0% found this document useful (0 votes)
1K views6 pages

Assam

The document provides a status update on various highway projects in Assam as of 30 April 2023. 9 projects are listed, providing details like project name and location, length, cost, award date, scheduled and likely completion dates, and progress updates. All projects are reported as having achieved 100% physical and financial progress, with most having been completed by their scheduled dates, except for a few that were completed recently or are nearing completion. No major issues are reported except for land acquisition delays in some cases.

Uploaded by

Sarang Mohide
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views6 pages

Assam

The document provides a status update on various highway projects in Assam as of 30 April 2023. 9 projects are listed, providing details like project name and location, length, cost, award date, scheduled and likely completion dates, and progress updates. All projects are reported as having achieved 100% physical and financial progress, with most having been completed by their scheduled dates, except for a few that were completed recently or are nearing completion. No major issues are reported except for land acquisition delays in some cases.

Uploaded by

Sarang Mohide
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Status as on 30.04.

2023
Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)

Assam
Improvement and Strenghtening of Road Section from
Completed
1 NH(O) Chand Khera to Kurti Bridge on Assam-Tripura Border in 208A 17.95 66.94 60.21 04-10-2016 28-11-2016 100.00% 100.00% 99.50% 24-01-2018 M/s Ganesh Ram Dokania -
on 31.03.2018
the state of Assam on EPC basis
One time improvement of Moran Town section of NH-37 Completed
2 NH(O) NH-37 3.5 14.52 13.5 31-05-2019 19-08-2019 100.00% 100.00% 100.00% 17-08-2020 M/s BB Enterprises -
from km 555.000 to km 558.500 on 31.12.2020
One time improvement of Digboi to Ledo Town section
Completed
3 NH(O) (via Powal and Margherita ) of NH-38 from km 20.000 to NH-38 31.5 30.84 26.92 29-07-2019 25-09-2019 100.00% 100.00% 100.00% 23-09-2020 M/s Ganpati Builders -
on 23.09.2020
km 53.000
Construction of 2-L Dibrugarh By Pass / realignment of
Completed M/s ABCI-JKM Pvt. Ltd (JV).
4 SARDP NH-37 from Bogibeel Junction at km. 581.700 to km. 37 15.447 379.32 96.84 20-02-2015 02-11-2015 100.00% 100.00% 100.00% 31/10/2018 -
on 31.10.2020
597.147
M/s ECI Engg.Construction
4-Laning of NH-52A from Gohpur (Km 264.100 on NH-52) Completed
5 SARDP 52 10.08 223.3 168.39 30-03-2015 11-12-2015 100.00% 100.00% 99.76% 10-12-2018 Co. Ltd. -
to Holongi (Km.20.370 on NH-52A) under SARDP-NE on 28.02.2022

2-laning with paved shoulders from km 6.25 to 10.40 of Completed M/s Shree Gautam
6 SARDP 53/37 4.15 76.78 53.21 23-03-2015 01-10-2015 100.00% 100.00% 99.69% 11-12-2017 -
Silchar Badarpur section on 15.05.2022 Construction Company Ltd.

Widening/Improvement to 4-Lane with Paved shoulder


Completed pm.dokmoka@skylarkworld.
7 NH(O)-TSP from km 66.00 to km 81.00 (Design Chainage 65.923 to 36/29 15.007 266.25 129.14 10-08-2020 30-09-2020 100.00% 100.00% 97.38% 24-03-2022 Skylark Infra Engg. Pvt. Ltd. -
on 27.12.2022 com
80.930) of Dokmoka - LoringThepi section- (Package-3)

4-Laning of NH-37 from Nagaon By-pass to Teliagaon


Physically PRL Projects & Infra Structure
8 SARDP (km 278.600 to km 288.600) in the state of Assam under 37 10.00 87.11 23-03-2020 01-07-2020 100.00% 100.00% 98.68% 23-12-2021 [email protected] -
Completed Ltd.
SARDP-NE Phase-A on EPC mode-Package-1
225.02
4-Laning of NH-37 from Teliagaon to Rangagara (km
Physically
9 SARDP 288.600 to km 297.000) in the state of Assam under 37 8.40 66.25 20-03-2020 01-07-2020 100.00% 100.00% 96.46% 23-12-2021 Ganga Sagar Singh [email protected] -
Completed
SARDP-NE Phase-A on EPC mode – Package - 2

[email protected]
4-Laning from Rangagara to Kaliabhor Tiniali from km
10 SARDP 37 18.32 289.99 196.24 16-01-2017 23-10-2017 100.00% 83.58% 83.32% 21-04-2020 31-05-2023 M/s Simplex Infrastructure kaustab.chakraborty@simpl -
297.00 to km 315.315 of NH-37 on EPC basis.
exinfra.com

4-Laning from Kaliabor Tinali to Dolabari section from


M/s Gammon India- S P manoj.rathore@gammonen
11 SARDP Km 0.0 to Km 17.3 of NH 37-A including construction of 37A 17.30 811.28 588.95 31-10-2014 29-11-2014 100.00% 98.52% 98.30% 28-11-2018 31-05-2023 -
Singla[SPSCPL] (JV) gineers.com
new Brahmaputra bridge

4-Lane highway connecting km 17.3 of NH 37A and km [email protected]


12 SARDP 182 of NH 52 between Dolabari and Jamuguri on EPC 37A &52 16.86 124.58 05-11-2021 07-02-2022 100.00% 67.66% 56.49% 09-08-2023 08-08-2023 Sri Babul Nath m -
basis [email protected]
1049.51
Construction of Jia Bharali Bridge (1.2Km) along with its
37A/ MKC Infrastructure Ltd. - RSM
13 SARDP approaches and River Training Work from km 25.552 to 1.95 448.03 21-12-2020 17-02-2021 100.00% 78.28% 77.76% 05-08-2023 05-08-2023 [email protected] -
715 Infra Projects (JV)
km 27.500 of NH-37A (New NH-715) (CoS work)

4-Laning from Jamuguri to Biswanath Chariali from km M/s T K Engineering [email protected]


14 SARDP 52 26.00 520.01 303.49 13-10-2016 19-12-2016 100.00% 79.46% 78.71% 19-06-2019 30-06-2023 -
182 to km 208 of NH-52 Consortium Pvt. Ltd.(TKECPL) [email protected]

4-Laning from Biswanath Chariali by-pass Km 208.00 to


Dhatarwal Construction
15 SARDP Gohpur Km 265.50 (Total length 57.50) in the state of 52 57.50 1099.35 393.48 18-10-2021 11-12-2021 100.00% 72.90% 71.21% 10-06-2023 10-06-2023 [email protected] -
Company Pvt. Ltd.
Assam on EPC basis Under SARDP-NE

4-Laning of Numaligarh to Jorhat section from Km. [email protected],


M/s Hindustan Construction
16 SARDP 402.500 to Km. 453.000 (Design Km 403.200 to Km 37 39.72 1655.44 454.89 31-10-2014 23-05-2015 100.00% 92.08% 88.66% 21-05-2018 31-05-2023 [email protected], -
Company (HCC)
454.240) except Dergaon bypass (with Toll Plaza) [email protected]
Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)

4-Laning of Jorhat to Jhanji section from Km. 453.00 to Vijeta Projects - Sweety
17 SARDP 37 37.80 738.15 220.40 05-11-2021 09-02-2022 100.00% 32.13% 30.26% 08-08-2023 15-11-2023 [email protected] -
Km. 491.08 Infrastructure (JV)

4-Laning of Jhanjhi Jn to Demow section from Km. [email protected],


Kamac Engg - Shiva Harlalka
18 SARDP 491.050 to Km. 535.250(Design Km 490.800 to Km 37 44.08 1369.02 234.20 25-07-2022 21-09-2022 100.00% 19.41% 17.05% 21-03-2024 21-03-2024 [email protected] -
(JV)
534.800) (with Toll Plaza) [email protected]

4-Laning of NH-37 Section between Demow to End of


Moran Bypass (From Km. 534.800 to Km. 561.700)
19 SARDP 37 26.90 385.57 122.50 14-10-2022 20-01-2023 100.00% 2.05% 0.00% 21-07-2024 21-07-2024 Mohan Lal Jain [email protected] -
including Emergency Landing Facility (ELF) on EPC
Mode.

4-Laning of NH-37 Section between End of Moran


20 SARDP Bypass to Bogibeel junction near Lapetketa ((Km. 37 19.18 330.30 223.50 31-01-2019 07-06-2019 100.00% 65.29% 63.15% 04-12-2021 31-08-2023 M/S Manaranjan Brahma[MB] [email protected] -
561.700-Km. 580.778) on EPC Mode.

4-Laning of Balachera-Harangjao section of NH-54 (ext.)


M/s Sushee Infra- M/s JSC planning.balachera@gmail.
21 NHDP II from km 275.00 to km 244.00 in the state of Assam under 54 Ext. 25.25 887.68 694.30 31-10-2017 26-12-2017 100.00% 66.32% 61.46% 24-06-2020 31-10-2023 -
PTPS (JV) com
east west corridor project.

Construction and up gradation to 4-Lane of existing two


lane with paved shoulder from Hapachara to Tulungia
22 NH(O)-NE road of NH-117 of existing Km 0.00 to km 14.050 and 102B/ 117 14.66 224.85 138.25 26-03-2020 26-06-2020 100.00% 73.85% 59.10% 26-12-2022 12-08-2023 B.K.Sons Infra Pvt. Ltd. [email protected] -
(Design Km 0.000 to km 14.660), (Design length- 14.660
km) under BMP

Widening/Improvement to 4 -Lane with Paved Shoulder


from Ch. 52.470km to Ch.71.500 km (DesignCh.48.655km
Rajendra Singh Bhamboo Infra [email protected]
23 NH(O)-NE to Ch.67.556km)of Tulungia Jogighopa Bridge Approach 17 18.90 691.53 418.49 22-03-2021 09-07-2021 95.00% 73.35% 66.74% 10-01-2023 06-09-2023 -
Pvt. Ltd. o.in
Section (Package-5) of Bilasipura- Guwahati road (NH
17)

Construction of New 2-Lane Bridge with its approaches


[email protected]
24 NH(O)-NE from km 0+000 to Km 4+385 across River Brahmaputra 17 4.39 746.76 402.75 10-08-2021 12-11-2021 100.00% 25.65% 23.02% 11-11-2024 11-11-2024 S.P. Singla Private Limited -
m
on NH-17 at Jogighopa

Widening/Improvement to 4-Lane with paved shoulder


from Ch.75.330Km to Ch.88.00km (Design Ch.71.800 to
25 NH(O)-NE 84.100 km) of Jogighopa Bridge Approach (Near NH-17 12.30 208.84 114.30 25-08-2020 26-10-2020 94.16% 48.76% 46.23% 19-04-2022 31-10-2023 Mayasheel Construction [email protected] -
Pancharatna)- Agia (near Nichinta) section (Pkg. 6) of
Bilasipura-Guwahati road (NH-17) on EPC under BMP

Widening/Improvement to 4 -Lane with Paved Shoulder


from Ch. 88.000km to Ch.99.930 km (Design
mayasheelconstruction@gm
26 NH(O)-NE Ch.84.100km to Ch.96.000 km) of Sagunbashi forest NH-17 11.63 286.72 135.89 24-03-2023 to be given - - - - - Mayasheel Construction Land Acquisition
ail.com
(near Nichinta) to starting of Krishnai Bypass Section
(Package-7) of Bilasipura Guwahati road (NH 17)

Widening/Improvement to 4-Lane with paved shoulder


from Km 99+930 to Km 143+680 (Design Chainage
96+000 to 139+750) of (Paikan to Dhupdhara Sahar) of
M/s YFC Projects Pvt. Ltd.- [email protected]
27 NH(O)-NE Bilasipura-Guwahati Road on NH-17 in the state of 17 43.75 1457.59 742.00 14-03-2023 to be given - - - Land Acquisition issue
M/s TTC Infra India (JV) m
Assam on EPC mode under Bharatmala Pariyojana in
Economic Corridors (Project Length – 43.750km) under
NH(O)-NE (Package-8)

Widening/Improvement to 4-Lane with Paved Shoulder


from Ch. 143+680km to Ch.177+372km (Design
Ch.139+750km to Ch.173+434km) of Bilasipura-
ANIL Das - SAILAJA
Guwahati road on NH-17 (Section: Dhupdhara Sahar to
28 NH(O)-NE 17 33.68 1000.27 458.47 20-03-2023 to be given - - - Commercial Construction Pvt. [email protected] Land Aquisition & Forest Issue
Milmila Reserve Forest (before Chayagaon Market)) in
Ltd. (JV)
the state of Assam on EPC mode under Bharatmala
Pariyojana in Economic Corridors (Project Length –
33.684km) NH(O)-NE (Package-9)
Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)

Widening/Improvement to 4-Lane with Paved Shoulder


from Ch. 177+372km to Ch.203+783km (Design
Ch.173+434km to Ch.200+750km) of Bilasipura-
ANIL Das - SAILAJA
Guwahati road (NH 17) (Section: Milmila R.F (before
29 NH(O)-NE 17 27.32 1264.90 539.93 31-03-2023 to be given - - - Commercial Construction Pvt. [email protected] Land Acquisition issue
Chayagaon Market) to Approach of Airport Junction (VIP
Ltd. (JV)
Chowk) in the State of Assam on EPC mode under
Bharatmala Pariyojana in Economic Corridors (Project
Length - 27.316km) for (Package-10)

Widening/Improvement to 4(Four) Lane with Paved


Shoulder From Km 38+500 to Km 51.246 (Design
M/s Mehta Contruction
30 NH(O)-NE Chainage 38.500 to 50.959) with Proposed Daboka NH-29 12.46 516.88 229.82 24-02-2023 to be given 0.00% - - - - [email protected] Land Acquisition issue
Company
Bypass of Daboka - Parokhaowa (Package -1) of NH-29
in the State of Assam on EPC mode.

Widening/lmprovement to 4-Lane with paved shoulders


P. D. Agrawal Infrastructure
from Km. 51+246 to Km. 66+000 (Design Chainage [email protected]
31 NH(O)-NE 36/29 15.21 335.88 138.33 26-03-2021 12-07-2021 90.19% 85.90% 81.95% 03-01-2023 31-10-2023 Ltd. -Apex Structure Pvt Ltd. -
50+710 Km to 65+923 Km) of Parokhuwa-Dokmoka n
(JV)
section (Package-2)
Widening/Improvement to 4-Lane with Paved Shoulder
from km 81+000 to km 95+400 (Design Chainage 80+930
32 NH(O)-TSP 36/29 15.47 260.07 141.35 03-02-2021 25-06-2021 95.28% 91.97% 91.97% 17-12-2022 31-05-2023 S.S Builders [email protected], -
to 96+400) of Loring Thepi - Ganapath Gaur Gaon
Section - (Package-4)
Widening/lmprovement to 4-Lane of Daboka Dimapur
[email protected]
Stretch from Km 95+400 to Km 113+830 (Design
33 NH(O)-NE 36/29 17.43 288.85 141.46 31-03-2021 12-07-2021 62.70% 29.35% 23.37% 12-01-2023 31-12-2023 B.K.Sons Infra Pvt. Ltd. [email protected] Forest Issues
Chainage 96+400 Km to 113+830 Km) of Ganpath Gaur
om
Gaon- Kwaram Taro Vitlage- (Package-5)
Widening/Improvement to 4-Lane with Paved Shoulder
from KM 113+300 to Km 146+230 (Design Chainage ablnh29pkg6@ashokabuildc
34 NH(O)-NE 36/29 31.88 625.64 282.11 10-09-2021 14-07-2022 92.51% 17.27% 12.05% 13-07-2024 13-07-2024 Ashoka Buildcon Ltd. Land Acquisition issues.
113+830 to 145+712) of Kwaram Taro Village - Dillai on.in
Section (Package-6)
Widening/lmprovement to 4-Lane with Paved Shoulder
from Dillai at Km 146+230 to Lahorijan at Km 157+46O shankaragarwaloffice@gma
35 NH(O)-NE 36/29 10.79 204.10 81.27 02-09-2022 20-01-2023 91.10% 2.66% 0.00% 20-07-2024 20-07-2024 M/s Shankar Agarwal -
(Design Chainage 145+712 to 156+502) of Dillai - il.com
Lahorijan (Package - 7)
4-Lane Bridge including approaches over River Larsen & Toubro Ltd. Heavy
36 EAP (JICA) Brahmaputra between Dhubri (on North Bank,Assam) 127B 19.28 4997.04 3165.99 24-11-2020 15-12-2020 100.00% 31.10% 28.75% 12-09-2028 12-09-2028 Civil Infrastructure IC Larsen & [email protected] -
and Phulbari (on south Bank,Meghalaya) on NH-127B Toubro Ltd.(L&T)

Widening / Improvement to 4-Lane with Paved Shoulder


configuration of existing single lane road from Srirampur
(near Bhairiguri Village) to Kachukhana Harichara
[email protected]
Paglagaunj (Package-I) of Srirampur - Dhubri Section of
37 EAP (JICA) 127B 27.65 613.89 297.28 12-09-2022 15-02-2023 90.01% 1.22% 0.00% 14-02-2025 14-02-2025 Simplex Infrastructures Ltd. kaustab.chakraborty@simpl Land Acquisition issues.
NH-127B from existing Km 0.000 to Km 28.050 (Design
exinfra.com
Km 0.000 to Km 27.650), (Design Length=27.650 Km)
under JICA ODA Loan assistance (Phase-V)
[Srirampur - Dhubri Pkg-1]

Widening / Improvement to 4-Lane with Paved Shoulder


configuration of existing single lane road from
Kachukhana Harichara Paglagaunj to Dhubri - Phulbari
Bridge approach (Package-II) of Srirampur - Dhubri M/s Jandu Construction India [email protected],
38 EAP (JICA) 127B 26.50 909.02 453.90 04-08-2022 02-01-2023 90.02% 5.54% 3.10% 01-01-2025 01-01-2025 Land Acquisition issues.
Section of NH-127B from existing Km 28.050 to Km Pvt. Ltd. [email protected]
55.060 (Design Km 27.650 to Km 54.154), (Design
Length=26.504 Km) under JICA ODA Loan assistance
(Phase-V) [Srirampur - Dhubri Pkg-2]
Rehabilitation & upgradation to 4-Lane with Paved
shoulder of Dergaon Town section from Km 426.800 to M/s Rajinder Infrastructure [email protected]
39 NH(O) 2/ NH-37 10.60 287.63 122.50 19-03-2020 30-06-2020 100.00% 80.24% 76.47% 19-06-2022 30-06-2023 -
Km 437.800 (Total length-11.00 km) on NH 37 on EPC Pvt.Ltd. [email protected]
basis
Widening/improvement to 4-Lane with paved shoulder
from km. 581+700 to km 606+300 of NH-37 on existing [email protected]
40 NH(O)-NE Dibrugarh-Lahoal-Chabua Bypass i.e. from Lepetketa to 37 24.60 215.27 115.82 31-03-2022 25-07-2022 100.00% 29.61% 23.53% 24-07-2024 24-07-2024 Ganpati Builders ganpatibuilders0082@gmail -
Kandulibari Grant Gaon section under NH(O) - NE .com
[Pkg.1]
Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)

Widening/improvement to 4-Lane with paved shoulder


from km. 606+300 to km 626+030 of NH-37 on existing [email protected]
41 NH(O)-NE 37/15 19.73 170.95 101.16 05-04-2022 25-07-2022 100.00% 13.03% 10.10% 24-01-2024 24-07-2024 JKM Infra works LLP -
Lahoal-Chabua Bypass i.e. Kandulibari Grant Gaon to [email protected]
Nalanihulla section under NH(0) - NE [Pkg.2]
Widening/Improvement to 4-Lane with Paved Shoulder
from km 626+030 (Nalani hulla Gaon) to km 650+450
(Chotahapjan) on existing Tinsukhia -Makum Bypass of
37/15 &
42 NH(O)-NE NH-15 (OLD NH-37) and Strengthening of existing NH- 41.32 458.59 210.00 03-02-2023 to be given 95.55% - - - - M/s TTC Infra India [email protected] Land Acquisition issues.
38/315
315 (OLD NH-38) from Km 0+000 (Chotahapjan) to Km
16+900 (Bogapani section) (2-Lane +PS) under NH(0) -
NE (Pkg-3)
Widening/ Improvement to 2-Lane with Paved Shoulder
from Km 16+900 (Bogapani) to Km 27+150 (Golai Gaon)
on existing Dibrugarh to Ledo section with proposed 37/15 & [email protected],
43 NH(O)-NE 10.25 356.65 114.99 28-02-2023 to be given 90.00% - - - - M/s RK Infracorp Limited Land Acquisition issues.
Digboi Bypass (Green Fiefld and Brownfield) (2 - 38/315 [email protected]
Lane+PS) of NH-315 (OLD NH-38) in Tinsukia District in
the State of Assam on EPC mode (Section-4).

Widening/Improvement to 2-Lane with paved shoulder


from km 27+150 (Golai Gaon) to km 47+682 (Ledo) on
existing Dibrugarh to Ledo section with proposed
44 NH(O)-NE Margherita - Ledo Bypass (Greenfield) (2-Lane +PS) of 38/315 20.53 643.42 272.77 31-03-2023 to be given - - - - - Kamac Engineers Pvt. Ltd. [email protected] Land Acquisition issues.
NH-315 (Old NH-38) in Tinsukia District in the State of
Assam on EPC (Package-5) under Bharatmala
Pariyojana in Economic Corridors (Pkg-5)
4-Laning of Silchar - Dhanehari section from Existing
Chainage km 263+800 of NH 37 to km 12+920 of NH 306
(Design Chainage km 0+000 to km 20+000) on Silchar - YFC Projects Pvt. Ltd. - TTC [email protected]
45 NH(O)-NE 37 & 306 20.00 1256.90 504.34 21-03-2023 to be given - - - - - Land Acquisition issues.
Vairengte - Sairang road in the State of Assam under Infra India (JV) m
Bharatmala Pariyojna on EPC mode. (Project Length –
20.00 km) (Package-1)
4-Laning of Dhanehari Lailapur / Vairengte section from
Existing Chainage km 12+920 to km 43+000 of NH 306
(Design Chainage km 20+000 to km 49+360) on Silchar - Jandu Construction India Pvt. [email protected], Land Acquisitin issue and
46 NH(O)-NE 306 29.36 1716.21 592.80 31-03-2023 to be given - - - - -
Vairengte Sairang road in the State of Assam under Ltd. (JCIPL) [email protected] Forest issue.
Bharatmala Pariyojna on EPC mode. (Project Length
29.360 km) under NH(O)-NE (Package-2)
Construction of 4-Lane Badarpur Bypass from Design
Chainage km 27+300 at crossing with NH-6 (Old NH-44)
Near Siddeswar Pt.-I Village to Design Chainage km
47 NH(O)-NE 38+600 on NH-37 (Old NH-44) at Kandigram Chaita 6 & 37 11.10 574.26 292.29 16-03-2023 to be given - - - - - S S Builders [email protected] Land Acquisition issues.
Village in the State of Assam on EPC Mode under
Bharatmala Pariyojana in Economic Corridors (Project
Length – 11.1 km).
Widening & Improvement to 2-lane with Paved shoulder
configuration of Dudhnoi - Dainadubi section (NH-217)
under Bharatmala Pariyojana from design km 0+000 to shyamaconstruction0005@
48 NH(O)-NE 62/217 8.42 88.56 33.71 31-03-2023 to be given - - - - - Shyama Construction Land Acquisition issues.
km 8+415 (existing km 0+000 to km 8+600 of Old NH-62) gmail.com
in the State of Assam on EPC mode under NH(O)-NE,
(Assam portion)
Widening & Upgradation to two lanes with paved
shoulders road from Tamenglong to Mahur (NH-137) in Anusha Projects Pvt. Ltd.-
49 NH(O)-NE the State of Assam starting from km 116.480 near 137 20.02 904.04 344.66 31-03-2023 to be given - - - - - BKD Infrastructures Pvt. Ltd. [email protected] Land Acquisition issues.
Hangrum to km 136.500 near Hejaichak (Package-8) on (JV)
EPC mode under NH(O)-NE (Assam portion)

Widening & Upgradation to two lanes with paved


shoulders road from Tamenglong to Mahur (NH-137) in
50 NH(O)-NE the State of Assam starting from km 136.500 near 137 19.99 860.37 344.66 31-03-2023 to be given - - - - - KPC Projects Ltd. [email protected] Land Acquisition issues.
Hejaichak to km 156.489 near P. Leikul (Package-9) on
EPC mode under NH(O)-NE (Assam portion)
Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)

Widening & Upgradation to two lanes with paved


shoulders road from Tamenglong to Mahur (NH-137) in Anusha Projects Pvt. Ltd.-
51 NH(O)-NE the State of Assam starting from km 156.489 near P. 137 19.92 890.33 354.69 31-03-2023 to be given - - - - - BKD Infrastructures Pvt. Ltd. [email protected] Land Acquisition issues.
Leikul to km 176.410 near Borowapu (Package-10) on (JV)
EPC mode under NH (O)-NE (Assam portion)

Widening/Improvement to 4-Lane with Paved Shoulder


Kaluwala Construction Pvt.
from km 0+800 (Kandulijan Gaon) to km 27+701 (Simen Land Acquisitin issue and
52 NH(O)-NE 515 26.90 609.16 267.62 31-03-2023 to be given - - - - - Ltd.- [email protected]
Chapori) of NH-515 in the State of Assam on EPC mode Forest issue.
Nirmal Buildinfra Pvt. Ltd. (JV)
under BMP (Dibrugarh-Oyan, Package-1)

Widening/Improvement to 4-Lane with Paved Shoulder


Kaluwala Construction Pvt.
from km 27+701 (Simen Chapori) to km 55+000 Land Acquisitin issue and
53 NH(O)-NE 515 27.30 562.05 249.40 31-03-2023 to be given - - - - - Ltd.- [email protected]
(Nagabang Gamsuk) in Dhemaji district in the State of Forest issue.
Nirmal Buildinfra Pvt. Ltd. (JV)
Assam on EPC mode under Bharatmala (Package-2)

Widening/Improvement to 4-Lane with Paved Shoulder


from km 55+000 (Nagabang Gamsuk) to km 82+514 Kaluwala Construction Pvt.
Land Acquisitin issue and
54 NH(O)-NE (Oyan) in the State of Assam and Arunachal Pradesh on 515 27.51 665.47 266.24 31-03-2023 to be given - - - - - Ltd.- [email protected]
Forest issue.
EPC mode under Bharatmala Pariyojna of Length 27.514 Nirmal Buildinfra Pvt. Ltd. (JV)
Km (Package-3)

Total 1127.73 35311.96 16775.36


Remarks/ Issues
Awarded Right of way Original
NHDP NH No. Sanctioned Date of Cumulative Cumulative (Land Aquisition Issue/
Length Cost (ROW) Schedule Likely date of Official Mail IDs of
SL. No. Phase/ Name of Project (Old/ Cost/TPC Date of Award Start/Appointed Physical Financial Name of the Contractor Forest Issue/ Utility
(Km) Rs. in Available Completion completion Contractor
Scheme New) Rs. in crore Date progress % progress % Shifting/ Contractor
crore % Date
Issue)

Multi modal Logistic Park at Jogighopa (MMLP), Bongaigaon District, & MMLP-2 at Silchar, Assam under BHARATMALA PARIYOJNA (MoRTH- Logistics Section)

Development of External Trunk Connectivity and Internal


Infrastructure Works at Multi
ram_chandrapaulmmlp@ya
1 - Model Logistics Park at Jogighopa in the State of Assam 8.944 165.94 05-06-2020 30-09-2020 100.00% 80.03% 70.29% 31-03-2022 15-07-2023 M/s Ram Chandra Paul -
hoo.com
on EPC Mode Road
(Package-I: Road and Utility Works) Connectivity:
NH 17
(Sevoke
(West
Bengal) to
Guwahati
Development of Internal Infrastructure works at Multi (Assam
modal Logistic Park at Jogighopa in the State of Assam (Building Credible Engineering credibleengineering@gmail.
2 - Rail 693.97 80.07 05-08-2020 30-09-2020 100.00% 96.42% 94.46% 31-03-2022 16-05-2023 -
in EPC mode (Package -2, Building & Infrastructure Connectivity:
Work) Construction Pvt. Ltd. com
works) Kolkata –
Bongaigaon
and Kolkata –
Guwahati line

Earthwork in Formation, Road Work, Construction of Waterways 6.78 Km


Bridges, Blanketing, P. Way Linking works including Connectivity:
(Railway
Supply of P. Way Fittings and Track Ballast in NW-2 from
Dhubri - Work: sumconinfraventures@gmai
3 - connection with Construction of Railway Siding from 21.84 09-10-2020 01-12-2020 100.00% 45.13% 37.71% 01-04-2022 25-12-2023 Sumcon Infraventures LLP -
Sadiya on Jogighopa l.com
Jogighopa Railway Station to MMLP at Jogighopa from River Rly. station
Ch. 00 to 3760 (Package -3, Railway Siding from Brahmaputra
to IWT)
Jogighopa Railway Station to MMLP) & accessible
to Haldia and
Kolkata,
eastern coast
Development of Inland Water Transport (IWT) Terminal at via Indo-
MMLP Jogighopa, Assam , borne by IWAI in respect of Bangladesh
‘deposit
Phase-IA comprising of Site Development, One Jetty, [email protected]
4 - work’ of 70.92 63.9 06-10-2021 22-04-2022 100.00% 22.23% 8.24% 21-10-2023 21-10-2023 DVP Infra Projects Pvt. Ltd. -
Approach Trestle, Shore Protection Work, Storage [email protected]
IWAI
Areas, Building, Utilities and Others on EPC mode on
NW-2