BoQ for Enhanced T-Shelter (NRC)

The contractor will submit samples for all the materials which to be used in the project in order to aprove it by the engineer in NRC office during the first week after signing
of contract directly and before process of handing over of the site, in case of the contractor installed any unproved materials, he will remove it at his own expense. The work
includes an exhaustive operation and maintenance training for the technical staff in charge of the targted area.

Supply T-Shelter Materials and the price include - buy the materials and transportation due to the quantity of Shelters in sites separate - store - guardians -keep from damage-
Erection T-Shelter wood fram and the price include - Excavation and filling soil work - durbsan works- erection wood fram from wooden pole and wooden plates install it by
nails -erection the roof and walls from wooden plate and install it by nails on wood fram- , the cut of wood must be according to drawing and Supervisor engineer instructions
and execute all necessary to recieve the work ready according to specification, drawing and Supervisor engineer instructions.
Estimated Cost USD
No Description of work Unit Remark
Qu Unit cost Total cost
Structure works .
Wooden Vertical Poles:
Supply and installation wooden poles according the following Specifications:
Dimensions: 7.5 cm x 7.5 cm x 300 cm free of cracks, heavy, good quality Treatment: paint against
the ground ants (Termite) before install it. Quality: high quality which is called commercially "Orooq"
The price shall include Implement foundation 40x40 cm and depth 60 cm for these wooden poles with PCs 10.00 8.00 80.0
20 x 20 cm concrete footing with 30cm depth, backfilled with compacting as well and all the
necessary works to finish the work. Location of belts: in middle and top of sidewalls from both sides
(in/out).and all the necessary works to finish the work in according to the specifications and
instructions of the supervising engineer.
Wooden Horzional Poles:
Supply and installation wooden poles according the following Specifications:
Dimensions: 7.5 cm x 7.5 cm x 300 cm free of cracks, heavy, good quality Treatment: paint against
PCs 4.00 7.00 28.0
the ground ants (Termite) before install it. Quality: high quality which is called commercially
"Orooq". Location of belts: in middle of roof .The price shall include all the necessary works to finish
the work in according to the specifications and instructions of the supervising engineer.
Wooden Plate:
Supply and installation wooden plates according the following Specifications:
Dimensions: 10 cm width x 2.5 cm depth x 300 cm length flate and hard wood cm free of cracks,
PCs 26.00 2.40 62.4
heavy, good quality.
The price shall include all the necessary works to finish the work in according to the specifications
and instructions of the supervising engineer.
Wooden Plywood (Timber):
Supply and installation wooden plates according the following Specifications:
Dimensions: 244 x 122 x 0.6 cm flate and hard wood cm free of cracks, heavy, good quality
M2 42.00 6.40 268.8
Treatment: paint against the ground ants (Termite) before install it. Quality: high quality which is
called commercially "Orooq". The price shall include all the necessary works to finish the work in
according to the specifications and instructions of the supervising engineer.

1/13/2020 Page 1 of 2 Prepared by: Shelter Team


BoQ for Enhanced T-Shelter (NRC)
The contractor will submit samples for all the materials which to be used in the project in order to aprove it by the engineer in NRC office during the first week after signing
of contract directly and before process of handing over of the site, in case of the contractor installed any unproved materials, he will remove it at his own expense. The work
includes an exhaustive operation and maintenance training for the technical staff in charge of the targted area.

Supply T-Shelter Materials and the price include - buy the materials and transportation due to the quantity of Shelters in sites separate - store - guardians -keep from damage-
Erection T-Shelter wood fram and the price include - Excavation and filling soil work - durbsan works- erection wood fram from wooden pole and wooden plates install it by
nails -erection the roof and walls from wooden plate and install it by nails on wood fram- , the cut of wood must be according to drawing and Supervisor engineer instructions
and execute all necessary to recieve the work ready according to specification, drawing and Supervisor engineer instructions.
Estimated Cost USD
No Description of work Unit Remark
Qu Unit cost Total cost
Steel Sheet for the roof:
Supply and installation steel sheet for the roof according the following Specifications: Steel Galvnised
Sheets 0.5mm Thickness, Zinc Coated 1.0 x 2.0 m with good quality. The price shall include all the M2 21.76 4.50 97.9
necessary works to finish the work in according to the specifications and instructions of the
supervising engineer.
Insulation sheet for the roof:
Supply and installation Insulation sheet for the roof according the following Specifications: Insulation
sheet: Tin sided (9mm thick) with good quality. The price shall include all the necessary works to M2 18.00 0.90 16.2
finish the work in according to the specifications and instructions of the supervising engineer.

Wooden door:
Installation wooden door from plywood 12 mm thickness approved type, on frame from wooden poles
5x5 cm and according to the following: Dimensions: 0.9 x 1.9 m with 3 hinges 15 cm , with locks The PCs 1.00 10.00 10.0
price includes all the necessary works to finish the work in according to the specifications and
instructions of the supervising engineer.
Wooden window:
Installation of wooden window from plywood 12 mm thickness approved type, on frame from wooden
poles 5 x 5 cm and according to the following. Dimensions: 60 x 60 cm with 3 hinges10cm ,with PCs 2.00 5.00 10.0
locks. The price includes all the necessary works to finish the work in according to the specifications
and instructions of the supervising engineer.
Coating paint and finishing:
Apply of oringe coating paint to the external plywood including NRC and door logos in the long side
of shelters. the work include filling the holes with speary fileen the price includes all the necessary LS 1.00 50.00 50.0
works to finish the work in according to the specifications and instructions of the supervising engineer.

Total cost 623.3

1/13/2020 Page 2 of 2 Prepared by: Shelter Team