Quality and Standards As per drug control specification
Production Capacity: Qty. Qty. a) 60 lakh Pieces of 2-5 ml
b) 12 lakh Pieces of 20-50 ml
Value a) 1.35 Crore
b) 0.84 Crore
Total-2.19 Crores
Uploaded on February 2020
Introduction
Disposable Syringes are being used by doctors to inject medicines through intravenous or intramuscular ways for
the treatment of diseases & also by research & development personnel. Disposable syringes are made of plastic
material and are used in the field of medical and veterinary science. Due to their availability in sterilized condition,
ready to use, and cost effectiveness, disposable syringes are fast replacing the age-old glass syringes.
Moreover, the horror of AIDS worldwide has almost dispensed with the reuse of syringes and the demand of
disposable syringes has increased phenomenally. Disposable syringes are mostly injection moulded from
polypropylene. Syringes are available in sizes of 1 ml, 2 ml, 5 ml and 10 ml, 50ml in a variety of designs and
consist of either two or three components construction. The number and size of injection moulding machines
required depend upon syringe construction, number of mould cavities, annual production.
Market
Disposable syringe has a wide market potential. The age-old glass syringes are very fast becoming obsolete. In
the Eastern region of the country there is no unit manufacturing this product. Some of the units manufacturing
this product are in other parts of the country.
(1) Steryware, Faridabad
(2) Cadilac
(3) Dispovan, Faridabad
(4) Cadilac hospital product, Ahmedabad
(5) Surgiplus, Ahmedabad
(6) Transplastic, Pondicherry
(7) Albert David, M.P.
(8) Manoj Surgical, Indore .
Some of these units are 100% export-oriented units. Disposable syringes are very common product being used
by hospitals. Govt is also a very big buyer of syringes. In view of the fast expanding market, the prospects of
disposable syringe are very bright.
Basis and Presumption
1. The scheme is based on single shift (8 hours) basis and 300 working days per annum.
2. The estimates are drawn for a production capacity generally indicated techno economically viable for model
type of activity.
3. Cost in respect of land and building, machinery and equipments, raw-materials and the selling prices of the
finished products etc. are those generally obtained at the time of preparation of the project profile and may vary
depending on various factors.
4. The time period for achieving full/envisaged capacity utilization is three years.
5. The interest rates considered are those which are presently charged by state financial institutions.
6. The labour wages are considered as per the prevailing rates. They may vary from place to place.
7. The margin money is 25% for fixed capital and working capital. The pay back period for the project is 3 years.
Implementation Schedule
Project implementation will take a period of 8 months from the date of approval of the scheme. Break-up of
activities will relative time for each activity is shown below:
Nature of Activities Estimated Period
1. Market Survey & Preparation of project report One Month
2. Enterprise registration from DIC Two weeks
3. Sanction of loan from bank or state financial institution One Month
4. Approval from drug controller & Clearance from Pollution Control Board Two Weeks
5. Placement for order for delivery of Plant & machinery One Month
6. Installation of plant & machinery Two Month
7. Power connection One Month
8. Trial run Two weeks
9. Commencement of production Eight Month onwards
Technical Aspects
Process of Manufacture:
Production of disposable syringe requires special injection moulding machines and special moulds. M/s DGP
Windsor has introduced ferromatic injection moulding machine for this purpose. Raw material required is
polypropylene. It is fed into the injection moulding machine and moulded in chilled condition to get better clarity.
The moulded syringes is then assembled with the needle in automatic assembly machine. The whole assembly is
then sterilized in sterilization plant using ethylene oxide. The completed syringe is then blister packed in
automatic packing machine.
Quality Control
The product should conform to drug control specification and drug license should be obtained for production of
this item.
Production Capacity (per month)
2 ml -5 ml size- 60 lakh Pcs
20-50 ml size - 12 laks Pcs
Pollution Control
No special pollution control measures are needed for manufacture of this item.
Energy Conservation
Proper maintenance of the power operated machines and judicial use of them will conserve energy.
Financial Aspects
A. Fixed Capital Investment
(i) Land & Building Area Sq. mtrs. (Rs)Per Month
Land 600 Rented 20,000
Built up area 400
ii) Machinery & Equipments
Description Qty. (Nos) Rate (in Rs.lakh) Value (in Rs. Lakh)
A) Production Unit
1. Zigma Injection Moulding Machine cap. 80 Ton 2 18 36.0
2. Injection moulding machine cap. 120 Ton 1 24 24.0
3. Sterilization Plant (Ethylene Oxide) 1 6 6.0
4. Bilster Packing Machine 1 9 9.0
5. Packing Machine 2 7 14.0
6. Scrap Grinding Machine 1 1.5 1.5
7. Air Compressor 1 1.5 1.5
8. Water Pump 1 0.2 0.2
9. Chilling Plant 1 2.0 2.0
10. Moulds of 2 ml, 5 ml, 10 ml, & 50 ml including Barrel & Plunger - Varies per sizes as 20.0
Erection and Electrification @ 10% 11.4
Total Rs 125.6
Furniture & Fixture 80,000
Pollution Control & lab. Equipments 80,000
Pre-operative expenses 25000
Total Fixed capital investment Rs 127.45
Working Capital (Per Month)
Raw Material
S.No. Name of the Raw Material Qty. Rate per kg/pc Value (Rs. Lakh
1. Polypropylene 4.5 tons 90/- 4.05
2. Rubber Gaskets 6 lakh 0.50 3.0
3. Needle 6 lakh 0.50 3.0
4. Packing Material lumsum 0.50
5. Printing ink lumsum 0.20
Total 10.75
Staff and Labour
Designation Nos. Salary (Rs.) Total (Rs.)
Manager 1 8,000/- 8000/-
Mfg. Chemist 1 7000 7000/-
Analytical Chemist 1 7000 7000/-
Skilled Workers 4 5000 20000/-
Semi-skilled workers 3 4500 13500/-
Accountant 1 5000 5000/-
Sales Manager 1 5000 5000/-
Peon cum Chowkidar 1 3000 3000/-
68500/-
Perquisites @ 15% of Salaries 10250/-
Total 78750/-
or say 79000/-
Other Expenses
Activity Amount (Rs)
Electricity 10000
Water 1000
Telephone 1000
Transportation 6000
Rent 20000
Maintenance and Repairing 1000
Advertisement & Publicity 1000
Insurance 2000
Misc. Exp. 1000
43000
Total Working Capital P.M
= 10,75,000 +79000+43000
= 11.97 Lakh
Working capital for 3 months
= 11.97 x 3
= 35.91
Total Capital Investment
= Rs. 127.45 lakh + 35.91 lakh
= 1.63 crore
Cost of Production (PM)
Description Amount (Rs Cr)
1. Recurring expenditure 1.44
2. Depreciation on plant & machinery @ 10% 0.13
3. Depreciation on furniture @ 20% 0.02
4. Interest on T.C.I @ 13% 0.21
Total 1.78
Turnover by sale of 60 lakh pcs of 2 ml to 5 ml on average Sale price 2.25/- per piece 1.35 crore
12 lacs pcs. of 20-50 ml @ 7/- per piece 0.84 crore
Total 2.19 crore
Net Profit = 219 Lakh – 178 Lakhs
= 41 Lakh
41x100
Percentage profit on sale -----------------
219
=17.52 %
41x100
Percentrage profit on TCI -----------------
163
=25.15%
Fixed Cost
40% of Staff and Labour = 3.79 Lakh
40% 0f Other expenses = 2.06 Lakh
Total Depreciation = 13.0 Lakh
Intrest on Total Capital Investment = 21.0 Lakh
Rs. 39.85 Lakh
39.85x100
Break Even Point -----------------
39.85+41.00
=48%
Addresses of Machinery and Equipment Suppliers:
1. M/s D.G.P. Windsor India Ltd.,
E-6, U2 Road, Wogle Industrial Estate Thane
Mumbai-400604.
2. M/s Sunanda Industrial Machinery A Division of Mafatlal Marg Industries Ltd.,
109, Standard House,
83, Maharishi Karup Road,
Mumbai-400002.
3. M/s Indian Hydraulic Ind. Pvt. Ltd.,
70 Shivaji Marg,
Industrial Area,
New Delhi-110015.
4. M/s Ferromatik Milacron India Ltd.,
Plot No. 92, Phase-
I, GIDC Vatva, Ahmedabad-382445
Addresses of Raw Material Suppliers:
1. M/s Indian Petrochemicals Corporation Ltd.,
P.O. Petrochemicals Township,
Vadodara-391346
2. M/s Reliance Industries Ltd.,
Swastik Mill Compound, V.N. Purav Marg,
Chembur, Mumbai-400071.
3. Gas Authority of India Ltd.,
16 Bhikaji Cama Palace,
R.K. Puram, New Delhi-110066