MMP-CKL-0007 PID Check List
MMP-CKL-0007 PID Check List
2.00 OPERABILITY
2.10 Normal Operation
2.20 Turndown Operation
2.30 Control Loops
2.40 PCS / PSD Interfaces
2.50 Manual / Auto & Local / Control Room Operation
2.60 Motor Control & Indication Requirements
2.70 Isolation for Operability
3.00 SAFETY
3.10 Relief Valve Location / Set Pressure / Size & Sizing Case
3.20 Relief Valve Inlet / Outlet Line Sizes & Valve Interlocks
3.30 ESDV Location / Failure Mode / Test Facilities for Riser Valves
3.40 Blowdown Facilities : Location / Inlet/Outlet Line Sizes
3.50 Low Temperature Considerations / Thermal Sleeves
3.60 Process Trips : Location / Requirement
3.70 LO / LC Requirements for isolation Valves
3.80 Hazop Comments
3.90 Hydrate Inhibition Requirements
3.91 Insulation Requirements (PP, Winterisation, Acoustic)
3.92 Layout Requirements (Elevations, Line Slopes etc.)
3.93 Liquid Containment / Bunding Requirements
3.94 Syphoning / Vacuum Break Requirments
3.95 Filters & Strainers
3.96 Certification Comments
6.00 PUMPS
6.10 Type of pump properly represented?
Page 1 of 5
Sr. No. Check Points Checked Comments
Type of driving equipment is shown? (electric motor, air operated, steam
6.20
turbine)
6.30 Requirement of VFD identified, if needed?
6.40 Seal flush arrangement, API cooling plan, casing vent and drain identified?
Are minimum flow by-pass requirements identified (restriction orifice or
6.50
flow control valve?)
6.60 For metering pumps, are pulsation dampeners shown?
7.00 COMPRESSORS
7.10 Type of compressor shown correctly?
7.20 Special suction piping arrangement, if any, shown?
7.30 Type of driving equipment shown?
7.40 Check valve requirement marked?
7.50 Knock out drums provided upstream of process compressors?
7.60 Utility connections shown to compressors, as required?
Page 2 of 5
Sr. No. Check Points Checked Comments
9.00 INSTRUMENTATION
9.10 Control Valve Sizes / Handwheels / Bypass etc.
9.20 Control Valves / On-off valves failure position shown?
9.30 Level Bridles
9.40 Alarm & Trip Set Points
9.50 Instrument Tag Numbers
9.60 Type of instruments selected properly (e.g. flow instruments)?
9.70 Flow meters upstream / downstream requirements shown?
All instrumentation tapping arrangements shown as per instrumentation
9.80
Line Tap assembly (LTA)?
Requirement of handwheel and valve open / close position interlock /
9.90
indication in control room are marked?
For air cooled heat exchangers, control of motors (VFD, Auto variable
9.10
pitch) or bypass control, etc shown?
10.00 METALLURGY
10.10 Corrosion / Erosion
10.20 Corrosion Inhibition
10.30 Chloride Stress Cracking (304 SS / 316 SS)
10.40 Low Temperatures
12.00 CONSISTENCY
12.10 Process Data Sheets ( Nozzle Schedule Etc.)
12.20 Piping Specifications
12.30 Philosophies
12.40 Clients Specifications
12.50 Holds List
12.60 Symbology (Legend Sheet Accuracy)
12.70 Termination Point (TP's) for Vendor Drwings
12.80 Checked Process Calculations ( Line Sizing / Cv's / PSV's )
12.90 Equipment Details ( Vessel internal etc)
12.91 Equipments drains / vents shown.
12.92 Vendor Information incorporation
12.93 Packages Items representation as box?
Note: 1. This checklist is prepared for IFR (issued for review) revisions
For IFH (issued for hazop) revision, additional are - Are client comments
incorporated?
For IFD (Issued for Design) revision, additional - Are hazop comments
incorporated?
Page 3 of 5
This checklist is an attachment to "The Handbook of Chemical Process Engineering"
Name Date
Checker
Approver
Process Engineering"
Checklist Number:
MMP-CKL-0007
Comments
Signature