0% found this document useful (0 votes)
82 views3 pages

Kill Sheet Ucup

This document contains a well control worksheet for conducting a wait and weight method for a leak off test. It provides details on: 1) Pre-test data including drilling fluid properties, casing and hole details. 2) Calculations for maximum allowable drilling fluid density, annular surface pressure, and initial circulating pressure. 3) Details on pumping equipment, drill string and annulus volumes, and total active fluid system. 4) Shut-in well data and calculations for kill fluid density and final circulating pressure.

Uploaded by

Yusuf Arifin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views3 pages

Kill Sheet Ucup

This document contains a well control worksheet for conducting a wait and weight method for a leak off test. It provides details on: 1) Pre-test data including drilling fluid properties, casing and hole details. 2) Calculations for maximum allowable drilling fluid density, annular surface pressure, and initial circulating pressure. 3) Details on pumping equipment, drill string and annulus volumes, and total active fluid system. 4) Shut-in well data and calculations for kill fluid density and final circulating pressure.

Uploaded by

Yusuf Arifin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

WELL CONTROL WORKSHEET

SURFACE STACK – WAIT AND WEIGHT METHOD


LSP PPSDM MIGAS

Name: ………………. Test Number: ………… Date: ………

PRE-RECORD DATA LEAK OFF TEST DATA

1. ORIGINAL FLUID 11. DRILLING FLUID DENSITY (B) : ……..


9.4 ppg
10.0
DENSITY (A) : ……… ppg 12. SURFACE LOT PRESSURE (C) : ……..
1500 psi
8.920
2. ID CASING : ……… inch
13. MAX. ALLOWABLE DRILLING FLUID DENSITY:
3. MD CASING
4500
SHOE : ……… ft C
4. TVD CASING MAFD (D)  B 
0.052 x TVD
SHOE (TVDCS) : ……….
4500 ft Casing
5. HOLE DIAMETER : ……….8.5 inch ......
1500
MAFD (D)  9.4
......   ........
15,81
ppg
6. MD HOLE : ……….
5.200 ft 4500
0.052 x ......
5.200
7. TVD HOLE : ………. ft 14. INITIAL MAXIMUM ALLOWABLE ANNULAR
8. BOP STACK SURFACE PRESSURE (MAASP)
10000
RATING : ………. psi
4360 MAASPI (E)  (D - A) x 0.052 x TVDcs
9. CASING BURST : ………. psi
10. SURFACE EQUIPMENT
RATING : 10000psi MAASPI (E)  ( ...... 10.0 ) x 0.052 x ...........  ........
15.81 - ........ 4500
1359 psi
KILL RATE PRESSURE (psi)
PUMP DATA SLOW PUMP AT TVD: …………. ft
RATE (SPM)
PUMP 1 PUMP 2
PUMP OUTPUT 1 (F) : ……..
0.0997 bbl/stk
50 300
300
PUMP OUTPUT 2 (G) : ……..
0,0997 bbl/stk

LENGTH CAPACITY VOLUME PUMP TIME


SECTION
(ft) (bbl/ft) (bbls) STROKES (Min)
2.0 21 0,42
SURFACE LINE

DRILL PIPE 4780 84,85 851 17.02


0,01775

HWDP
420 0.0075 3.15 0.64
DRILL COLAR 32

TOTAL DRILL STRING (TDS) (H) 90 904


18.08

DP/HWDP - HOLE 280 12.84 129 2.58


0.04588
420 0.03222 13.53 136 2.72
DC - HOLE
4500 0.05298 2392
DP - CASING 238.41 47.84

DC - CASING 0

TOTAL ANNULUS (I) (I) 53,134


264,78 2657

TOTAL WELL SYSTEM (H+I) (J) 354,78 3561 71,214

ACTIVE SURFACE VOLUME (K) 600 6018


120.36

TOTAL ACTIVE FLUID SYSTEM (J+K) (L) 954,78 9579 191,574


WELL CONTROL WORKSHEET
SURFACE STACK – WAIT AND WEIGHT METHOD
Name: ……………………….. Test Number: ………… Date: ………

SHUT-IN WELL DATA DRILLING PARAMETER


800 80
15. SIDPP : psi RPM :
850
16. SICP : psi WOB : 10000 Lbs
17. PIT GAIN : 4.6 bbls SPM : 100

CALCULATION
20. FINAL CIRCULATING PRESSURE (FCP)
18. KILL FLUID DENSITY (KFD) KFD
FCP  KRP x
OMW
SIDPP
KFD  OMW  ........
0.052 x TVD FCP  ...... x  . ....... psi
... .....
......
KFD  ........   ......... ppg 21. PRESSURE DROP/ N STROKE
0.052 x ......
(N = TOTAL DRILL STRING STROKE/10)
(ICP  FCP)
19. INITIAL CIRCULATING PRESSURE (ICP) P/ N stroke  x N psi/N stk
TDS Stroke
ICP  SIDPP  KRP ( ....  ..... )
P/ ...... stroke  x .......
...................
ICP  ( ......  . ....... )  ........ psi
 ................psi/ .......stk

SIDPP SICP

Casing
Shoe
Depth

TD
Hole
NOTES:

You might also like