Acknowledgement BUILDING SC 297211 NALG 0674 2023

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

TS-bPASS

OFFICE OF THE NALGONDA MUNICIPALITY


NALGONDA DISTRICT

TS-bPASS - BUILDING PERMIT ORDER U/S.174(2) OF TELANGANA MUNICIPALITIES ACT 2019


(WITHOUT MORTGAGE)

To
Sri. POLAGONI VIJAY KUMAR Application No / Permit No 297211/NALG/0674/2023
S/o PARVATHALU
H.NO.4-15,RAJEEV NAGAR,CHEEKATI DATE 30-05-2023
MAMIDI (V),MUNUGODE(M),NALGONDA DIST

Sir/Madam,
Sub: Nalgonda Municipality, Nalgonda District - Permission for construction of Individual Residential Building consisting of
Ground Floor + 1 Upper Floor situated at Plot No: PART OF PLOT NO.08, Street/Road: SAGAR ROAD, Colony:
VENKATA RAMANA COLONY, Survey No: 643, Nalgonda(V), Nalgonda(M), Nalgonda, Nalgonda(Dist) in an extent of
149.66 Sq.Mtrs (178.99 Sq.Yds). Building Permit Order- Issued - Reg

Ref: 1. Your Application 297211/NALG/0674/2023, dated: 30-05-2023


2. G.O.Ms.No.168, MA & UD, dt.07-04-2012.
3. G.O.Ms.No.7, MA & UD, dt.05-01-2016.
4. G.O.Ms.No. 62 MA & UD, dt. 21.03.2020.

Your application for individual residential building permission submitted in the reference cited has been sanctioned based on
the self-certification given by you as detailed below and subject to conditions mentioned therein

A APPLICANT DETAILS
1 Name Sri. POLAGONI VIJAY KUMAR
B PLOT DETAILS
1 Plot No PART OF PLOT NO.08
2 Survey No 643
3 Open Plot or Piece of Land N/A
4 Street/Road SAGAR ROAD
5 Village Name Nalgonda
6 Town / City Nalgonda
7 Mandal Nalgonda
8 District Nalgonda
C DETAILS OF PERMISSION SANCTIONED
1 Extent of Plot 149.66 Sq.Mtrs (178.99 Sq.Yds)
2 Road affected area 0 Sq. Meters
3 Net Plot Area 149.66 Sq. Meters
4 Height (Mts) 6
5 Setbacks
a. Front setback (Mts) 1.5
b. Rear setback (Mts) 1.0
c. Side setback – I (Mts) 1.0
d. Side setback – II (Mts) 1.0
6 No. of Rain Water Harvesting Pits 1
7 No. of Trees 5
8 No of floors Ground Floor + 1 Upper Floor
D FLOOR DETAILS

1
ground 79.48 Sq. Meters

2
Floor1 79.48 Sq. Meters
Total Built-up Area 158.96 Sq. Meters
E DETAILS OF PAYMENT

1
Site Approval Charges ₹ 1795.92

Development Charges on built up


area(As per G.O. Ms. No.225, dt:
2
30.08.2016 , G.O. Ms No. 226 and dt: ₹ 3179.2
30.08.2016 ,G.O. Ms No. 223, dt:
30.08.2016)

3 14% Open Space Contribution Charges


₹ 60141.77
On Prevailing Market Value

4
Vacant Plot Charges ₹ 491.26

5
Conversion Charges ₹ 748.3

6
Debris Charges ₹ 1500

7
Compound Wall Fee ₹ 500

8
Rain Water Harvesting Charges ₹ 2244.9

9
Postage/ Advertisement Charges ₹ 200

10
Building Permit Fee ₹ 2384.4

11
TS-bPASS User Charges ₹ 1000

12
Vacant Land Tax ₹ 859.17

13 Regularization charges with ref to the


₹ 11972.8
land value
14 33% Compound Fee On Penal
₹ 3951.02
Charges

15
Labour cess ₹ 18821.5
TOTAL(INR) ₹ 109790.23999999999
F OTHER DETAILS
Construction to be Commenced
1 30-11-2023
Before
2 Construction to be Completed Before 30-05-2026

The Building permission is sanctioned subject to following conditions:

1. The certificate issued does not confer upon any ownership rights over the property. At a later stage, if it is found that
the documents are false and fabricated or any misrepresentation of the facts or false statements or against the
building rules, regulations and Master Plan land use provisions, the permission will be revoked U/s 176 (9) of
Telangana Municipalities Act 2019.
2. The permission accorded does not bar the application or provisions of Urban Land Ceiling & Regulations Act 1976.
3. Building Rules & Regulations shall be followed strictly while making the construction.
4. The construction shall be commenced within 06 months and shall be completed within 03 years.
5. A safe distance of minimum 3.0M vertical and Horizontal Distance between the Building & High-Tension Electrical
Lines and 1.5M for Low Tension electrical line shall be maintained.
6. Prior Approval should be obtained separately for any modification in the construction.
7. Rain Water Harvesting Structure (percolation pit) shall be constructed as per provisions made under WALTA Act
2002.
8. Stocking of Building Materials on footpath and road margin causing obstruction to free movement of public
& vehicles shall not be done, failing which permission is liable to be suspended.
9. This sanction is accorded based on the Self Certification by the Applicant, Accordingly, it is deemed that the
applicant has given the Road Affected Portion to The Commissioner at free of cost without claiming any
Compensation at any time as per the Self Certification.
10. The Registration Authority shall undertake registrations only after issuance of work commencement letter by the
competent authority and only for the permitted built up area as per building permission.
11. The Financial Agencies and Institutions shall extend loans facilities only to the permitted built up area and only after
work commencement letter is issued by the competent Authority.
12. The owner/builder shall cover the building material, stock at site. Every builder or owner shall put Tarpaulin on
scaffolding around the area of construction and the building.
13. All the construction material and debris shall be carried in the trucks or other vehicles which are fully covered and
protected, so as to ensure that the construction debris or the construction material does not get dispersed into the
air or atmosphere or air in any form whatsoever.
14. The dust emissions from the construction site should be completely controlled and all precautions shall be taken on
that behalf.
15. The vehicles carrying construction material and debris of any kind shall be cleaned before it is permitted to ply on
the road after unloading such material.
16. Every worker on the construction site and involved in loading, unloading and carriage of construction material and
construction debris should be provided with mask helmets, shoes to prevent inhalation of dust particles and safety.
17. Owner and builder shall be under obligation to provide all medical help, investigation and treatment to the workers
involved in the construction and carry of construction material and debris relatable to dust emission.
18. Owner/builder shall maintain Muster Roll of all the employees/workers and make necessary insurance till the work is
completed failing which the sanction accorded will be cancelled without further notice.
19. Owner / builder shall transport the construction material and debris waste to the construction site, dumping site or
any other place in accordance with rules and in terms of this order.
20. Owner/builder shall mandatorily use a welt jet in grinding and stone cutting, wind breaking walls around the
construction site.
21. Tree plantation shall be done along the periphery and also in front of the premises as per T.S. Water Land and
Trees Rules 2002.
22. If greenery is not maintained 10% additional property tax shall be imposed as penalty every year till the condition is
fulfilled.
23. The Owner / Developers shall ensure the safety of construction workers.
24. The Owner / Developers shall ensure a comprehensive risk insurance policy of construction workers for the duration
of construction.
25. If there are any Court cases pending, the proposal is subject to outcome of Court Order.
26. . No external roof, verandah, wall of a building shall be constructed or reconstructed of grass, leaves, mats or other
inflammable materials, except with the permission of the Commissioner.
27. The building should have on site treatment system (Septic tank with soakaway / twin bleach pit / decentralized
treatment system / fecal sludge and septage) or connected to sewerage system, waste water treatment recycling
system.

Additional Conditions:

1. Post verification will be carried out as per Rules framed under Telangana Municipalities Act 2019 and action will be
initiated under section 178 & 180 if any violation or misrepresentation of the facts is found.
2. In case of false declaration, the applicant is personally held responsible as per section 174(3) of Telangana
Municipalities Act 2019.
3. The applicant or owner is personally held responsible and accountable in case of false or incorrect Self-Declaration
if any found and shall be liable for punishment as per the provisions under section 177 & 180 of Telangana
Municipalities Act 2019.
4. If the plot under reference is falling in any prohibited lands / Govt. lands / Municipal lands / layout open space,
earmarked parks and playground as per Master plan / Water bodies / FTL/ Buffer zone, the Building Permit Order
will be revoked and structure there upon will be demolished without issuance of any notice under section 174 (4) of
Telangana Municipalities Act 2019.
5. Permission granted shall stand lapsed if the construction is not completed within stipulated period and a fresh
application shall have to be submitted as per section 174(14) of Telangana Municipalities Act 2019.
6. The applicant shall not proceed with the construction till the post verification is done and a work commencement
letter is issued. during this period post verification will be done by the department and will be informed to the
applicant.
7. The issued proceedings are valid for any financial assistance / loan from financial institutions.

Sri. POLAGONI VIJAY KUMAR


S/o PARVATHALU
H.NO.4-15,RAJEEV
NAGAR,CHEEKATI MAMIDI
(V),MUNUGODE(M),NALGONDA Sri. K.V. Ramana chary
DIST Commissioner
NalgondaMunicipality
Date: 30-05-2023
Time:06:58 pm
NOTE: This is a computer generated letter, and does not require any manual signatures.

You might also like