Risk Assessment For Protection of Existing Underground Utilities
Uploaded by
salman ahmed
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Risk Assessment for Protection of Existing Undergr... For Later
Share
100%
100% found this document useful, undefined
0%
, undefined
Print
Embed
Report
100%
(1)
100% found this document useful (1 vote)
453 views
9 pages
Risk Assessment For Protection of Existing Underground Utilities
Uploaded by
salman ahmed
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Risk Assessment for Protection of Existing Undergr... For Later
Share
100%
100% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Risk Assessment for Protection of Existing Undergr... For Later
You are on page 1
/ 9
Search
Fullscreen
ce onan, / Evaluation Hazard Identification, Risk Assessment and Determir ing Control SS STS a EE ett nai ot cee tos —— = E= a sous | osiotas sememeraTa fea Risk and Identified | ces | nas | xsemttcte® | 2486 | Yecesaary contol Measures | HRAnE | Acton might be harm ——-- sor ore emnestowe |r |e? aes se een eee eee Pee eerreteens the site plan. Maintain ati site Access tothe enlsting underground wl be through astoel nat acer intermediate landing shall be placed at max 6m interval‘Anprapite PPE tobe us by all operatives Manual Handling | Musculoskeletal | Body pain {or thar protection ste dieorcers Enenaer/ Workers associated at De mot attempt to ft any load that seems foreman manual ing heavy. HSE afer 3/2) © | Use comct manushansingtchnisue Share or plitload with other operatives Use correct gloves to protect fom shara edge Ensure agreed working areas bavicaded General Protection | sitehazerdeto | Physi injures ith caneate blocks andl secured site publi fram plant, Engineer / Ssuipment, | Pedestrian parsing Perimeter signing, “Construction st dr foreman Hobeanees, | threugh the werk te keep ut’ tobe eepayed on perimeter. IWS oer raterinsand ste Erect Safe arival lave company display sign at entrance, Visors to report tothe ate ofce and sgn sal aa. [wstersregster Lockable gates, huts/containerseacured and locked amove and sacure addr from exiting underground utities/exeavation, shale te aur all workers are stable, secure raters stoked pled and Ways the snd ofeach oniAlltals ta be maintained in god ste Use of Hand Tools | cuts and General site condition abrasions fying. | Workers, Enenaer/ objects ‘Tools to only bo used forth task intended foreman Inline with any manufactures instructions HSE afer Alltool tobe inspected bythe user prior a || a2 [aAlltoolsto be approprstely stored to avoid damage All damaged tools tbe removed from use tinmediately| Appropriate PPE tobe supplied and worn asidenifed Prevent use of tols by unauthorized persons Biporureto | Person operating the “Tools with biltin vibration dampener Hand arm ceupational | Hand Tool/Machine protection tobe used where available ste vibration injures to blood. | and Genoral Workers Engineer / vestels. nerves Gloves to be worn when using tools that foreman and joints generate vibration or impact THE officer Vibration training/tolbox mesting tobe completed for all operatives, ‘Any existing conditions or new symptoms talbe referred to occupational health advisorMore work ie restictd to shor Noise Exposure tohigh | General workers duration ste levels leadingt | and visitors Enenaer/ cecupational Use slfdampening tools where available foreman hearinglose HSE afer Appropriate PPE ta be supplied and worn alal ie |asiencied Noise monitoring tobe cari out for tasks and equipment that all outside the scope of short duration Hearing protection to be worn forall ‘equlpment that exceeds levels af 5a Ensure to inspect the chain Block ard the Ltingusing chain | Oroploas, sing | Pye iniony fling tbe ured for the protaction of any site block and falurefooken iting water pipes Engneer/ instalation of - Operatives workings foreman beam the bottom Ensure installation plan must be In brite to /HSE officer sllinvolved before any iataltion kes pace Ling equipment (Cain block tobe | 3| 12 | carted by 3" partyazeney and visually hacked bythe activtysupenizor before No parson ic lone to work under a suspended load (water ip ine] ina long pevod of time without a watener cod commanication betiaen the instore and helpers tobe in plRiskand dented of ee sm] Process Hazard | person who mightbe | — RikRating controls introduced to reduce se isk ating hee placed on Tarde Permit work npaze[Confne Spare) 8 | Workingin a stmorpheres | Fatality i confined space | Oxygen evel (Min Ensure all operatives workngina confined Enginosr/ Max) Workare working on space had undargone Specs Training in foreman confine space working na confined space and ceed IsSE was swith 3 Pay oticar Carton monoxise | Burns due totate and ‘The stmosghar (Ai Level nd 425 shall be fumes rom plant | Workers working on testad and montor before the workers enter sndangines | te confne space the manhole pt and tunel -Anemergancy rescue plan should be in place Fire srenploion before work begin ue ne excavation Loss of consciousness owing to nereases Allworkers entering tothe canine space body temperature rust be timed by 3° party (heat stress) aja] a fa Dehydration ‘No workers sal alow entering the tunnal if there sa hazardous atmosphere detected, Progressive instalation of forced ar entiation system installed inthe tunel Unt afe to work Smoking o use of motile phone is forbidden Inaconfine space Drink water before working inthe tunel ‘and keep hydrated during the working activity Follow the Metnod statement procedure and rest if necenaDo not goto the tunnel #medicaly nf. ‘Gai Wain and crmpatent tunneling Working witheable | Electrocution | Sura injries lectin iallowed to connect or ste { distibution boxes disconect the TBM or generator Enginosr/ Workare working on foreman the electric cables and ‘Any damages found tthe poner IWSE tonnection ‘eable/plugs or eactrel sence: apart oticer Immediately othe foreman ° 8 | Distribution boxes from control cabin must be locked sl tine t provent Uinauthorzed access “Tuna iver shal be msintinal dry ane power cables installed at ais evel Allprotective circuitry tobe maintained operations! aa ‘Sopanisor te ensure proper prewar Protecion tthe | Weterwith | ai workers working behing site Enieting Pipeline | 224688 | or tne protection Engineer / roves Ensute good working lator and if foreman Feeding working at heghtasove 2.0, eaaty Ise harness must be use fear 10 2 Supenisorto ensure the instalation of beam ie secured Ensure te deploy tained erkers forthe eb‘Supanisorto ensure prope ventilation on theres Ensure operatives working with electrical tos are competent and with experience Fallin enistng Ensure Se will secured with conerste Unauthorised | underground, | Body fracture beers ste “score Coliapres of Enginesr/ the | Puble/ stake holder -Appsint person to moniter all movement foreman underground tthe ope the underground utility a ‘ties afs af Safety poste must be posted on the site boundary to auarethe public nat work ison progress and ne authorised Personnel ill ener inthe work ar “Ration iskand identified of | Risk Rating FskRatng | eet sm] Process Harard__| person who might be Control introduced to reduce rs warm F | Rating | Rating ‘Noswalable | Skin alergy, ath ‘All mnast now whose contact person She Emergency notice boards | enue ‘response tam at the Project Sts, Engieer/ procedure posted atthe foreman sites Labour, Pipe fier, Designated emergency instruction Psst officer mason notice boards must be informed & Lackot caeeaded tal tna TET / Internal 7 responsible 4) 32 | praining i alae person in carol Stand-by emersency vehicle must be emergency prepare & sable daring the course situation ofworks.‘Missing emergency vehicle Unavallabilty of First Alder ‘Responsible Tn-Charge must explain the location of acess emergency. routes and locations of fre point’s box CConsidar al areas onsite ae well luminated lighted [stalished Contact for key pesomelr ersecy ‘Ensure ALL aware & understood the Emergoncy Procedure & Plan during exeavation works. Ensuring the First Aid kts bois salable tall tie, Standby Corte First Ader (iF works commencing a thenight shift operation).Sevasty ($) Frequncy F) T Minor T improbable [> Major Sinelelajury | 2 Poestble 3 Major Multiple njusies | 3 Occasional Single Dash 4 Frequent "More Than 5 is unacceptable reassess tank and preventive [5 Multiple Desk 3 Regular actions ‘T= Os deemed to be the it of practicability
You might also like
Risk Assessment Concrete Repair Works
PDF
No ratings yet
Risk Assessment Concrete Repair Works
9 pages
Curbstone and Interlock
PDF
100% (2)
Curbstone and Interlock
3 pages
Block Wall - Risk Assessment
PDF
100% (3)
Block Wall - Risk Assessment
19 pages
Drainage Sewerage Piping Work Risk Assessments
PDF
100% (1)
Drainage Sewerage Piping Work Risk Assessments
4 pages
Risk Assessment CG 4750 Installation of Lighting Protection Pole Street Lighting Pole and Light Fittings
PDF
100% (2)
Risk Assessment CG 4750 Installation of Lighting Protection Pole Street Lighting Pole and Light Fittings
5 pages
Risk Assessment For Concrete Crack Repair
PDF
100% (2)
Risk Assessment For Concrete Crack Repair
4 pages
Excavation Risk Assessment
PDF
100% (2)
Excavation Risk Assessment
4 pages
Excavation Work RISK ASSESSMENT
PDF
100% (1)
Excavation Work RISK ASSESSMENT
8 pages
Mewp Risk Assessment
PDF
No ratings yet
Mewp Risk Assessment
3 pages
0024-00-Risk Assessment For Metal Guard Rail Works
PDF
No ratings yet
0024-00-Risk Assessment For Metal Guard Rail Works
5 pages
Risk Assessment For Flushing, Hydrostatic Test & Dewatering of Piping
PDF
No ratings yet
Risk Assessment For Flushing, Hydrostatic Test & Dewatering of Piping
16 pages
Risk Assessment For Demolition of Slab - Book Store-HCNS
PDF
100% (1)
Risk Assessment For Demolition of Slab - Book Store-HCNS
4 pages
Risk Assessment Carbon Steel Pipes Installation (Grooved & Threaded)
PDF
No ratings yet
Risk Assessment Carbon Steel Pipes Installation (Grooved & Threaded)
6 pages
MST For Earthworks
PDF
No ratings yet
MST For Earthworks
22 pages
HSE Risk Assesment - Excavation and Backfilling
PDF
100% (2)
HSE Risk Assesment - Excavation and Backfilling
5 pages
Risk Assessment/Management Form: Risk Assessment-Erection of Roof Girder and Beam
PDF
100% (2)
Risk Assessment/Management Form: Risk Assessment-Erection of Roof Girder and Beam
3 pages
Risk Assesment (Service Staircase)
PDF
No ratings yet
Risk Assesment (Service Staircase)
2 pages
5 - Risk Assessment - Finishing Works
PDF
100% (1)
5 - Risk Assessment - Finishing Works
10 pages
Jsa For Shoring
PDF
No ratings yet
Jsa For Shoring
2 pages
Scaffolding Risk Assessment: Rev SECL Job No
PDF
100% (1)
Scaffolding Risk Assessment: Rev SECL Job No
5 pages
RA For Laying of RC Pipeline For Storm Water
PDF
100% (1)
RA For Laying of RC Pipeline For Storm Water
13 pages
Hira of RCC Work
PDF
100% (1)
Hira of RCC Work
2 pages
Risk Assessment - Trenching and Excavation - 2023
PDF
No ratings yet
Risk Assessment - Trenching and Excavation - 2023
9 pages
Risk Assessment For Above Ground Drainage System
PDF
No ratings yet
Risk Assessment For Above Ground Drainage System
2 pages
Risk Assessment For Civil Works - Evaporation Ponds & Manifold Areas
PDF
No ratings yet
Risk Assessment For Civil Works - Evaporation Ponds & Manifold Areas
9 pages
Risk Assessment For Testing and Commissioning For Mechanica BMS Systems and Plumbing
PDF
No ratings yet
Risk Assessment For Testing and Commissioning For Mechanica BMS Systems and Plumbing
6 pages
HSE Plan Electricl
PDF
No ratings yet
HSE Plan Electricl
66 pages
MSRA - Demolition
PDF
No ratings yet
MSRA - Demolition
30 pages
Job Safety Analysis (JSA) For Core Cutting
PDF
No ratings yet
Job Safety Analysis (JSA) For Core Cutting
2 pages
Carpentry Works and Form Works
PDF
100% (1)
Carpentry Works and Form Works
7 pages
Installation Steel Structure
PDF
No ratings yet
Installation Steel Structure
11 pages
Risk Assessment Erection of Precast Concrete Elements
PDF
100% (2)
Risk Assessment Erection of Precast Concrete Elements
2 pages
Risk Assessments For Formwork
PDF
No ratings yet
Risk Assessments For Formwork
1 page
GIS-RA-4061E-004 Risk Assessment For Road Crossing Area (Rev.00)
PDF
100% (1)
GIS-RA-4061E-004 Risk Assessment For Road Crossing Area (Rev.00)
6 pages
Jha Excavation-Earthwork
PDF
No ratings yet
Jha Excavation-Earthwork
11 pages
Anchor Bolt Setting - Rev 01
PDF
No ratings yet
Anchor Bolt Setting - Rev 01
26 pages
Ra Concrete Chipping 7514
PDF
No ratings yet
Ra Concrete Chipping 7514
5 pages
ACP Panel Fixing
PDF
No ratings yet
ACP Panel Fixing
5 pages
Hira RCC Cement Mill
PDF
100% (1)
Hira RCC Cement Mill
2 pages
Method Statement For Suspended Ceiling Installation
PDF
No ratings yet
Method Statement For Suspended Ceiling Installation
2 pages
IM-08-B HSE Wall Grinding For Finishing Work
PDF
No ratings yet
IM-08-B HSE Wall Grinding For Finishing Work
2 pages
Risk Assess T-27 - Housekeeping
PDF
No ratings yet
Risk Assess T-27 - Housekeeping
1 page
HEMP-005 Excavation Manual & Mechanical Rev.2
PDF
No ratings yet
HEMP-005 Excavation Manual & Mechanical Rev.2
9 pages
Risk Assessment of Flag Poles
PDF
No ratings yet
Risk Assessment of Flag Poles
5 pages
Risk Assessment and Method Statement
PDF
No ratings yet
Risk Assessment and Method Statement
18 pages
Risk Assessment of Backfilling
PDF
100% (1)
Risk Assessment of Backfilling
2 pages
Risk Assessment For Installation of Sleeves Puddle Flanges
PDF
No ratings yet
Risk Assessment For Installation of Sleeves Puddle Flanges
5 pages
Brazing Risk
PDF
100% (1)
Brazing Risk
2 pages
Carpentry Works 20.09.2020
PDF
No ratings yet
Carpentry Works 20.09.2020
11 pages
Risk Assessment RV 01-U
PDF
No ratings yet
Risk Assessment RV 01-U
26 pages
Risk Assessment Foundation Work
PDF
No ratings yet
Risk Assessment Foundation Work
2 pages
Aluminum Cladding InstallationR - Risk.assessment - Word
PDF
100% (2)
Aluminum Cladding InstallationR - Risk.assessment - Word
4 pages
Cutting Work
PDF
No ratings yet
Cutting Work
1 page
Installation & Testing of Underground Drainage Piping
PDF
No ratings yet
Installation & Testing of Underground Drainage Piping
7 pages
Block Work MS (Sample)
PDF
100% (2)
Block Work MS (Sample)
18 pages
Method Statement Concrete Works 2019
PDF
100% (2)
Method Statement Concrete Works 2019
8 pages
Children & Young People's Services RISK ASSESSMENT
PDF
No ratings yet
Children & Young People's Services RISK ASSESSMENT
2 pages
F03 Vendor Quarterly Compliance Inspection
PDF
No ratings yet
F03 Vendor Quarterly Compliance Inspection
2 pages
AR08-16 Laying HDPE Pipes Risk Assessment
PDF
No ratings yet
AR08-16 Laying HDPE Pipes Risk Assessment
5 pages
Risk Assess Plastering 2006 Tcm17 26368
PDF
100% (3)
Risk Assess Plastering 2006 Tcm17 26368
2 pages
OHS Policy Statement: Occupational Health and Safety
PDF
100% (1)
OHS Policy Statement: Occupational Health and Safety
1 page
F05 Ohs Non-Conformance Issue Form
PDF
100% (1)
F05 Ohs Non-Conformance Issue Form
1 page
10-F01 MACHINERY, TOOLS AND EQUIPMENT SAFETY REGISTER and INSPECTION MATRIX
PDF
No ratings yet
10-F01 MACHINERY, TOOLS AND EQUIPMENT SAFETY REGISTER and INSPECTION MATRIX
2 pages
Plant and Facility Safety Ohs-Pr-02-09-F01 Register & Inspection Matrix
PDF
No ratings yet
Plant and Facility Safety Ohs-Pr-02-09-F01 Register & Inspection Matrix
3 pages
Plant and Facility Safety Ohs-Pr-02-09-F04 Porta-Cabin Inspection
PDF
No ratings yet
Plant and Facility Safety Ohs-Pr-02-09-F04 Porta-Cabin Inspection
1 page