0% found this document useful (0 votes)
288 views9 pages

Material Engineer jOB ROLES

The document provides a summary of Okorie Primus' qualifications and experience as a Materials Engineer. He has over 10 years of experience in engineering, procurement, construction, and installation projects involving materials like carbon steel piping. His most recent role was as a Materials Engineer for a metro rail project in Qatar, where his responsibilities included developing and testing materials, providing technical advice, and overseeing quality control processes. He has a university degree in materials engineering and various industry certifications.

Uploaded by

Bleep News
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
288 views9 pages

Material Engineer jOB ROLES

The document provides a summary of Okorie Primus' qualifications and experience as a Materials Engineer. He has over 10 years of experience in engineering, procurement, construction, and installation projects involving materials like carbon steel piping. His most recent role was as a Materials Engineer for a metro rail project in Qatar, where his responsibilities included developing and testing materials, providing technical advice, and overseeing quality control processes. He has a university degree in materials engineering and various industry certifications.

Uploaded by

Bleep News
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

OKORIE PRIMUS.C.

Construction/Oil&Energy,Civil Building,High Rise Building,pipe Laying Projects


Email: [email protected]
Mob: +97466417105
Materials ENGINEER

OBJECTIVE_______________________________________________________
Seeking a , Materials Engineer role requiring skills such as NDT, Welding, Coating/Painting, QC
Inspections, Quality Assurance, Quality Auditing, Fitness For Service, Material Selection &
Design and Cathodic Protection in order to drive the required levels of safety, regulatory
compliance and integrity or lifecycle performance of facilities as well as improve asset
management and optimize operational budgets.

CAREER SUMMARY_________________
Materials Engineer/Inspector with a university (B.Eng.) Degree in Metallurgical & Materials
Engineering, IRCA Lead Auditor (ISO 9001:2008) , NACE I.C.I and NEBOSH IGC,CMQ(ASQ)
certifications and six years of experience .

I have been employed continuously in EPCI, Oil & Gas projects for more than ten years with
both contractors and clients in positions from Technician to Welding Inspector, QA/QC
Inspector and QA/QC Engineer, Materials Engineer in various inspection, testing, supervision
and Quality Management roles either through secondment or direct employment in the
Nigerian Niger-Delta regions and Qatar.

The works mainly mechanical, covering Oil and Gas/LNG piping, Coating/painting inspection,
NDT and welding and fabrication inspection of pipelines, pressure vessels, Above Ground
Storage tanks, platforms, pig Launchers and Receivers, Manifold Skids, Offshore jackets and
structural works.

WORK EXPERIENCES
10 years’ experience in Engineering, Procurement, Construction and Installation projects
involving Carbon steel piping, Construction of tanks, vessels and structural steel fabrications
Materials Engineer(MEP)
INELT Trading & Contracting CO WLL (Jan 2017 – Till Date)
Project: Metro Phase 1 System, Rolling Stock And Track Work
Client: Qatar Rail Company
Project Location: Musheireb
Consultant: ZITRON
Roles Synopsis

● Developing, modifying, testing and evaluating materialsproviding technical advice about


the suitability of materials
● Diagnosing faultsadvising on, planning and organising inspections, maintenance and
repairsoverseeing operational quality control processes
● Liaising with suppliers, customers and manufacturing/development staffsupervising
engineering and technical staff.
● select the best combination of materials for specific purposes
● test materials to assess how resistant they are to heat, corrosion or chemical attack
● analyse data using computer modelling software
● assess materials for specific qualities (such as electrical conductivity, durability,
renewability)develop prototypes
● consider the implications for waste and other environmental pollution issues of any
product or process
● advise on the adaptability of a plant to new processes and materials
● work to solve problems arising during the manufacturing process or with the finished
product, such as those caused by daily wear and tear or a change of environment
● supervise quality control throughout the construction and production process
● monitor plant conditions and material reactions during use
● help to ensure that products comply with national and international legal and quality
standards
● advise on inspection, maintenance and repair procedures
● liaise with colleagues in manufacturing, technical and scientific support, purchasing and
marketing
● supervise the work of materials engineering technicians and other staff
● consider the costs implications of materials used and alternatives, in terms of both time
and money
● take account of energy usage in manufacturing and in-service energy saving, e.g. in
transport and construction applications

Alcon Nig. Ltd, Port Harcourt (July. 2013—Dec 2013)


Project: Idu Gas Plant Revamping Project, Bayelsa. EPC work completion and
Flare down for Idu field Gas Development and flow station Revamping
(Phase 2)
Client: NAOC
Role Synopsis
• Preparation of Inspection, Test Plans, Work Instructions and formats.
• Inspection of Piping System wise and conform it is according to P & ID, Isometric
Drawings.
• Review, comment and recommend approval on contractor’s shop drawings, technical field
queries, Method Statements, Inspection and Test Plans
• Inspection of Static Equipment & Rotatory Equipment.
• Follow of ASME, API Standards
• Attending Daily weekly Meetings with Client, Co-Ordination with Client for Technical
Discrepancies.
• Submission of Weekly Quality Report With respect of all activities.
• UT Gauging for Steam Drums and Pressure Vessels.
• Monitoring of welding consumables, Preheating, Welding and weld visual inspection,
PWHT/NDT, Hardness Test, PMI Test as per the WPS, ITP.
• Marking Request for Inspection Formats (IR) and Field Inspection Reports.
• Inspection of Flange Bolt Tightening, Flange Alignment Preparation of Survey Report.

Materials Engineer Qatar


Mid-Mac Contracting CO WLL (April 2016 – Dec 2016)
PROJECT ROAD A1 & A4 LUSAIL DEVELOPMENT PRIMARY INFRASTRUCTURE WORKS PACKAGE
1(CP4B),MARINA UNDERPASS STRUCTURAL STEEL RIBS
Consultant:DorschGruppe, Qatar.
Preparing RFI (Request For Inspection) for all civil activities like Excavation, Backfilling, FDT (Field
Density Test), Lean concrete , Reinforce concrete, Curing, Moisture test, Surface preparation,
Concrete coating , DFT(Dry Film Thickness) .
• Surveillance inspection of all civil ongoing activities at project site.
• Coordinating with construction engineers and PMT (Project Management Team) & Project
Inspection Department (PID) for inspection of each activity for client approval.
• Witnessing of the testing of compressive strength of concrete at the 3rd party laboratory.
• Witnessing of Field testing like Compaction test FDT (Field Density Test) and Dry film thickness
(DFT).
• Coordinate with Consultant regarding the site activities as per standard.
• Inspection of concrete finishing and building finishing according to standard and specification.
• Inspection of all formwork and Reinforcement steel work as per standard.
• Liaise with the contractor’s field staff and Third party laboratory to ensure that all required testing
has been performed as per standard.
• Deep ability to read and interpret building plans, specifications and building codes; make
mathematical computations rapidly and accurately.
• Great ability to communicate clearly and concisely, both orally and in writing.
• Demonstrated ability to inspect various types of residential, commercial and industrial building.
• Inspection of roads and utility diversions, earthworks, waterproofing, concreting & asphalt work. 
• Reporting the all related activities to QA/QC manager.
• Reviewing all quality related activities & preparing all quality related reports on site.
• Preparing Weekly report of project related to project Quality Management.
• Issuing the NCR (Non Conformance Report) for any nonconformance.
• Reviewing third laboratory inspection.
• Conducting material inspections for all CIVIL items delivered at the site. 
• Documentation of all RFI’s (Request for Inspection) after signed by the consultant.
• witnessing and sentencing of all site inspections within their disciplines
• Coordinate all site inspections with the site subcontractors
• Ensure that all inspection reports are accurate and that all attached documents are current status
• Ensure all work is correctly prepared prior to any inspection being undertaken
• Review all inspection reports for compliance
• Assist the site QC manager in the organization, maintenance and control of the quality system
• Liaise with the site construction engineers and provide assistance when requested
• Prepare nonconformance reports to the QA manager and assist in developing corrective actions
• Assist the QC manager and construction manager in resolving any discrepancies and ambiguities
• Coordinate with the Client QC inspectors for the resolution of site problems
• Coordinate with the site subcontractors to ensure that communications exist and are maintained
• Assist the site subcontractors in the resolution of drawing interpretation
• Attend the weekly QC meetings
• Review work procedures and method statements for compliance with good work practices and
the customers contract specializations
• The issuance of nonconformance reports in conjunction with the site QC manager
• The completion of QC site instructions and coordinate their closure The review of inspection test
packages during the course of construction activities
• Compliance with the site's health and safety regulations
Roles Synopsis
QaQc Inspector
Midmac Contracting W.L.L (Feb 2015 – Nov 2015)
PROJECT ROAD A1 & A4 LUSAIL DEVELOPMENT PRIMARY INFRASTRUCTURE WORKS PACKAGE
1(CP4B),MARINA FEATURE ARCH.
Consultant:DorschGruppe, Qatar.
Role Synopsis:
Preparing RFI (Request For Inspection) for all civil activities like Excavation, Backfilling, FDT (Field
Density Test), Lean concrete , Reinforce concrete, Curing, Moisture test, Surface preparation,
Concrete coating , DFT(Dry Film Thickness) .
• Surveillance inspection of all civil ongoing activities at project site.
• Coordinating with construction engineers and PMT (Project Management Team) & Project
Inspection Department (PID) for inspection of each activity for client approval.
• Witnessing of the testing of compressive strength of concrete at the 3rd party laboratory.
• Witnessing of Field testing like Compaction test FDT (Field Density Test) and Dry film thickness
(DFT).
• Coordinate with Consultant regarding the site activities as per standard.
• Inspection of concrete finishing and building finishing according to standard and specification.
• Inspection of all formwork and Reinforcement steel work as per standard.
• Liaise with the contractor’s field staff and Third party laboratory to ensure that all required testing
has been performed as per standard.
• Deep ability to read and interpret building plans, specifications and building codes; make
mathematical computations rapidly and accurately.
• Great ability to communicate clearly and concisely, both orally and in writing.
• Demonstrated ability to inspect various types of residential, commercial and industrial building.
• Inspection of roads and utility diversions, earthworks, waterproofing, concreting & asphalt work. 
• Reporting the all related activities to QA/QC manager.
• Reviewing all quality related activities & preparing all quality related reports on site.
• Preparing Weekly report of project related to project Quality Management.
• Issuing the NCR (Non Conformance Report) for any nonconformance.
• Reviewing third laboratory inspection.
• Conducting material inspections for all CIVIL items delivered at the site. 
• Documentation of all RFI’s (Request for Inspection) after signed by the consultant.
• witnessing and sentencing of all site inspections within their disciplines
• Coordinate all site inspections with the site subcontractors
• Ensure that all inspection reports are accurate and that all attached documents are current status
• Ensure all work is correctly prepared prior to any inspection being undertaken
• Review all inspection reports for compliance
• Assist the site QC manager in the organization, maintenance and control of the quality system
• Liaise with the site construction engineers and provide assistance when requested
• Prepare nonconformance reports to the QA manager and assist in developing corrective actions
• Assist the QC manager and construction manager in resolving any discrepancies and ambiguities
• Coordinate with the Client QC inspectors for the resolution of site problems
• Coordinate with the site subcontractors to ensure that communications exist and are maintained
• Assist the site subcontractors in the resolution of drawing interpretation
• Attend the weekly QC meetings
• Review work procedures and method statements for compliance with good work practices and
the customers contract specializations

QAQC ENGINEER Mercury Engineering W.L.L (Dec 2015 – April 2016)


PROJECT: LUSAIL DEVELOPMENT PRIMARY INFRASTRUCTURE WORKS PACKAGE 1(CP1)
CONTRACT NO TAC/QA/LUS/GEN/1204

• Perform all daily inspection and test of the scope and character necessary to achieve the
quality of construction required in the drawings and specifications for all works under the
contract performed ON or OFF site.
• Cary out inspection and checking for all quality related procedures in the site and ensures
activity at the site are as per approved method statement and inspection test plan.
• Coordinate with the consultant’s representative and Site 1n-charge for inspection and
meeting about quality problems including the closure of Non-Compliance Report.
• Taking care of QA/QC documents of the entire project including certificates, calibration,
test results, inspection requests, non-compliance reports and site
instruction/observations, permanent materials delivered and other QA/QC documents.
Responsible for the closure of Non-conformance, NCR and Site Instruction, SI.
• Responsible for the quality and workmanship of every activity, thorough knowledge of
all phases of engineering construction relating to Civil, Architectural and Structural
discipline interfacing the multidisciplinary operations.
• Develop method statement for the activity including risk assessment and job safety
environmental analysis and Inspection Test Plan and Checklist based on specifications of
the project.
• Carry out Internal Audit at the site as scheduled in the Project Quality Plan, PQP.
• Liaise the Technical Engineer for submission of material submittals to Consultant.

QA/QC Inspector, Nigeria


Alcon Nig. Ltd, Port Harcourt (Oct.2011—Nov.2012)
Project :Uquo Gas Plant, Eket Central Processing Facility: Construction works
(Civil and Structural prefabrication, Mechanical, piping, Electrica Instrumentation works)
Client: Septra Energy Nig. Ltd
Role Synopsis
• Interpret welding procedures and ensure all work is executed using the appropriate
welding procedure.
• To carry out Fit-up Inspection, and Release for Welding.
• To carry out the site inspections as per QCP / ITP, WPS and as per the Approved
Procedures.
• To conduct welders Awareness meeting in order to control welding Repairs.
• Examine and acceptance or reject pressure welds and welding performance.
• Ensure an "Inspection Test Plan" is issued for each work package and to discuss the
applicable inspection activities with the Craft Foreman responsible for work
execution.
• Plan, schedule and dispatch Non-Destructive Testing Personnel in accordance with
project requirements.
• Monitor welding activities and quality performance to ensure an acceptable standard of
quality is achieved.
• Verify welder qualifications.
• Review incoming work packages to ensure they comply with Client Standards and
Applicable Codes.
• Witness pressure testing and ensuring that recordable calibrated pressure gauges are
used.
• Witness pneumatic testing and ensure that a procedure is in place and the authorized
inspector is consulted before test commences.
• Document, report and initiate "Non-Conformance Reports" for any non-conforming
items.
• Coordinate with Client and/or Authorized Inspector on all requested inspection
activities.
• Coordinate with Client and/or Authorized Inspector on all requested inspection
activities.
• To conduct the Line Walk Down and Bolt Torque as per the Isometric Drawing.
• To prepare hydro testing packages and witnesses the hydro test as per the test
pressure.

QA/QC Inspector, Nigeria


Alcon Nig. Ltd, Port Harcourt (July. 2013—Dec 2013)
Project: Idu Gas Plant Revamping Project, Bayelsa. EPC work completion and
Flare down for Idu field Gas Development and flow station Revamping
(Phase 2)
Client: NAOC
Role Synopsis
• Preparation of Inspection, Test Plans, Work Instructions and formats.
• Inspection of Piping System wise and conform it is according to P & ID, Isometric
Drawings.
• Review, comment and recommend approval on contractor’s shop drawings, technical field
queries, Method Statements, Inspection and Test Plans
• Inspection of Static Equipment & Rotatory Equipment.
• Follow of ASME, API Standards
• Attending Daily weekly Meetings with Client, Co-Ordination with Client for Technical
Discrepancies.
• Submission of Weekly Quality Report With respect of all activities.
• UT Gauging for Steam Drums and Pressure Vessels.
• Monitoring of welding consumables, Preheating, Welding and weld visual inspection,
PWHT/NDT, Hardness Test, PMI Test as per the WPS, ITP.
• Marking Request for Inspection Formats (IR) and Field Inspection Reports.
• Inspection of Flange Bolt Tightening, Flange Alignment Preparation of Survey Report.

Welding Inspector, Nigeria


Delattre Bezons Nig. Ltd (Nov. 2009—Aug. 2011)
Project: Bonny train 6 OSBL Project. Engineering, Procurement and
Construction of 1×85000 m3 LNG Tank; 2 × 65000m3 LPG Tanks; 1×36000m3
FR Condensate Tank; Installation of Gas lift manifolds and tie-in to the gas sales manifold
Client: Nigeria LNG Ltd
Role Synopsis/responsibilities
• Preparing and reviewing of Welding Procedure Specification (WPS) and Procedure
Qualification Record (PQR) including Welding Inspection in all common welding Process
like SMAW, GTAW, SAW, and FCAW.
• Conducting Welders Performance Qualification Test (WPQT) As Per Codes / Standards.
• Material inspection such as Pipes, Fittings, Gaskets, Flanges, Valves, and review of
Material Data Sheet.
• Preparing Pipe line Stringing Report, Marking of Heat no., Pipe no., and Length.
• To carry out the site inspections as per QCP / ITP, WPS and as per the Approved
Procedures
• To carry out Fit-up Inspection, and Release for Welding.

• Weld Visual Inspection of welded Joints as per Codes and Standards.


• To conduct welders Awareness meeting in order to control welding Repairs.
• Witnessing of NDT Activities such as PT, HT, MPT, and RT & UT.
• Preparing of Pipe line Traceability (pipe book & weld map)
• Witness the Holiday Test and Release the Section for lowering.
• Witness the sand bedding, lowering, sand padding and back filling.
• Fit-up Inspection of Tie-in Joints, and Release for Welding.
• Releasing the section for Hydro-Testing,
• Witness the pipeline pigging, Hydrostatic Testing, De watering, Swabbing, and Drying.
EDUCATIONAL_DETAILS______________________________________________
• The Welding Institute(TWI), UK(2015)
Senior Welding Inspector--Level 2
• Federal University of Technology, Owerri
B.Eng Tech (METALLURGICAL & MATERIALS ENGINEERING)

PROFESSIONAL CERTIFICATIONS AND TRAININGS______

1. CMQ(ASQ)__DEC 2016
2. IRCA Lead Auditor --ISO 9001: 2008(QMS)
3 CSWIP 3.1(Welding Inspector Level 2)—(August 24th 2015)
4. NEBOSH IGC – Feb 2015

PERSONAL DETAILS______________________________________________
Name : OKORIE PRIMUS CHINONYE
Date of Birth : December 23RD 1986
Sex : Male
Contact Address : No 100 Al Mutasim Street Al MatarQadeem, Doha
Qatar
Phone : +97466417105,+97431017464
E-mail Address : [email protected] [email protected]
State of Origin : Imo
Nationality : Nigerian
Marital Status :Married
Skype Id :engrprince66
Visa Status :Transferrable work Visa with NOC

You might also like