UPDATED : APRIL, 4TH 2016.

Clamping I
Actual
Date Item : 706-884 seat base Karyawan No
Time/ mnt
4-Apr Aktifitas 1 7.25
Lem 2 2 7.29
Rakit seat frame, front leg 3 7.23
Clamping, ukur 4 7.28
Tembak 5 7.21
Pasang bag leg, ukur mal front corner blog 6 7.17
Back corner blog, screw, lagbolt 7 7.19
Bersihkan lem 8 7.22
Ukur bentangan kaki 9 7.23
10 7.28
Jumlah 72.35
Average 7.24
7.725

Std Time / Allow 10% Total (in


mnt (in mnt) mnt)
7.42 0.74 8.16 445 7.42
7.48 0.75 8.23 449 7.48
7.38 0.74 8.12 443 7.38
7.47 0.75 8.21 448 7.47
7.35 0.74 8.09 441 7.35
7.28 0.73 8.01 437 7.28
7.32 0.73 8.05 439 7.32
7.37 0.74 8.10 442 7.37
7.38 0.74 8.12 443 7.38
7.47 0.75 8.21 448 7.47
73.92 7.39 81.31 4435
7.39 0.74 8.13 443.5
7.3916667
UPDATED : APRIL, 5TH 2016.

Clamping II

Actual Std Allow


Date Item : 708-882 Rail + CB Karyawan No Time/ Time / 10% (in
mnt mnt mnt)
5-Apr Aktifitas 1 2.49 2.82 0.28
Lem 2 2 2.51 2.85 0.29
Rakit front riil, side riil 3 2.53 2.88 0.29
Clamping 4 2.50 2.83 0.28
Tembak 5 2.48 2.80 0.28
Pasang corner block, screw, lagbolt
2.87 0.29
6 2.52
Bersihkan lem 7 2.50 2.83 0.28
8 2.55 2.92 0.29
9 2.51 2.85 0.29
10 2.49 2.82 0.28
10 Cycles 25.08 28.47 2.85
Average 2.51 2.85 0.28

Clamping I

Actual Std Allow


Date Item : 708-882 - Back Frame Karyawan No Time/ Time / 10% (in
mnt mnt mnt)
5-Apr Aktifitas 1 2.49 2.82 0.28
Lem 2 2 2.38 2.63 0.26
Rakit back leg, top cap 3 2.41 2.68 0.27
bottom back rest, back rail 4 2.52 2.87 0.29
clamping 5 2.45 2.75 0.28
Tembak 6 2.48 2.80 0.28
pasang cleat vertikal back leg 7 2.4 2.67 0.27
bersihkan lem 8 2.49 2.82 0.28
9 2.55 2.92 0.29
10 2.50 2.83 0.28
10 Cycles 24.67 27.78 2.78
Average 2.47 2.78 0.28
Total (in
mnt)

3.10 169 2.82


3.14 171 2.85
3.17 173 2.88
3.12 170 2.83
3.08 168 2.80
3.15 172 2.87
3.12 170 2.83
3.21 175 2.92
3.14 171 2.85
3.10 169 2.82
31.31
3.13
0.000

Total (in
mnt)

3.10 169 2.82


2.90 158 2.63
2.95 161 2.68
3.15 172 2.87
3.03 165 2.75
3.08 168 2.80
2.93 160 2.67
3.10 169 2.82
3.21 175 2.92
3.12 170 2.83
30.56 1667
3.06 166.7
2.778333
UPDATED APRIL 5TH, 2016

Clamping II

Actual Allow
Item : 537-882 Rail + CB Std Time / Total (in
Date Karyawan No Time/ 10% (in
revisi 2 mnt mnt)
mnt mnt)
29-Mar Aktifitas 1 2.31 2.52 0.25 2.77
Lem 2 2 2.35 2.58 0.26 2.84
Rakit front riil, side rail 3 2.30 2.50 0.25 2.75
Clamping 4 2.29 2.48 0.25 2.73
Tembak 5 2.32 2.53 0.25 2.79
Pasang corner block, 2.58 0.26 2.84
screw, lagbolt 6 2.35
Bersihkan lem 7 2.37 2.62 0.26 2.88
8 2.30 2.50 0.25 2.75
9 2.31 2.52 0.25 2.77
10 2.35 2.58 0.26 2.84
10 Cycles 23.25 25.42 2.54 27.96
Average 2.33 2.54 0.25 2.80

Clamping III

Actual Allow
Item : 536-882 - Back Std Time / Total (in
Date Karyawan No Time/ 10% (in
Frame mnt mnt)
mnt mnt)
4-Apr Aktifitas 1 5.03 5.05 0.51 5.56
Lem 2 2 5.10 5.17 0.52 5.68
Rakit back leg, top cap, 5.08 0.51 5.59
bottom back rail 3 5.05
Komponen back rest 4 5.08 5.13 0.51 5.65
clamping 5 5.15 5.25 0.53 5.78
Tembak 6 5.17 5.28 0.53 5.81
Bersihkan lem 7 5.07 5.12 0.51 5.63
Ukur bentangan 8 5.09 5.15 0.52 5.67
9 5.06 5.10 0.51 5.61
10 5.01 5.02 0.50 5.52
10 Cycles 50.81 51.35 5.14 56.49
Average 5.08 5.14 0.51 5.65
0.000

151 2.52
155 2.58
150 2.50
149 2.48
152 2.53
155 2.58
157 2.62
150 2.50
151 2.52
155 2.58

1525.00

25.417

303 5.05
310 5.17

305 5.08

308 5.13
315 5.25
317 5.28
307 5.12
309 5.15
306 5.10
301 5.02
3081
308.1
5.135
Clamping III

Actual Std Time / Allow 10% Total (in


Date Item : 556-536 - Seat Base Karyawan No
Time/ mnt mnt (in mnt) mnt)

28-Mar Aktifitas 1 6.10 6.17 0.62 6.78


Lem 2 2 6.18 6.30 0.63 6.93
Rakit 4 leg, 4 riil 3 6.14 6.23 0.62 6.86
Clamping 4 6.06 6.10 0.61 6.71
Tembak 5 6.11 6.18 0.62 6.80
Bersihkan lem 6
Ukur bentangan kaki 7
8
9
10
Jumlah 30.59 30.98 3.10 34.08
Average 6.12 6.20 0.62 6.82

Clamping III
Actual Std Time / Allow 10% Total (in
Date Item : 556-536 - Seat Base Karyawan No
Time/ mnt mnt (in mnt) mnt)

29-Mar Aktifitas 1 8.57 8.95 0.90 9.85


Lem 2 2 8.54 8.90 0.89 9.79
Rakit 4 leg, 4 rail 3 8.12 8.20 0.82 9.02
Clamping 4 8.22 8.37 0.84 9.20
Tembak, screw 5 8.16 8.27 0.83 9.09
Pasang jig mal 6
Sekat kaki 7
Ukur bentangan 8
Bersihkan lem 9
10
Jumlah 41.61 42.68 4.27 46.95
Average 8.32 8.54 0.85 9.39

UPDATED : APRIL 4TH, 2016

Clamping II

Actual Std Time / Allow 10% Total (in


Date Item : 556-536 - seat base Karyawan No
Time/ mnt mnt (in mnt) mnt)
4-Apr Aktifitas 1 5.07 5.12 0.51 5.63
Lem 2 2 5.02 5.03 0.50 5.54
Rakit 4 kaki, 4 rail 3 5.16 5.27 0.53 5.79
Clamping 4 5.01 5.02 0.50 5.52
Tembak 5 5.17 5.28 0.53 5.81
pasang jig mal 6 5.03 5.05 0.51 5.56
pasang sekat kaki 7 5.09 5.15 0.52 5.67
screw 8 5.06 5.10 0.51 5.61
bersihkan lem 9 5.10 5.17 0.52 5.68
10 5.05 5.08 0.51 5.59
Jumlah 51 51.27 5.13 56.39
Average 5.08 5.13 0.51 5.64
370 6.17
378 6.30
374 6.23
366 6.10
371 6.18
1859
371.80
6.20

537 8.95
534 8.90
492 8.20
502 8.37
496 8.27
2561
512.2
8.54
setelah pakai jig mal
307 5.12
302 5.03
316 5.27
301 5.02
317 5.28
303 5.05
309 5.15
306 5.10
310 5.17
305 5.08
Wednesday, April 13, 2016

Clamping II

Actual Time/ Std


Allow 10% Act Min Act Min
Date Item : 536-881, Back Frame Karyawan No mnt Time / (in mnt) Total (in mnt) (Menit) (Detik)
(mnt:dtk) mnt
13-Apr Aktifitas : 1 06:40 6.67 0.67 7.33 6 40 0.67 6.67
Lem komponen (20 komponen) 2 2 06:12 6.20 0.62 6.82 6 12 0.20 6.20
Rakit komponen (BL, FL, TC, SR,
3 06:51 6.85 0.69 7.54 6 51 0.85 6.85
Back rest 16 komp)
Clamping 4 07:12 7.20 0.72 7.92 7 12 0.20 7.20
Nail 5 06:45 6.75 0.68 7.43 6 45 0.75 6.75
Setting kemiringan backrest, 6 07:09 7.15 0.72 7.87 7 9 0.15 7.15
pastikan backrest sudah sesuai
Bersihkan lem 7 07:15 7.25 0.73 7.98 7 15 0.25 7.25
8 07:07 7.12 0.71 7.83 7 7 0.12 7.12
9 06:43 6.72 0.67 7.39 6 43 0.72 6.72
10 06:33 6.55 0.66 7.21 6 33 0.55 6.55
Jumlah 1:08:27 68.45 6.85 75.30
Average 06:50 6.85 0.68 7.53

NB: Waktu untuk rakit komponen lebih lama dibandingkan dengan waktu clamp
UPDATED : APRIL, 4TH 2016

Clamping III

Actual
Date Item : 536-882 - Back Frame Karyawan No Time/ Std Time / Allow 10%
mnt (in mnt)
mnt
4-Apr Aktifitas 1 5.03 5.05 0.51
Lem 2 2 5.10 5.17 0.52
Rakit back leg, top cap, bottom back 5.08 0.51
rail 3 5.05
Komponen back rest 4 5.08 5.13 0.51
clamping 5 5.15 5.25 0.53
Tembak 6 5.17 5.28 0.53
Bersihkan lem 7 5.07 5.12 0.51
Ukur bentangan 8 5.09 5.15 0.52
9 5.06 5.10 0.51
10 5.01 5.02 0.50
10 Cycles 50.81 51.35 5.14
Average 5.08 5.14 0.51

UPDATED : APRIL, 6th 2016

Clamping III

Actual
Std Time / Allow 10%
Date Item : 536-882 - seat Frame Karyawan No Time/
mnt (in mnt)
mnt
6-Apr Aktifitas 1 0.51 0.85 0.09
Lem 2 2 0.51 0.85 0.09
rakit seat frame 3 0.51 0.85 0.09
Clamping 4 0.55 0.92 0.09
Tembak 5 0.55 0.92 0.09
Bersihkan lem 6 0.55 0.92 0.09
7 0.53 0.88 0.09
8 0.53 0.88 0.09
9 0.53 0.88 0.09
10 0.54 0.90 0.09
10 Cycles 5 8.85 0.89
Average 0.53 0.89 0.09

UPDATED : APRIL, 7th 2016


Clamping II

Actual
Std Time / Allow 10%
Date Item : 536-882 - apron Karyawan No Time/
mnt (in mnt)
mnt
7-Apr Aktifitas 1 3.25 3.42 0.34
Lem 2 2 3.20 3.33 0.33
rakit rail, corner block 3 3.23 3.38 0.34
Clamping 4 3.19 3.32 0.33
Tembak 5 3.24 3.40 0.34
Bersihkan lem 6 3.26 3.43 0.34
7 2.40 2.67 0.27
8 2.38 2.63 0.26
9 2.39 2.65 0.27
10 2.41 2.68 0.27
10 Cycles 29 30.92 3.09
Average 2.90 3.09 0.31
Total (in mnt)

5.56 303 5.05


5.68 310 5.17

5.59 305 5.08

5.65 308 5.13


5.78 315 5.25
5.81 317 5.28
5.63 307 5.12
5.67 309 5.15
5.61 306 5.10
5.52 301 5.02
56.49 3081
5.65 308.1
5.135

Total (in mnt)

0.94 51 0.85
0.94 51 0.85
0.94 51 0.85
1.01 55 0.92
1.01 55 0.92
1.01 55 0.92
0.97 53 0.88
0.97 53 0.88
0.97 53 0.88
0.99 54 0.90
9.74
0.97
Total (in mnt)

3.76 205 3.42


3.67 200 3.33
3.72 203 3.38
3.65 199 3.32
3.74 204 3.40
3.78 206 3.43
2.93 160 2.67
2.90 158 2.63
2.92 159 2.65
2.95 161 2.68
34.01
3.40
Tuesday, April 19, 2016

Clamping I

Actual
Std Allow
Item : 543-880, Appron / SA Seat Time/
Date Karyawan No Time / 10% (in
Frame mnt
mnt mnt)
(mnt:dtk)

19-Apr Apply glue to corner blocks 1 02:50 2.83 0.28


Position rails in Jig 2 2 02:50 2.83 0.28
Clamping 3 02:34 2.57 0.26
fix and nail corner blocks x4 4 02:39 2.65 0.27
Screw x 16 5 03:08 3.13 0.31
Clean glue 6 02:58 2.97 0.30
Inspect and stack 7 03:00 3.00 0.30
8 02:54 2.90 0.29
9 02:37 2.62 0.26
10 02:30 2.50 0.25
Jumlah 0:28:00 28.00 2.80
Average 02:48 2.80 0.28
Total (in Act Min Act Min
mnt) (Menit) (Detik)

3.12 2 50 0.83 2.83


3.12 2 50 0.83 2.83
2.82 2 34 0.57 2.57
2.92 2 39 0.65 2.65
3.45 3 8 0.13 3.13
3.26 2 58 0.97 2.97
3.30 3 0 - 3.00
3.19 2 54 0.90 2.90
2.88 2 37 0.62 2.62
2.75 2 30 0.50 2.50
30.80 22 360 6.00 28.00
3.08
UPDATED : APRIL 5TH, 2016

Clamping II

Actual Std Allow


Item : 543-815 - Front Total (in
Date Karyawan No Time/ Time / 10% (in
Frame mnt)
mnt mnt mnt)
5-Apr Aktifitas 1 1.06 1.10 0.11 1.21
Lem 2 2 1.04 1.07 0.11 1.17

1.13 0.11 1.25


Rakit front leg, front rail 3 1.08
stretcher 4 1.02 1.03 0.10 1.14
clamping 5 1.06 1.10 0.11 1.21
Tembak 6 1.07 1.12 0.11 1.23
bersihkan lem 7 1.09 1.15 0.12 1.27
8 1.11 1.18 0.12 1.30
9 1.01 1.02 0.10 1.12
10 1.00 1.00 0.10 1.10
10 Cycles 10.54 10.90 1.09 11.99
Average 1.05 1.09 0.11 1.20

UPDATED : APRIL 6th, 2016

Clamping II

Actual Std Allow


Item : 543-815 - back Total (in
Date Karyawan No Time/ Time / 10% (in
Frame mnt)
mnt mnt mnt)
6-Apr Aktifitas 1 2.30 2.50 0.25 2.75
Lem 2 2 2.28 2.47 0.25 2.71
rakit back leg, top cap, 2.38 0.24 2.62
back rail 3 2.23
bottom back rest 4 2.25 2.42 0.24 2.66
back rest, stretcher 5 2.28 2.47 0.25 2.71
klamping 6 2.29 2.48 0.25 2.73
tembak 7 2.22 2.37 0.24 2.60
bersihkan lem 8 2.28 2.47 0.25 2.71
9 2.30 2.50 0.25 2.75
10 2.31 2.52 0.25 2.77
10 Cycles 23 24.57 2.46 27.02
Average 2.27 2.46 0.25 2.70
66 1.10
64 1.07

68 1.13

62 1.03
66 1.10
67 1.12
69 1.15
71 1.18
61 1.02
60 1.00
654
65.4
1.09

150 2.50
148 2.47

143 2.38

145 2.42
148 2.47
149 2.48
142 2.37
148 2.47
150 2.50
151 2.52
UPDATED : APRIL 4TH, 2016

Clamping II

Actual Std Allow


Item : 536-883 - front Total (in
Date Karyawan No Time/ Time / 10% (in
Frame mnt)
mnt mnt mnt)
1-Apr Aktifitas 1 1.18 1.30 0.13 1.43
Lem 2 2 1.20 1.33 0.13 1.47
Rakit front leg, front
1.28 0.13 1.41
rail 3 1.17
Clamping 4 1.21 1.35 0.14 1.49
Tembak 5 1.22 1.37 0.14 1.50
pasang sekat kaki 6 1.15 1.25 0.13 1.38
Bersihkan lem 7 1.15 1.25 0.13 1.38
8 1.16 1.27 0.13 1.39
9 1.18 1.30 0.13 1.43
10 1.17 1.28 0.13 1.41
Jumlah 12 12.98 1.30 14.28
Average 1.18 1.30 0.13 1.43
78 1.30
80 1.33

77 1.28

81 1.35
82 1.37
75 1.25
75 1.25
76 1.27
78 1.30
77 1.28
UPDATED : APRIL 7th, 2016

Clamping I

Actual Std Allow


Date Item : 536-815 - apron Karyawan No Time/ Time / 10% (in Total (in
mnt)
mnt mnt mnt)
7-Apr Aktifitas 1 2.45 2.75 0.28 3.03
Lem 2 2 2.43 2.72 0.27 2.99
rakit seat rail,tenon,
3 2.40 2.67 0.27 2.93
swivel support
Clamping 4 2.49 2.82 0.28 3.10
Tembak 5 2.45 2.75 0.28 3.03
Bersihkan lem 6 2.42 2.70 0.27 2.97
7 2.40 2.67 0.27 2.93
8 2.38 2.63 0.26 2.90
9 2.39 2.65 0.27 2.92
10 2.41 2.68 0.27 2.95
Jumlah 24 27.03 2.70 29.74
Average 2.42 2.70 0.27 2.97

UPDATED : APRIL 8th, 2016

Clamping I

Actual Std Allow


Item : 536-815 - base Total (in
Date Karyawan No Time/ Time / 10% (in
frame mnt)
mnt mnt mnt)
8-Apr Aktifitas 1 7.31 7.52 0.75 8.27
Lem 2 2 7.35 7.58 0.76 8.34
rakit base, leg, corner
3 7.24 7.40 0.74 8.14
blog
Clamping 4 7.26 7.43 0.74 8.18
Tembak 5 7.23 7.38 0.74 8.12
screw, lem pasang 7.47 0.75 8.21
stretcher 6 7.28
pasang mall, tembak 7 7.30 7.50 0.75 8.25
pasang sekat kaki 8 7.26 7.43 0.74 8.18
bersihkan lem 9 7.23 7.38 0.74 8.12
10 7.24 7.40 0.74 8.14
10 Cycles 73 74.50 7.45 81.95
Average 7.27 7.45 0.75 8.20
Clamping III

Actual Std Allow


Total (in
Date Item : 536-815 - apron Karyawan No Time/ Time / 10% (in
mnt)
mnt mnt mnt)
8-Apr Aktifitas 1 4.35 4.58 0.46 5.04
Lem 2 2 4.31 4.52 0.45 4.97
rakit seat rail,tenon,
3 4.32 4.53 0.45 4.99
swivel support
Clamping 4 4.37 4.62 0.46 5.08
Tembak 5 4.36 4.60 0.46 5.06
Bersihkan lem 6 4.31 4.52 0.45 4.97
7 4.34 4.57 0.46 5.02
8 4.32 4.53 0.45 4.99
9 4.30 4.50 0.45 4.95
10 4.31 4.52 0.45 4.97
10 Cycles 43 45.48 4.55 50.03
Average 4.33 4.55 0.45 5.00
165 2.75
163 2.72

160 2.67

169 2.82
165 2.75
162 2.70
160 2.67
158 2.63
159 2.65
161 2.68

451 7.52
455 7.58

444 7.40

446 7.43
443 7.38

448 7.47

450 7.50
446 7.43
443 7.38
444 7.40
275 4.58
271 4.52

272 4.53

277 4.62
276 4.60
271 4.52
274 4.57
272 4.53
270 4.50
271 4.52
Wednesday, April 20, 2016

Clamping II

Actual
Std Allow
Time/
Date Item : 556-815, Bottom Frame Assy Karyawan No Time / 10% (in
mnt
mnt mnt)
(mnt:dtk)

20-Apr Apply glue to legs, rails, strechers,


2 1 09:47 9.78 0.98
corner blocks
Assemble all components 2 09:53 9.88 0.99
Clamping 3 09:43 9.72 0.97
Nail all joints 4 10:19 10.32 1.03
Fix and nail corner blocks x 8 5 10:03 10.05 1.01
Screw corner block x 16 6 10:15 10.25 1.03
Check the diagonal distance and nail
7 09:53 9.88 0.99
legs with scrap wood
Position and nail rails 8 10:17 10.28 1.03
Clean glue 9 10:00 10.00 1.00
Inspect and stack 10 09:45 9.75 0.98
Jumlah 1:39:55 99.92 9.99
Average 09:59 9.99 1.00
Total (in Act Min Act Min
mnt) (Menit) (Detik)

10.76
9 47 0.78 9.78
10.87 9 53 0.88 9.88
10.69 9 43 0.72 9.72
11.35 10 19 0.32 10.32
11.06 10 3 0.05 10.05
11.28 10 15 0.25 10.25
10.87
9 53 0.88 9.88
11.31 10 17 0.28 10.28
11.00 10 0 - 10.00
10.73 9 45 0.75 9.75
109.91 95 295 4.92 99.92
10.99
Tuesday, April 12, 2016

Clamping II

Actual
Std Allow
Time/
Date Item : 556-880, Front Frame Karyawan No Time / 10% (in
mnt
mnt mnt)
(mnt:dtk)

12-Apr Aktifitas : 1 3:02 3.03 0.30


Lem 2 2 2:30 2.50 0.25
Rakit side rail,front rail, front leg,
3 3:06 3.10 0.31
corner block
Clamping 4 3:00 3.00 0.30
Nail 5 3:19 3.32 0.33
Bor tempat screw corner block ke
6 3:21 3.35 0.34
front leg
Insert screw 10x 7 2:47 2.78 0.28
Setting bentangan front leg 8 2:47 2.78 0.28
Bersihkan lem 9 3:20 3.33 0.33
10 2:46 2.77 0.28
Jumlah 29.97 3.00
Average 3.00 0.30

Friday, April 15, 2016

Clamping II
Actual
Std Allow
Time/
Date Item : 556-880, Back Frame Karyawan No Time / 10% (in
mnt
mnt mnt)
(mnt:dtk)

15-Apr Glue to legs 1 03:18 3.30 0.33


Glue to slats, topcap, and rail 2 2 03:24 3.40 0.34

Assemble legs, rail, slats and topcap 3 03:06 3.10 0.31

Clamping 4 02:54 2.90 0.29


Position rail, slats with jig 5 03:19 3.32 0.33
Nail to topcap and rail 6 03:39 3.65 0.37
Nail to slats 7 03:17 3.28 0.33
Position legs with jig 8 02:47 2.78 0.28
Clean glue 9 03:37 3.62 0.36
Inspect and stack 10 02:57 2.95 0.30
Jumlah 0:32:18 32.30 3.23
Average 03:13 3.23 0.32
Friday, April 15, 2016

Clamping II

Actual
Time/ Std Allow
Date Item : 556-880, Full size Karyawan No Time / 10% (in
mnt
mnt mnt)
(mnt:dtk)

15-Apr Glue to legs with dowel steel 1 02:25 2.42 0.24


Assemble SA front leg frame and SA
2 02:39 2.65 0.27
back leg frame 2
Clamping 3 02:36 2.60 0.26
Glue Corner blocks and back seat
4 02:49 2.82 0.28
cleat
Nail all joints 5 03:11 3.18 0.32

Fix corner blocks and back seat cleat 6 02:45 2.75 0.28

Screws x 11 7 02:38 2.63 0.26

Drill for lag bolts and fix lagbolts 8 02:39 2.65 0.27

Clean glue 9 02:49 2.82 0.28


Inspect, and stack 10 02:38 2.63 0.26
Jumlah 0:27:09 27.15 2.72
Average 02:42 2.72 0.27
Total (in Act Min Act Min
mnt) (Menit) (Detik)

3.34 3 2 0.03 3.03


2.75 2 30 0.50 2.50
3.41
3 6 0.10 3.10
3.30 3 0 - 3.00
3.65 3 19 0.32 3.32
3.69
3 21 0.35 3.35
3.06 2 47 0.78 2.78
3.06 2 47 0.78 2.78
3.67 3 20 0.33 3.33
3.04 2 46 0.77 2.77
32.96 26 238 3.97 29.97
3.30
Total (in Act Min Act Min
mnt) (Menit) (Detik)

3.63 3 18 0.30 3.30


3.74 3 24 0.40 3.40
3.41
3 6 0.10 3.10
3.19 2 54 0.90 2.90
3.65 3 19 0.32 3.32
4.02 3 39 0.65 3.65
3.61 3 17 0.28 3.28
3.06 2 47 0.78 2.78
3.98 3 37 0.62 3.62
3.25 2 57 0.95 2.95
35.53 27 318 5.30 32.30
3.55
Total (in Act Min Act Min
mnt) (Menit) (Detik)

2.66 2 25 0.42 2.42


2.92
2 39 0.65 2.65
2.86 2 36 0.60 2.60
3.10
2 49 0.82 2.82
3.50 3 11 0.18 3.18
3.03
2 45 0.75 2.75
2.90 2 38 0.63 2.63
2.92
2 39 0.65 2.65
3.10 2 49 0.82 2.82
2.90 2 38 0.63 2.63
29.87 21 369 6.15 27.15
2.99
Monday, April 18, 2016

Clamping III

Actual
Std Allow
Time/ Total (in
Date Item : 556-884, Front Frame Karyawan No Time / 10% (in
mnt mnt)
mnt mnt)
(mnt:dtk)

18-Apr Apply glue to legs and front rail 1 01:30 1.50 0.15 1.65
Assamble legs and front frame 2 2 01:15 1.25 0.13 1.38
Clamping 3 01:46 1.77 0.18 1.94
Nail all joints 4 01:12 1.20 0.12 1.32
Clean glue 5 01:20 1.33 0.13 1.47
Inspect and stack 6 01:22 1.37 0.14 1.50
7 01:54 1.90 0.19 2.09
8 01:31 1.52 0.15 1.67
9 01:24 1.40 0.14 1.54
10 01:20 1.33 0.13 1.47
Jumlah 0:14:34 14.57 1.46 16.02
Average 01:27 1.46 0.15 1.60

Monday, April 18, 2016

Clamping II

Actual
Std Allow
Time/ Total (in
Date Item : 556-884, Back Frame Karyawan No Time / 10% (in
mnt mnt)
mnt mnt)
(mnt:dtk)

18-Apr Apply glue to legs, pull stick, top


1 02:59 2.98 0.30 3.28
cap, and back rail
Assamble all joints 2 2 02:45 2.75 0.28 3.03
Clamping 3 02:41 2.68 0.27 2.95
Nail all joints 4 02:55 2.92 0.29 3.21
Clean glue 5 02:38 2.63 0.26 2.90
Inspect and stack 6 02:21 2.35 0.24 2.59
7 02:27 2.45 0.25 2.70
8 02:30 2.50 0.25 2.75
9 02:31 2.52 0.25 2.77
10 02:24 2.40 0.24 2.64
Jumlah 0:26:11 26.18 2.62 28.80
Average 02:37 2.62 0.26 2.88
Act Min Act Min
(Menit) (Detik)

1 30 0.50 1.50
1 15 0.25 1.25
1 46 0.77 1.77
1 12 0.20 1.20
1 20 0.33 1.33
1 22 0.37 1.37
1 54 0.90 1.90
1 31 0.52 1.52
1 24 0.40 1.40
1 20 0.33 1.33
10 274 4.57 14.57

Act Min Act Min


(Menit) (Detik)

2 59 0.98 2.98
2 45 0.75 2.75
2 41 0.68 2.68
2 55 0.92 2.92
2 38 0.63 2.63
2 21 0.35 2.35
2 27 0.45 2.45
2 30 0.50 2.50
2 31 0.52 2.52
2 24 0.40 2.40
20 371 6.18 26.18
Tuesday, April 19, 2016

Clamping II

Actual
Std Allow
Time/
Date Item : 556-885, Back Frame Karyawan No Time / 10% (in
mnt
mnt mnt)
(mnt:dtk)

19-Apr Apply glue to back leg, back rail, and


2 1 02:53 2.88 0.29
back slats
Assemble all components 2 02:34 2.57 0.26
Clamping 3 02:28 2.47 0.25
Nail all joints 4 02:53 2.88 0.29
Clean glue 5 02:59 2.98 0.30
Inspect and stack 6 02:36 2.60 0.26
7 02:42 2.70 0.27
8 03:45 2.75 0.28
9 02:47 2.78 0.28
10 02:37 2.62 0.26
Jumlah 0:28:14 27.23 2.72
Average 02:49 2.72 0.27
Total (in Act Min Act Min
mnt) (Menit) (Detik)

3.17
2 53 0.88 2.88
2.82 2 34 0.57 2.57
2.71 2 28 0.47 2.47
3.17 2 53 0.88 2.88
3.28 2 59 0.98 2.98
2.86 2 36 0.60 2.60
2.97 2 42 0.70 2.70
3.03 2 45 0.75 2.75
3.06 2 47 0.78 2.78
2.88 2 37 0.62 2.62
29.96 20 434 7.23 27.23
3.00
Clamping III

Actual Std Allow


Total (in
Date Item : 27016-610-002 Stretcher Karyawan No Time/ Time / 10% (in
mnt)
mnt mnt mnt)
27-Mar Aktifitas 1 40 0.67 0.07 0.73
Lem 2 2 38 0.63 0.06 0.70
Rakit stretcher 3 39 0.65 0.07 0.72
Clamping 4 37 0.62 0.06 0.68
Tembak 5 39 0.65 0.07 0.72
Bersihkan lem 6 39 0.65 0.07 0.72
7 40 0.67 0.07 0.73
8 38 0.63 0.06 0.70
9 38 0.63 0.06 0.70
10 39 0.65 0.07 0.72
Jumlah 387 6.45 0.65 7.10
Average 38.70 0.65 0.06 0.71

UPDATED : APRIL 5TH, 2016

Clamping I

Actual Std Allow


Total (in
Date Item : voronado - Back Frame Karyawan No Time/ Time / 10% (in
mnt)
mnt mnt mnt)
28-Mar Aktifitas 1 2.53 2.88 0.29 3.17
Lem 2 2 2.49 2.82 0.28 3.10
Rakit back leg, top cap 3 2.50 2.83 0.28 3.12
bottom back rest, back rail 4 2.52 2.87 0.29 3.15
clamping 5 2.45 2.75 0.28 3.03
Tembak 6 2.48 2.80 0.28 3.08
pasang corner back rest 7 2.49 2.82 0.28 3.10
bersihkan lem 8 2.51 2.85 0.29 3.14
ukur bentangan 9 2.55 2.92 0.29 3.21
10 2.50 2.83 0.28 3.12
Cycle 10 25.02 28.37 2.84 31.20
Average 2.50 2.84 0.28 3.12

Clamping II

Actual Std Allow


Total (in
Date Item : voronado - front Frame Karyawan No Time/ Time / 10% (in
mnt)
mnt mnt mnt)
28-Mar Aktifitas 1 3.11 3.18 0.32 3.50
Lem 2 2 3.13 3.22 0.32 3.54
Rakit front leg, front rail, side 3.13 0.31 3.45
rail 3 3.08
Clamping 4 3.15 3.25 0.33 3.58
Tembak 5 3.18 3.30 0.33 3.63
pasang corner block, screw, lagbolt 6 3.10 3.17 0.32 3.48
Bersihkan lem 7 3.11 3.18 0.32 3.50
8 3.07 3.12 0.31 3.43
9 3.12 3.20 0.32 3.52
10 3.06 3.10 0.31 3.41
Cycle 10 31 31.85 3.19 35.04
Average 3.11 3.19 0.32 3.50
40 0.67
38 0.63
39 0.65
37 0.62
39 0.65
39 0.65
40 0.67
38 0.63
38 0.63
39 0.65
387
38.7

173 2.88
169 2.82
170 2.83
172 2.87
165 2.75
168 2.80
169 2.82
171 2.85
175 2.92
170 2.83
1702
170.2
2.836667

191 3.18
193 3.22

188 3.13

195 3.25
198 3.30
190 3.17
191 3.18
187 3.12
192 3.20
186 3.10
Clamping II

Item : DC8788S - Back Actual Std Time / Allow 10% Total (in
Date Karyawan No
Frame Time/ mnt mnt (in mnt) mnt)

22-Mar Aktifitas 1 3.03 3.05 0.31 3.36


Lem 2 2 3.10 3.17 0.32 3.48
Rakit back leg, top cap, 3.22 0.32 3.54
bottom back rail 3 3.13
Komponen back rest 4 3.09 3.15 0.32 3.47
Clamping 5 3.11 3.18 0.32 3.50
Tembak 6
Bersihkan lem 7
8
9
10
Jumlah 15 15.77 1.58 17.34
Average 3.09 3.15 0.32 3.47

Clamping III

Item : DC8788S - Front Actual Std Time / Allow 10% Total (in
Date Karyawan No
Frame Time/ mnt mnt (in mnt) mnt)

23-Mar Aktifitas 1 3.45 3.75 0.38 4.13


Lem 2 3.29 3.48 0.35 3.83
Rakit side rail, front rail, 3.55 0.36 3.91
front leg 3 3.33
Clamping 4 3.25 3.42 0.34 3.76
Tembak 5 3.35 3.58 0.36 3.94
Pasang corner block,
screw, lagbolt 6
Ukur bentangan 7
Pasang penyekat kaki 8
Bersihkan lem 9
10
Jumlah 17 17.78 1.78 19.56
Average 3.33 3.56 0.36 3.91
183 3.05
190 3.17

193 3.22

189 3.15
191 3.18
946
189.2
3.15
234

2318.35
231.84

225 3.75
209 3.48

213 3.55

205 3.42
215 3.58

1067
213
3.56
234

2584.96
258.50
UPDATED : APRIL 4TH, 2016

Clamping II

Item : DC8770 Actual Std Allow


Date (square) - front Karyawan No Time/ Time / 10% (in Total (in
mnt)
Frame mnt mnt mnt)
1-Apr Aktifitas 1 1.26 1.43 0.14 1.58
Lem 2 2 1.30 1.50 0.15 1.65
Rakit front leg, 1.35 0.14 1.49
front rail 3 1.21
Clamping 4 1.32 1.53 0.15 1.69
Tembak 5 1.31 1.52 0.15 1.67
pasang bunga 6 1.27 1.45 0.15 1.60
Bersihkan lem 7 1.31 1.52 0.15 1.67
8 1.28 1.47 0.15 1.61
9 1.26 1.43 0.14 1.58
10 1.28 1.47 0.15 1.61
10 Cycles 13 14.67 1.47 16.13
Average 1.28 1.47 0.15 1.61

UPDATED : APRIL 6th, 2016

Clamping I

Actual Std Allow


Item : DC8770S - Total (in
Date Back Frame Karyawan No Time/ Time / 10% (in mnt)
mnt mnt mnt)
7-Apr Aktifitas 1 2.45 2.75 0.28 3.03
Lem 2 2 2.43 2.72 0.27 2.99
Rakit seat
rail,tenon, swivel 3 2.40 2.67 0.27 2.93
support

Clamping 4 2.49 2.82 0.28 3.10


Tembak 5 2.45 2.75 0.28 3.03
Bersihkan lem 6 2.42 2.70 0.27 2.97
7 2.40 2.67 0.27 2.93
8 2.38 2.63 0.26 2.90
9 2.39 2.65 0.27 2.92
10 2.41 2.68 0.27 2.95
10 Cycles 24 27.03 2.70 29.74
Average 2.42 2.70 0.27 2.97
86 1.43
90 1.50

81 1.35

92 1.53
91 1.52
87 1.45
91 1.52
88 1.47
86 1.43
88 1.47

165 2.75
163 2.72

160 2.67

169 2.82
165 2.75
162 2.70
160 2.67
158 2.63
159 2.65
161 2.68