Metal furniture and different metal craft artistic, stylists making is one of the most
promising business undertakings in the country today. This is evident in the products that are
currently being produced and imported from other countries.
Metal arts, design and other metal awesome products articles in furniture industry are
becoming more popular. The articles like chairs, sofas, tables, doors and beds are made in
quite attractive models with different designs on their arms and backs. Wooden furniture after
some period is worn out due to defects in wood quality and normal wear and tear. Due to
elegant appearance, durability and innovative designs, Metal furniture is becoming popular in
modern society. They are fast replacing the conventional art craft techniques practice in the
old Passion Method of metal forming in metal-wood-glass-plastic combine furniture
products.
The flourishing metal craft in the country has prompted the Federal TVET institutions
to develop CNC-operated Plasma Cutting Machine equipment that will improve the metal
forming technology (Plasma Cutting with Wrought Iron Mixture) of the industry, its
productivity, and the quality of its products. The machine is widely used in the ornamental
wrought iron industry.
TVET institutions are mainly expected to replicate new and selected technologies and
transfer the same to the relevant industry in order to increase the competitiveness of the sector
according to international standards. It's also needed that these technologies focus on creative
capacity building and greatly contribute to the economic development of the country
especially in manufacturing sector.
The general objective of this project is to design and develop a quality CNC Plasma Cutting
Machine that is easier to use therefore that could produce and supply the demands of the
Mixed-furniture and manufacturing industries. It will also train TVET Teachers and MSE
workers in enhancing their skills in the field of designing and fabrication.
1 CNC Plasma Cutting, it has a diverse range of applications. These including cutting of
various sizes and thickness of metals and drilling a wide range of materials such as
Stainless Low, Medium, High carbon metals and alloy metals that cannot be cut with the
Oxy-Acetylene cutting process.
The proposed CNC Plasma machine is designed to improve the quality in making metal
furniture products and serve its purpose to help in other related manufacturing fabrication,
especially in the field of metal fabrication industries. Its design is simple but slightly a
stronger and stable machine made. The machine is easy to fabricate with use of available
materials in the local market in the country at a low cost price.
The machine is controlled by Mach 3 Interface Board and Mach 3 Operating software. The
machine is automated cutting solutions aimed at increasing the productivity of manufacturing
processes while enhancing product quality. CNC Plasma machine can cut a wide variety of
materials, anywhere from the most soft materials up to a harden types of metals, establishing
itself as a very flexible cutting device. The machine are powered by 3 sets of Nema 34
stepper motors are responsible for running the whole system of the machine. The cutting
device of the machine is the sets of high-frequency plasma inverter 60 models of Telwin
Machineries plasma cutting products. The main power supply was 3 phase which is suitable
for ideal metal working shops. The machine main component was easily assemble and
Note: beware of the deformation of the materials during full welding brace the materials as
secure as possible since it’s a long span tank.
h. Drill the prepared materials on the location given in the detailed drawing using
milling/drilling machine.
i. Face and turn bushing with an outside
diameter of 34.5mm and inside diameter
of 20.5mm with a length of 155mm as
given in the detailed drawing using a lathe
machine.
j. Cut 60mmx60mm square pipe with the
length given on he detailed drawing using
a cut off machine.
k. Drill the material on the desired location
shown in the detailed drawing, weld and
assemble the prepared tapped bushing on
the drilled materials and grind using a
portable grinding machine.
Note: Assemble and weld together the lower and upper rail, spring and bushing.
4. Acme lead arm post. 1 assembly
Tools and materials needed:
6mm plate
25mm round bar
Hydraulic sheering machine
Portable grinding machine
Steel rule
Tape rule
Tri-square
Mig/mag welding machine
a. Prepare and cut 6mm plate with a dimension given in the detailed drawing using a
hydraulic sheering machine/portable grinding machine.
b. Drill with M6 on the location given in the detailed drawing using a drilling machine
/milling machine.
d. Assemble and weld all the sub-part following the detailed drawing.
Note: weld all subpart upon assembly
5. Acme lead arm shaft support: 1 pc
Tools and materials needed:
16mm round bar
M16 die set
Cut off machine
Portable grinding machine
Tape rule
Mig/mag welding machine
M24 nut
a. Cut 16mm round bar with a length of 1195.75 mm a given in the detailed drawing using
a cut off machine.
b. Prepare
bushing
with a 16mmOD
and tap drill with
M12 as shown in
the detailed
drawing using lathe machine
c. Drill the pipe with M16 as show in the detailed drawing using a milling machine/drilling
machine.
c. Perform bearing fitting with the materials using a micro meter with a lathe machine and step
turn the materials following the detailed drawing.
8mm plate
60mm length M12 bolt with bolt
10mm plate
Hydraulic sheering machine
MIG welding machine
Milling machine
Caliper
Steel rule
Center punch
b. Drill the materials on the location given in the detailed drawing using a drilling
machine.
c. Assemble and weld the prepared parts following the detailed drawing using a
MIG/MAG welding machine
d. Prepare and cut 10mm plate with a
dimension given in the detailed drawing
using a hydraulic sheering machine.
e. Drill the materials on the location given in
the detailed drawing using a drilling
machine.
f. Assemble and Weld the prepared material
together with the M12 bolt following the
detailed drawing using MIG/MAG
welding machine.
b. Face, turn, drill and bore (bearing fitting) the prepared materials following the dimension
given in the detailed drawing using a lathe machine.
c. (Inner housing)Tap drill the prepared materials with M6 and drill thru with M6 (outer
housing) using a milling machine with rotary indexing accessories.
6mm plate
Hydraulic sheering machine
Milling/drilling machine
Portable grinding machine
Vernier caliper
Steel rule
a. Prepare, layout and cut 6mm plate following the dimension
as given in the detailed drawing using a Hydraulic sheering
machine.
b. Lay out the material and drill or slot every subpart following
the location given in the detailed drawing using a
milling/drilling machine.
c. Assemble and weld every subpart following the detailed
drawing using a MIG/MAG welding machine. (weld upon
assembly).
13. Middle Cover (1 assembly)
c. Assemble and weld the prepared subpart following the detailed drawing using a
MIG/MAG welding machine.
b. Turn and face with a desired dimension given in the detailed drawing using a lathe
machine.
c. Step-turn the materials into a bearing fitting with a dimension of equivalent to the
bearing required using a late machine.
d. Turn and thread the materials with M12x1.5p with a length of 30 mm as given in
the detailed drawing using a lathe machine.
e. Mill the head of the bolt with the required dimension as given in the detailed
drawing using milling machine with rotary indexing.
16. Roller bushing.
Tools and materials needed:
40mm round bar
Power hacksaw machine
Lathe machine
Caliper
c. Drill and bore the materials with a desire outside diameter of 40mmand with an
inside diameter (bearing fitting) of 32mm considering the plus/minus 0.01 with
micro meter using a lathe machine.
e. Drilling and filing with the toothed gear following the deep and size of the keyway as
given in the detailed drawing using a milling machine.
f. Prepare and cut 2mm sheet metal (belts single/double stopper for 32T and 64T toothed
gear following the dimensions as given in the detailed drawing using a hydraulic sheering
machine.
g. Turn and drill the materials with a desired diameter as given in the detailed drawing using
a lathed machine
h. Assemble and weld the stopper with the 32T and 64T toothed gear as shown in the detailed
drawing using a MIG/MAG welding machine.
24. Stopper Motor Support assembly
Tools and materials needed:
6mm plate
Drilling /milling machine
Round file
Caliper
Portable grinding machine
Paint primer
Paint (orange)
Hardener
All-purpose thinner
Sanding paper
Pallet
Body filler with hardener
Air compressor
Spray gun
PPE
1. Clean the surface of materials for debris before painting.
2. Mixed primer, hardener and all-purpose thinner and apply on the materials using air
compressor and spray gun.
3. Apply body filler as needed and sanding the parts until leveled
4. Apply again with primer for checking and retouch
5. Apply body filler again and sanding until fine and level
6. Then apply again with final primer.
7. Mixed enough lacquer colored paint and add hardener and all-purpose thinner.
8. Spray on the surface of the materials observing the distance of the materials from the
spray gun.
9. After applying, check if there are discrepancies of the output, if there are, repair with
sanding with water and spray again until 2 or 3 times coating.
10. Apply on the frame and other parts following the same process above.
11. After finishing the paint, assemble all the parts with caution.
2. Procedures
a. Find an appropriate place in the front cover of the control panel for the placement of the
control switches of plasma cutting machine & main power of the power transformer.
b. Then, using the drilling machine or portable drill make a hole where the switches are
installing. Carefully tight the locks of the switches to avoid lose connection.
c. Using the angle grinder cut the portion of the control panel where the outlets of the 3-phase
source were installing. This power source is intended for the supply of plasma cutting machine.
d. Find an appropriate place for the installation of the 3-phase main power switch. The
installation is place outside the control panel, particularly outside of the control panel which is
accessible and cannot disturb the movement of the machine.
1. Circuit breakers
2. Magnetic contactors
3. MACH-3 module
4. Power transformer (220v primary, 24v secondary, 10A)
5. Digital stepper drive (2.4-7.2A 20-80 VDC for Nema 34 stepper)
6. Terminal blocks
7. Fun
Note:
1 If the coil of the magnetic contactor is 380v, use line 1 & line 2, or line 3 for A1 & A2 of the
contactor.
2 If the coil of the magnetic contactor is 220v, use the neutral line and either of the line 1, line 2, or
line 3.
3 Same power & control circuit is use in the power transformer, but if using the 380v source select
only two lines for the supply. But if using 220v source just select either of the three lines and the
neutral wire.
• Schematic Diagram for Limit Switches, Snubber Circuit, MACH-3 Microcontroller, Digital Stepper
Drive, & Stepper Motor
4. Materials
ITEM Rem To be
QTY. UNIT NAME AND DESCRIPTIONS
NO. arks purchase
1 5 Unit Lathe Machine with complete accessories Ok
2 2 Unit Vertical Milling Machine with complete accessories Ok
3 2 Unit Horizontal Milling Machine with complete accessories Ok
4 2 Unit Power Hacksaw Machine Ok
5 2 Unit Welding Machine with complete accessories Ok
6 2 Unit Upright Drilling Machine with complete accessories Ok
7 2 Unit Portable Grinder with complete grinding disc Ok
8 2 Unit Air Compressor for painting Ok
9 1 Unit Bending Machine / Roller Machine Ok
Slotting Machine / Shaping Machine with complete tools and
10 1 Unit Ok
accessories
11 1 Unit Cut-off Machine Ok
12 1 Unit Pedestal Grinder Ok
13 1 unit Radial drill machine Ok
14 2 unit Floor type drill press machine Ok
15 1 Unit Surface grinder machine Ok
The note
To be
Acetylene / oxygen Welding with complete tools and accessories purchase
16 2 tank
Note: oxygen and acetylene gas are empty. empty
tank for
refill
Just refer to the