MANHOURS REPORT - SITE PROJECT

DATE PROJECT NAME

13 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

06.00 07.00 08.00 09.00 10.00 11.00


Weather Condition at Overtime
Bright Bright Bright Bright Bright Bright
WEATHER CONDITION
12.00 13.00 14.00 15.00 16.00 17.00
-
Bright Bright Bright Bright Bright Bright
06.00 07.00 08.00 09.00 10.00 11.00 Temperature and wine Condition at
- - - - - - Overtime
TEMPERATURE (◦C) / WIND CONDITION
(KNOT) 12.00 13.00 14.00 15.00 16.00 17.00
-
- - - - - -

A. MANPOWER - MANHOURS
Normal Work Overtime Work
Total Manhours
No Position Today
Manpower Total Hours Total Manhours (NW) Manpower Total Hours Total Manhours (OT)

1 Director 1 0 0 0 0 0 0
2 Project Manager 1 8 8 0 0 0 8
3 Site Manager 1 8 8 0 0 0 8
4 HSE Officer 1 8 8 0 0 0 8
5 Administration 1 8 8 0 0 0 8
6 Supporting Project 1 8 8 0 0 0 8
7 Supporting Project 1 0 0 0 0 0 0
8 Supporting Project 1 0 0 0 0 0 0
9 Asst. Project Manager 1 0 0 0 0 0 0
10 Mechanical Supervisor 1 0 0 0 0 0 0
11 Elektrical Supervisor 1 0 0 0 0 0 0
12 Assment Supervisor 1 0 0 0 0 0 0
13 Workers 16 0 0 0 0 0 0

TOTAL 28 40 40 0 0 0 40
June 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM) 40
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MM
Daily Manhours (DM) 40
July 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM)
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MM
Daily Manhours (DM) 0
TOTAL MANHOURS ON PROJECT 40

B. HSE STATISTIC
NO DESCRIPTION THIS DAY PREVIOUS CUMMULATIVE REMARK
HSE Induction 0 0 0
Toolbox Meeting (TBM) 0 0 0
HSE Training 0 0 0
LEADING INDICATOR

Vehicle Inspection 0 0 0
APD Inspection 0 0 0
Machine Inspection 0 0 0
HSE Patrol 0 0 0
Permit To Work 0 0 0
Job Safety Analysis & HSE Plan 1 0 1
house keeping 0 0 0

Page 1 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

13 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

Near Miss 0 0 0
First Aid Case 0 0 0
Medical Treatment Case (MTC) 0 0 0
Restricted Work Day Case (RWDC) 0 0 0
Lost Work Day Case (LWDC) 0 0 0
LAGGING INDICATOR

Fatality 0 0 0
Motor Vehicle Accident 0 0 0
Property Damage 0 0 0
Environment Damage 0 0 0
Illness or Sickness 0 0 0
Lost Time Injury (LTI) 0
Total Recordable Case (TRC) 0
Lost Time Incident Frequency Rate (LTIFR) 0
Total Recordable Incident Rate (TRIR) 0

Prepared by, Checked by, Approved by,


HSE Officer PT. KPE Project Manager PT. KPE Director PT KPE

Noven Yudha P Sulton Ibrahim Surya

Page 2 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

15 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

06.00 07.00 08.00 09.00 10.00 11.00


Weather Condition at Overtime
Bright Bright Bright Bright Bright Bright
WEATHER CONDITION
12.00 13.00 14.00 15.00 16.00 17.00
-
Bright Bright Bright Bright Bright Bright
06.00 07.00 08.00 09.00 10.00 11.00 Temperature and wine Condition at
- - - - - - Overtime
TEMPERATURE (◦C) / WIND CONDITION
(KNOT) 12.00 13.00 14.00 15.00 16.00 17.00
-
- - - - - -

A. MANPOWER - MANHOURS
Normal Work Overtime Work
Total Manhours
No Position Today
Manpower Total Hours Total Manhours (NW) Manpower Total Hours Total Manhours (OT)

1 Director 1 0 0 0 0 0 0
2 Project Manager 1 0 0 0 0 0 0
3 Site Manager 1 8 8 0 0 0 8
4 HSE Officer 1 8 8 0 0 0 8
5 Administration 1 0 0 0 0 0 0
6 Supporting Project 1 0 0 0 0 0 0
7 Supporting Project 1 0 0 0 0 0 0
8 Supporting Project 1 0 0 0 0 0 0
9 Asst. Project Manager 1 0 0 0 0 0 0
10 Mechanical Supervisor 1 0 0 0 0 0 0
11 Elektrical Supervisor 1 0 0 0 0 0 0
12 Assment Supervisor 1 0 0 0 0 0 0
13 Workers I 6 8 48 0 0 0 48
13 Workers I 10 0 0 0 0 0 0
TOTAL 28 24 64 0 0 0 64
June 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM) 40 64
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MM
Daily Manhours (DM) 104
July 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM)
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MM
Daily Manhours (DM) 0
TOTAL MANHOURS ON PROJECT 104

B. HSE STATISTIC
NO DESCRIPTION THIS DAY PREVIOUS CUMMULATIVE REMARK
HSE Induction 8 0 8
Toolbox Meeting (TBM) 0 0 0
HSE Training 0 0 0
LEADING INDICATOR

Vehicle Inspection 0 0 0
APD Inspection 0 0 0
Machine Inspection 0 0 0
HSE Patrol 0 0 0
Permit To Work 1 0 1
Job Safety Analysis & HSE Plan 0 1 1
house keeping 0 0 0

Page 3 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

15 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

Near Miss 0 0 0
First Aid Case 0 0 0
Medical Treatment Case (MTC) 0 0 0
Restricted Work Day Case (RWDC) 0 0 0
Lost Work Day Case (LWDC) 0 0 0
LAGGING INDICATOR

Fatality 0 0 0
Motor Vehicle Accident 0 0 0
Property Damage 0 0 0
Environment Damage 0 0 0
Illness or Sickness 0 0 0
Lost Time Injury (LTI) 0
Total Recordable Case (TRC) 0
Lost Time Incident Frequency Rate (LTIFR) 0
Total Recordable Incident Rate (TRIR) 0

Prepared by, Checked by, Approved by,


HSE Officer PT. KPE Project Manager PT. KPE Director PT KPE

Noven Yudha P Sulton Ibrahim Surya

Page 4 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

16 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

06.00 07.00 08.00 09.00 10.00 11.00


Weather Condition at Overtime
Bright Bright Bright Bright Bright Bright
WEATHER CONDITION
12.00 13.00 14.00 15.00 16.00 17.00
-
Bright Bright Bright Bright Bright Bright
06.00 07.00 08.00 09.00 10.00 11.00 Temperature and wine Condition at
- - - - - - Overtime
TEMPERATURE (◦C) / WIND CONDITION
(KNOT) 12.00 13.00 14.00 15.00 16.00 17.00
-
- - - - - -

A. MANPOWER - MANHOURS
Normal Work Overtime Work
Total Manhours
No Position Today
Manpower Total Hours Total Manhours (NW) Manpower Total Hours Total Manhours (OT)

1 Director 1 0 0 0 0 0 0
2 Project Manager 1 0 0 0 0 0 0
3 Site Manager 1 8 8 0 0 0 8
4 HSE Officer 1 8 8 0 0 0 8
5 Administration 1 0 0 0 0 0 0
6 Supporting Project 1 0 0 0 0 0 0
7 Supporting Project 1 0 0 0 0 0 0
8 Supporting Project 1 0 0 0 0 0 0
9 Asst. Project Manager 1 0 0 0 0 0 0
10 Mechanical Supervisor 1 0 0 0 0 0 0
11 Elektrical Supervisor 1 0 0 0 0 0 0
12 Assment Supervisor 1 0 0 0 0 0 0
13 Workers I 6 8 48 0 0 0 48
13 Workers I 10 0 0 0 0 0 0
TOTAL 28 24 64 0 0 0 64
June 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM) 40 64 64
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MM
Daily Manhours (DM) 168
July 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM)
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MM
Daily Manhours (DM) 0
TOTAL MANHOURS ON PROJECT 168

B. HSE STATISTIC
NO DESCRIPTION THIS DAY PREVIOUS CUMMULATIVE REMARK
HSE Induction 0 8 8
Toolbox Meeting (TBM) 0 0 0
HSE Training 0 0 0
LEADING INDICATOR

Vehicle Inspection 1 0 1
APD Inspection 0 0 0
Machine Inspection 1 0 1
HSE Patrol 0 0 0
Permit To Work 0 1 1
Job Safety Analysis & HSE Plan 0 1 1
house keeping 0 0 0

Page 5 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

16 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

Near Miss 0 0 0
First Aid Case 0 0 0
Medical Treatment Case (MTC) 0 0 0
Restricted Work Day Case (RWDC) 0 0 0
Lost Work Day Case (LWDC) 0 0 0
LAGGING INDICATOR

Fatality 0 0 0
Motor Vehicle Accident 0 0 0
Property Damage 0 0 0
Environment Damage 0 0 0
Illness or Sickness 0 0 0
Lost Time Injury (LTI) 0
Total Recordable Case (TRC) 0
Lost Time Incident Frequency Rate (LTIFR) 0
Total Recordable Incident Rate (TRIR) 0

Prepared by, Checked by, Approved by,


HSE Officer PT. KPE Project Manager PT. KPE Director PT KPE

Noven Yudha P Sulton Ibrahim Surya

Page 6 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

17 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

06.00 07.00 08.00 09.00 10.00 11.00


Weather Condition at Overtime
Bright Bright Bright Bright Bright Bright
WEATHER CONDITION
12.00 13.00 14.00 15.00 16.00 17.00
-
Bright Bright Bright Bright Bright Bright
06.00 07.00 08.00 09.00 10.00 11.00 Temperature and wine Condition at
- - - - - - Overtime
TEMPERATURE (◦C) / WIND CONDITION
(KNOT) 12.00 13.00 14.00 15.00 16.00 17.00
-
- - - - - -

A. MANPOWER - MANHOURS
Normal Work Overtime Work
Total Manhours
No Position Today
Manpower Total Hours Total Manhours (NW) Manpower Total Hours Total Manhours (OT)

1 Director 1 0 0 0 0 0 0
2 Project Manager 1 0 0 0 0 0 0
3 Site Manager 1 8 8 1 1 1 9
4 HSE Officer 1 8 8 1 1 1 9
5 Administration 1 0 0 0 0 0 0
6 Supporting Project 1 0 0 0 0 0 0
7 Supporting Project 1 0 0 0 0 0 0
8 Supporting Project 1 0 0 0 0 0 0
9 Asst. Project Manager 1 0 0 0 0 0 0
10 Mechanical Supervisor 1 0 0 0 0 0 0
11 Elektrical Supervisor 1 0 0 0 0 0 0
12 Assment Supervisor 1 0 0 0 0 0 0
13 Workers I 6 8 48 6 1 6 54
13 Workers I 10 0 0 0 0 0 0
TOTAL 28 24 64 8 3 8 72
June 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM) 40 64 64
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 MM
Daily Manhours (DM) 72 240
July 2023 (Monthly Manhours / MM)
Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Daily Manhours (DM)
Date 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 MM
Daily Manhours (DM) 0
TOTAL MANHOURS ON PROJECT 240

B. HSE STATISTIC
NO DESCRIPTION THIS DAY PREVIOUS CUMMULATIVE REMARK
HSE Induction 0 8 8
Toolbox Meeting (TBM) 1 0 1
HSE Training 0 0 0
LEADING INDICATOR

Vehicle Inspection 0 1 1
APD Inspection 1 0 1
Machine Inspection 0 1 1
HSE Patrol 1 0 1
Permit To Work 0 1 1
Job Safety Analysis & HSE Plan 0 1 1
house keeping 1 0 1

Page 7 of 8
MANHOURS REPORT - SITE PROJECT
DATE PROJECT NAME

17 Juni 2023 Pekerjaan Overhaul Generator TK-4 Dongfang 90MW (PR 52915

Near Miss 0 0 0
First Aid Case 0 0 0
Medical Treatment Case (MTC) 0 0 0
Restricted Work Day Case (RWDC) 0 0 0
Lost Work Day Case (LWDC) 0 0 0
LAGGING INDICATOR

Fatality 0 0 0
Motor Vehicle Accident 0 0 0
Property Damage 0 0 0
Environment Damage 0 0 0
Illness or Sickness 0 0 0
Lost Time Injury (LTI) 0
Total Recordable Case (TRC) 0
Lost Time Incident Frequency Rate (LTIFR) 0
Total Recordable Incident Rate (TRIR) 0

Prepared by, Checked by, Approved by,


HSE Officer PT. KPE Project Manager PT. KPE Director PT KPE

Noven Yudha P Sulton Ibrahim Surya

Page 8 of 8