LOPA Checklist
LOPA Checklist
The scenarios are well defined and all IEs chosen lead to the
consequence, not different (e.g. small LoC vs large LoC)
IEs and IPLs from HAZOP have been considered for suitability to the
LOPA process
All IPLs are Independent of IEs and other IPLs. (e.g. BPCS function to
appear only once in a threat line)
There are no IEs that are without IPLs (eg corrosion, pipe leak,
vehicle impact etc, earthquake) - these are to be excluded.
Comments:
Date:
By:
Position and
Qualifications
Independence: Independent person to that which carried out the hazard, risk assessment
Signed: