LOAD- TEST
J.4 Carry out pile driving analyser (PDA) test on 250mm diameter
pile complete with all necessary preparation for installing
transducers, setting up the necessary equipment and monitoring
by experience personnel. Nos 20
PILING RECORD
J.5 Allow for submission of piling records including original
copy of piling records to the Engineer. Rate to include
for preparation of 'as built piling layout drawing. L.Sum
AS BUILT DRAWING
TO COLLECTION RM
J - 1/8
OPTION 1
TO COLLECTION RM
J - 2/8
OPTION 1
EXTENSION JOINTS
12.70mm (ove B28rall) Butt weld connection 0.80m girth
between edges of mild steel extension head and base cap plates
including coated heavily with bituminous compound
J.22 Blok Utama no 100
J.23 Blok Penginapan no 210
J.24 Blok Dormitori no 110
J.25 Dewan Makan no 50
J.26 Water Tank no 23
TO COLLECTION RM
J - 3/8
OPTION 1
TO COLLECTION RM
J - 4/8
OPTION 1
CUT-OFF PILES
Cut off 250mm diameter precast concrete spun pile to required
level and roughen the inner surface to detail
J.27 Blok Utama no 316
J.28 Blok Penginapan no 670
J.39 Blok Dormitori no 344
J.30 Dewan Makan no 156
J.31 Water Tank no 23
J.33 Provide and weld 6mm thick mild steel plates to detail
for 250mm diameter piles no 1513