A. Project Overview
Borey Chaktomuk I has already Installed 24 core Fiber from CooTel Site Named KDF052 with the total length is about 2.5km.
However, this cable is mainly use for backbone access network only and even the costing for installation is also higher than the
normal access line. Additionally, the EDC also charge for monthly pole service around 5$/month.
1
Xinwei (Cambodia) Telecom Co., Ltd.
Building No. B3 and No. C3-1, Street 169,
Veal Vong, 7Makara, Phnom Penh City, Cambodia
Telephone Number: +855 23 470 3838
Email Address: [email protected]
B. Project Scope
a. Acceptances Criteria
- Supply Fiber Cable (4cores)
- Supply all requires materials for fiber cable such as ODF, Slave and closure
- Installation and Splicing Fiber Cable
b. Unacceptance Criteria
- Install and configure all internal network and configuration
- Supply optical transmission machine and equipment (media, modem and/or switching)
- Maintain the cable which is cut by the owner.
C. Project Costing
a. Costing
Advance Unit
No Description Qty Amount
Pay Price
I Fiber Charge
1 Fiber Optic 4_Core 4.3km $810.00 $810.00
2 Labor (Lay fiber cable) 1Time $500.00 $500.00
3 ODF (4core) 4pc $80.00 $320.00
4 Fiber Optical Patch Cord 32pc $1.50 $48.00
5 Other accessories (connectors, Closure,...) 1time $200.00 $200.00
Sub Total: $1,878.00
Discount:
Noted: All above prices are exclusive of VAT 10%
Total: $1,878.00
b. Payment
We would like to request 50% deposit after all agreement is done. And the remaining fee has to be
clear after project handle.
D. Project Scheduling
The project will be starting 7 days after getting first deposit. Installation and configuration will be finished
within 5 days for both locations in Project I. The first phase, connecting from Borey Chatomuk I to showroom
will be finish within 2 days and the second phase, the connection from Borey Chaktomuk I to Borey
Chaktomuk II will be finished 3 days after phase 1.
II. Project II
A. Project Overview
Based on location of Borey East Land and Home, it
is a bit isolated and far from the other projects. The
concept of owner wants to develop and sustain and
efficient for transmit a huge data from this location
to Chatomuk City View.
2
Xinwei (Cambodia) Telecom Co., Ltd.
Building No. B3 and No. C3-1, Street 169,
Veal Vong, 7Makara, Phnom Penh City, Cambodia
Telephone Number: +855 23 470 3838
Email Address: [email protected]
B. Project Scope
a. Acceptances Criteria
- Supply Fiber Cable (4cores)
- Supply all requires materials for fiber cable such as ODF, Slave and closure
- Installation and Splicing Fiber Cable
b. Unacceptance Criteria
- Install and configure all internal network and configuration
- Supply optical transmission machine and equipment (media, modem and/or switching)
- Maintain the cable which is cut by the owner.
C. Project Costing
c. Costing
Advance Unit
No Description Qty Amount
Pay Price
I Fiber Charge
1 Fiber Optic 4_Core 2 Rolls $780.00 $1,560.00
2 Labor (Install fiber cable, splicing, Connecting) 1Time $1200.00 $1,200.00
3 ODF (4core) 2pc $80.00 $160.00
4 Fiber Optical Patch Cord 130pc $1.50 $195.00
5 600 x 960 x 800 Rack Mount 4 Fan + 1Tray + 1PDU (15U) 2PCs $350.00 $700.00
6 Other Accessories: 1time $300.00 $300.00
- Optical Slave
- Optical Splice Closure
- -----
Sub Total: $4,115.00
Discount:
Noted: All above prices are exclusive of VAT 10%
Total: $4,115.00
d. Payment
We would like to request 50% deposit after all agreement is done. And the remaining fee has to be
clear after project handle.
D. Project Scheduling
The project will be starting 7 days after getting first deposit. Installation and configuration will be finished
within 7 days.
III. Recommendation
Based on the location of Borey East Land and Home, we can give some recommendation and optional choices as below:
1- 12 Core Cable
Even the price for 12 cores cable is quite more expensive than the 4 cores is, the strength is also quite more suitable
for long distance, longer 2km. Here is the cost estimating for 12 core fiber installation:
The above calculated is not included EDC pole rental fee. Thus the monthly fee should be:
8000 meters/ 50meter = 160 poles then the monthly fee is about $160/months
3
Xinwei (Cambodia) Telecom Co., Ltd.
Building No. B3 and No. C3-1, Street 169,
Veal Vong, 7Makara, Phnom Penh City, Cambodia
Telephone Number: +855 23 470 3838
Email Address: [email protected]
This option is possible but we need a professional fiber installer and splicers. However there are many causes which
can the 4 core easier to cut than the 12 cores; heavy rain with strong wind, broken tree, heavy hit by human ….
If we want a zero down time connectivity, it is possible to install a backup link. We can install only underground cable
for our back but the cost is too expensive, but we can install wireless transmission backup link by using Airfiber 5, the
transmission medium powered by Ubiquiti
https://www.ui.com/airfiber/airfiber5/
The total cost for this backup link is about $2,800 - $4,000
based on what material and pole you will use for this
installation.