Pile Cap Design Sheet v1.09

This document summarizes the design of a pile cap to support 5 piles. The key inputs include material properties, pile geometry, and an allowable load of 400 tons. The results show the cap is 3.97m x 3.97m x 1.75m with 51 cm^2/m reinforcement in both directions. Design checks confirm the cap satisfies requirements for maximum bearing stress, shear strength, and reinforcement ratios.

Uploaded by

SES DESIGN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
201 views4 pages

Pile Cap Design Sheet v1.09

This document summarizes the design of a pile cap to support 5 piles. The key inputs include material properties, pile geometry, and an allowable load of 400 tons. The results show the cap is 3.97m x 3.97m x 1.75m with 51 cm^2/m reinforcement in both directions. Design checks confirm the cap satisfies requirements for maximum bearing stress, shear strength, and reinforcement ratios.

Uploaded by

SES DESIGN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Pile Cap Design SSE-EXCEL-SECTION

Ref: ACI318 & CRSI 2008 Job: CRSI The author will not be responsible for any uses of this software!
Worked Example #5: 5 piles v1.09
1. Inputs
Pile Data: Material: STP data:
Pile: 1 1 1=pile f'c= 20.7 Mpa N60= 20
1 blank=non fy= 413 MPa L= 12 m
1 1
Pile: Column: 363.2 363.2
5x5 D= 0.25 m dia. of pile a= 1 m col's dim //x

[email protected]
Lx= 2.15 m dist. btw axes of piles in x b= 1 m col's dim //y
2795t
xi= blank=auto Ly= 1.07 m dist. btw axes of piles in yex= 0 m eccentric x
363.2
[email protected] 3.97
e= 0.79 m edge of cap ey= 0 m eccentric y
c= 0.25 m cover fct= 0.25 factor to find Mu*
H= 1.75 m height of cap Pos.= 1 1-center,
363.2 363.2
f= 0 =0; 1.2 factor to S.W 2-edge,
for rebar design 3-corner
yi= blank=auto
Design option: Loadings: ULS SLS 3.97
Qall= 400 t allowable load Nz= 2795 1747 t>0 downward
Φ= 0.85 0.75-ACI or 0.85-CRSI Mx= t.m
ec= 0.08 m** (0.05 or 0.076m) My= t.m
Pi(xi,yi) ρmin= 1 1=0.25*sqrt(f'c)/fy, 0=No **eccentricity
Clear (xi,yi) >> CAL >> PDF

3. Results:
Dimension: Reinforcement: no/m dia As spc. ratio<1chk kg Graphic option:
A= 3.97 m Asx= 51.0 cm2/m Asx= 4 43 58.1 0.25 0.88 OK 1298 shape: 1 1:round, 2:square
B= 3.97 m Asy= 51.0 cm2/m Asy= 4 43 58.1 0.25 0.88 OK 1298 size: 25
H= 1.75 m Asw**= NAN cm2 Asw= 1 12 1.13 0.02 NAN for case of two piles scale axe: 1.5 (=1 to 5)
H>= 1.10 m **case of a signle pile to EC2 cm2 m Label: 1 1=yes, 0=no
Reaction: 1 1=Rs, 2=Ru excl Sw
Design check: chk Quantity: no/m dia Atop kg scale: 2.98
Rs max/Qall= 0.9 <=1? OK Atx= 4 10 3.14 70.2
2way shear at fcol= 0.98 <1? OK Aty= 4 10 3.14 70.2
2way shear at d/2= 0.00 <1? side bar= 1 10 0.79 9.67 *factor to determine critical section of bending moment design-see graph
1way Vx at fcol= 0.58 <1? OK total kg= 2746
1way Vx at d= 0.00 <1? m3= 27.6
1way Vy at fcol= 0.58 <1? OK kg/m3= 99.6
1way Vy at d= 0.00 <1?
Settlement= 96.1 mm NO
ratio= 0.5 <1? OK Two-way Shear at a signle pile
ratio= 0.8 <1? OK Two-way Shear at Two adjacent piles
ratio= 0.9 <1? OK Two-way Shear at Corner pile
ratio= 1.6 <1? OK One-way Shear at Corner pile

2. Design:
nb= 5 number of pile Cap on a signle pile
xG;yG= 0 0m A= 3.97 m =Lx*np+D+2*e EC2 9.8.4
Nz= 2795 1747 t >0 downward B= 3.97 m =Ly*np+D+*e Ned= 2795 t
Mx= 0 0 t.m =Mx-Nz*(ey-yG) Hrec= 1.10 m =max(A,B)/4 Ned/S= 593 Mpa
My= 0 0 t.m =My+Nz*(ex-xG) SW= 68.94 t =2.5*A*B*H F's= 299 t =N/4*(1-min(a,b)/min(B,H))
Fs= 612 t =N/4*(1-C/min(B,H))
Pile (xi,yi) A's= 83.4 cm2
xi= -1.07 1.07 0 0 0 yi= 1.07 1.07 0 0 0 As= 170 cm2
0 0 0 0 0 0 0 0 0 0 A's+As= 254 cm2
-1.07 1.07 0 0 0 -1.07 -1.07 0 0 0 Aw= 254 cm2 max(A's+As,2*h)
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0

Pile (xi,yi) n col= 2 n.col A(m) n. row 3 0


xi= -1.07 1.07 0 0 0 2 3.97 yi= 1.07 1.07 0 0 0
0 0 0 0 0 1 1.82 0 0 0 0 0
-1.07 1.07 0 0 0 2 3.97 -1.07 -1.07 0 0 0
0 0 0 0 0 0 1.82 0 0 0 0 0
0 0 0 0 0 0 1.82 0 0 0 0 0
1st col=-(n.col-1)*Lx/2*Pile P1=-(n.row max-1)*Ly/2*Pile
>=2nd col=(1st col+Lx)*Pile xG= 0 >=2nd col=1col yG= 0

Pile (xi,yi)/G 0 /G
xi= -1.07 1.07 0 0 0 yi= 1.07 1.07 0 0 0
0 0 0 0 0 0 0 0 0 0
-1.07 1.07 0 0 0 -1.07 -1.07 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
1st col=-(n.col-1)*Lx/2*Pile P1=-(n.row max-1)*Ly/2*Pile
>=2nd col=(1st col+Lx)*Pile Σxi^2= 4.621 >=2nd col=1col Σyi^2= 4.62

Reaction
Rui= 559 559 0 0 0 81 Rsi= 363 363 0 0 0
559 0 0 0 0 14 363 0 0 0 0
559 559 0 0 0 363 363 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 max= 559 0 0 0 0 0 max= 363
=Pile*(Nz/nb-Mx*yi/Σyi2+My*xi/Σxi2) =Pile*((Ns+1*SW)/nb-Msx*yi/Σyi2+Msy*xi/Σxi2)
Level arm: -0.9 0.9 0 0 0 Level arm: 0.9 0.9 0 0 0
0 0 0 0 0 0 0 0 0 0
-0.9 0.9 0 0 0 -0.9 -0.9 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
=max(0,xi-ex-a*fc*sign(xi)+ec*sign(xi) =max(0,yi-ey-b*fc*sign(yi)+ec*sign(yi)
MRy= 0 504 0 0 0 My1= 1007 t.m MRx= 504 504 0 0 0 Mx1= 1007 t.m
0 0 0 0 0 0 0 0 0 0
0 504 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
=max(0,Rui)*level arm =max(0,Rui)*level arm
MRy= -504 0 0 0 0 My2= 1007 t.m MLx= 0 0 0 0 0 Mx2= 1007 t.m
0 0 0 0 0 0 0 0 0 0
-504 0 0 0 0 -504 -504 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
=max(0,Rui)*level arm My= 1007 t.m max =Nz*ec if a signle pile =max(0,Rui)*level arm Mx= 1007 t.m max =Nz*ec if a signle pile
bw= 3.97 m =B, if nb=3, y2-y1 bw= 3.97 m =A, if nb=3, x2-x1
H= 1.75 m H= 1.75 m
dx= 1.505 m =H-c dy= 1.51 m =H-c
Φ= 0.9 Φ= 0.9
mx= 0.071 =Mx/(Φ*bw*d^2*0.85*fc) <= 0.268 my= 0.07 =My/(Φ*bw*d^2*0.85*fc) <= 0.268
a= 0.111 m =d*(1-sqrt(1-2*mx)) a= 0.11 m =d*(1-sqrt(1-2*mx))
z= 1.45 m =d-0.5*a z= 1.45 m =d-0.5*a
Hence, Asxreq= 186.9 cm2 Hence, Asyreq= 186.9 cm2
(1) 1.4/fy*bw*d= 202.5 cm2 =if(As>(1), As) (1) 1.4/fy*bw*d= 202.5 cm2 =if(As>(1), As)
(2) 4/3*As= 249.2 cm2 =if((1)<(2), (1) (2) 4/3*As= 249.2 cm2 =if((1)<(2), (1)
(3) 0.18/100*bw*H= 125.0 cm2 =if((3)<(2), (2) (3) 0.18/100*bw*H= 125.0 cm2 =if((3)<(2), (2)
Asx= 202.5 cm2 =else (3) Asy= 202.5 cm2 =else (3)
(4) spacing correction β= 1.0 =max(A,B)/min(A,B) (4) spacing correction β= 1.0 =max(A,B)/min(A,B)
factor= 1 =If(A>=B,1,2*β/(1+β)) factor= 1 =If(A>=B,1,12*β/(1+β))
Asx= 186.9 cm2 =Asreq*2β/(1+β) 47.1 Asy= 186.9 cm2 =Asreq*2β/(1+β) 47.1
Asx 2piles= 5.0 cm2/m= 0.25/100*1m*spacing(20cm) Asy 2piles= 5.0 cm2/m= 0.25/100*1m*spacing(20cm)
Asx= 202.5 cm2 =max(Asx,(4)) Asy= 202.5 cm2 =max(Asy,(4))
Asx= 51.0 cm2/m =max(Asx,(4))/bw Asy= 51 cm2/m =max(Asy,(4))/bw

Two-way Shear
at dx/2= 0.75 m dy/2= 0.75 m
Pile= 0 0 0 0 0 at u1= 10.02 m =u0+4*d
0 0 0 0 0 Φvc= 1.276 Mpa, Φ*min(0.33, 0.17*(1+2/β), 0.083*(2+α*d/u0))*sqrt(f'c)
0 0 0 0 0 ΦVc= 1925 t, OK
0 0 0 0 0 Vu= 0t 0
0 0 0 0 0 α= 40 40 interior, 30 edge, 20 corner
β= 1 Long/Short of column

At face of column
X= -1.07 1.07 0 0 0 Y= 1.07 1.07 0 0 0
0 0 0 0 0 0 0 0 0 0
-1.07 1.07 0 0 0 -1.07 -1.07 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 wx= 0.651 m 0 0 0 0 0 wy= 0.65 m

Pile= 1 1 0 0 0 at u0= 4 m =2*(a+b)


0 0 0 0 0 Φvc= 3.808 Mpa, 0.85*d/w*(1+d/c)*0.17*sqrt(fck) Φvc= 3.81 Mpa, 0.85*d/w*(1+d/c)*0.17*sqrt(fck)
1 1 0 0 0 ΦVc= 2293 t, ΦVc= 2293 t, OK
0 0 0 0 0 Vu= 2236 t
0 0 0 0 0 ratio= 0.975 ratio= 0.98
ratio= 0.975 average OK

One-way Shear in X
case w>=dx at d
wx+ec>= 0 0 0 0 0 Vx= 0 0t w+ec= 0 0 0 0 0
dx+a/2 0 0 0 0 0 Mu= 0 0 t.m 0 0 0 0 0
v1.06 0 0 0 0 0 Vd/M= 0 0 0 0 0 0 0
0 0 0 0 0 ro= 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
k= 0 0 0.16+17*ro*Vd/M/sqrt(fck)
Vu= 0 0 0 0 0 k= 0 0 >0.17 Mu= 0 0 0 0 0
0 0 0 0 0 Φvc= 0 0 Mpa 0 0 0 0 0
0 0 0 0 0 bw= 0 0 m =y2-y1 0 0 0 0 0
0 0 0 0 0 ΦVc= 0 0 t 0 0 0 0 0
0 0 0 0 0 Vx= 0 0 t 0 0 0 0 0
Vleft= 0t ratio= 0 0 OK Mleft= 0t
Vright= 0t Mright= 0t

dx= 1.51 m - At face of col


wx<dx= -1 1 0 0 0 Vx= 1118 1118 t w=xi-a/2+ec= -0.65 0.65 0 0 0
at column 0 0 0 0 0 wx= 0.651 0.651 m 0 0 0 0 0
v1.06 -1 1 0 0 0 Mu= 727.6 727.6 t.m -0.65 0.65 0 0 0
0 0 0 0 0 Mu/Vd= 0.432 0.432 <1 0 0 0 0 0 wleft= -0.65
0 0 0 0 0 Vd/Mu= 2.313 2.313 >1 0 0 0 0 0 wrig= 0.65
ro= 0.004 0.004
k= 1.08 1.08 =(3.5-2.5*M/Vd)*(0.16+MAX(17*ro/sqrt(fck),8/1000)*Vd/M)*dx/wx
Vu= -559 559 0 0 0 k= 0.83 0.83 <0.83 Mu= -364 364 0 0 0
0 0 0 0 0 Φvc= 3.21 3.21 Mpa 0 0 0 0 0
-559 559 0 0 0 bw= 3.97 3.97 m =bending -364 364 0 0 0
0 0 0 0 0 ΦVc= 1918 1918 t 0 0 0 0 0
0 0 0 0 0 Vx= 1118 1118 t 0 0 0 0 0
Vleft= -1118 t ratio= 0.583 0.583 OK Mleft= -728 t
Vright= 1118 t Mright= 728 t
One-way Shear in Y
at d
wy>=dy= 0 0 0 0 0 Vx= 0 0t w=yi-b/2+ec= 0 0 0 0 0
at dy 0 0 0 0 0 Mu= 0 0 t.m 0 0 0 0 0
v1.06 0 0 0 0 0 Vd/M= 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 ro= 0 0 0 0 0 0 0
k= 0 0 0.16+17*ro*Vd/M/sqrt(fck)
Vu= 0 0 0 0 0 k= 0 0 >0.17 Mu= 0 0 0 0 0
0 0 0 0 0 Φvc= 0 0 Mpa 0 0 0 0 0
0 0 0 0 0 bw= 0 0 m =y2y1 0 0 0 0 0
0 0 0 0 0 ΦVc= 0 0 t 0 0 0 0 0
0 0 0 0 0 Vx= 0 0 t 0 0 0 0 0
Vt= 0t ratio= 0 0 OK Mt= 0t
Vb= 0t Mb= 0t

dy= 1.51 m - At face of col


wy<dy= 1 1 0 0 0 Vx= 1118 1118 t yi-b2+ec= 0.65 0.65 0 0 0
at column 0 0 0 0 0 wx= 0.651 0.651 m 0 0 0 0 0
v1.06 -1 -1 0 0 0 Mu= 727.6 727.6 t.m -0.65 -0.65 0 0 0
0 0 0 0 0Mu/Vd= 0.432 0.432 <1 0 0 0 0 0 wleft= -0.65
0 0 0 0 0Vd/Mu= 2.313 2.313 >1 0 0 0 0 0 wrig= 0.65
ro= 0.004 0.004
k= 1.082 1.082 =(3.5-2.5*M/Vd)*(0.16+MAX(17*ro/sqrt(fck),8/1000)*Vd/M)*dy/wy
Vu= 559 559 0 0 0 k= 0.83 0.83 <0.83 Mu= 364 364 0 0 0
0 0 0 0 0 Φvc= 3.21 3.21 Mpa 0 0 0 0 0
-559 -559 0 0 0 bw= 3.97 3.97 m =bending -364 -364 0 0 0
0 0 0 0 0 ΦVc= 1918 1918 t 0 0 0 0 0
0 0 0 0 0 ratio= 0.583 0.583 OK 0 0 0 0 0
Vt= 1118 t Mt= 728 t
Vb= -1118 t Mb= -728 t

Two-way Shear at Two adjacent piles Two-way Shear at a signle pile


Vu= 1118 t =2*Rumax Vu= 559 t =Rumax
b0= 7.65 m =pi()*(dp+d)+2*L b0= 5.5 m =pi()*(dp+d)
ΦVc= 1469 t =Φ*0.33*sqrt(f'c)*b0*d ΦVc= 1056 t =Φ*0.33*sqrt(f'c)*b0*d
ratio= 0.76 <1? OK ratio= 0.53 <1? OK

Two-way Shear at Corner pile One-way Shear at Corner pile


Vu= 559 t =Rumax Vu= 559 t =Rumax
b0= 3.19 m =pi()*(dp+d)/4+2*E b= 3.48 m =2*(E*sqrt(2)+dp/2+min(d,0.33))
ΦVc= 614 t =Φ*0.33*sqrt(f'c)*b0*d ΦVc= 344 t =Φ*0.17*sqrt(f'c)*b*d
ratio= 0.91 <1? OK ratio= 1.62 <1? NO

Settlement by STP (Group piles)


sg(e)= 96.1 mm =0.96*q*sqrt(Bg)*I / N60
se= 35.8 mm =sg(e)*sqrt(D/Bg)
D= 0.25 m diameter of piles
d= 1.52 m (distance between axe of piles = 2.5D to 3D)
n= 3 (nomber of row of piles)
m= 2 (nomber of column of piles)
Bg= 1.77 m (smalle dimension, if signle pile =Diameter of pile)
Lg= 3.29 m (large dimension, if signle pile =Diameter of pile)
N60= 20 (average standard penetration number within seat of settlement
(=Bg deep below the tip of the piles)
L= 12 m (length of pile)
(G+Q)g= 1747 t (load total in SLS)
q= 301 t/m2 = (G+Q)g / (Lg*Bg)
I= 0.5 influence factor max(0.5, 1- L/8Bg)