00 ETAP System Modelling

ETAP is a software platform used for modeling, analyzing, and operating power systems throughout their lifecycle. It allows users to build a single line diagram of an AC power network, perform studies under different configurations and conditions, and create customized presentations and reports. The software provides tools for intuitive modeling, automatic connectivity checks, and multi-level access management for power system design, analysis, and operation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views32 pages

00 ETAP System Modelling

ETAP is a software platform used for modeling, analyzing, and operating power systems throughout their lifecycle. It allows users to build a single line diagram of an AC power network, perform studies under different configurations and conditions, and create customized presentations and reports. The software provides tools for intuitive modeling, automatic connectivity checks, and multi-level access management for power system design, analysis, and operation.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 32

ETAP System Modelling

AC Network
ETAP Overview

• One-Line Diagram • Mode Toolbar


• Toolbar Format • System Toolbar
• Dumpster • Study Case Toolbar
• Project Overview • Message Log
• Project Toolbar
ETAP Overview
From Modelling to Operation
ETAP is a platform for continuous design and operation in all stages of
a power system life cycle - from original concept through specification,
design, integration, test, commission and in-service support.
Mode Toolbar Format
Analysis Toolbar Format
Create a New Presentation
Auto Build
• Quick & Intuitive Single Line Generation
• No need to Drag, Drop, Connect
• Auto-build without Leaving Equipment Palette
• Automatic spacing & Alignment Rules
Voltage Propagation
Check Circuit Continuity
Remote Connector
Insert Protective Device

HINT

Protective Devices can be inserted


Without breaking connection line
Move from Dumpster
Rules:
• Move From Dumpster can be done only under “Edit” mode
and “Base” revision data
• Deleted Items (element groups) must be present in
Dumpster beforehand
• IDs of the moved elements, along with the connections,
status, and properties are preserved
• Move desired Dumpster cell group by selecting from the
Dumpster window
• Move From Dumpster capability also supported inside
Composite Networks
• Both sections of Remote Connector element must be moved
from the dumpster at the same time

Elements can be moved from the Dumpster into the one-line


diagram with the same name IDs by using the following
methods:
• Right-click on the one-line diagram and select Move From
Dumpster
• Click on Edit on the Menu Bar and select “Move From”
Data Block
Create a Data Block for Bus elements to display the following:
• Bus Name (ID)
• Nominal Bus kV
• kW Loading
• Voltage Drop in kV
One-Line Template

• Select All and create a One-


Line Template by selecting
“Add to”
• Create a new Project and
retrieve saved One-Line
template by selecting “Get
from”
3-D Database
Study Conditions
Different Operating Requirements

Generator 1 in Voltage Control Mode Generator 1 in Swing Mode


Study Conditions
Different Configurations

Configuration Normal Configuration GenOFF


Study Conditions
Different Engineering Data

Revision Base Revision Sub2a Mod


3-D Database
3-D Database
3-D Database
Presentations 1. Original SLD 2. PDs Hidden on SLD

3. LF Study on SLD 4. SC Study on SLD


Configurations
1. LF Study on Config1 (All Breakers Closed) 2. CS Study on Config1 (All Breakers Closed)

3. LF Study on Config2 (One Breaker Open) 4. SC Study on Config2 (One Breaker Open)
Revisions 1. LF Study on Config1 of Rev1 (Tx. Ratings Changed) 2. CS Study on Config1 of Rev1 (Tx. Ratings Changed)

3. LF Study on Config2 of Rev1 (Tx. Ratings Changed) 4. SC Study on Config2 of Rev1 (Tx. Ratings Changed)
User Access Management
System Modelling
AC Network
The End