This document requests technical specifications for a data center solutions quote including: 1. General project information such as location, deadlines, and key contacts. 2. Technical specifications covering input power requirements, cooling needs, IT equipment details, and environmental/site factors. 3. Requirements for protection systems including fire suppression and environmental monitoring.

Uploaded by

Bahadir Akoglan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views2 pages

DC Questionnaire

This document requests technical specifications for a data center solutions quote including: 1. General project information such as location, deadlines, and key contacts. 2. Technical specifications covering input power requirements, cooling needs, IT equipment details, and environmental/site factors. 3. Requirements for protection systems including fire suppression and environmental monitoring.

Uploaded by

Bahadir Akoglan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1/21/2021

Detailed Information Sheet for Data Center Solutions


GENERAL INFORMATION
. Customer Name
. Opportunity name Mandatory
. BFO Opportunity ID
. Installation Location Mandatory
Quote Type Mandatory Budgetary
. Quote deadline (RFQ/RFI) (dd/mm/yy)
On-Site groundbreaking/commissioning/other deadline(s)
. Links to customer supplied files (CAD drawings, pdf, etc.)
. Local Sales Manager: Mandatory
. Local Sales Engineer / Solution Architect Mandatory

TECHNICAL SPECIFICATIONS
. Specifications Required? Design Default Customer Requirements
400V-3P 50Hz or
. Input Voltage, Freqency, Power limit etc. kAIC limit? Mandatory
380V-3P 50Hz
Expected Uptime Tier Level? Mandatory Tier III
SITE

Is a Generator needed?
. If "YES" then specify redundancy (N, N+1, 2N)
No If needed N+1 or N+N ?

ATS needed? Closed Transition? External? Done By Others? Mandatory No

. Space constrains or other site limitations


Are there extreme temperatures on site? Regular temperatures range: Minimum: -
. 20ºC / -4ºF - Maximum: +40ºC / 104ºF Mandatory No No
ENVIRONMENTAL

If "YES", please specify temperature range.


CONDITIONS

Site altitude (m/ft.)


. Over 900m / 3.000 ft. derating is considered.
Mandatory < 1200' 3m

. Exsiting Building or New Design Building Existing Building


Area type and related design considerations: (urban, rural, marine, mining, corrosive,
. snow, wind, seismic...)
Commercial Building

. Space conditions and location (floor, area size, height etc.)

. Special requests (aisle widths, vestibule, No

.
ATTRIBUTES

Fire-resistance rating for the room (min) 0


PHYSICAL

Number and Type of room doors


. 40"x84" main entry, 34 x 84" additional egress typical.

. Interior Acces zones? Cold Aisle Door? None


Interior and Exterior lighting requirements (type, controls, Occupancy/Vacancy, dusk
to dawn, etc)

. Number of racks Mandatory

Type of Racks (Network or Server Rack) Mandatory

. Type of rPDU Metered

Any specific rack color needed?


IT RACKS

Critical Load power distribution redundancy (N, 2N) 2N


42U x 600mm x
. Rack size (height x width x depth) or SKU
1200 ISO

. Maximum rack load above 1000 kg? No

. Additional rack space needed for Cable Management or 3rd party equipment?

. Rack level security (access control handles) needed? No

. Initial IT load or average rack density (KW or KW/rack) Mandatory

. Final IT load or average rack density (KW or KW/rack) Mandatory


POWER & UPS

Single or dual external electrical feed to input electrical panel.


. TIER I and II -> Single Mandatory Dual
TIER III and IV -> Dual

. UPS system desired and redundancy (N, N+1, 2N) UPS yes;

. Battery runtime (Min SOL/EOL @ %Datacenter Capacity Rating) 5m EOL @ 100%

. What kind of capacity kAIC panels and transformers are required? 65 kAIC typ.
Specific cooling type and options preferred? DX vs. CW?
. InRow, CRAC, Overhead fancoils,… Control scheme (supply or return)
If Chilled Water, are there any expected EWT, LWT, % of PG or EG?
Operating Conditions required or desired. Server Inlet Temp and deltaT or hot aisle 25°F Delta T
. temp control limits; Airflow CFM/kW requirement 130 cfm/kw

. Required room humidity and temperature range None Specified


COOLING

Is Continious Cooling required? No

. Cooling redundancy (N, N+1) N+1

Double electric feed for the cooling units No

. UPS support for continuous cooling runtime (emerg. Ventil., buffer tank, etc.) None
Will the space be treated as 'Occupied' or 'Unoccupied' space?
Unoccupied
If 'Occupied' how many people are expected to occupy the space at once?

. Distance and Height from condensers / chillers to IT Module (ft./m)

.
PROTECTION

Is automatic smoke detection required? (per IBC 907.2.18.1 - 1, 907.2.2.23) Yes


SYSTEM
FIRE

. Type of Fire extinguishing system. Alternate automatic fire protection system


desired? (IBC Section 904)
NOVEC 1230

. Is Early Detection System (VESDA) required? No


Fire Suppression System controlled power down procedures to include
. Main/Genset/UPS/HVAC/ERV power down per NFPA70 645.10 and NFPA75 9.4
Yes

REMOTE MONITORING SYSTEM


Environmental Monitoring Netbotz in IT
Please specify any requests for specific sensors modules
Number of Interior Cameras
. Netbotz Camera
0

Number of Exterior Cameras


. Pelco Camera
0