This weekly progress report summarizes Shashank Shekhar's work in the first week of his cooperative housing society maintenance system project. Key activities included finalizing the project title, submitting a synopsis, determining technical and economic feasibility, and completing initial requirement gathering. For the next week, the focus will be on exploring appropriate software design and technologies for development. The student's performance this week was deemed satisfactory by their guide.

Uploaded by

Shashank Shekhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views2 pages

WPR 1

This weekly progress report summarizes Shashank Shekhar's work in the first week of his cooperative housing society maintenance system project. Key activities included finalizing the project title, submitting a synopsis, determining technical and economic feasibility, and completing initial requirement gathering. For the next week, the focus will be on exploring appropriate software design and technologies for development. The student's performance this week was deemed satisfactory by their guide.

Uploaded by

Shashank Shekhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Weekly Progress Report (WPR)

Domain of Engineering and Technology


Amity School of Engineering and Technology

Week: 1 Duration: 29/05/2023 to 04/06/2023

To be filled by Student

Name of Student: Shashank Shekhar

Enrolment No. A2305219583

Programme & Semester BTech (CSE), Semester 7

Project Title finalized, if Yes, give Data Analysis: Cooperative Housing Society
name, if No, give reason(s) Maintenance System

Synopsis submitted Yes

Literature review NA

Requires a smartphone(android
Technical & Economical Feasibility
temporarily). Economically feasible

Bill of Material NA

Requirement gathering completed.


Project Progress Schedule (PERT
Next: Exploring the software design and
Chart)
technology to be used for development.

Design of critical components NA

Fabrication work (give %) 0

Experimental work (give %) 0

Result and Analysis Requirements outlined.

Report writing NA

Signature of student
Work done in this week:
The current project pertains to the development of a Cooperative Housing Society
Maintenance system which the intended users can easily install on their smartphones and
navigate through various services, ranging from daily help services, to maintenance, bill
payments and notifications, enumerating amenities, etc. The requirement gathering stage
is completed and basic components that form the essence of the application have been
finalised.

To be filled by Guide (strike off whichever is not applicable)

Performance of students is satisfactory

Performance of students is unsatisfactory

A warning to be issued to student