Daily Report-457
Daily Report-457
Daily Report-457
Contractors:
WEEK :W75 TIME : 08:00 - 21:00 WIB
10. Administration
11. others
- Housekeeping 1/28/2023 info
- Install Ball Catcher 5/19/2023 Postponed
METHODS
1 Survey using total station
2 Unloading material using TMC 8
3 Mob-demob material use mobile pick up
4 Erection bucket elevator using overhead crane extisting 10 Ton
5 Scaffolding for work at height
1 Utility car 3 unit TOOLS QTY MATERIAL QTY SAFETY ISSUE
2 1 Toolkit 5 set 1 Rebar 1 lot
3 2 Ladder 6 ea 2
4 3 Scaffolding 1 lot 3
5 4 Ratchet 4 Set 4
5 Total station 2 Set 5
6 Saw 2 unit
7 Grinder 3 unit
8 Drill machine 5 unit
9 Welding machine 5 unit
10 Drill impack 1 unit
11 Electrical tools set 2 set
12 Sump pump 1 set
13 Blower 2 set
Prepared By:
PT. Livia Andalan Indonesia Checked By: Approved By:
PT. Molycop Indonesia PT. Molycop Indonesia
PROJECT CONTROL
PROJECT SPV PROJECT MANAGER
CILEGON SAG PROJECT : DBT & HOPPER
ZZ
6 Juli 2018
==================================================
==================================================
==================================================
==================================================
==================================================
==================================================
==================================================
=========================================
F
CILEGON SAG PROJECT : DBT & HOPPER
6 Juli 2018
-
CILEGON SAG PROJECT : DBT & HOPPER
Photo of Documentation