Amir Sohail
Civil Engineer
Islamabad, Pakistan 44000
+923339190066
[email protected]
A Civil Engineer with MSc in Civil Engineering (CEM) having more than 10 years of vast experience in
infrastructure, Multi Stories Building, Small Dam, flyovers, roads, underpasses, drain& Rigid pavements.
Knowledge of construction methods and construction sequences in civil structural constructions below or
above the ground. Organized and dependable candidate successful at managing multiple priorities with
a positive attitude. Willingness to take on added responsibilities to meet team goals.
Skills
AutoCAD 2007,Primavera P6, MS Office (Word, Excel & Power Point)
Microsoft WINDOWS XP, Web Internet.
Personal Skills
Time Devoted, Self-Motivated, Resulted Oriented, Positive Attitude, and Ability to
Manage and communicate with a wide range of people.
Engineering/project management experience
Project bids
Engineering background
Project area set up
Project site supervision
Work History
2020-10 - Current PROJECT ENGINEER PPS-07
FEDERAL GOVT EMPLOYES HOUSING AUTHORITY ISLAMABAD, Kashmir Avenue
Apartment mauve area, Islamabad, Pakistan
The project is about providing housing facilities to the federal government
employees under Naya Pakistan housing schemes initiated by honorable
Prime Minister of Pakistan
Project consists of three towers (Tower A, B & C) and each tower contains 3
basements & G+21 floors
The substructure structure includes foundation piles, Raft foundation and three
basements for parking
Duties & Responsibilities Over all project and contract management and top
supervision on project consultants and contractor over the project
performance.
Worked well in a team setting, providing support and guidance.
Adaptable and proficient in learning new concepts quickly and efficiently.
Skilled at working independently and collaboratively in a team environment.
Paid attention to detail while completing assignments.
Passionate about learning and committed to continual improvement.
Self-motivated, with a strong sense of personal responsibility.
Demonstrated respect, friendliness and willingness to help wherever needed.
Acted as a team leader in group projects, delegating tasks and providing
feedback.
2017-12 - 2020-09 Assistant Resident Engineer
MOTT MCDONALD PAKISTAN
Project BUS RAPID TRANSIT CORRIDOR PROJECT Peshawar, KPK Funded
By Asian development bank (ADB)
Project Summary:
BRT is one of the largest and mega project in Pakistan , Half Millions people will
be facilitated on daily basis , which having 27 Km length , including elevated
structure , under passes and running on grade predominantly
A high capacity drainage system along the corridor is also inclusive .Multi storey
buildings for DEPOTS are also a part of this project
Duties & Responsibilities: Managing and directing the work scope as per the
client requirements and the project specification
Coordination meeting with the client and contractor representatives to
evaluate the progress
Supervising and monitoring the work to maintain the standard and to ensure the
quality as per the client requirement and project specification
Review the shop drawing submittals, and BBS (Bar bending Schedule) against
the approved construction drawings
To check and monitor concrete work, Asphalt work and Earth work as per the
project specification
Daily site visit, progress report and checking the inspection requests for all
activities
Issuing NCR and site memo to ensure and maintain the quality of the project
Supervising and monitoring the whole activities of the project such as sub
structure including (pile work, pile caps) and super structure including (Bridges,
under passes , rigid pavements , mix traffic , drainage and building depot
structure ) as per the approved construction drawings details and specification
of the project
Minutes of meeting with clients and contractor to evaluate the progress and to
resolve the site issues with consultation.
Developed cost estimates and project specifications for proposals.
Obtained special project permits and records of governmental approval.
Evaluated and adjusted construction and engineering processes to maximize
project efficiency, solving technical problems.
Monitored construction progress, updating documents and information.
Wrote reports, kept thorough field notes and logged daily activities.
Conducted material tests and analysis using Type equipment and tools.
Facilitated construction by mapping out utility installations and establishing
reference points, grades and elevations.
Visited project sites during construction to monitor progress and consult with
contractors and on-site engineers.
Adhered to timelines to meet quality assurance targets.
Analyzed waterways to identify engineering problems and recommended
corrective actions.
Performed construction observation and took soil samples.
Identified and resolved potential structural issues.
2016-12 - 2017-12 District Engineer
IMC WORLD WIDE
Project : School construction Rehabilitation Program KPK & PUNJAB
Pakistan funded by DFID
Construction Supervision and Monitoring
Conduct Inspections (26 Minimum per school, based on Milestones and Sub-
Milestones)
Perform MANDATORY site visit for all major concrete pours (foundations,
columns, grade slab, and roof slab/beam) for the entire time of the activity
All Visits to
Active Schools (where construction is underway) to be conducted with
Contractor Site
Engineer
A minimum of 12 Unique School Site visits per week, with accompanying
inspections is a basic requirement
All Inspections to include the following information on MIS as applicable: o The
name(s) of the Contractor Representative, CCSI Members on site for inspection
O Observations, related to the particular inspection
O The recommendations made in the case of failure and the stipulated time for
issues to be addressed (details in MIS and concise version in Site
Register)
O A clearly agreed re-inspection date with the contractor representative
O Accurate Photographs related to the specific details in the inspection
O All required construction forms to be filled and attached e.g
Contract
Variation Orders, Rebar Approval Forms, Material Approval Forms, Source
Approvals, Bar bending schedules, concrete test results, non-compliance
reports etc
O For re-inspections (because of failure of previous inspection or delays),
District Engineer will be required to make a specific entry addressing the
resolution of the issue
O All MAJOR MILESTONE VISITS to require JOINT MEASUREMENTS (with
Wrote, reviewed and edited technical document in accordance with template
requirements.
Captured technical schematics for use in project planning and execution.
Developed work plans for various personnel roles based on strengths and
talents.
Developed positive working relationships with stakeholders to effectively
coordinate work activities.
Developed cost estimates and project specifications for proposals.
Reviewed technical drawings developed by CAD technicians and drafters.
Illustrated potential obstacles when conducting site assessments for planned
projects.
Provided input to team lead regarding areas for process and procedural
improvement.
2015-01 - 2016-07 Junior Engineer
EURO CONSULT PAKISTAN PVT LTD
Project: construction of retaining walls/ Roads in Distt kohat & karak ( Client :
Irrigation dept KPK Pakistan)
Duties & Responsibilities: o Inspecting project sites to monitor progress
O Ensuring design specifications and safety standards on the project site
O Handling direct operations and maintenance activities on project site
O Handling cost-of-materials and on-site project visits documents
O To determine strength and adequacy of concrete of Retaining Walls
Testing soils and materials
O Ensure optimal working of construction personnel
O Dealing all issues related to Site with Contractor
O Managing and maintaining of accurate field notes, and maintaining of flow
of technical information.
Assisted engineers with inspections of finished construction.
Adhered to timelines to meet quality assurance targets.
Studied corrections from senior engineers to learn and grow professionally.
Prepared standard reports and documentation to communicate results to senior
management.
Developed, prepared and reviewed reports and studies to identify and
recommend engineering solutions.
Maintained positive work atmosphere by building relationships with co-workers,
customers, clients, and management.
Evaluated quality control processes and made recommendations for
improvements in quality control.
2012-07 - 2013-11 Site Engineer
NRCC WORKS PVT LTD PESHAWAR
Project: Construction of GANDAO Small Dam(WSS)&Building construction
Mohmand Agency (client Fata Development Authority)
Duties & Responsibilities: o Handling the construction layout
Meeting with consultants and client engineers
Preparation of bar-bending schedules , survey work and further execution as per
drawings
O Coordinating with the suppliers and dealers for the materials
O Checking of the safety of workers and others at the site
O To ensure the quality of the product used in the construction
O Checking that all the technical equipment's are in good working condition
O Checking that all the government policies and rules are being followed
O Maintaining the daily and monthly reports of working
Maintain all the records of the projects.
2012-01 - 2012-06 Site Engineer
GUL CONSTRUCTION COMPANY PVT LTD KOHAT
Education
2017-01 - 2019-04 M.S: Construction Engineering Management
IQRA NATIONAL University - Peshawar
Construction of Admin Block KUST Kohat
2007-01 - 2011-04 B.Sc.: Civil Engineering
CECOS University - Peshawar
2004-01 - 2007-04 F.Sc Pre: Engineering
Fazaia Inter college Kohat
Secondary School Certificate
2002-01 - 2004-04 SSC
KCET public high school Kohat
Affiliations
Registered Engineer (CIVIL/32101), Pakistan Engineering Council, Islamabad.
2: Member of Professional Excellence Group(PEG) , PEG002652,
3 weeks Surveying & Leveling internship program at Abbott Abad conducted by
CECOS University Peshawar
Languages
English
Professional Working
Urdu
Native or Bilingual
Pashto
Native or Bilingual