MK-32 16 00 3.880 3.880 13 50.420 SAMPLE


33 MK-33 18 00 6.560 6.560 19 124.520

PROJECT
34 MK-34 25 13 7.000 7.460 11 82.140

35 MK-35 25 13 5.800 6.260 11 68.820


CONCRETE SLAB
36 MK-36 10 00 4.560 4.540 4 18.160

37 MK-37 10 00 3.700 3.700 2 7.400 CLIENT

38 MK-38 10 00 3.320 3.320 2 6.640

BPK SUGIANTO
39 MK-39 10 00 7.600 7.600 4 30.400

CONSULTANT

N/A

PROJECT NUMBER SAMPLE

DATE

DESIGNED BY

CHECKED BY

S-02
SCALE
A B C D
2

15.000 m

WWW.CSIBERKELEY.COM
5.000 m 5.000 m 5.000 m

0.300 m
1.000 m 3.000 m 1.000 m 1.000 m 3.000 m 1.000 m 1.000 m 3.000 m
0.300 m
6-16BC+5-16B
4-50TC+4-50T
14-25BF

14-25BF
6

7-50TC

1.000 m
18-12BC+17-12B

8-12BF+7-12BE
31-25TC

32-25TC
31-12BF
4.000 m

2.000 m

6-12BF+7-12BE 3-16BF+3-16BE 4-12BF+5-12BE 3-16BF+3-16BE 6-12BF+6-12BE 2-16BF+1-16BE


20-16BC+21-16B
6-50TC+6-50T

1.000 m
12-50TC
25-25BF

25-25BF
5

1.000 m

21-16TC 20-18TC+20-18T 36-16TC 20-16TC


11-25TC+11-25T
8-12BF+9-12BE
33-25TC

34-25TC
42-12BF

11-25BC
4.000 m

2.000 m

2-16BF+1-16BE

2-10BC 2-10BC+2-10B 2-10BC+1-10B 1


2-10BC
18-16BC+19-16B
6-50TC+5-50T

1.000 m
24-25BF

24-25BF
11-50TC

4-10TC
4

1.000 m

3-10TC

NO DESCRIPTION DATE
8-12BF+8-12BE
33-25TC

33-25TC
11-25BC
39-12BF
20.000 m

4.000 m

2.000 m

BC+1-10B 2-10BC 3-10BC


2-10BC
18-16BC+19-16B
6-50TC+5-50T

1.000 m
24-25BF

24-25BF
11-50TC

21-16TC 18-18TC+17-18T 33-16TC 18-18TC+19-18T 20-16TC


3

1.000 m

DRAWING
8-12BF+9-12BE
33-25TC

34-25TC
42-12BF

11-25BC

DRAWING3
4.000 m

2.000 m

2-10TC+1-10T 2-10TC+2-10T

STRUCTURE
1-10BC+1-10B 1-10BC+1-10B 3-10BC
8-25BC+9-25B
6-50TC+6-50T

SAMPLE
1.000 m
12-50TC
25-25BF

26-25BF
2

PROJECT
1.000 m

CONCRETE SLAB
18-12BC+19-12B

6-12BF+7-12BE
31-25TC

32-25TC
30-12BF
4.000 m

2.000 m

2-16BF+1-16BE 2-16BF+2-16BE CLIENT


22-16TC 19-18TC+19-18T 36-16TC 20-18TC+20-18T 19-16TC

BPK SUGIANTO
6-12BF+7-12BE 3-16BF+3-16BE 4-12BF+5-12BE 3-16BF+3-16BE 6-12BF+6-12BE
6-16BC+5-16B
4-50TC+4-50T

28-25TC
14-25BF

14-25BF

1.000 m

CONSULTANT
0.300 m
1

N/A

PROJECT NUMBER SAMPLE

DATE

DESIGNED BY

CHECKED BY

Rebar Plan
(Scale 1:50) S-03
SCALE
A B C D
2

WWW.CSIBERKELEY.COM
15.000 m

5.000 m 5.000 m 5.000 m

0.300 m
1.000 m 3.000 m 1.000 m 1.000 m 3.000 m 1.000 m 1.000 m 3.000 m
0.300 m
4-50TC+4-50T
6

7-50TC

1.000 m
31-25TC

32-25TC
4.000 m

2.000 m
6-50TC+6-50T

1.000 m
12-50TC
5

21-16TC 36-16TC 20-16TC


1.000 m

20-18TC+20-18T
11-25TC+11-25T
33-25TC

34-25TC
4.000 m

2.000 m

1
6-50TC+5-50T

1.000 m
11-50TC

4-10TC
4

1.000 m

3-10TC NO DESCRIPTION DATE


33-25TC

33-25TC
20.000 m

4.000 m

2.000 m
6-50TC+5-50T

1.000 m
11-50TC

21-16TC 18-18TC+17-18T 33-16TC 18-18TC+19-18T 20-16TC


3

DRAWING
1.000 m

DRAWING4
33-25TC

34-25TC
4.000 m

2.000 m

STRUCTURE
2-10TC+1-10T 2-10TC+2-10T

SAMPLE
6-50TC+6-50T

1.000 m
12-50TC

PROJECT
2

1.000 m

CONCRETE SLAB

CLIENT
31-25TC

32-25TC
4.000 m

2.000 m

22-16TC 19-18TC+19-18T 36-16TC 20-18TC+20-18T 19-16TC


BPK SUGIANTO

CONSULTANT
4-50TC+4-50T

28-25TC

1.000 m

N/A
0.300 m
1

PROJECT NUMBER SAMPLE

DATE

DESIGNED BY

CHECKED BY

S-04
SCALE

Top Rebar Plan


(Scale 1:50)
A B C D
2

15.000 m

WWW.CSIBERKELEY.COM
5.000 m 5.000 m 5.000 m

0.300 m
1.000 m 3.000 m 1.000 m 1.000 m 3.000 m 1.000 m 1.000 m 3.000 m
0.300 m
6-16BC+5-16B
14-25BF

14-25BF
6

1.000 m
18-12BC+17-12B

8-12BF+7-12BE
31-12BF
4.000 m

2.000 m

6-12BF+7-12BE 3-16BF+3-16BE 4-12BF+5-12BE 3-16BF+3-16BE 6-12BF+6-12BE 2-16BF+1-16BE


20-16BC+21-16B

1.000 m
25-25BF

25-25BF
5

1.000 m
8-12BF+9-12BE
11-25BC
42-12BF
4.000 m

2.000 m

2-16BF+1-16BE

2-10BC 2-10BC+2-10B 2-10BC+1-10B 1


2-10BC
18-16BC+19-16B

1.000 m
24-25BF

24-25BF
4

1.000 m

NO DESCRIPTION DATE
8-12BF+8-12BE
39-12BF

11-25BC
20.000 m

4.000 m

2.000 m

BC+1-10B 2-10BC 3-10BC


2-10BC
18-16BC+19-16B

1.000 m
24-25BF

24-25BF
3

1.000 m

DRAWING
8-12BF+9-12BE
11-25BC
42-12BF

DRAWING5
4.000 m

2.000 m

STRUCTURE
1-10BC+1-10B 1-10BC+1-10B 3-10BC
8-25BC+9-25B

SAMPLE
1.000 m
25-25BF

26-25BF
2

PROJECT
1.000 m

CONCRETE SLAB
18-12BC+19-12B

6-12BF+7-12BE
30-12BF
4.000 m

2.000 m

2-16BF+1-16BE 2-16BF+2-16BE CLIENT

BPK SUGIANTO
6-12BF+7-12BE 3-16BF+3-16BE 4-12BF+5-12BE 3-16BF+3-16BE 6-12BF+6-12BE
6-16BC+5-16B
14-25BF

14-25BF

1.000 m

CONSULTANT
0.300 m
1

N/A

PROJECT NUMBER SAMPLE

DATE

DESIGNED BY

CHECKED BY

Bottom Rebar Plan


S-05
(Scale 1:50) SCALE
A B C D
2

15.000 m

WWW.CSIBERKELEY.COM

5.000 m 5.000 m 5.000 m

Provided = 21.1 % (Over) Provided = 8.7 % (Over)

Provided = 4958 % (Over) Provided = 8295.5 % (Over)


6

Provided = 393.9 % (Over)


Provided = 46.1 % (Over) Provided = 38.2 % (Over)

Provided = 7 % (Over) Provided = 7.4 % (Over)

Provided = 4835.9 % (Over) Provided = 4760.8 % (Over)


4.000 m

Provided = 73.4 % (Over) Provided = 34.6 % Provided


(Over) = 12.6 % (Over)

Provided = 8.9 % (Over) Provided = 8.8 % (Over)

Provided = 6506.1 % (Over) Provided = 7150.8 % (Over)


5

Provided = 173.4 % (Over)


Provided = 82 % (Over) Provided = 44.4 % (Over)

Provided = 6.5 % (Over) Provided = 6.7 % (Over)

Provided = 4197.5 % (Over) Provided = 4517.3 % (Over)


4.000 m

Provided = 8.9 % (Over)


Provided = 135.8 % (Over) Provided = 32.5 % (Over)

1
Provided = 2.7 % (Over) Provided = 2.8 % (Over)

Provided = 5436.5 % (Over) Provided = 6070.1 % (Over)


4

Provided = 183.1 % (Over)


Provided = 80.3 % (Over) Provided = 45 % (Over)

NO DESCRIPTION DATE
Provided = 8.3 % (Over) Provided = 5.5 % (Over)

Provided = 3950.7 % (Over) Provided = 4227.8 % (Over)


20.000 m

4.000 m

Provided = 10.8 % (Over)


Provided = 142.5 % (Over) Provided = 41.2 % (Over)

Provided = 2.7 % (Over) Provided = 2.8 % (Over)

Provided = 5360 % (Over) Provided = 6082 % (Over)


3

Provided = 183.5 % (Over)


Provided = 80.2 % (Over) Provided = 45.1 % (Over)

DRAWING

Provided = 6.5 % (Over) Provided = 6.7 % (Over)

Provided = 4013.6 % (Over) Provided = 4589.3 % (Over) DRAWING6


4.000 m

Provided = 9.7 % (Over)


Provided = 136 % (Over) Provided = 32.4 % (Over)
STRUCTURE

Provided = 8.6 % (Over) Provided = 8.2 % (Over)

SAMPLE
Provided = 6221 % (Over) Provided = 6566.9 % (Over)
2

PROJECT
Provided = 171.3 % (Over)
Provided = 81.9 % (Over) Provided = 46.2 % (Over)

CONCRETE SLAB
Provided = 8 % (Over) Provided = 6.5 % (Over)

Provided = 4403.1 % (Over) Provided = 3593.3 % (Over)


4.000 m

CLIENT

Provided = 78.1 % (Over) Provided = 10.8 % (Over)


Provided = 29.2 % (Over)

BPK SUGIANTO

Provided = 21 % (Over) Provided = 8.3 % (Over)


CONSULTANT
Provided = 5112.4 % (Over) Provided = 8401 % (Over)
1

Provided = 382.7 % (Over)


Provided = 46.2 % (Over) Provided = 37 % (Over) N/A

PROJECT NUMBER SAMPLE

DATE

DESIGNED BY

CHECKED BY

Reinforcement Profile: Layer-A


(Scale 1:50)
S-06
SCALE
1 2 3 4 5 6

20.000 m

(Scale 1:50)
4.000 m 4.000 m 4.000 m 4.000 m 4.000 m

Provided = 21.8 % (Over) Provided = 26.9 % (Over)

A
Provided = 15.5 % (Over) Provided = -12.3 % (Under) Provided = 18.9 % (Over)

Reinforcement Profile: Layer-B


Provided = 9.2 % (Over) Provided = 8.3 % (Over) Provided = 8.5 % (Over) Provided = 9.9 % (Over)
Provided = 205 % (Over) Provided = 186.6 % (Over)

5.000 m
Provided = 16.8 % (Over) Provided = 18.4 % (Over)

Provided = 7.4 % (Over) Provided = 8 % (Over) Provided = 7.7 % (Over) Provided = 7.3 % (Over)
Provided = 202.4 % (Over) Provided = 206.3 % (Over)

B
Provided = 29.4 % (Over) Provided
Provided
= 158.7
= 243.6
% (Over)
% (Over) Provided = 240.5 % (Over) Provided = 26 % (Over)

Provided = 7.9 % (Over) Provided = 8.1 % (Over) Provided = 8.4 % (Over) Provided = 9.7 % (Over)
Provided = 699 % (Over) Provided = 713 % (Over)

5.000 m
15.000 m
Provided = 17.9 % (Over) Provided = 12.3 % (Over)

Provided = 6.7 % (Over) Provided = 8 % (Over) Provided = 7.8 % (Over) Provided = 8.5 % (Over)
Provided = 187.4 % (Over) Provided = 197.5 % (Over)
2
C

Provided = 24.8 % (Over) Provided


Provided
= 148.2
= 230.2
% (Over)
% (Over) Provided = 227.3 % (Over) Provided = 29.1 % (Over)

Provided = 143.4 % (Over) Provided = 9.4 % (Over) Provided = 12.3 % (Over) Provided = 12.1 % (Over) Provided = 11.8 % (Over) Provided = 170.9 % (Over)
5.000 m

Provided = 17.1 % (Over) Provided = 163.5 % (Over) Provided = 117.8 % (Over) Provided = 283.5 % (Over) Provided = 19.9 % (Over)

Provided = -100 % (Under) Provided = 29.4 % (Over) Provided = 30.8 % (Over) Provided = 194.6 % (Over) Provided = -100 % (Under)
D

Provided = 47.3 % (Over) Provided = 234.5 % (Over) Provided = 17.8 % (Over)

SCALE
DATE
NO

CHECKED BY
DESIGNED BY
PROJECT NUMBER
N/A
CLIENT
PROJECT
DRAWING

S-07
STRUCTURE

SAMPLE

CONSULTANT
DESCRIPTION
WWW.CSIBERKELEY.COM

DRAWING7

SAMPLE
BPK SUGIANTO
CONCRETE SLAB
DATE

You might also like