This document appears to be an electrical diagram or schematic for a building. It shows multiple sub-meter panels labeled SMC4F, SMC5F, and SMC6F. Each sub-panel has 8 circuits labeled P401 through P408. There are main circuit breakers and busbar gutters shown. Wire labels and specifications are included. The diagram is labeled as an FDAS riser diagram and includes a reference to Aiwa Technologies Philippines Inc. and A.G.C. Design Concepts.

Uploaded by

Ayrton Ilagan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
166 views6 pages

Dian

This document appears to be an electrical diagram or schematic for a building. It shows multiple sub-meter panels labeled SMC4F, SMC5F, and SMC6F. Each sub-panel has 8 circuits labeled P401 through P408. There are main circuit breakers and busbar gutters shown. Wire labels and specifications are included. The diagram is labeled as an FDAS riser diagram and includes a reference to Aiwa Technologies Philippines Inc. and A.G.C. Design Concepts.

Uploaded by

Ayrton Ilagan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

I

WH

RH
AIWA- TECHNOLOGIES PHILIPPINES
REF INC.

A.G.C. DESIGN CONCEPTS

4x1.25mm TF WIRE IN
MCB NEMA 1
SMC6F (SUB-METER) 150AT/AF, 3P

EDP6F BUSBAR GUTTER


MCB

M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P603
P607

P605

P601
P604
P608

P606

P602
ALEXANDER G. CO
MCB NEMA 1
SMC5F (SUB-METER) 150AT/AF, 3P FDAS RISER DIAGRAM
EDP5F BUSBAR GUTTER
MCB SCALE NTS
M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P503
P507

P505

P501
P504
P508

P506

P502
MCB NEMA 1
SMC4F (SUB-METER) 150AT/AF, 3P

EDP4F BUSBAR GUTTER


MCB

M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P403
P407

P405

P401
P404
P408

P406

P402
MCB NEMA 1
SMC3F (SUB-METER) 150AT/AF, 3P

EDP3F BUSBAR GUTTER


MCB

M M M M M M M M

60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT, 60AT,


100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P 1P 1P

P303
P307

P305

P301
P304
P308

P306

P302
3428
7323275 - 01,02,2019 - Q.C

PP2C

PP1C

PP2B

PP1B

PP2A

PP1A
MEP EDPGF 100AT, 70AT, 100AT, 70AT, 100AT, 70AT,
M kWH METER
100AF, 100AF, 100AF, 100AF, 100AF, 100AF,
1P 1P 1P 1P 1P 1P MDP

M M
M M M M M M MCB MCB NEMA 4X
200kVA, 400V, 800AT/AF, 3P
3P, 3W+N+G, 60Hz ADP (ATS)
GENERATOR SET MCB MCB NEMA1
BUSBAR GUTTER 150AT/AF, 3P

SMCGF (SUB-METER)

CCTV RISER DIAGRAM


POWER RISER DIAGRAM SCALE NTS
SCALE NTS

I I I I I I I I

I I I I I I I I

I I I I I I I I

I I I I I I I I

I I I

I I I I

INTERCOM RISER DIAGRAM CATV RISER DIAGRAM CATV RISER DIAGRAM


SCALE NTS SCALE NTS SCALE NTS
a a a
a down
Sa a Sa b to C.O
Sab
b c c a a STUDIO 6
a a' b'
b a' a c b b
UNIT 1C a b'
a b a' b'
Sabc b down
b to C.O a
c a
a b a' b'
b b a
down going a' going b'
a b a b Sabc up
to C.O up going
down Sab AIWA- TECHNOLOGIES PHILIPPINES
S3b' down
UNIT 2C Sab to C.O c Sabc Sab NOTE
S3a' S3a' S3b' Scd S3c' INC.
b a b 3F: ADP-3
a STUDIO 5 4F: ADP-4
c b b c a
a b a b a b a b a 5F: ADP-5
b a b a b a 6F: ADP-6
a b a
Sabc b a Sabc a
a Sabc
b down
Sabc STUDIO 4
a
Sabc
Sdef
aa Sab
b b Sab a to C.O A.G.C. DESIGN CONCEPTS
a c a STUDIO 8 b
e b a Sabc c
Sa c a down c
b a b a b
d to C.O
a b Sab
UNIT 1B d c
b a b LIGHT b
f a b c
b COURT a
c down UNIT 2B a
a b a b to C.O a
c a d
down c Sabc
to C.O a STUDIO 3
b b a b b Sab
e
b a
d b a
down
a down
ALEXANDER G. CO
d Sab to C.O b
a a to C.O c
c b a c a a b c
b f b b a Sab
b b
down UNIT 1A c down
to C.O to C.O c b
c b STUDIO 2 a STUDIO 7
a a Sabc b Sab
e b a a d
Sa
b d Sab
a
a a d a a b a
Sa b a b a
a a
f
UNIT 2A
c FIRE EXIT c
Sabc a going b a
a' down b b
c
g S3a'b' b a b a S3b'c' Sab
UTILITY RM.
S3a' Sg e c a
going d
STUDIO 1 a a
down b
up b' b' to C.O c' c' d
Sabc
Sab down
b to C.O
b a
d d c a b a
c a c
a b

3428
d 7323275 - 01,02,2019 - Q.C
c d c

GROUND FLOOR LIGHTING LAYOUT SECOND FLOOR LIGHTING LAYOUT 3RD TO 6TH FLOOR LIGHTING LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100

LOAD SCHEDULE COMPUTATION


e' 30AT,1P,23
0V
NEMA-3R EN IN
e' UNIT 1C SUMP PIT CL.
PUMP
e'
RISER UP
SMCGF EDPGF
e' tap to
e' MEP ADP lights
tap to MDP

going
lights AIWA- TECHNOLOGIES PHILIPPINES
S3e' UNIT 2C
down INC.
COVERED AREA going

I
up

PP1C MIPB
I PP2C
I I going
down
A.G.C. DESIGN CONCEPTS
I
PP1B
PP2B

UNIT 1B
LIGHT
COURT
UNIT 2B
tap to
lights tap to
lights

OPEN ROOF DECK


tap to
lights ALEXANDER G. CO

I
PP2A
UNIT 1A

PP1A

UNIT 2A
PIPE
CHASE

I
30AT,3P,400V IN
NEMA-3R ENCL.
TRANSFER PUMP

tap to
30AT,3P,400V IN lights
NEMA-3R ENCL.
TRANSFER PUMP 300AT,3P,400V IN
NEMA-3R ENCL.
FIRE PUMP

40AT,3P,400V IN
NEMA-3R ENCL.
3428
JOCKEY PUMP
7323275 - 01,02,2019 - Q.C

ROOFDECK LIGHTING LAYOUT GROUND FLOOR POWER & AUXILIARY LAYOUT SECOND FLOOR POWER & AUXILIARY LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
e' 30AT,1P,23
0V
NEMA-3R EN IN
e' UNIT 1C SUMP PIT CL.
PUMP
e'
RISER UP
SMCGF EDPGF
e' tap to
e' MEP ADP lights
tap to MDP

going
lights AIWA- TECHNOLOGIES PHILIPPINES
S3e' UNIT 2C
down INC.
COVERED AREA going

I
up

PP1C MIPB
I PP2C
I I going
down
A.G.C. DESIGN CONCEPTS
I
PP1B
PP2B

UNIT 1B
LIGHT
COURT
UNIT 2B
tap to
lights tap to
lights

OPEN ROOF DECK


tap to
lights ALEXANDER G. CO

I
PP2A
UNIT 1A

PP1A

UNIT 2A
PIPE
CHASE

I
30AT,3P,400V IN
NEMA-3R ENCL.
TRANSFER PUMP

tap to
30AT,3P,400V IN lights
NEMA-3R ENCL.
TRANSFER PUMP 300AT,3P,400V IN
NEMA-3R ENCL.
FIRE PUMP

40AT,3P,400V IN
NEMA-3R ENCL.
3428
JOCKEY PUMP
7323275 - 01,02,2019 - Q.C

ROOFDECK LIGHTING LAYOUT GROUND FLOOR POWER & AUXILIARY LAYOUT SECOND FLOOR POWER & AUXILIARY LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
WH

tap to
lights
STUDIO 6
30AT,1P,230V IN
NEMA-3R ENCL.
BOOSTER PUMP
LIGHTNING
ARRE
50M RADIUSSTER
RH R

WH
RH R

P306
60AT,3P,400V IN
NEMA-1 ENCL.
AIWA- TECHNOLOGIES PHILIPPINES

I
REF ELEVATOR
tap to I
lights INC.
STUDIO 5 COVERED AREA
P305
P304
REF

RH R

I P308
STUDIO 4
WH A.G.C. DESIGN CONCEPTS
tap to STUDIO 8
lights I
WH REF

LIGHT LIGHT
COURT COURT
R
P303
REF

RH R
RH

I
STUDIO 3
WH

tap to OPEN ROOF DECK


lights
ALEXANDER G. CO
tap to
WH
lights
P302

tap to STUDIO 2 STUDIO 7


lights I
R
I

RH

REF

NOTE
RH R
P307 ADP-9 : 3F & 4F
ADP-11 : 5F & 6F
WH

FIRE EXIT SUB-METER


CENTER RISER UP
UTILITY RM.
P301 EDP3F
STUDIO 1
MTTC
I

WH going
up MCTVPB
REF
IPB3F
tap to
lights

RH R

3428
7323275 - 01,02,2019 - Q.C

3RD TO 6TH FLOOR POWER & AUXILIARY LAYOUT ROOFDECK POWER LAYOUT GROUND CCTV & FDAS LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100
STUDIO 6

RISER DOWN
TAP TO 6F
AIWA- TECHNOLOGIES PHILIPPINES
INC.
STUDIO 5 COVERED AREA

STUDIO 4 A.G.C. DESIGN CONCEPTS


STUDIO 8

LIGHT LIGHT
COURT COURT

STUDIO 3
OPEN ROOF DECK
ALEXANDER G. CO

STUDIO 2 STUDIO 7

RISER
FIRE EXIT
DOWN
UTILITY RM.
STUDIO 1

3428
7323275 - 01,02,2019 - Q.C

SECOND FLOOR CCTV & FDAS LAYOUT 3RD TO 6TH FLOOR CCTV & FDAS LAYOUT ROOFDECK CCTV & FDAS LAYOUT
SCALE 1:100 SCALE 1:100 SCALE 1:100

VOLTAGE DROP CALCULATION SHORT CIRCUIT ANALYSIS DESIGN ANALYSIS


L=20 L=50 L=25 L=12 Pole Mounted Service Entrance LIGHTING & CONVENIENCE RECEPTACLE LOAD
VD=.176 VD=1.6 VD=1 VD=.333 DT = 500kVA
%Z=6% 2020 SQ.M x 24VA/SQ.M = 48,480 VA
34.5kV 20 SMALL APPLIANCES = 40,000 VA
2SETS I = 1,000,000kVA
4x250mm2 THHN 2x50mm2 THHN 2x14mm2 THHN 2x5.5mm2 THHN SUB TOTAL = 88,480 VA
FAULT
SERVICE FARTHEST
ENTRANCE MDP SMC6F P606 MDP APPLICATION OF DEMAND FACTOR
LOAD
2xkxIxL 1.732xkxIxL Where: k , Copper = 12
Z u= .0005 Z t = .06 Zse = .0019
FIRST 10,000VA @ 100% D.F = 10,000 VA
CM CM Aluminum = 18 FAULT
34.5kV REMINDER @ 40@ D.F = 31,392A
VOLTAGE DROP @ MDP Isc = 1,000,000kVA SUB TOTAL = 41,392 VA
VD = 1.732xkxIxL = 1.732x12x563.5x20 = .234V
CM 2*500,000
VOLTAGE DROP @ SMC6F MOTOR LOADS @ 100% D.F
VD = 2xkxIxL = 2x12x111.62x50 = 1.6V Zu = kVA base = 500 kVA = .0005 Z t = %Z = 6 = .06 32 - 2HP ACCU = 88,320 VA
CM 83690 utility SC kVA 1,000,000 kVA 100 100
VOLTAGE DROP @ P606 9 - 4.2kW ACCU = 37,800 VA
Zse = R2 + X2 Z Total = Zu + Z t + Z se
VD = 2xkxIxL = 2x12x44.11x25 = 1V = .0005+.06+.0019 1 - 2HP BOOSTER PUMP = 2,760 VA
CM 26240
Service Entrance, L=20m,2SETS(4-250mm2 ) Z Total = .0624 1 - 2HP ELEVATOR PIT PUMP = 2,760 VA
VOLTAGE DROP @ FARTHEST LOAD Resistance (R) , R = .029 /305m
VD = 2xkxIxL = 2x12x12x12 = .333V 20m =.00095 I sc = 1.732*V = 1.732*400V
1 - 15HP ELEVATOR MOTOR = 18,706 VA
CM 10380 Rse = .029 Z .0624
2*305m 2 - 5HP TRANSFER PUMP = 13,440 VA
TOTAL VOLTAGE DROP I sc = 11,103A
VD = .234+1.6+1+.333 = 3.17V Reactance (X) , X = .048 /305m 1 - 60HP FIRE PUMP = 71,358 VA
Xse = .048 20m =.0016 THEREFORE, THE MINIMUM 1 - 7.5HP JOCKEY PUMP = 9,699 VA
% VD = VD x 100 = 3.17 x 100 = .79% 2*305m KAIC RATING TO BE USE @
V 400
THEREFORE, THE VOLTAGE DROP FROM
Zse = .000952 +.00162 = .0019 MDP IS 18kAIC OTHER LOADS
TRANSFORMER TO FURTHEST LOAD IS .79% ONLY 32 - REFRIGERATOR = 32,000 VA
32 - RANGE/RANGEHOOD = 96,000 VA

TOTAL COMPUTED LOAD = 414,235 VA

SERVICE ENTRANCE CONDUCTOR


TOTAL FULL LOAD CURRENT: [414,235VA + 25%(18,706)//(400V)(1.732) = 604.66A
USE: 2SETS (4-250mm THHN + 1-50mm
MAIN: 800AT/400AF, 400V,3P,18kAIC