Lord of The Infrastructure
Lord of The Infrastructure
of the Infrastructure
A Management Guide for IT Infrastructure Managers
By Art Carapola
Copyright © 2016 by NewVista Advisors, llc and Art Carapola
NewVista Advisors, llc
22 Indian Wells Road
Brewster, NY 10509
www.nvadvisors.com
Some Initial Thoughts
Why did I write this book?
Having managed IT organizations for over 30 years, with the majority of that time focused
on large IT Infrastructures I have long since developed a deep understanding of what’s
important and what is not. Managing an IT Infrastructure is a thankless job. Most people
don’t even realize it exists until something goes wrong. When that happens, their views
are usually not very kind.
I have found that most Infrastructure Managers are literally thrown into the job with little
or no training. People that were exceptional technologists are often chosen to lead an
Infrastructure team. Other times exceptional Infrastructure Engineers move on to new
companies to become an Infrastructure Manager.
However you became the leader of an IT Infrastructure Organization, the odds are good
that you are finding yourself in many situations that no one prepared you for. This book is
designed to teach the reader how to manage an IT organization and to infuse in you the
information you will need to be far more successful than most. It’s for those lucky
individuals that suddenly find themselves in charge of IT – either a part of IT (such as the
head of Infrastructure) or the entire organization (as in the CIO/CTO).
Why You Should Read This Book
Whether you are a new Infrastructure Manager or you are hoping to move up into that
role, this book provides a prescriptive description of what it takes to be successful in that
role. It provides a roadmap to assist you in determining what needs to be your immediate
areas of focus, how to navigate relationships, manage your staff, deal with company
politics and the inevitable landmines they entail. The book describes how you will build
both short and long-term plans and execute on those plans. It is about managing
technology and technology teams, IT budgets, Risk, Assets, and large IT projects.
This book assumes that the reader has some exposure to managing tasks or projects and
possibly even small teams. Understand that there is a chasm of difference between
managing a task driven team and managing an entire organization. My goal is to make
that transition less painful.
This book defines major activities that an Infrastructure Manager will undertake on a day
by day basis. It helps you understand how to assess the organization and technology you
are now managing, the policies and processes that must be in place to manage day to day
activities, how to measure how well your organization and technology are performing, and
what you need to do to make it better.
Most importantly, it is designed to alert you to the primary causes that managers get
derailed from their job. If this is your first management position you will surely
encounter many new situations you may not have ever thought about. New relationships,
new expectations, and undefined goals all can spell doom.
What this book is NOT about
This book is not designed to teach you about Networking, Information Security, Windows
Networks, Servers or Desktops. In short, this is NOT about any specific technology.
This book is also not a comprehensive tutorial on Project Management. Although Project
Management will be discussed in some depth, it will not make you into a great project
manager if you have no previous background. There are more detailed books and courses
focused on doing that. It will provide the basics for you to function, successfully
managing projects, however.
Who is the audience for this book?
There are several audiences for this book.
Art has outstanding client centric focus on building technology organizations that foster
exceptional relationships with key internal and external parties driven and rewarded by
achieving shared business goals.
Art’s career is built on the premise that technology is the change agent & transformational
lever that allows organizations to lead.
Art is a creative thinker and catalyst for new ideas with a strong record of fostering
technology innovation, pushing the limits for adoption, and understanding both the impact
and opportunity of emerging and disruptive technologies.
Art is an outstanding organization and team leader with experience in leading cross
cultural global teams in as many as 25 countries, in high-growth fast-paced environments.
CORE COMPETENCIES
Table of Contents
The Basics
What Do You Do With The Information You Collected In Your Initial Assessment?
Strategic Issues
IT Communications
IT Newsletters
Notification of Systems Maintenance Events
Contingency
A Project Today Impacts Keeping the Lights on Tomorrow
Optimizing an IT budget
Outsourcing as an Alternative
People Management
MBWA
Staff Compensation
Dealing with Staff Issues – Problem Employees, Conflict Resolution
IT Processes
Incident Management
The Help Desk
IT Asset Management
Asset Management is a Collection of Processes
Risk Management – Understanding What Can Impact or Derail Something You Are
Responsible For
Risk Identification
Risk Categories
Risk Assessment
Risk Mitigation
Risk Acceptance
Information Security Risks
Risk Documentation
Risk Reporting and Review
Project Planning
Project Execution
Operational Management
Change Management
Information Technology Metrics – A Critical Component of Your Toolbox
Call Trending
Messaging Services
Server Availability
Storage Availability
Network Availability
Mobile Devices
The Complainer
Home Setups
Final Words
Appendix A
Some Items You Should Focus On Understanding When You Start a New Position
The Basics
How did you get here?
One of the most important questions you need to answer for yourself as soon as you
embark on your journey to become “Lord of the Infrastructure” is “how did I get here?”
That sounds simple enough, but in reality it’s far more complicated than “because of my
great technical work and commitment to the company”. Here are a few questions that you
should think about when answering this question:
Your staff must include those technical subject matter experts that will design, build and
maintain the systems. This is usually the most difficult transition for a new IT manager –
letting go of the technology tasks. I’ve seen this bring down new managers again and
again.
What will now be your key areas of focus?
Your job is now focused on how the technology you are responsible for meets the needs of
the business and hopefully drives it to greater success. This means you will interact more
closely with business management than ever before. In most cases the IT manager must
build a set of plans (Tactical Plan for short term initiatives – Strategic Plan for long term
direction). The strategic plans are usually socialized with the major business leaders in the
organization to ensure you are well aligned with their direction and needs, and to get their
concurrence on your agenda.
You will focus on optimizing the cost/benefit ratio of the technology you deploy, the
alignment of technology initiatives with business plans and direction, operating within
allocated budgets, sourcing and retaining the best technical people, representing your
organization in the interaction with the business and other technical peers.
Some of the skills that are needed for this role include:
Never ever ever lie! - This is my number one measure of a person. You can fix a
lack of specific skills, however most real managers realize you can’t fix a lack of
integrity. Once you are labeled as a liar you are done.
Have your facts straight. - If you absolutely know the answer, then reply to a
question. If not, don’t be afraid to say “I can’t answer that right now, but I will get
you the answer by the end of the day (week, etc.). “ Make sure you give the person
SOME response by the deadline you set for yourself, even if that response is “I’m
still working on that answer but it will take a bit more time”.
Prepare “elevator speeches” for those questions you expect to be asked. An
elevator speech is a very short canned answer – named after the tendency to be
asked questions when you’re trapped in an elevator. Question “So John, I hear your
team is developing a new remote access capability. What’s that all about?” You
should be prepared to respond with the details: Why you’re doing it, what it means
to the users, what issues it solves, when it will be available, what the economics are
(saves this much or costs this much extra but gives us these benefits), what would
the result be if you didn’t do this.
Be dependable – If you say something will happen by a certain time or date, make
sure it happens or make sure you’ve prepped people for (communicated) the delay
Be prepared to justify your requests – If you are looking for something – budget to
buy something, additional headcount, etc. – have the justification for your request
fully prepared and ready to go before you make that request. There will be more on
this later.
Bottom line it comes down to the following – if someone asks you a question, make sure
you are fully prepared to answer it. If you answer a question, build your reputation so that
people believe the information you communicated is correct and truthful. Essentially, you
are knowledgeable, credible and have high-integrity.
Difficulty Leading your team (ability to influence, build and maintain a team, role
modeling) - How well you manage your team will also be a major factor in your success in
your new role. You cannot underestimate the level of this challenge. Whether you were
promoted from within or brought in from the outside there will always be someone on
your team that believes to the core of their being that they should have been given your
job. Only your actions and your team’s successes will address this over time. Some
things to keep in mind:
Hire the Best of the Best of the Best – I know, easier said than done, but you might
be surprised at the number of people that won’t hire someone smarter than they
are. Make sure you hire the smartest most enthusiastic people you can find for
every role you have available. I have always been the most successful when every
person on my team is smarter than I am in their specific technical focus. Don’t let
critical roles remain unfilled for extended periods of time.
Listen to your team and make sure they feel comfortable challenging you and
telling you when you’re wrong! – I always try to hire the best and smartest in their
field and make sure they know I expect them to tell me when I am going down the
wrong path. That has saved my butt more often than I like to think about. This
also gives the subject matter experts the understanding that their opinions and
contributions are respected and that they still have some level of control over their
area of responsibility (remember that person who believes he/she should have
gotten your job?)
Empowerment – Understand what level of empowerment you can push down to
your team.
As an example, in one of my roles where I had End User Support and the Help
Desk in my organization I learned an important lesson in empowerment. We had
standards for desktop software (which was installed on every PC) and optional
programs that were allowed (such as Photoshop) but were restricted to only those
that absolutely needed them. There was a defined process to get these optional
programs, which consisted of approval by a person’s senior manager and approval
by me.
At one meeting, someone from our Help Desk pointed out to me that I had never
rejected a request from someone that had their senior manager’s approval. That
person recommended that I be taken out of the process and that, once the
requestor’s senior manager approved the request, the Help Desk would be
empowered to supply the software. That was a great recommendation and it
encouraged us to look at other processes that could be simplified.
There are similar stories across virtually every aspect of the IT organization. The
bottom line is not to inject yourself into the individual activities unless your
contribution delivers some real demonstrable value.
Make sure you credit your people for their work! – Praise your team and individual
staff members publicly whenever possible and appropriate. If someone outside of
your organization praises an accomplishment, instantly respond with praise those
on your team that did the heavy lifting. Your team will quickly resent you if they
believe you took credit for a success that they completed and you had little to do
with. Don’t see this as a lost opportunity to look great to the broader organization.
The fact that your organization is running well and is having success will directly
reflect on you.
Reward exceptional performance – When someone goes above and beyond, take it
past public praise and reward them. It doesn’t have to be a huge reward like a
major bonus (unless that is warranted). It can be something small but meaningful.
If one of your team needed to work the weekend and missed some family event,
reward them by offering to pay for dinner for the staff member and his/her spouse.
Give someone an extra day off. Refer to these as “Spot Awards”, since they are
given on the spot of the extraordinary event.
Deal with personnel issues quickly and firmly – If you have a personnel issue don’t
hope it goes away. It never will. Start documenting what you are doing to address
the issue as soon as you become aware of it. Document every conversation where
the issue was discussed – with everyone, including HR. Don’t suffer under the
delusion that, if things go very wrong, an unethical HR person will place the blame
on you for something that HR told you to do. Retain all EMAIL concerning this
person in a separate EMAIL folder. Create a separate file to hold all back-up
information. Bring HR into the discussion as early as possible and work with them
to either put the staff member on the right track or manage them out of the business.
(Much more on this later)
Be a mentor for your staff – Become the “Go To” person for your staff. Help them
work past issues. If you don’t have the skills to work through an issue, arrange for
them to get help from another employee or outside person. Own the problem and
always try to help your team member improve their skills or work through
challenges.
Issues with Honesty (Betrayed Trust) – I already mentioned this in the “Ability to
Influence” category. Hopefully I don’t have to say a whole lot here. Again, this is my
number 1 hot button. You can fix incompetence, but you can’t fix a basic lack of honesty.
If you get the reputation of being a liar, you might as well start looking for another job.
Over-Confidence, Defensiveness or Arrogance – These are all personality flaws that you
should avoid. Nobody wants to work with a jerk.
Don’t wait for that assessment to be brought to you – you need to go out and actively seek
it. Infrastructure Managers must develop communications plans outward to your
customers to tell them what you are doing. In addition, in as many situations as possible,
you should elicit customer feedback through surveys (help desk incident resolution survey,
etc.) On an annual basis the entire customer base should be asked to fill out a survey
describing their satisfaction with your services and what they need changed.
I can give lots of examples of where this has gone wrong. In most cases the story ends
with the person unwilling to accept feedback getting fired. A good example is a recent
office build out and headquarters relocation for a New York City Financial Services firm.
The Head of Real Estate pushed back on any input from anyone – whether that was IT or
the individual business unit stakeholders. The net result was that a huge number of items
needed to be torn down and rebuilt. Costs quickly got out of hand. By the time the move
was completed it costs almost twice what had been budgeted (which was already many
tens of millions of dollars), the project was about 6 months late, and everybody had an
issue with something in the new location. What do you think this manager’s chances are
of surviving in his position?
Poor Response to a Crisis -
How well or poorly you respond to a crisis will be one dimension where you will be
assessed with great prejudice by all involved – your management, your peers and
especially your users. This is truly one area where you must shine from day one, simply
because the inability to calmly and effectively lead your organization back into full
systems availability could mean the difference between a minor bump in the road and the
business failing.
Imagine for a second if you are responsible for supporting a Trading Floor at a financial
institution. If the network goes down and the market decides to crash at the same time, the
losses could be calculated into the many millions of dollars per minute,
What are the steps you must take to respond to a crisis? It obviously depends on the crisis,
but let’s assume the worst.
Assemble a team to resolve the crisis. You should have plans beforehand to
understand who will be engaged depending on what issue arises
Communicate with the impacted stakeholders – better to over communicate than to
under communicate
Have escalation plans in place – know when to escalate and to whom
Have periodic status update calls – get everyone together on a call every hour, half
hour, 15 minutes – whatever is required to make sure the extended team is well
synced up.
Don’t wait to bring in help – Bring in the vendors sooner rather than later,
especially if you have support contracts in place with them.
When the crisis has been resolved, communicate that broadly, thanking everyone
for their patience and thanking those that participated in the resolution for their
help. Explain in simple language what happened, why it happened and what you
have done (or are doing) to ensure it doesn’t happen again.
Starting the New Job
Your Initial Assessment
When you first start in a new IT Management Position it is important to make a
dispassionate assessment of your organization from your new management perspective. If
you were promoted into your new position, the most difficult part of this will be the need
for you to separate yourself from your past role as a technologist on the team in order to
develop a dispassionate assessment. As an example, if you were previously lead engineer
in the Networking department, now promoted to head of networking for the company,
your tendency will be to automatically assess the technology at a minimum as being in
great condition. (A simplistic example admittedly) This would be a mistake.
One of your key goals in this assessment will be to determine if there is anything in your
new organization that needs fixing. There is a huge amount of information available online
today discussing the top priorities of IT for the year, for the new CIO or CTO, for the
organization undergoing change, ad infinitum. You will learn that most IT problems will
fall into four generic areas:
Your assessment will almost always find issues you need to address and nothing here
should scare you away. The challenge will, of course, be to define an achievable plan to
address whatever is found. Each of these subjects will be reviewed in detail later in the
book.
Contracts – this is everything from contracts with carriers that include such
items as burst rate charges, end dates and termination fees, to contracts with
outsourced support organizations (Printer support, desktop support), to data
center colocation contracts (SLAs, renewal notification dates, holdover clauses,
etc.). Make a file of the contracts and a calendar of important dates and set up
automated alerts. The Legal and Finance departments can help you with this.
is one of the key areas you will be measured against. It is a commitment to the
company.
People – get the last performance evaluation and whatever portions of the
personnel files that are available to you for each member of your staff. Review
these in detail. If you were promoted into your position you may find that some of
your staff, who you have always enjoyed working with, have issues you will need
to understand and deal with, some may be professional development, and others
may be personnel issues that will require an ongoing partnering with your HR team.
Applications – What applications does your organization support? Are you just
providing the platform (servers) and pipes (network) or do you have development
or support responsibilities for the application? Does the application have any
special characteristics that need to be taken into consideration if you are planning to
virtualize servers or move to a new data center with higher network latency (e.g.
further away and less expensive)? Understand what is running in your environment
and what your role is to ensure that application is successful.
What Do You Do With The Information You Collected In Your Initial
Assessment?
Once you have collected the information about your organization you need to put it to
use. If this were an IT audit (which is essentially what you are doing), the auditor would
come back to you with a series of Recommended Actions (recommendations) as well as
the impact of not doing them on the organization. The list is usually separated into short
term (tactical) and longer term (strategic) recommendations. Your goal should be to
develop this type of list for yourself.
Tactical Issues
There are no staff sourcing, retention, Develop strategies and plans in this area.
separation or succession strategy or Socialize the plans with HR and then within
plans in place IT.
IT Communications
There are few places where the saying “Perception is Reality” applies more substantially
than it does for IT. The big issue you will need to contend with is that IT Infrastructure is
essentially an invisible service until something goes wrong. At that point your
organization will become the object of incredible focus – all directed at “what went
wrong”. You literally will not be given the opportunity to communicate all of the
wonderful things that have continually gone right (until this failure).
The only way to address this inevitable situation is to proactively communicate the
success. You should communicate to everyone – up, down and across. In each case the
message should be crafted to accentuate the positive (successes), and also to address
(explain) the failures or incidents and to communicate what has been done to ensure that
the negative incidents are not repeated.
To your staff
To your customers
IT Newsletters
Notification of Systems Maintenance Events
Announcement of major changes to Infrastructure and Applications
Monthly Dashboard reports to Management and Business Stakeholders
Frequently Asked Question Lists should be published and Pro-actively Distributed
Help Desk feedback to users providing ticket results and also eliciting feedback
through satisfaction surveys
IT Newsletters
IT Newsletters are regularly distributed publications that are designed to communicate a
variety of information on a periodic basis. Some of the types of information you may
want to include are:
Some IT Metrics since the last newsletter. This may include information on
systems availability, performance against IT goals (call resolution times, etc.),
number of calls, user satisfaction results since the last newsletter
Explanations of outages and what’s been done to ensure they don’t happen again
IT Schedule of Events, such as user training, IT upgrades
New Technology Updates
Restatement of Policies
Tips for users
Contact info for specific types of questions
Awards to IT Staff members
Web links that may be useful to the staff
Notification of Systems Maintenance Events
Whenever IT will be modifying the environment in a way that will impact the user, either
through a period of unavailability or through a change in how the system or an application
will operate, the user base should receive several notification messages in an EMAIL to
ensure they will be able to manage through any impact. You should create a template that
defines the categories of information that needs to be communicated, so these are easy to
generate and nothing gets left out. The notification should minimally cover:
A notification of a system event should be sent out for such activities as software patching
and upgrades, DR Tests, systems changes, etc.
It’s important to note that these Systems Maintenance events should always have gone
through the Change Management Process that you have put into place. Also, they MUST
be well communicated within your own organization. The Help Desk staff should be well
briefed on what is happening and who to call if they experience user issues at the start of
business after an update has been applied to the systems. Any peer technology
organizations that may be impacted by the updates should also be briefed on the changes
and should be required to sign-off on the change request.
Note that you may get push-back from a business or technology group on your changes or
schedule. This should have long been resolved in your Change Management Meetings
(part of the change management process) but you may find these things coming up once
the broad notifications go out. As an example, you may find an investment group within
your organization (Investment Banking or Private Equity) that is in the middle of working
on a deal and they cannot lose the systems for a Saturday or Sunday afternoon. If they
come back at you with such an issue you need to relent and reschedule (in the event you
haven’t figured that out yourself)
Announcement of Major Changes to Infrastructure and Applications
As a subset to the Notification of Systems Changes, the Announcement of a Major Change
to Infrastructure and Applications is a broadly communicated announcement to the
organization. In this particular case, however, this change can have serious ramifications
that must be well understood.
As such these major changes must be communicated well in advance of any actual
change. I’m talking about months here. Your team should be prepared to support the
organization with some level of resources to explain the changes and even help the users
make changes to their world to make the update transparent.
Monthly Dashboard Reports to Management and Business Stakeholders
A Dashboard is a report that provides a multi-dimensional status of a particular subject or
activity. Within the Infrastructure Department there are two types of Dashboard reports
that you will typically need to create; the monthly Operational Dashboard, which covers
results of the operational activities such as the Help Desk, Systems and Network
operations, Customer Satisfaction and so on. The second type of report is the Project
Dashboard, which provides a periodic update on the status of an individual project. You
will have a Project Dashboard Report for each of your major projects and possibly another
one that covers a bunch of smaller projects. Project Dashboards are usually updated and
published on a weekly basis. Both of these reports will be covered in painful detail later
in this book.
Both reports are characterized by having a front page that summarizes the detail in the rest
of the report. They also make use of the typical RAG (Red-Amber-Green) highest-level
status indication wherever possible. This allows senior management to review the front
page and then drill down to any of the areas that are not in “Green” status.
Frequently Asked Question Lists should be published and Pro-actively
Distributed
This is relatively self-explanatory. The IT FAQs are used to provide answers to common
issued the Help Desk may need to address. In addition, FAQs should always be used
when major changes to the environment are planned.
Help Desk Feedback to Users Providing Ticket Results
Communicating with users that have been experiencing issues is a critical function that
must be a cornerstone of your End User Support Strategy. In this particular case, when a
Help Desk ticket is closed you should communicate with the user that opened the ticket.
The communication typically comes in the form of a user survey, but it also includes ticket
closure info. Minimally the communication consists of:
Identification of the support ticket (Ticket Number, Issue Identification, Time
Opened, Time Closed, Technician Assigned, etc.)
Ticket Closure Info – What was done to address the user issue, if the Technician
states that the resolution was to the satisfaction of the user, any other comments
Contact Info To Escalate – Basically a statement that says, if the resolution was not
to your satisfaction, if you have additional comments, or if you just want to discuss
this issue with IT management, please call (name, phone)
Customer Satisfaction Survey - A short survey that collects information about the
user’s experience, the results that IT delivered and the overall satisfaction with the
process and resolution.
The IT Intranet Site
Every IT organization should have an internal Intranet site that allows users to get
information, make requests, etc.
IT Newsletters
Ticketing Portal
In addition, a well-designed IT Intranet site will include a web interface into the Help
Desk Ticket System which allows users to:
Submit Help Desk tickets without calling the Help Desk – a benefit to both the
users and to your team.
Look up the status on any of the Help Desk tickets they have submitted
Training Schedule
There should be a section of the IT Intranet site that provides information about any
Computer related seminars or training that are either available in-house or through outside
providers
A Project Communications Plan
Just as you need a plan for communications to the broad user base, you will need a
communications plan for each of your major projects. This will be covered in more detail
in the Project Management portion of this book.
For the time being, the following should be components of your Project Communications
Plan:
What exactly would go into the “Keeping the Lights On” portion of the budget? You
would include such items as:
New Projects
Most broadly, new projects can be considered anything that does not qualify as a “Keeping
the Lights On” item. This would include anything from adding technology to create an
application development lab that does not exist today, to performing a broad software or
hardware upgrade of all PCs in the enterprise, to building a new data center and migrating
to it. Projects can be relatively small or they can be massive, involving multiple
departments.
Here are some examples of what is a project and some examples of what is NOT a project
It’s important to be able to differentiate between projects and to-dos. Aside from the
difference in how you approach these tasks in real-life, they are treated very differently in
the budget. To-Do items are part of your “Keep the Lights On” Budget and Projects are
not.
There will be much more information on structuring and running projects later in this
book, but for the moment we will look only at the budget portion of the project.
OK, let me say this again in case you missed it or don’t understand it – ANYTHING you
miss when preparing the initial project cost must be brought to management when that
cost arises in the project to get their approval for a budget variance. The reason for my
emphasis here is that this surprise to management is not a good thing, not for the project,
not for the IT Organization, not for the company, and, you guessed it, ESPECIALLY not
good for you. It doesn’t matter who missed the cost, as far as management is concerned
YOU are responsible for the overrun. Maybe you didn’t ask enough questions.
I have managed lots of projects over the years and, as a Project Manager, getting a clear,
complete and accurate articulation of the costs from the technical contributors on a project
has always been one of my more difficult tasks. My best advice to you is to ensure that
every cost you are being told to put in a budget is backed up by a valid quotation from the
vendor.
Also, be exceptionally wary of budget numbers that are incredibly even numbers. If you
ask for a budget for network equipment and you’re given a number like $1 million, ask to
be provided the backup for that projection – a vendor quote. One million dollars is fine if
the actual costs come in at $923,000, but not when they come in at $1.35 million. As a
good example of this I had a situation where we were building a Disaster Recovery Data
Center. The budget I was asked to provide for the networking gear was $787K, because
that was what the cost of the last identical data center cost. The actual quotation we later
received (as in after the budget was set) was $1.077 million dollars. The reason was (1)
The original order had additional equipment for a separate project that drove a greater
discount off list and (2) The new environment was not quite 100% the same as the first
data center. Don’t depend on past purchases to develop budgets for projects today. Trust
but verify!
There are so many things to keep in mind when developing a project cost. Here are a few
questions you should ask that may uncover hidden costs:
. . just thrown at you in the hallway, what should you answer? Well, I would suggest an
answer like:
“There are many variables that can impact the cost so I couldn’t possibly give you an
answer that would be accurate here. Let me take a look at it later today (Note: or
whenever you believe you would have time), and I will come back with a good ballpark
figure for you that is at least defensible.”
Note, in this answer I didn’t say “I have no idea” and I did not blow-off the answer
entirely. The goal is to ensure that the person asking the question knows that you cannot
provide an answer that is in any was actionable or fit for decision making purpose, but
given sufficient time you can.
Capital Investments versus Expenses
When preparing a project budget, you will need to develop a comprehensive set of costs
that are properly divided between capital and expense. At the most basic level this would
appear simple enough - equipment costs, facility build-out costs, software purchases in
most cases, and so on would be capital costs. Items like services to be performed –
equipment movers, supplemental technicians, etc. – are considered expense items. Work
with your Finance department to properly allocate expenditures.
Capital Expense
Conversion of data
Contingency
Once you have completed your entire project budget (expense and capital), you should
always add a contingency budget line at the bottom of the sheet. I always use 10% as the
contingency figure. This money is obviously for the items within the project that just
cannot be accurately predicted.
A Project Today Impacts Keeping the Lights on Tomorrow
It is important to note that a project you are implementing today will have an impact on
successive years “Keeping the Lights On” budget and activities. As a very simple
example, if a project this year required buying a few servers and a network switch, those
items would have depreciation impacts in successive years, as well as maintenance cost
impacts. Also, depending on the number of items being added to the environment, they
may have support personnel impacts too.
These future impacts should be fully articulated in any justifications that you present to
management for this project. I often develop a 5-year cost assessment for every new
initiative. This clearly will expose the ongoing (future) “keep the lights on” costs that
result from a project initiative.
Optimizing an IT budget
This is a huge subject that I can only touch on here. For so many years one of the strategic
tag lines for IT has been “doing more with less”. To a certain extent that is true, although I
don’t know many IT budgets that have noticeably shrunk.
The question is, where do you start when you need to do more, but your budget is not
going up? There are places to look in almost every area:
Systems – If Server Virtualization has not yet become the deployment strategy of choice
for most application deployments, it should be considered.
Data Center – Unless you’re running a monster environment (in which case you are likely
not reading the right book), building and running your own data center is not a good
thing. You cannot approach the cost efficiencies of a large colocation site. If you currently
utilize data centers or server rooms carved out of your office space, consider the
advantages that a colo will provide. That said, colocation sites can cost can vary widely
depending on what they provide and how they charge. Consider for a moment a real-life
example of two data centers. One data center uses “Metered Power”, where the user area
has the electricity it consumes measured. The data center operator charges what it is billed
by the power company (Per Kilowatt Hour), with a multiplier that is designed to account
for an amortization of the common utility fees for cooling. A second data center uses
“Circuit Based Power”, where the user area is charged for the maximum amount of power
that a circuit can deliver (set fee). In this example, for a 100 KW site I migrated from a
circuit-based location to a metered-based location, the metered power site costs about
$25K per month, while the circuit based power site costs over $100K per month, and
amazingly the circuit based site had one-third the space and less than one third the amount
of equipment. Understand the alternatives here – they have a huge budget impact.
End User Support - End user support is a huge cost area in every organization and one
where cost containment is always challenging. It’s hard to find a short term cost reduction
without impacting the quality of services, however by implementing a longer-term
strategy you can drive costs down. First, by ensuring there are highly skilled staff
supporting the users you will optimize the effectiveness of the team and hence their
efficiency. By deploying tools such as ticketing systems and call analysis tools you will
focus your team’s efforts. Finally by developing a deep set of End User Support Metrics,
you will understand where there are repetitive issues where you need to understand the
root cause to fix it forever. More will be said about optimizing this area later.
Outsourcing as an Alternative
One question you are sure to hear over and over is “Can this be outsourced?” The
obvious answer will always be “that depends”. We’ve already built a case for outsourcing
the data center. Other parts of the environment are not so clear cut.
The obvious question you need to ask is “why would I outsource this function”? In most
cases the answer is to reduce costs. So I ask “how is this outsourced group going to
provide the service at a lower cost AND make a profit?”
For End User Support the answer is usually they will provide low skill staff that are
paid low wages and few benefits. Service levels are impacted negatively. Also,
since the outsourcer’s staff is onsite full time there are inevitable jealousies that
they are singled out to not get the benefits and are paid less than actual employees
of the company
Printer and Copier support vendors will consume much of your time pitching their
services. Their pitch will always be the all-inclusive “we’ll service your printers
and ensure you never run out of toner cartridges for less money than you can do it
yourself.” Of course, this is never true. Understand the hidden costs, such as
monthly copy or print page allocations, and how much each extra page will cost
you. You’ll find that the actual cost is much different than what you budgeted for.
Understand that the cost of a function is the cost of a function. Unless there is some
unusual cost associated with a full time employee (such as an unusually generous benefit),
or there are some very high cost and high-value tools that will dramatically improve the
efficiencies of a function (and are amortized among many clients) there is no way for an
outside firm to provide the same level of service as you AND make a profit for less money
than you are paying.
Managing the Budget
More often than not I see IT managers that are completely oblivious to the current status
of their budget. This is obviously a huge problem and one that will eventually catch up to
and derail that person’s career. IT managers are measured in many dimensions, but budget
management is very close to the top of the list.
Managing the budget isn’t difficult and it certainly will make your life easier if you can
intelligently answer budget questions when asked about it. You need to understand the
following:
What’s in your budget and what’s not – How often in my career has someone come
to me and said “I need to buy this (whatever it is)”. For big items I check that
group’s budget and find the money isn’t there. After we go through the inevitable
–“It’s there, I budgeted for it last year – remember?” - we find that the money has
been spent on a variety of unbudgeted items. Understand what is in your budget
and what you may be putting at risk if you spend the money on unbudgeted items.
Also, use the lessons (as in mistakes) to do a more complete job of preparing next
year’s budget.
What is the timing of your spending? – Understand if a large budget line item is
designed to be spent all at the start of the year, or at the end of the year or linearly
throughout the year.
What monies are coming from the business? – Most likely some projects and some
operational activities will be directly paid for or charged back to the business. You
must understand what they have paid for and ensure that (1) if they ask you for
some service or expenditure that is not within that funding, you make sure they will
give you a variance to spend the extra money and (2) manage the costs allocated to
their budget carefully as they will not be very amused if you charge costs not
related to their business or over-run the budget allocation without their knowledge
and permission.
What monies can be moved around?– If you find you are overspending in one area
but under-spending in another, you must understand what monies are fungible –
able to be reallocated among different budget accounts. You obviously can’t spend
expense money on capital (or visa-versa). You also usually can’t spend money
coming from a business unit on expenses for another business unit. You may be
able to move allocations within your direct organization (such as from Network to
End User Support).
Be prepared to justify or lose your budget – In a larger organization you will find
there are periodic budget reviews (quarterly, semi-annual, etc.). These reviews are
designed to understand how every organization is utilizing their budget and make
adjustments as required. You need to be prepared to respond to such situations as
“Every group needs to give back 10% of their remaining money” or “we see you
have only spent 10% of this budget account’s money. Explain how the remainder
will be spent for the rest of the year or lose it”.
This is where the timing issue comes in. Bottom line for this budget event – you
should know what budget you absolutely need to maintain to keep everything you
have committed to running and what you can give up. Also be prepared to discuss
how you can scale back your activities and what impact it will have on the
organization. As an example, scaling back a project or putting it on hold until the
next year to save money this year.
The later you try to fix your budget, the more painful it is to fix. If you realize in
February that you have an unbudgeted $10,000 spend in a $120,000 budget that is
otherwise spent evenly across the year (say $10,000 a month), you can fix things by
cutting back $1,000 per month for the remaining 10 months. Probably doable with
a little pain. If you ignore this until November and still plan to make your budget
number for the year, you cannot spend any money in December. An overly
simplified example to demonstrate that you should address budget issues as soon as
you learn about them.
Monthly Variance Reports
You should ask for a Monthly Budget Variance Report from your company’s finance
department. In its simplest form, a Variance Report tells you how much is in the budget
by budget code, how much has been spent and how much is left (or has been overspent) .
You need to see this and understand it and what is behind it. Keeping a close track on the
budget spending will allow you to take any required corrective action before you get into
trouble.
Why is spending off? Are there budgeted headcount that has gone unfilled for
some number of months? What is being done to fill that headcount?
If spending is not happening in a linear fashion (equal amounts of a line item each
month), is it due to expense timing? For example, a line item for maintenance
could be consumed in the first quarter because that is when the maintenance
contracts renew. Another example may be a major budgeted capital expenditure
which is not planned to be made until the last quarter. Be prepared to explain that
when questioned by finance.
Are you overspending in certain areas because of increased demand by the business
or unexpected issues? How will this overspend be funded?
Do you have groups within your organization that are not spending according to
plan?
If the numbers look especially different from what you would expect them to be,
ask the finance department for the backup to the report, essentially what items were
charged against what accounts. I have seen many situations where items were
mistakenly applied to the wrong accounts and really screwed up the allocation of
funds.
Reviewing the monthly variance report can give you great insight into how your
organization is performing against the plan. The money aspect of the review is important
of course, but understanding where overspending or under-spending is equally valuable.
Your staff may not always be completely transparent about how well they are managing
their responsibilities, however their spending will give you another point of reference.
Handling “Unbudgeted” Business Requests
You will undoubtedly be faced with many “unbudgeted” requests from the business.
These will range from relatively simple items that you can easily cover to relatively
significant requests, such as the deployment of a large business application or a new
office. The most important advice I can give you is to never agree to these larger requests
without clearly stating that these will not be covered by your current budget. Also, again
as I have said previously, never fall into the trap of even mentioning a wild ballpark range
of estimated cost before you have reviewed what is being requested and calculated a
potential cost.
Your response should be that you’ll communicate that cost when you have a good
understanding of the project, translate those costs into the required budget and will begin
working on the project once the money has been approved and you have a budget code to
charge to. You will be pushed hard to start work before everything is approved and in
place, but resist being the nice guy.
The request should be analyzed as you would for any project. Where the budget exists, in
your IT budget or in the business’ budget, really doesn’t matter much, as long as you have
full control over the budget. To clarify what I mean by this, you should be fine having
your spending on any budget represented in a consolidated project budget, but do
not give approval rights to your spending on a project to people outside of your
direct reporting chain. They will not understand the details of what you need to do and
will only slow down your progress if you need to wait for their approval to commit to
spending.
Vendor Selection and Management
Vendor Management is a discipline that enables organizations to control costs, drive
service excellence and mitigate risks to gain increased value from their vendors
throughout the deal life cycle. Vendor management is not negotiating the lowest price
possible. Vendor management is constantly working with your vendors to come to
agreements that will mutually benefit both companies.
At many companies, the CIO has de facto responsibility for managing IT vendors, but the
day-to-day reality is that individual departments, technology platform owners and project
offices manage vendors for their local needs, tapping into corporate procurement and legal
staff for some of the tactical contracts and pricing analysis. That can work in smaller
companies with a small number of vendors, where the CIO or head of infrastructure can
manage the information. This will be too much of a challenge in a larger environment.
Vendor management enables you to optimally develop, manage and control vendor
contracts, relationships and performance for the efficient delivery of the products and
services you contracted for. This can you help meet your business objectives, minimize
potential business disruption, avoid deal and delivery failure. It also ensures more-
sustainable multi-sourcing, while driving the most value from your vendors. The goal is to
select the right vendors; categorize vendors to ensure the right contract, metrics and
relationship; determine the ideal number of vendors; mitigate risk when using vendors;
and potentially establish a vendor management organization that best fits the company.
Although the ability to manage vendors effectively enhances the business perception of IT
effectiveness and helps IT Management achieve success, few people have actually been
formally trained in managing these relationships.
Here are some best practices to consider in developing your vendor management selection
and approach:
Establish a Vendor Selection Process - The vendor management process begins by
selecting the right vendor for the right reasons. The vendor selection process can be
a very complicated and emotional undertaking if you don’t know how to approach
it from the very start. You will need to analyze your business requirements, search
for prospective vendors, lead the team in selecting the winning vendor and
successfully negotiate a contract while avoiding contract negotiation mistakes.
Document the process early on - This would include RFPs, Proposals, demos and
negotiations.
Determine the model of Vendor Management you will use - Is there a dedicated
resource for this function or an actual Vendor Management department?
Set the parameters of the relationship - Determine up front how you will help each
other be successful.
Categorize your vendor relationships into buckets - You will soon see if you have
multiple relationships for resources, network equipment, PCs, etc. Reduce this
number as much as possible to gain control and reduce costs.
Come Together on Value -. Vendor management will focus quality for the money
that is paid, not on simply negotiating the lowest overall price. Most often the
lowest price also brings the lowest quality. If you want a high-quality product or
solution, you should be willing to pay more in order to receive it. If the vendor is
serious about the quality they deliver, they won’t have a problem specifying the
quality details in the contract.
Scrutinize the Prospects - Once you start to look at individual vendors, be careful
that you don’t get blinded by the “sizzle instead of the steak.” Depending upon the
size of the possible contract, they will pull out all the stops in order to get your
business. This may include a barrage of overzealous salespeople and “consultants”.
Just because they send a lot of people in the beginning, doesn’t mean they will be
there after the contract is signed. Understand who will be part of the long-term
team supporting your account and get to know them well before committing to a
vendor.
Ask the right questions - As you begin your vendor search, ask some questions that
will help you eliminate the more obvious misfits. For example, is the proposed
material, service or outsourcing project within the vendor’s area of expertise?
Remain Flexible - Be wary of restrictive or exclusive relationships. For example,
limitations with other vendors or with future customers. In addition, contracts that
have severe penalties for seemingly small incidents should be avoided. If the
vendor asks for an extremely long term contract, you should ask for a shorter term
with a renewal option. Tie-down renewal cost escalation as much as possible.
On the other hand, you should be open to the vendor’s requests also. If an issue is
small and insignificant to you but the vendor insists on adding it to the contract you
may choose to bend in this situation. This shows good faith on your part and your
willingness to work towards a contract that is mutually beneficial to both parties.
Seek to Understand Your Vendor’s Business Too – I’ll use that horrifically over-used
term “the win-win” situation. You don’t win if your great deal puts your vendor out
of business. I have actually worked for one huge multi-national firm that just did
not get this simple fact and often put their vendors out of business. If you are
constantly leaning on them to cut costs, either the quality of their work will suffer
or they will go out of business. The partnership aspect of vendor management
includes your contributing knowledge or resources that may help the vendor better
serve you.
Once you have selected your vendors, here are some best practices to ongoing
management of the relationships:
Collect information throughout the relationship - Understand how the vendor is
delivering against commitments and Service Level Agreements. Address issues
along the way as they arise. Have your data all ready when it is time to renew
contracts.
Share Information and Priorities - The most important success factor of vendor
management is to share information and priorities with your vendors. Providing
only the necessary information to the vendor at the right time will allow a vendor to
better service your needs. This information may include usage forecast information,
new technology deployments, changes in design and expansion or relocation
changes, just to name a few.
Balance Commitment and Competition – Your goal in vendor management is to
gain the commitment of your vendors to assist and support the operations of your
business. Conversely, the vendor is expecting a certain level of commitment from
you. Include the incumbent vendor when looking to make future purchase but get
competitive bids, especially for the larger procurements.
Allow Key Vendors to Help You Strategize – In many cases I have found that the
vendors of some key pieces of technology are better suited than my internal staff to
contribute to strategic discussions. The reason is obvious; the good vendors are
well informed about the manufacturer’s technology and product roadmaps. The
vendors are often the experts in their business area and you can tap into that
expertise in order to give you a competitive advantage.
Build Partnerships For The Long Term - Vendor management values long term
relationships over short term gains and marginal cost savings. Constantly changing
vendors to pursue the lowest price for each purchase will end up costing you more
money in the long run. Other benefits of a long term relationship include trust,
preferential treatment and access to insider or expert knowledge.
Monitor Performance - Once the relationship with the vendor has begun, don’t
assume that everything will go according to plan and executed exactly as specified
in the contract. The vendor’s performance must be monitored constantly in the
beginning. This should include the requirements that are most critical to your
business. For example: shipping times, quality of service performed, order
completion, call answer time, etc.
Communicate Constantly - The bottom line in vendor management best practices is:
communication, communication, communication! Don’t assume that the vendor
intimately knows your business or can read your mind. A well established and well
maintained line of communication will avoid misunderstandings and proactively
address issues before they become problems.
The time, money and energy used to nurture a positive vendor relationship cannot be
measured directly against the company’s bottom line. However, a well-managed vendor
relationship will result in increased customer satisfaction, reduced costs, better quality,
and better service from the vendor. When and if problems arise, rest assured that a well-
managed vendor will be quick to remedy the situation.
A request for proposal (RFP) is a solicitation, often made through a bidding process, by
an agency or company interested in procurement of a commodity, service or valuable
asset, to potential suppliers to submit business proposals. It specifies what the customer is
looking for and establishes evaluation criteria for assessing the proposals. The RFP
outlines the bidding process and contract terms, and provides guidance on how the bid
should be formatted and presented.
The RFP will always spell out very clearly what you are trying to purchase and what your
expectations are for associated services, warranty and so on. The RFP is distributed to a
number of acceptable vendors of the product or service providers. Those providers are
instructed to respond to the RFP with a proposal delivered back to you at a specified date
and time. The time is usually “by 5PM” on a specified day.
Table of contents for the RFP Response Proposal – This defines exactly how
The materials that must be delivered as part of the RFP response – this
usually includes some number of paper copies of the proposal, so you don’t
have to duplicate responses from multiple vendors and distribute them, an
electronic copy of all materials being delivered, etc.)
The details of the purchase - This includes hardware, software, services and
ongoing support
The desired purchase and implementation schedule - The Request for Proposal
should provide the timeline for the RFP process as well as the project itself.
Although the actual implementation schedule is determined after the project starts,
any major milestones that are known should be articulated here along with typical
timings for milestones that are still in flux (define which are hard dates and which
are not). These may include:
Request for Proposal Timeline:
All proposals in response to this RFP are due no later than 5pm EST (date).
Evaluation of proposals will be conducted from (start date) until (end date).
Upon notification, the contract negotiation with the winning bidder will
begin immediately. Contract negotiations will be completed by (date).
Project Timeline:
Proposal Evaluation Criteria – in this section you must describe what criteria you
are using to evaluate proposals. If there is a minimum acceptable answer to any of
the criteria, you should articulate that fact here. Evaluation criteria can include
such factors as Technical Expertise and Experience, Organizational Experience,
Proposal Overall Suitability to the Requirements, Support and Warranty Provisions,
and of course Cost.
Terms and Conditions – The terms and conditions spell out the details of the
business relationship you are willing to enter into.
Questions – The process to ask questions about the RFP and how questions will be
managed. As an example, in some companies any question that gets asked by any
of the vendors will be answered and that question and answer will then be
distributed to all of the vendors working on an RFP response. Other companies do
not distribute answers. That is entirely up to you – there is no standard here.
Contact Information – This section provides the contact information (Name, phone,
email, address, etc.) of the designated company person that will be the single point
of contact for respondents during the RFP process. This section should also include
the preferred method of communication between the parties and have a disclaimer
such as “only communications that occurs or is confirmed in writing is considered
valid in this RFP process.” This prevents a vendor from having a conversation with
you and then claiming you gave them an extra week to deliver a proposal, or that
you exempted them from some requirement of the RFP process.
Adding Collateral Materials to the RFP
There are several documents that typically are included in the initial RFP package that the
respondent is required to fill out. Some of them are your typical business legal
documents, but a few are designed to ensure that you are able to analyze the responses in a
logical fashion, compare the results and identify the best overall solution. Here are the
usual documents:
Non-Disclosure Agreement – Yep! You find this baby everywhere. You can get a
copy of your company’s non-disclosure agreement from your legal department or
outside lawyer, if you don’t have a legal department. Often the legal department
will modify the standard non-disclosure to be more specific to this RFP.
Intent To Bid – You may include an “Intent to bid” form. This is a rather simple
document that just confirms that a company is interested in responding to your
RFP. This serves two purposes. (1) You know who to expect responses from on
the RFP response date (in case you need to stick around late to wait for one) and (2)
It lets you know early on if some of the folks you distributed the RFP to are not
interested in pursuing your business. You may need to add additional companies to
your RFP distribution if you find you won’t receive sufficient responses.
Response Information Tables – I always include spreadsheets with my RFPs that
include multiple tabs of single column items that need to be filled in by the
respondent. These items should reflect the items you are purchasing, unit prices,
support that is included in the price, etc. Once all of the RFPs are received back, I
put the vendor response columns side by side into a new spreadsheet and can easily
compare those items that are important to me.
The RFP Process Steps and Timing
The RFP process consists of a few well defined steps:
As an example of both the good and bad forms of bid-leveling I will use a recent RFP for
a structured cabling project at a new headquarters construction project in New York City.
The RFP and bidding process was managed by the head of Real Estate and the consulting
project managers that he brought in. Together they represented the single most
incompetent group of people I have ever worked with.
The responses to the Structured Cabling RFP, which by the way was nothing more than a
set of drawings with notes defining the requirements, were leveled by the consulting
project managers. When the results came back I found that the numbers were all over the
place. Vendors that were typically the low cost providers had the highest cost numbers
and those that usually weren’t even on the map came in the lowest. I asked to see the
proposals.
I found that the numbers being used for comparison were simply the total cost numbers
that were on each proposal. There was no attempt to compare what was being provided
within the context of the price. The excuse I was given by the consultants AND the head
of Real Estate was that it didn’t matter what was in the proposal, it only mattered what
was in the RFP and if the vendor didn’t deliver that for the price being quoted they simply
wouldn’t get paid. Obviously you don’t want to get into a business arrangement with
these clowns. The issue here, of course, is that the vendors spell out clearly in their RFP
response/ Proposal what they are selling you and, once you sign the agreement, THAT is
what you have agreed to purchase, not what you put in the RFP.
As I drilled down into the proposals themselves I found that one vendor had two different
numbers quoted as the total cost on two different pages of their proposal. Neither the
vendor could explain what drove that difference in cost, nor could the folks evaluating the
proposals explain why they picked the number that they chose of the two. Actually they
didn’t even pick up on the fact that there were two numbers.
The deeper I drilled down, the more issues I found. I quickly realized that the different
vendors all had different amount of cable quoted for the project. The differences were as
much as 50% or several hundred thousand feet between proposals. Considering the cost
of copper, that amounted to a huge difference in cost.
The answer to this sort of issue is to determine what the most accurate (or logical) quantity
of an item is and to normalize the proposals around that number. In other words, if you
decide that the right number of feet of category 6A cable is 500,000 linear feet of cable,
than adjust every one of the proposals to 500,000 feet and make sure every contract is
written to charge only for the number of cable feet actually used. Adjusting the quantities
and types of items in the proposals the vendor proposal costs converged into a normal
spread of numbers – some of the vendors traditionally a bit more or less expensive than
others, but not the huge spreads we were seeing.
The process for bid-leveling is relatively clear:
Take a look at what the various vendors are proposing in terms of quantities, etc.
and normalize the proposals around your best estimates of the actual quantities you
will use
Check that all vendors are using the manufacturers and components you have
designated – sometimes they will slip in a cheap alternative to get the job.
Make certain you can calculate the unit pricing for everything you will want to buy
and compare those unit prices among the respondents. You should also get a
written clarification in the project that you can purchase additional units of
anything for these unit prices. As an example, for structured cabling you would
want a fixed price for additional cable drop locations – price for a 2-pack, a 4-pack,
and a 6-pack of data drops. A price for coax drops for TVs, individual printer
drops, and so on.
Look at the charges for individual components of pricing. If the overall best
proposal appears to be charging too much to test or label a cable, go back to them
and tell them they need to get those individual prices in line.
As I previously stated, you should create a spreadsheet that captures the main items
(quantities, costs, etc.) that you will use to determine the winning proposal. This
makes normalizing and comparing vendors a snap.
Notification of a Winner
Once you have selected a vendor, bring in the legal team to get a contract in place as soon
as possible. NEVER EVER just sign that line at the end of every proposal that says “to
accept this proposal just sign on the line below and return two signed copies.” Make sure
that the lawyers have reviewed the agreement, made any necessary changes and gives you
the approval to sign it (or sends it to the designated person that will sign it.
Don’t inform the losers that they have lost until you have a signed contract in place with
the winner. This is always uncomfortable, since you will be getting calls constantly from
them, but you need to keep the alternatives available until you have a signed deal.
People Management
If you’re new to people management you will surely find this is the most substantial
change in responsibilities since you moved on from your technical contributor days. This
will consume a very substantial portion of your time. Your “People Management”
activities will include:
Make no mistake about it; this is the one area I most often hear was the biggest surprise to
new managers. Once you have been doing this for some time you will find that, while it is
incredibly time consuming, it is relatively clear cut and manageable.
At the most basic level, staff face time is part of the job. Employees should always know
what is expected of them. They should hear about issues sooner, rather than later and
never at the appraisal for the first time. You should listen to what they have to say. Praise
in public but criticize in private.
An important concept to use in dealing with your staff is what is called effective listening.
Like everyone in life, your staff wants to know you are listening to them. Effective
Listening is a technique that will make it clear to those you are speaking with that you are
listening and they were understood, increase their trust in you and maximize the
information you get from the discussion. Some of the key points of effective listening:
Maintain Eye Contact and stay relaxed
Don’t interrupt the person you are taking to
Wait for the person to pause then ask clarifying questions
Ask questions that cannot be answered by yes or no. Keep the conversation going
Feedback what you have heard to ensure you received the message the person was
intending you to hear
Don’t jump in and try to prematurely impose your solution to their issue
Be the person they love!
Your success at People Management also benefits significantly by your personal
interaction with your staff – no matter how many people are on your team. As an example
of how NOT to do this, I once had a Network Manager working for me that managed
completely from behind his closed office door. He was able to access everything he
needed to access remotely and could summon any member of his team on a minute’s
notice, so he stayed in his office by himself unless he needed to interact with someone.
His staff didn’t like him and didn’t respect him. He wasn’t considered one of the team.
He had no personal connections with his staff and they frankly weren’t interested in one
with him. He failed and was eventually replaced. He failed at the few technical positions
he had after that and eventually left technology altogether and went on to a job where he
didn’t have to work with others.
I had another manager working for me that was the ultimate people person. He was
always out with his staff or with the users. If there was a major issue, he wasn’t sitting in
his office waiting for the phone to ring with an update – he was with the team working on
the problem adding whatever value he could. He never asked his team to work above and
beyond what could be expected without being there as part of the team. If the team was
working huge hours through the weekend, he was there with them; even if the only
support he could add was to rip up the boxes of equipment they were deploying and get it
to the trash.
This man’s staff loved him and would do anything to make the team succeed. They knew
he was always on his side and would fight for them when he needed to. Since he had such
spectacular staff support, his team was able to succeed at some exceptionally audacious
goals.
Who do you want to be like?
MBWA
There is a technique called MBWA – Management By Walking (or Wandering) Around.
No matter how high in the organization you get, MBWA should be a philosophy you
follow. MBWA will give you a great sense of how things are going. You will hear about
issues before they become so large that someone feels they must bring them to you. They
are also an opportunity for you to give some mentoring advice to the more junior members
of your staff. Best of all you will find that the staff will begin to feel so comfortable
talking to you that staff communications will never be an issue.
Hiring and Retention
Hiring and retention is NOT an HR issue. If your plan is to build a world class IT group,
you need to take the bull by the horns and own this. Your goal is to have the best person
in each slot as possible.
My philosophy has always been to hire people that are smarter than I am, certainly at their
specific responsibilities at a minimum. I want my staff to be independent thinkers but
team players. What I mean by that is they must be the type of person that will tell me
when I’m wrong. The “yes-man” (or “yes-woman”) has no place in my organization.
That said, when a decision is made I expect everyone to fall into line, embrace the
decision and work as hard as necessary to make it a success.
When you have built an organization of smart, competent technologists that are perfectly
capable of running their functional responsibilities independently (whether an individual
contributor or team leader), you can step back a bit and delegate more responsibilities
downward. Understand that this is the only way you will be able to scale your
organization. You will never be able to successfully run a 400 person organization if you
need to be involved in every decision.
Now that I have outlined the personality profile of the types of people I hire let’s move on
to what and how to get them. I’ll start with the “Captain Obvious” statement. In order to
have a world class IT organization you need to understand what key technologies
constitute your environment and have the skills in place to engineer and operate it. You
need at least one “star-performer” in each technology.
IT is interesting in that IT professionals are not only motivated by money, but also by the
challenge of developing a complex cutting-edge technology environment. Your
technology becomes part of your sales pitch as much as your salaries and benefits will. IT
is also a high-stress environment where any event that causes an interruption of service or
productivity immediately enters the realm of “blame”, with any resulting anger being
directed at your staff. Employees are on call virtually 24 x 7 to address incidents and
issues with little regard for work/life balance. It takes a special type of person to want to
do this. Understanding the motivations that drive candidates for jobs is as important as
understanding their technical competence.
Some skills are more difficult to source than others. Information Security, database design
and management, storage management, server virtualization and networking skills are
some of the most difficult to find.
Sourcing is always more difficult without a good job description. This document should
be carefully written to describe the skills needed as well as the roles responsibilities and
expectations. When developing a job description, work with your company’s HR
department to add the necessary boilerplate information about the company, benefits, and
educational requirements that need to be included. You must personally define the
responsibilities and required skills.
Don’t try to go it alone in sourcing staff. You will never succeed. It’s great to get referrals
from your friends and coworkers, but you must put everyone through the same rigorous
selection process. Recruiters can and will help you identify candidates but make no
mistake that they work for themselves, no matter how many assurances they give you
about their selection process and validation criteria, and especially how they “partner with
you”. They have only one goal – fill your role and get a commission. Retained Recruiters
are better than contingency recruiters because of the financial relationship. Contingency
recruiters will bury you with candidate paperwork – much of which bears little to no
relevance to your job specifications.
When you have selected someone as the candidate to move forward with you must check
their references. Obviously, a candidate will only give you the names of people that will
say great things about them. That means that you need to use your network to find people
that know your candidate, outside of the managed hiring process that is happening with
the recruiter.
When checking references have your list of questions prepared before the call. Minimally
you need to ask about:
The candidates technical proficiency
Validate the successes that are being claimed on the resume. Did the candidate
actually complete what is being claimed? Are the successes individual or was the
candidate a minor part of a large team? I know someone that would “lean into”
team group photos and then claim he was part of that team that achieved incredible
results. Don’t get fooled by people that claim the successes of others was their
own.
How does the candidate perform in the type of environment he/she will be hired
into? Is the candidate great in an ongoing maintenance and operating environment,
but is being hired into a major redefinition of the technology, or alternately is the
candidate a change-agent being hired into a maintenance job?
How well does the candidate perform under stress?
Has the candidate traditionally be available off-hours (if this is a 24 x 7 job) or is
the candidate a 9 to 5 person?
How has the candidate functioned within the team environment that he/she is
currently in?
Test why the candidate is leaving their current job. Is the reason they are looking to
move on as they described or are they one step away from getting fired?
You should add your own questions to this list. Don’t fall into the trap of making both the
personal interview and the reference check an event where all that is accomplished is you
describing the job and asking if this is something the candidate wants to do and is capable
of doing.
Retaining you staff is as important as filling the roles in the first place. There are a few
simple rules to follow here:
Hire people that you believe will stick around – take a look at the candidates work
history. If they have stayed at previous jobs for some number of years the
likelihood is that they will stay at your company too. Steer clear of people that
spend a few months to a year or so at each position unless you are hiring a
consultant.
Make sure you can develop a career path for a new hire – you can hire someone to
fill a role, but if the role does not have any chance for career advancement, you will
eventually lose your staff member. Work with each employee to develop a
demonstrable career path for them and a plan of training and experience that will
help them achieve those goals.
Tailor retention to the individual worker – While money is the motivator for many
people, those top rated “A” players are often more concerned with challenging
work, personal and professional growth opportunities, work/life balance, and
workplace flexibility
Find out what is driving underperformance – People whose performance drops
dramatically are often dealing with outside distractions. Skill issues may require
coaching or training. Personal issues such as divorce, health issues, mortgage
issues, etc. can take a toll on a staff member. Providing the support they need in
these situations can help salvage the situation and drive significant increases in staff
loyalty.
Understand how your managers are managing – Why does one person think that a
company is the best place in the world to work while others think they died and
went to hell? Most often this is due to the differences in how individual
departments are managed. Understand how your group managers are managing
their staff, and if they are embodying the values you want in your organization. Get
them the training they need to make their departments a place their staff members
will want to work.
Skill Development, Mentoring and Training
Another dimension of your People Management responsibilities will be Skill
Development, Mentoring and Training. This essentially exists in two components (1) The
“Personal Development” portion of the staff member’s Performance Appraisal and (2) the
fulfillment of that requirement in the form of an associated activity to develop that person
professionally.
How aggressively this is managed is very dependent on the organization. In some
companies the responsibility is placed on the employee to locate appropriate development
venues, propose it to management and once approved, complete the activity. This may be
taking technical development course, attending seminars or conferences or other similar
types of activities. In companies that pursue this more aggressively this is often tracked
by HR or some other professional development group. You may get periodic (monthly or
quarterly) reports summarizing each of your team member’s professional development
activities and be expected to work with them to meet their goals.
Whatever type of company you work for, it is in your interest to make sure that your team
receives the appropriate training. From your perspective this will increase the value of
each staff member to the group. From the employee’s standpoint, it not only increases
their knowledge, but also it helps fulfill the creative thirst for knowledge that most likely
initially made that person choose IT as a career in the first place. Also, it communicates to
the employee that both you as his manager and the company overall have his ultimate
success in mind.
Beyond the more formal training and skill development events, don’t lose sight of the
value of mentoring as a skill development tool. Every interaction you have with your staff
is an opportunity to mentor them. The more senior you become, the more value your
mentoring will have to the employee. This process is also valuable in building the bonds
between yourself and your team that engenders the loyalty you need when faced with
more challenging situations.
Generating Performance Plans
Every member of your team should have a performance plan in place that articulates your
expectations of that person. Most companies have some form of standardized format for
employee Performance Plans, so you will need to work within the bounds of your
company’s structure. That said, there are certain things you should be sure to include.
The appraisal should be structured in the exact same form as the Performance Plan –
usually the categories are the same. I always strive to praise the successes as much as I
articulate the failures; however the failures are where most of the conversation will take
place.
If you plan to give someone a VERY bad appraisal, you should bring the HR department
into the discussion before you give the appraisal. Have them review your appraisal of the
employee and get their reading of whether you are saying anything that either you can’t
say by law, or might come back to haunt you in the future. Also, for very bad appraisals it
might be wise to have a member of HR present when you actually give the appraisal to the
employee, especially if there are consequences for lack of improvement.
In most companies the employee is required to sign the appraisal. If they will not, or if
they want to read it over first, give them the time they need, within the bounds of your
company policy. Also, most companies allow the employee to have a copy of their
appraisal. (check with HR before you start the process)
Staff Compensation
Compensation … truly one of the more difficult parts of managing people. Here are some
basic observations I have made over the years:
Pretty much nobody thinks they are being paid enough money
Pretty much everybody thinks they are worth more than every one of their peers
People’s expectations for bonuses and raises are almost always unreasonable in
relation to their contribution
You will NEVER get true gratitude in return for the raise or bonus you were able to
get someone, no matter how much you had to fight the system to get it for them.
I know this seems like a dark and dismal assessment of people, but if you haven’t seen it
yet, you will. With all of this said, you still must be the champion for your team when it
comes to their compensation.
As an example, if your company is in the Financial Services industry in the New York
City area, and employs about 2,000 workers, then you would want to compare your jobs to
a similar company. In actuality, you probably want at least two or three comparable
companies to get a range.
There are several important things you can and should do to manage compensation fairly.
Force-rank your team members from the absolute best of the best to the worst of the
worst. This is an actual annual required exercise in many companies. At some
companies the goal is to see who is on the bottom and replace them with high-
performance individuals. A person I once worked for said that even if you are
managing a team of Einsteins, some will be more Einstein-like than others. The
meaning was that even in a department of all outstanding performers, it is possible
to rank them. It’s amazing that I am quoting this manager here because he
personally was a very low performer and pretty much his entire organization hated
him. We voted him off the island almost every week.
Ensure that there is a tight coupling between a person’s performance plan and their
appraisal. What were their results against goals? This will be used as a component
of the rankings.
For pay modifications (raises), understand what the range of possible changes could
be and what level of latitude you have. In a company where staff is grouped into
salary “grades” or ranges, your discretion on the size of raises may be limited. In
some instances a staff member’s salary will have reached the top of his or her range
and very little can be done to get additional money (of substance). My best advice
here is to be open, honest and direct in these situations. Work with your employee
to explore options to move into a higher salary grade, if possible.
Is your organization funding the bonus pool so that every person that meets their
objectives can receive their full target bonus, or have they reduced the overall pool
by some percentage due to business reasons? What latitude do you as a manager
have to move dollars around within your department?
BE FAIR! Whether you are talking about salary adjustments or bonuses don’t
allocate the dollars as if you’re running a popularity contest. Don’t reward old
friends or staff that followed you from your last job, at the expense of the rest of the
team.
Dealing with Staff Issues – Problem Employees, Conflict Resolution
It would be spectacular if your organization functioned without any staff problems, but
this is never the case. You will see attendance issues, drinking and drug issues, staffs’
personal and family problems impacting their performance and possibly distracting your
whole group. These are in addition to the normal skill or other technical performance
issues you will need to deal with. The best advice you can get is not to let any of these
issues go too far before addressing them.
Addressing issues early can be handled by having a brief and non-threatening talk with the
person. It could be as simple as the statement “Hey John, I see you’re getting in pretty
late every morning. Is there some issue I should know about?” John may have a great
answer, like “I need to get online every morning at 5AM to check status on the systems, so
I don’t get out of the house until 9 AM.” Or maybe he is just up until 1 AM playing
online games.
If an employee problem is serious, bring HR into the conversation. They will help you
understand how to proceed. If it is a personal issue where the employee needs some
outside support, the company may be able to help with therapists, doctors or other
services. They will also tell you what information to collect if the situation cannot be
recovered.
The best advice you can receive overall is to keep a file on every member of your team.
Both the good and bad should become part of that file. If you receive a note from a user
that praises a staff member, put it in his file. Same goes for complaints.
Most important is that any discussions you have with problem staff members should be
well documented. Just write a brief note that describes when the discussion took place
and where and what was discussed. Any specific directions, timings or consequences
should very specifically be noted.
It is important to be open, honest and direct when appraising an employee. I have seen,
and unfortunately inherited, many situations where employee problems were glossed over
in the appraisal process. The net result is always the same – when you try to address an
issue the employee always points to years of great performance appraisals from their last
manager and tries to change to conversation to why you are an issue. Glossing over issues
is not good for anyone. If the employee knew there was an issue, that person could
potentially address it, as opposed to letting it fester for years. It’s also not fair to the new
manager, who now has a terrible issue to contend with because you were incapable of
confronting the issue on your watch. Make no mistake about it, that fact will come back
to haunt you in the future. Performance appraisals must also always be part of each
employee’s file too.
Sometimes an issue you need to deal with is a conflict between two or more staff
members. If there is an actual issue where one person is at fault and the other is
complaining about it, you must deal with this quickly. Perform a quick investigation, get
the facts, have a discussion with the person at fault getting a commitment to fix the
problem and then talk with the other person explaining what has been done to address the
issue.
Often the conflict is more about roles and responsibilities or other issues where there is a
difference of opinion or personality conflict, as opposed to any clear issue or fault. For
these situations you need to first speak with each one alone to understand their side of the
argument and then meet with them together to see how you can resolve their differences.
Over the years I have used several techniques to get people or teams to work together
more effectively. At one job I had two major office locations where the IT teams just
could not stand working with the other team. I instituted a staff swapping program where
I would switch out one member of each team with one from the other team for a month at
a time – enough time to make them start identifying with the folks from the other
location. Within a year that issue was solved forever. On a more local basis I would ask
people in conflict to have lunch together once a week. (yes, I paid for it) This virtually
always worked.
Structuring the Organization
It’s impossible to overestimate the importance of clearly defining roles and responsibilities
both for the individual and often more importantly, in the organizational context. You
should know that structuring an IT organization is a complex activity with many nuances.
This book will only touch on the subject as an introduction and with some basic guidance
for the Infrastructure component of the organization. The reader is encouraged to continue
with additional in-depth research focused on your specific type of company and user
environment.
How you define the structure of your IT organization will depend on technology’s role in
the organization. Understand that there is no single right way to design the IT organization
and the structure of IT must evolve with changes to the organization. When you design
your organizational structure you must take the three foundational factors into account:
The Roles and Organizational Structures of Line Management – This refers to
Technically Aligned, Business Aligned , or Business Process Aligned
Organizational Structures
The Roles and Structures of Service Delivery – These roles include IT Capability
(the traditional role of IT providing services like a utility), Competitive Services
(where IT delivers services like an outside provider, charging for what you receive),
and Business Value (where IT becomes more fused with the business itself and is a
consideration in all strategic business decisions).
Governance Roles and Structures – This refers to Centralized, Distributed and
“Enabled” governance models
Today, the CIO’s goal is not just to “run” IT, but also to ensure that the business achieves
strategic value from the technology investments the company has made. Gartner has
identified four dominant futures for IT in the organization. They are not mutually
exclusive and may exist in combination:
IT as a Global Service Provider
In this scenario, the IT organization is an expanded and integrated shared-service
unit that runs like a business, delivering IT services and enterprise business
processes. It is virtually or fully centralized, focuses on business areas and business
value, adopts a marketing perspective, capitalizes on its internal position and
delivers competitive services.
IT as the Engine Room
In this scenario, IT capabilities are delivered rapidly at market-competitive prices.
The IT organization succeeds by monitoring technology and market developments,
and building expertise in IT asset optimization, sourcing and vendor management,
and IT financial management. It delivers ongoing cost improvements, looks for
new ways to deliver the same IT capabilities for less, and is highly responsive to
changing business needs.
IT “is” the Business
In this scenario, information is the business’s explicit product or at least is
inseparable from its product. The business is structured around information flow
(not process or function) and the IT organization innovates within the value chain,
rather than just enabling the supporting services found in every business.
Everyone’s IT
In this scenario, business leaders and individual contributors use information and
technology aggressively to break through traditional business perimeters and drive
ambitious collaboration. The focus is on information, rather than technology.
Highly mature businesses embrace this divergent model for its collaborative and
innovative potential. This model works in non-traditional situations such as
dynamic businesses, startups and R&D/entrepreneurial/community ventures.
The Infrastructure Organization Example
The previous discussion about IT organization was pretty high-level and somewhat
focused on larger organizations. Taking the discussion down to the level of a real IT
Infrastructure Organization in a small to medium size company, most I have seen have
adopted the Technology Aligned, IT Capability model, with some variation around
governance (centralized versus Business Unit alignment). This usually works well within
the infrastructure organization as Infrastructure services are most efficient when
centralized in some fashion.
Stated again, you must review your organizational structure to ensure that it is best
structured to support the needs of the organization AND it is sufficiently detailed to
clearly define the roles and responsibilities of the departments and the individuals. If there
is one thing you don’t want within your organization, it is a turf war between two or more
of your managers. Conversely, you don’t what to find there are segments of the
environment with no defined owner.
Most people use the word SAN (Storage Area Network) to describe both the storage
devices themselves (Such as EMC or Hitachi storage frames) and the network as a single
entity, but they are not. There are two distinct pieces of the environment – the storage
systems and the network connecting them together. The Storage Area Network (SAN) is a
fiber optic network fabric designed to support the storage systems. It connects the various
storage systems with the network and servers that use the storage systems. This network
may exist as a completely separate network connecting only to the servers and storage, or
it may utilize the primary IP network going to the servers and the Wide Area Network for
replication of the data.
You can see how this SAN is sometimes a battleground for ownership. Will this SAN
network be managed by the Systems or Storage team or will it be managed by the
Network team? The fact is, this is a network and requires the skills and capabilities of the
network staff. In addition, in many/most cases this network is integrated with the broader
IP network and must be configured holistically for such items as Virtual Networks and
Quality of Service (QoS).
For these reasons, the better choice would be to place ownership of the Storage Area
Network within the Network team. The exception would be if the environment was large
enough that a completely separate Storage Network was being deployed, in which case the
Storage or Systems team would build a SAN Network group within their organization,
focused specifically on this network.
__________________________________________________
The Centralized Technology Aligned Infrastructure Organization
Most organizations have their IT organization defined into two major functional
groupings; IT Infrastructure and Applications. These two major groupings are then
subdivided into a number of smaller groups focused on specific technologies or services.
Note that in many companies the Help desk and End User Services are one organization.
In addition, network services is again subdivided in to such groups as Local Area Network
(LAN), Wide Area Network, (WAN), Telecom, and sometimes network based services
such as Market Data Services.
Help Desk
The Help Desk is the first point of contact between the users and IT. It should be defined
as the single entry point for all user communications into IT. While the Help Desk is often
the place where the most junior IT staff starts out, that is not the best decision. As the first
point of contact between users and IT, especially when the user needs assistance in
resolving an issue, the staff should be skilled at resolving the issues presented to them.
Staffing for the Help Desk is usually driven by a metric such as the number of user calls
per Help Desk agent. This makes the case for a well-developed metrics program
especially important.
Staffing numbers for the EUS team depends on many factors, but one of the most
important drivers is the compliance with the standards. The more homogeneous the
environment, the more productive the EUS team will be. The number of EUS technicians
is usually driven by some user metric, such as 1 technician per 75 users (exact number will
vary by company)
Network Services
Network Services has overall responsibility for the various pieces of communications
technology in the organization. In all but the smallest of organizations this will minimally
consist of Local Area Networking with the company facilities, Wide Area Networking and
Telecommunications (Voice Communications). More than other organizations, the
Network Services group’s technologies are broad and relatively divergent.
The staff in Network Services needs to contend with technologies as varied as Ethernet
networking, Optical Networks – both internal fiber optic communications and external
fiber based optical networks such as dark fiber networks, SONET networks, Voice
Communications equipment, etc. In some companies the Network Services group is also
responsible for network security, or minimally the implementation of network security
architectures that are defined for them.
Network Services is also typically the organization with the greatest number of vendors
that produce recurring charges, such as the carriers that supply the external circuits. As
such, Vendor Management and cost optimization skills are essential in this group.
In some firms there are additional specialized voice communications systems, such
as in Financial Services, where Traders use specialized telephone systems that
include “Turrets” at trader positions. These are most simplistically specialized
telephone systems with a large number of preset connections between users at
different companies. Environments like Turret systems will require very
specialized skill sets.
Beyond the standard three Network Services sub-groups, some firms will have these
additional organizations within the Network Services function:
These responsibilities are very broad, and include such functional areas as:
Entitlement Systems – such as managing Active Directory User accounts
Messaging Systems – which include EMAIL, Instant Messaging, and mobile based
messaging services
Knowledge and collaboration systems such as SharePoint
Storage Systems – in this example Storage Systems is considered part of the
Systems Administration group. Storage Systems can also be broken out as a
separate function in larger organizations.
Systems Operations
The function of the Systems Operations Manager and team is to perform the ongoing
operational processes defied for the environment. These would include such items as:
Information Security
The Information Security function may or may not exist in every company as a separate IT
function or organization. In some small organizations this may be handled by one or more
individuals within the Network Services organization. In larger organizations and in those
organizations with specific risks, such as Financial Services companies, this function may
be supported by one or more individuals in one of the other functional groups, or it may be
a separate group onto itself. In larger organizations this is clearly a separate function that
is staffed according to company size and the mandate of this group.
It’s important to note that the IT Information Security function may not reside within IT at
all, but instead externally in a broader security function or other group.
IT Audit
In larger organizations, a separate group is created that provides an ongoing review and
auditing function of the various IT activities. This group monitors the finances, project
performance, and IT risks and controls that exist within IT. This function most often
exists within organizations that must conform to specific agency compliance requirements.
The most common need to broaden the organizational design is where there are multiple
physical sites or locations within the organization. Here are some examples of multiple
sites you may need to address:
Multiple small to very small sites, such as a retail organization with several hundred
stores either domestically or worldwide.
Multiple medium to large sites or offices locally, such as a number of large
domestic offices
Multiple sites that may be either domestic or internationally based
In the smallest of locations, where local IT personnel cannot be justified, you should
engage a local service provider to deliver day-to-day support, such as break/fix, software
installs and new equipment installations. If you have a more major requirement, like
deploying new server or network equipment, you can fly in the right staff to do the job.
The big difference in this case has to do with the required local management and
empowerment. In the case of domestic offices, the greatest time difference between
offices will be 3 hours (for US based companies). When your responsibilities include
international offices, this number grows to 12 hours worst case. That requires you add
two things to your organizational structure for the larger and distant offices.
1. You will need to put someone in charge as an IT site manager. That person could
be the most senior of the technical staff you deploy to that location or it could be an
actual site manager when the remote office is so large that you have a larger
number of IT staff working there.
2. Your staff at the remote location will necessarily be in a matrix management
environment. All members of these remote offices will report to more than one
manager. The technical personnel (EUS, Network, etc.) will report to the overall
manager of that function. In addition, they will report to the site manager for this
remote location. The site manager will report to the Head of Infrastructure, but also
to a local business manager at the site.
If you have a large number of remote offices you may consider adding a “Manager of
Regional Office Technology” to your organization. The remote Site Managers would
report into this person and this Regional Office Manager would report into the Head of IT
Infrastructure.
As I noted, the Site Managers would also report into some local senior manager at the
remote office. This is usually a senior business leader at that location. Together, the Site
Manager and the local business manager will manager daily prioritization of activities
which are tactical in nature.
Technology Management
IT Standards
The manageability of your technology environment will depend to a large extent on how
well you are able to define and adhere to a set of standards. You need to define your
standards across the entire IT environment, including the different types of Hardware
(server, desktop/laptop, storage, network, etc.), Software, Peripherals, Operating Systems,
Network Protocols, Development Languages, Telephony and Conferencing
This will undoubtedly be one of the more challenging efforts you will undertake in
transforming your organization. That said, the resulting impact on the efficiency and
effectiveness of your team will make this well worth the effort.
What will your organization look like of you don’t define or enforce standards? It isn’t
pretty for sure:
Not managing the standardization of the user workstation platform can cause havoc
when deploying a new application or an application upgrade. Different processor
speeds, different memory configurations and disk capacities, as well as different
operating system versions can all cause programs to crash or behave badly.
Imagine that Monday morning after a deployment as the End User Support team
needs to “debug” issues on a multitude of users whose machines no longer work –
each for a different reason.
Different types or levels of software on different machines can cause all sorts of
issues. Issues that may have been corrected on a later version will be present on the
older versions. Security exposures may exist and put the entire organization at risk.
Different Applications being used for the same function in different organizations
may appear to work well at a purely functional level (availability, alignment with
the user requirements, etc.), but they may cause more business related issues at a
higher level. As an example, multiple financial systems is the usual CIO’s
nightmare. You can almost be guaranteed that multiple financial systems will result
in differences in the charts of accounts. You can also guarantee that the different
systems will define data points differently, such as how profit and loss is defined by
two different departments. The amount of effort that goes into taking results from
different departments and integrating them into a single report is often astounding.
Another common application where we see multiple products existing in an
organization is CRM. Same types of issues.
There is a clear budgetary impact of not defining and enforcing standards. At the
most basic level you will lose the price advantage of the single large purchase. You
will need to purchase support for a multitude of different pieces of hardware and
software, increasing the overall cost. Finally, your support of the mixed
environment will be more complex, slower and ultimately will require more staff
and skill sets than a homogeneous environment.
So, what should you do if you move into a new position and find that you have a
heterogeneous environment (often referred to in the industry as a complete mess)? Get
started ASAP to standardize it! It is the only way to build a well-run IT environment and
frankly, to save your job.
Choosing standards – In some cases, choosing standards will be a trivial exercise. A good
example might be selecting Microsoft Office as the standard Office productivity platform.
A slightly more difficult issue will be that ongoing quasi-religious war … Apple vs. PC.
Do you select PC only? Apple Only? PC with some Apple in managed deployments
where they are specifically needed (imaging, video, and web design)? You can see how
this starts getting a bit more complex.
Absolute Standards – This will include such items as PC vs. Apple; standard model
of desktop and laptop (including hardware specs like memory and disk storage);
office productivity suite; standard browser, virus scanner, pdf reader, zip/unzip,
and EMAIL program; Printers (both personal and shared); Network Operating
System; standard server platform; and so on. If you are talking about user
workstation equipment, this would include those items that EVERY person gets,
whether they need it or not.
Non-Standard Standards – These are items that are on our list of supported
products, but not every user will get them. There is usually some form of process
defined for someone to request an item on this list and get it approved. Some great
examples of this include Adobe Photoshop or Adobe Illustrator. Google Chrome
might be on this list if you chose Microsoft Edge or Internet Explorer as the
standard Browser. A simple process for this group may be the authorization from a
person’s manager or senior executive. The help desk would have a small inventory
of each item on this list and would assign a copy once the approval is received.
Special Requests – This group is for the most part undefined and taken on a one-off
basis. This would include such items as a specialty piece of software, such as
physical security software, specialized Risk software, etc. In some cases,
something that starts in this category will later become part of the non-standard
standards – meaning anyone that later wants a similar type of software will need to
use this previously reviewed, approved and supported version. This category is one
where most organizations find the IT staff has no previous experience or skills to
support it.
Don’t Care – The “don’t care” category includes items that have no meaningful
impact on the operation of the IT environment. This might include such items as
scanners, small specialized printers, like label printers, mice, keyboards, etc. If
someone wants something you place in this category and is willing to pay for it, the
Help Desk is empowered to place the order and get the item installed.
Not allowed – There are some type of equipment of software applications that you
will specifically place on the “not allowed” list. An example of this might be
personal hotspots or connecting a personal wireless router to the network.
However you decide to categorize the technology that you will see in your organization,
you should have some clearly articulated process and selection criteria that you will use to
defend your choices. (You will absolutely be challenged on anything you decide to limit,
reject or place on the “Not Allowed” list.
Here are some good criteria for you to use during you “selection” or “decision making”
process:
Standard Operating Procedures
The need for defined and documented Standard Operating Procedures cannot be
overstated. You will undoubtedly find this to be one of the more challenging aspects of
managing an IT organization. IT Policies must flexibly address an ever changing
technology landscape, and therefore must be reviewed and updated at least on an annual
basis. If you happen to work in an industry that is required to comply with various
Federal regulations and International Standards ( such as Sarbanes-Oxley, COBIT, ITIL,
ISO 27000, ISO 2000, HIPPA and PCI to name a few), a comprehensive set of well-
defined policies is a requirement.
Beyond the regulator aspect, IT Policies are essential to your successfully managing your
IT environment. They will define what types of hardware and software can be used in the
organization, the processes for adding or removing users, adding accounts, the acceptable
use of company assets, how to report security incidents and so on.
As a hint here, if you find your organization has few documented policies you can
purchase IT Policy template packages from a number of sources. These template packs
will help kick-start your policy definition process, but should never be used “out of the
box”. Your policies must always take your specific organization into account.
Aside from the obvious checking a box on certification reviews (not meant to denigrate
the certification process), there is a real demonstrable need to have these policies AND to
make certain that every member of the staff knows that they exist. As mentioned above,
these policies help you to create a manageable IT environment – that’s the “when things
go good” part of the explanation. The converse of that is the “when things go bad”
scenario. When a staff member, be it a member of YOUR specific organization or the
broader user base, uses the equipment in a fashion that violates the company rules or even
just some societal rule of good behavior and the organization needs to take some action,
you must have some documented policy that the HR department and lawyers can point to
that defines that the behavior was against company policy. In addition, you need to have
some documented acknowledgement that the user in question was provided with a copy of
the policy and acknowledges that he/she read and understood it.
When developing your IT Policies you need to include the organization that owns the
particular area of technology in the definition process. They are best positioned to point
out flaws or omissions in the policies. Also, having the owners of the technology be part
of the policy setting effort instills a sense of ownership in that team, making them more
likely to enforce the standards and policies and more able to explain the rationale to users
that may have questions or challenge the policy.
Once a policy has been agreed to and signed-off on by the team that is creating it, the
policy should move onto receiving the approval of business management. In many
organizations there is an IT Steering Committee that typically consists of senior business
management. That committee should review the proposed policy, along with the data and
rationale that drives it. They will provide feedback to your group to adjust the policy as
required, and then to provide their final approval for the policy. Once that final approval
is received the policy transforms from something created by and for IT to a policy
business decision owned by all of the departments. This is now communicated to the
staff, including a statement that this has received Senior Business Management approval.
Communicating and Enforcing IT Standards and Policies
Standards and Policies are worthless without the proper enforcement. Make no mistake
about it, you will be challenged constantly on both. In order to make this work, you need
to be able to deliver a rational and articulate argument on why the standards and policies
are in place and why they need to be enforced. That said, you will need a commonsense
approach to making exceptions. There will be circumstances when someone cannot do
their job without utilizing a piece of technology that is not on your standards list. You
should include a process for vetting the reasons why people are asking for a standards or
policy exception and receiving the proper approvals to get that exception.
Clearly document your standards and policies, distribute them to the business and
get a signed confirmation back that they were received and understood
Document the reasons behind the standards, what they are there to achieve or to
prevent and what the consequences of not having them in place would be
Get the approval of senior IT and business management for the standards and
policies and communicate the fact of their approval to the users when the standards
are distributed
Provide periodic re-distribution and communication of the standards, always with a
returned signed confirmation feedback to ensure the staff keeps them in mind and
any changes are communicated
Develop simplified processes for purchasing the items covered by the standards
Ensure that the standards are updated periodically and re-communicated to stay
relevant to changes in the business, the technology or legal implications.
Create a commonsense approach to approving exceptions to the standards
Standards and policies should be distributed to the business on no less than an annual
basis. Also, whenever there is a meaningful change to the policy, it should either be
communicated to the business in its entirety or there should be an “all-hands” email
explaining the change and pointing to the policy on the company internal Intranet website.
I will restate this for emphasis - Communications of standards and policies should require
a positive verification and acknowledgment that the recipient received the communication,
read the document and understood the document and agrees to comply with the policy.
There should be a contact person designated for any questions or concerns. The
acknowledgement by every member of the staff with signature must have a “required by”
date associated with it. As with any other vital company policy, such as compliance,
signed verification of receipt, understanding and agreement to comply with the policy
should be a condition of employment.
Service Level Agreements
Service Level Agreements will be part of your life. Particular aspects of the service –
scope, quality, responsibilities – are agreed between the service provider and the service
user. If you become the new Infrastructure Manager ask for copies of the service level
agreements that your organization has entered into. There will be two types to collect:
Services TO YOU from Equipment vendors and other service providers – These are
relatively straightforward and consist of such things as Cisco Smartnet, etc. In addition,
you will most likely have service level agreements with providers of outsourced services
like Cloud Services, Data Center Colocation Services, etc. You need to understand early
on what level of services these SLAs commit to provide as well as the consequences for
non-compliance. Equipment vendors will provide guarantees for such items as Time to
Respond, Time to Repair/Resolution, time to provide replacement parts, etc. A Data
Center colocation site will provide guarantees around such items as power and cooling
availability, temperature range, humidity range, etc.
Services FROM YOU to your customers – I’ll make the case that this group of SLAs is
more important for you to fully understand and to focus on meeting or exceeding. The
SLA to your users is the definition of what services and service levels they can expect
from you. At one level this is defined to manage the expectations of your user
community. The SLA provides a bar that can deflect undue criticism. The SLA also is
used to define to your technical staff what the minimum acceptable performance is for the
things that they do.
If your IT Organization has not created SLAs to define the service levels that the business
should expect, you should. In some cases, the organization is not currently capable of
delivering consistent service that will meet an SLA. In situations where I have found that
in the past, I begin by defining the target service levels as Service-Level GOALS or
Objectives. This may seem like simple semantics however the choice of words is
carefully considered. If you defined something as a Service Level Agreement, it is
considered an absolute commitment to the organization that you are capable of meeting
that service-level and have every intention to do so. It might have negative consequences
if you miss any specific commitment levels (such as financial impact to the individuals –
bonuses or possibly the loss of your job). If you define these measures as Service Level
Objectives, you are stating that the organization might not be capable of meeting these
goals consistently. That is a huge distinction.
IT Processes
IT Process definitions are essential to providing a well-managed and predictable service.
The challenge here is that, by and large, I find that organizations have not gone through
the effort of formally defining the primary IT processes that occur in their environment.
Many of those that have defined the processes do not enforce them with any rigor.
Finally, fewer still measure the results of the processes to find out how they are
performing and making changes where appropriate.
________________________________________________
When I asked to see copies of the root-cause analysis reports being produced by their
“problem management” team, as expected I found that the entire process was lip service.
Where any root cause analysis reviews were even being done, they were started weeks
after the event. The people that were present and part of both the initial failure and the
remediation to bring the systems back online were not the ones that produced the reports.
The root cause sections were basically a litany of anything and everything that could
possibly have contributed to the failure. One “power failure” report read “The failure
could have been caused by someone leaning against the power button on the server. It
also could have been caused by a failure of the PDU in the cabinet or a failure of the
circuit breaker feeding that PDU in the distribution panel. Finally it could have been
caused by a failure in a remote PDU feeding the distribution panel.”
Everyone would agree that it COULD have been caused by any of those things – but the
actual cause of the failure was never found. It was clearly obvious to me that the people
that were producing these Root-Cause-Analyses were never trained in how to do them. It
was also clear that nobody was actually ever reading these reports, and the people that
were producing them knew that. As long as that “Green” indicator for problem
management on the monthly dashboard could be lit, everyone was happy – but nothing
ever got fixed.
________________________________________________
IT Processes are a huge subject to take on. Defining these processes can be as large an
effort as embracing a formal process methodology, such as ITIL, or as simple as taking a
few of the most common ones and defining a process that works for your team. You need
to approach the subject of process definition in a way that is appropriately scaled for your
group or company.
If you and your organization are new to IT Process definition, I recommend starting slow.
You should begin with those processes that have the biggest impact on improving services
and build from there. I would recommend starting with Incident Management and Change
Management – not necessarily at the full ITIL level of comprehensiveness. I would
follow up these processes with a Disaster Recovery process.
ITIL Processes
If you plan to take on the challenge of making your department a process driven
organization in a big way, then you will likely want to consider embracing one of the
formal process methodologies. In the IT Infrastructure world, your best choice will be
ITIL.
Here is a formal definition of ITIL :
“ITIL, formerly an acronym for Information Technology Infrastructure Library, is a set of
practices for IT service management (ITSM) that focuses on aligning IT services with the
needs of business. In its current form (known as ITIL 2011 edition), ITIL is published as a
series of five core volumes, each of which covers a different ITSM lifecycle stage.
Although ITIL underpins ISO/IEC 20000 (previously BS 15000), the International Service
Management Standard for IT service management, there are some differences between the
ISO 20000 standard and the ITIL framework.
ITIL describes processes, procedures, tasks, and checklists which are not organization-
specific, but can be applied by an organization for establishing integration with the
organization’s strategy, delivering value, and maintaining a minimum level of competency.
It allows the organization to establish a baseline from which it can plan, implement, and
measure. It is used to demonstrate compliance and to measure improvement.”
Some of the other processes you will want to consider within your IT Infrastructure
Organization include
Request Fulfillment
Access Management
Problem Management
Problem Management / Root Cause Analysis
Later in this book we will discuss IT Metrics in some detail. I consider the collection,
analysis and publication of IT Metrics to be one of the single most important initiatives
you can undertake in an infrastructure organization. You will hear lots of reasons why
later.
Right now we will just mention them in the context of Problem Management and Root-
Cause Analysis. Root Cause Analysis is defined as:
The obvious goal of Problem Management is to uncover the underlying problem that is
causing Service Interruptions within your environment. Once the root-cause of a service
interruption is known, you can either address the problem with a fix on all impacted pieces
of technology (which may be every workstation for instance), or you can include the
workaround to an issue in a Knowledge Base to be used by your technical staff.
You are not going to perform a root-cause analysis for every issue you have worked
through in your organization, but there are two circumstances where this is necessary.
Problem Management must be scaled to the size of your organization. Very large
organizations sometimes have entire groups devoted to pursuing the underlying causes of
repetitive issues. A small business may task specific individuals with performing a Root-
Cause-Analysis of a repetitive problem occurring in their specific space. You must define
a Problem Management Report that is appropriate for your organization. There are plenty
of templates out on the internet to get you started. Understand that, especially in a
company of any significant size, a formal Problem Management Function will require
resources to focus on the investigations; however, whatever the size of your company and
the resources you devote to Problem Management, the impact of improved availability and
performance will make devoting these resources worthwhile.
Incident Management
The goal of Incident Management is to restore any service interruptions as quickly as
possible. In the older versions of ITIL, The Incident Management process included user
requests for new items like software, etc. In the latest version of ITIL, Requests are
broken down into a different process (although still handled by the same people.)
While Incident Management is a process that hits the entire organization, the folks most
involved are the Help Desk and End User Support (Desktop Support) teams.
The Help Desk
As the focal point in the organization for user related issues, the Help Desk has a
disproportionate impact on user perception of IT. Frankly, I have never seen any company
where the IT Help Desk gets enthusiastic positive reviews. The best assessments I have
seen include such statements as “they do pretty good considering the overall lack of
resources they have” or the delightful “well, they certainly aren’t as bad as they *USED*
to be!” Why are Help Desks almost universally held in such low esteem?
I quickly engaged a few temps to just answer the phone and log the calls (manually in a
spreadsheet). This helped a bit, but clearly wasn’t the solution – it was just designed to
slow the bleeding.
My path to fixing the Help Desk took several years and included:
Sourcing qualified and committed End User Support staff
Installing the tools to track and manage user tickets
Installing a telephone environment that can track the number of phone calls, hold
times and abandoned calls
Developing processes to classify the severity of an issue or event and deploy the
correct skills to address it. Also defined escalation procedures and trigger points for
escalation
Identify the Help Desk expert for the different types of technologies being
supported
Developing monthly Help Desk Metrics that were used both as a communications
tool to Senior Management and to drive improvements to how the Help Desk was
managed. (much more on this later)
Communicating with users during the resolution process and afterward. Every call
was followed by a user satisfaction survey.
At this point the Help Desk was running pretty good, but good wasn’t good enough – we
wanted GREAT! So we engaged an outside consulting firm to help us move up to the level
where our users were actually our fans. This process was part presentation, part watching
videos and part focus group, where the focus group consisted of the End User Support
organization, and also my complete set of direct reports and me.
To say this was interesting is an understatement. The Help Desk team had a huge number
of great and relevant recommendations. The most memorable one to me had to do with
the process of authorizing the Non-Standard Standard software (remember, that’s the
group we will support, but it is not pre-installed on every machine). I was part of the
approval process, but frankly “added no value”, since I had not rejected anyone’s request
that had been approved by their management. THEY redefined the process at that
meeting, streamlining it and resulting in a noticeable improvement in customer
satisfaction. (yep, I was the problem here). I was voted off the process.
The message here is to make sure you have skilled people on the Help Desk that want to
work on the Help Desk and will take pride at creating a first class group. Make sure you
have the tools in place to manage the calls, analyze what the call issues are and how well
you are responding to them and communicate with the users. Over communication is
better than under communicating. Finally, listen to your people and reach out to them for
their opinions.
Attempting first contact resolution of issues
A Service Interruption incident must be solved within the agreed solution period, as we
will discuss later in the Incident Triage section. The aim is the fast recovery of the IT
Service, where necessary with the aid of a Workaround. The best case goal is for the
solution to be achieved during the first attempt by 1st Level Support – the Help Desk. As
you will see in the section on Metrics, this “First Contact Closure” is SO important that it
must be tracked through your metrics program. If after exhausting the possible solutions
to a problem the service interruption is not fixed, the Incident is transferred to a suitable
group within 2nd Level Support. (End User Support, Network, Systems, etc.)
Triage of Issues and Incident Prioritization
All issues are not created equal. If an EMAIL or application server is down, that’s way
more important than the person that is waiting for Photoshop to be installed on his or her
machine. User support calls are always triaged into a set of well-defined call severity
levels. The higher the severity, the greater the response.
Typical Severity Level Classifications are:
Severity 1-Critical/Emergency - Critical Impact/System Down
Severity 2-High - Significant Impact
Severity 3-Medium - Minor impact and priority
Severity 4- Scheduled or Low priority
Severity 5 – Very Low / Project Work
The Incident Prioritization Guideline describes the rules for assigning priorities to
Incidents, including the definition of what constitutes a Major Incident. Since Incident
Management escalation rules are usually based on priorities, assigning the correct priority
to an Incident is essential for triggering appropriate Incident escalations.
An Incident’s priority is usually determined by assessing its impact and urgency, where
Urgency is a measure how quickly a resolution of the Incident is required
Impact is measure of the extent of the Incident and of the potential damage caused
by the Incident before it can be resolved
Incident Urgency (Categories of Urgency)
This section establishes categories of urgency. The definitions must suit the type of
organization, so the following table is only an example. To determine the Incident’s
urgency, choose the highest relevant category:
Incident Urgency
Category Description
The damage caused by the Incident increases rapidly.
Work that cannot be completed by staff is highly time sensitive.
High A minor Incident can be prevented from becoming a major Incident
by acting immediately
Several users with VIP status are affected.
The damage caused by the Incident increases considerably over time.
Medium
A single user with VIP status is affected.
The damage caused by the Incident only marginally increases over
Low time.
Work that cannot be completed by staff is not time sensitive
Incident Impact (Categories of Impact)
This section establishes categories of impact. The definitions must suit the type of
organization, so the following table is only an example:
To determine the Incident’s impact, choose the highest relevant category
Incident Impact
Category Description
A large number of staff are affected and/or not able to do their job.
The financial impact of the Incident is (for example) likely to exceed
High $10,000.
The damage to the reputation of the business is likely to be high.
Someone has been injured.
A moderate number of staff are affected and/or not able to do their
job properly.
A moderate number of customers are affected and/or inconvenienced
Medium in some way.
The financial impact of the Incident is (for example) likely to exceed
$1,000 but will not be more than $10,000.
The damage to the reputation of the business is likely to be moderate.
A minimal number of staff is affected and/or able to deliver an
acceptable service but this requires extra effort.
A minimal number of customers are affected and/or inconvenienced
Low but not in a significant way.
The financial impact of the Incident is (for example) likely to be less
than $1,000.
The damage to the reputation of the business is likely to be minimal
Incident Priority Classes
Incident Priority is derived from urgency and impact.
Incident Priority Matrix
If classes are defined to rate urgency and impact (see above), an Urgency-Impact
Matrix (also referred to as Incident Priority Matrix) can be used to define priority classes,
identified in this example by colors and priority codes:
Severity Definitions
Support Requests that are made to the Help Desk are prioritized based on the nature,
severity and time of request. The following descriptions provide some guidance on how
you should develop a Support Request Prioritization philosophy, based on the severity of
the event or issue.
Severity 1 – Critical [Emergency] – This Severity Level is assigned to a problem, or issue,
impacting a significant number of users and/or any mission critical IT issue affecting a
single customer.
Severity 2 ‐ High – Non critical but significant issue affecting a single user; or an issue
that is degrading the performance and reliability of supported IT Services; however, the
services are still operational. Support issues that could escalate to Severity 1 if not
addressed promptly.
Severity 3 ‐ Normal– Routine support requests that impact a single user or non ‐ critical
software or hardware error.
Single user’s workstation is down, but the user may be able to use other
workstations to remain productive.
Printing issues for single user.
User productivity affected but not completely halted.
Frequently used software corrupted and needing re ‐ installation.
Software and hardware installs, upgrades, and other similar requests.
Severity 4 ‐ Low– A Priority resulting from a minor service issue or general inquiry from
the customer that does not affect the customer’s ability to utilize the technology.
Escalations are necessary because the particular resource that is working on the issue may
have a skill gap that they are afraid to expose by asking for help. Also, the solution may
require another department be brought into the effort to fix the issue. The more-senior
person to whom a call is escalated to can also become a buffer between the technical staff
working on the problem and the impacted users, who may be calling every 5 or 10
minutes. Whatever the reason, if you can’t get a problem addressed quickly, escalate to a
more senior staff member.
As an example, if a Severity 1 issue is not fully resolved within 1 hour, the issue must be
escalated to the Senior Manager in that particular technology tower (such as the head of
networks for a network issue or head of systems for a server issue). In addition, for a
Severity 1 issue, the Head of Infrastructure and the IT Organizational Head (CIO, CTO)
must be informed.
The escalation must include the pertinent information (1) What went wrong; (2) Where are
we in the recovery process; (3) What is the projected Time or Repair. If you know
enough about the cause of the failure, you should include what changes need to be made to
ensure this does not happen again.
In addition to escalation, there is a requirement for ongoing communication with the user.
Users need to hear from someone with a status update on their issue from time to time.
Obviously, the more critical the issue is, the more often that the communication should
happen.
Most everybody has heard of IT Asset Management and will throw the term around, but
what does it really mean? Here is the definition you will see most often:
IT asset management (ITAM) is the set of business practices that join financial,
contractual and inventory functions to support life cycle management and strategic
decision making for the IT environment. Assets include all elements
of software and hardware that are found in the business environment.
Now that we’ve defined Asset Management you should know that very few companies do
this really well across all asset types. I have seen estimates that 80% of companies still do
not have a centralized way of managing assets through the lifecycle. What are the primary
questions you should be able to answer from an asset management system?
How many of each type of device do I have deployed across the enterprise? How
many are deployed by site?
What is the cost of all of the assets I have deployed? What is their current value?
What is the lease expiration date of each of the leased assets?
How many copies of each type of software do I have deployed across the
enterprise? How many licenses do I own for each type of software?
What is the function that each device I have deployed is performing in the
environment? For example, if the device is a server, what application or
applications reside on the box?
How many virtualized servers do I have in my environment?
What operating system resides on each device in the environment?
What is the serial number of the asset deployed at each location (extra credit)
In the event you can’t make the connection between what asset management is and how it
can help you, I’ll give you some basic examples:
Many companies purchased computers (desktops and laptops) on a very ad-hoc
basis. “We need 10 new desktops this week, call the vendor and get 10 delivered”.
Vendors love this type of shop because you are always paying the highest price.
Asset management will allow you to see how many of each you actually have
deployed. Even mid-sized companies see this number almost immediately go into
the thousands. At that point, you can negotiate a contract with your preferred
manufacturer/vendor directly with a defined delivery schedule. Assume you have a
3-year replacement cycle. If you have 3000 devices in your environment, that’s
1000 per year. You’ll get a great discount.
Understanding the actual landscape of devices will also help you plan for upgrades
to software. For desktop and laptop devices most companies have long since gone
to a “software image based” build. If you haven’t gotten there yet, you need to.
The problem with image based building of user computers is that it has its greatest
impact when the environment is very homogeneous (most all of the computers are
the same), and it is actually harder if you have a wild mix of different PCs. Asset
Management helps you understand what is out there and limit the variation as much
as possible. If you find very small populations of some devices, get them out of
your environment. Replace them with one of the newer standard devices.
One issue with complex software environments is that upgrading the environment
is always a major challenge. Consider a large front or back office environment in a
trading firm. It’s not unusual to see an application requiring 10 to 15 servers. You
can patch these environments pretty well, but upgrading to a new version is a
challenge. Do you upgrade the fail-over environment and make that primary after
testing is complete until the primary is also upgraded? Do you build a whole new
environment on new hardware and then cut over once that is well tested. This
would be the most effective plan, but also the most expensive.
Now let’s throw in the fact that the hardware the application resides on is leased.
How will you handle this situation? Do you wait until the lease is almost up, which
may be a very long time? Do you provide new hardware and cutover – but then
what happens to the hardware for the remainder of the lease? This is how
companies that lease servers often keep the server for months or even years beyond
the lease expiration date, making the leasing company rich. Ideally, you would
want to synchronize the lease schedule with the application vendor’s major release
timing (if possible). This scenario is a great example of why you need to develop
an asset management strategy. You may find that complex software environments
such as the one we just described is best hosted on purchased equipment, rather
than leased.
Lease verses purchase is one aspect of the Asset Management strategy that you will need
to focus on. Most likely you will end with a strategy that includes both. Some assets are
better leased, some are better purchased. Understanding the challenges that each
methodology brings will help you provide better guidance when the folks from Finance
stop by to make the case that you should be leasing everything.
Asset Management is a Collection of Processes
Implementing Asset Management can be accomplished in a variety of ways, but it comes
down to Tools and Processes. From a process standpoint, Asset Management is focused in
three areas:
Inventory of Devices
Contracts and Finance
Software Compliance
Inventory of Devices
The inventory of devices is the most basic level of any asset management effort. Whether
you are focused on user equipment, network, systems and servers, data centers or any
other part of the IT environment, a precise inventory is almost a foundational requirement
onto which other management processes are built. This is about capturing the basics: what
assets are on hand, where they reside and who owns them. It’s about maintaining an
accurate, up-to-date view of deployed hardware and software assets, so that at any time
you can see an “actual state” of the components that comprise your infrastructure.
The complexity and costs to respond to an unexpected audit not only decreases your
negotiating strength with your vendors, but places risk around unforeseen fees to “true up”
the license numbers. As a bit of advice here, this can be one of your organizations
greater areas of Risk. You should complete an annual review of software compliance
across your business and “true-up and deficiencies in valid license numbers.
How Effective Is Your Company’s Asset Management Process?
As mentioned, the quality of the IT Asset Management efforts at different companies is all
over the map. There are firms that are doing little to no real IT Asset Management and
there are also larger firms that have an entire organization dedicated to the task. Gartner,
Inc. created a Maturity Model that defines the various states of IT Asset Management.
Once you have located your company’s current state of control, you can use this tale to
decide how far up the Maturity Model you need to take your process. From there you will
develop a Roadmap that gets you there.
To assess your ITAM current state, consider all the dimensions that enable the ITAM
building blocks; namely Organization, Process and Tools. Also consider the landscape
across the Asset Classes (Data Center equipment, Network, Desktops, etc.); there are
different tools and processes that come into play for each major Asset Class and there may
be a significant difference in your current state capabilities for each Asset Class as well.
Understanding that true Asset Management will require purchasing and contractual
information, the solution will cross organizational boundaries. Just within IT this will
impact Help Desk/End User Support, Network, and Application Development. Outside IT
the staff in Procurement, Finance and Contracts (Legal) will benefit from the
environment. In order to get the maximum benefit from the system you will need to
understand the current processes in all of these departments and assemble a solution that
works for everybody.
Designing a consolidated system that manages both equipment and software inventory and
financial, legal and procurement data has additional benefits. One clear benefit is that all
activities will now be focused on one single data repository. When this is not true, each of
the environments tends to keep its own version of the inventory, leading to obvious
differences in data sets.
Here are some additional “Best practices” Items:
Good Inventory Practices Start With An Accurate Baseline - Establish your
baseline at the very beginning of the project. An accurate inventory of installed
hardware and software forms the foundation of a solid ITAM program. This
baseline identifies in ITAM which assets need to be redeployed, reused or retired.
Doing a physical baseline is a first necessary step to make sure you have all
connected and non-connected IT assets in your repository. Perform an automated
inventory first, which you will validate during the physical Inventory. In this
fashion you only need to manually add the items that were not captured during the
automated sweep.
Go Deep and Then Go Wide - A winning strategy for companies is the start of an
inventory practice around one asset class, such as servers. This way, you can put
processes in place to capture and reconcile the detail you need and test the
processes though regularly scheduled updates to ensure they are thorough and yield
the right results. Once successful, the same processes can be implemented for PCs,
network equipment and detailed software inventory.
Have a Process Owner - Inventory management needs a single process owner who
can consider the needs and requirements from all stakeholders and assure
accountability throughout the entire process.
Ensure Stakeholder Alignment - Going beyond stakeholders in IT operations, IT
Asset Management has stakeholders in contracts, procurement, finance and
compliance. Because each department is involved in discrete parts of the IT Asset
Management lifecycle, defining cross-departmental processes upfront helps meet
multiple goals.
Establish IT Asset Management project milestones - Implementing IT asset
management requires careful coordination between IT and process owners. Best
practices call for setting project milestones for process definition, software
implementation, integrations, training, testing and rollout.
Set specific operational and financial goals - Most IT Organizations initiate IT
Asset Management projects to gain specific, measurable results in three areas: cost
control, risk mitigation and service level improvement. You must set specific
operational and financial goals to show incremental progress against each of these.
Defining, collecting and communicating a comprehensive set of metrics around IT
budget impact assessments, service quality levels and decreased risk of compliance
irregularities attributable to the IT Asset Management process will demonstrate the
impact.
Standardize on hardware configurations and software license titles –One of the
most important themes throughout this book, instituting standardized configurations
means selecting fewer hardware configurations and software titles, which enables
significant volume purchase leverage and also reduces the burden on the service
desk and End User Support.
Conduct internal audits - Regularly review asset management practices to ensure
cross-functional processes are supported by automation as much as possible.
Document these processes so that you can show proactive resource control in the
face of an audit.
Inventory Reconciliation
Another benefit of the automated IT Asset Management system is the asset reconciliation
function that most commercial products include. Most simply put, the inventory that is
captured in today’s sweep is compared to what is in the database. Differences (extra items
or missing items) are noted. You now have the opportunity to investigate why there are
differences. The most likely causes will be changes to the environment that did not go
through the Change Management process, such as software installed on a desktop
machine. Whatever the cause, you will have the opportunity to fix the asset inventory and
perhaps plug a hole in one of your other processes that caused the discrepancy.
Lifecycle Management
IT Asset Management extends inventory and configuration management by layering in
processes that manage each asset throughout its complete lifecycle. For each asset in your
environment, there is a beginning (procurement), a middle (moves, adds, changes) and an
end (retirement).
Managing the asset lifecycle requires a full appreciation of each of the processes
associated with the stages of the lifecycle. These processes can be automated through an
integrated system that leverages inventory and configuration management systems.
Summarizing and putting it all together, here are some of the processes that can be
automated using a capable Asset Management System:
IT Asset Management Tools
There are a huge number of available tools that can support part or all of an IT Asset
Management program. The hardest part of the selection will be to choose a tool that is the
right size for your organization and which can integrate with other software components in
your environments. I have seen several efforts where a “do-everything” tool was selected
at a cost of millions of dollars, but was so complex that it never reached production status
– never had any real data or real users. The lesson here is that it is better to get something
running and producing value, even if it only supports a piece of your long-term goal.
Selecting a product that can be deployed in stages is a good strategy.
If you are running a tiny IT shop with less than 100 PCs, a few servers and network gear,
you’re best advised to develop a minimalist type of Asset Management environment. You
likely won’t have an extensive set of tools to seek out and identify the equipment on the
network and your central Database will likely be built in Excel.
As you move up the value chain there are two primary features that you need in an Asset
Management Toolset:
A Risk has both a cause and, if it occurs, consequences which could threaten the success
of your activity. The Risk Management Process Consists of six basic components:
In a formal Risk Management environment, the standard way of compiling and tracking
Risks is in a database called the “Risk Register”. This is relatively simplistic in terms of
implementation – it can be as simple as a spreadsheet or a SharePoint Database. More will
be said about the Risk Register later.
Before we go too far, let’s define some terms that we will be using when we discuss Risk
Management:
Incident – An Incident is defined as “Any event which is not part of the standard
operation of a service and which causes, or may cause, an interruption to, or a
reduction in, the quality of the service”. The key differentiation between Incidents
and Risks is Incidents are events that have already occurred.
Issue – Issues are problems that have already occurred – Risks are potential
problems that have a potential to occur but may not. An Issue therefore is a
realized Risk. Issue Management can be minimized by effective Risk
Management.
Risk – A Risk is defined as “a possible event that can cause harm or loss, or affect
the ability to achieve objectives”. Risks are potential problems that have the
potential to occur but may not.
Risk Register – The Central Repository of Risk Data for your organization or an
individual project. This is most effectively implemented as a list in SharePoint and
set up in Spreadsheet format. Each Risk occupies one record in the list.
As with a number of items in this book, the depth of the Risk Management Process you
implement in your organization will depend on the size and scope of the activities you
perform. Whatever the scale of what you are doing, you must include some form of Risk
Process in your activities.
Again, what is meant by a Risk? Let’s give some real world examples (meaning they
actually have happened) for an IT Infrastructure organization. We will use our example of
building a new Headquarters Facility for your company.
You are responsible for engineering, implementing and integrating all of the technology in
this new building. That will consist of a new Server Room where the servers and the core
of your network will reside, IDF closets on each floor, a new Trading Floor, where there
will be a high density of users, each having a substantial amount of equipment and all of
the Audio/Video systems in the building. You must additionally connect this new facility to
both your Primary and Disaster Recovery data centers. The relocation of the staff has
been broken into three separate move events each separated by only 2 weeks.
Delivery of a Functioning Server Room – This is usually the first thing you need to get
started. It will be the location where any external circuits are terminated. It is where the
Network Core, WAN edge equipment and local processing resources are located. You are
dependent on the facilities group to deliver this room. They have promised it will be
delivered on April 1st (yes, I did pick that date because it’s a joke that it will come in on
time). Here is your first risk:
Risk: The facility group will miss its delivery date for the server room
Impact: The communications circuits are scheduled to be terminated and activated
two days after the room turnover date. The room will not be ready for their arrival,
so you will need to reschedule the carrier to return at a future date. The carrier
cannot come back for two weeks if the termination and activation is rescheduled.
Mitigation Plan: What will you do? You need to come up with a plan on how you
will address this situation if it happens. You need to come up with that plan when
you first start the project, NOT when the Risk turns into an issue.
Also note that in this first example, the Risk was based on a Dependency on something
outside of your control.
This is a great hint – Look at the dependencies on your Project Schedule. They will
most always become Risks you need to plan for!
Delivery of External Circuits – The next step in a typical project like this is to have the
external circuits brought into your building and terminated in your server room. We will
assume here that the server room has been turned over to you. What sort of Risks might
you encounter here?
Risk Impact
Cannot get permit to install conduit to
Delay in provisioning circuit
manhole
Note that in all of these cases there was a delay in delivery of the circuit. This means that
any of the subsequent tasks that are dependent on the circuit delivery will be impacted
Beyond these two milestone events, the following are some additional Risks you should
plan for in the scenario we described:
I’m sure you can see by now that this isn’t really hard.
Risk Management Process
While Risks can be identified in many ways, they are most likely to be self-identified
through a project planning process or similar activity on the operations side, as well as
through status and project reviews.
It is important to make Risk Management part of everybody’s job. When one of your staff
members identifies a risk, they can either log it themselves or communicate it to someone
with the responsibility for collecting and managing risks.
New Risks should be reviewed by the Project Manager for a specific project related risk or
the technical department manager for an operational risk.
The Risk Lifecycle
There are five stages to the Risk Lifecycle
Risk Identification
Risks are identified via multiple sources including audits, project planning, project
reviews and operational incidents. The Risk definition should capture the event (such as
“Server Room not turned over on time), and not the cause, the failure of a control or the
effect of the risk. The Risk should map into one of the Risk Categories that is defined.
Risk Categories
Risks are categorized into groups that define what aspect of a project or the business will
be impacted if the risk is realized into an issue. The following are the typical categories
that Risks in an Infrastructure environment will be mapped into:
Unrealistic Schedule
Inadequate Schedule Estimates
Schedule Risks
Excessive Time to Market
Exiting of Existing Facilities
Cost Overruns
Financial Risks Lease Terms / Exit Strategy
Valuation of Existing Assets
Summary of Risk Categories (cont.)
Category Potential Risks
Inadequate Staffing
Inadequately Trained Staff
Resource Risks
Inadequate Staff Productivity
Inadequate Tools
Cost Overrun
Inadequate Cost Estimates
Vendor Risks
Financial Viability
Decision Risks
Vendor/Client Disagreements
Inadequate Cost Estimates
Design Risks
Financial Viability
Decision Risks
Changes in Technology
Technology Risks
Unproven Designs
Risk Assessment
Risks are assessed (or analyzed) to evaluate the potential scope of the risk, the likelihood
of occurrence and the potential impact
The first step is to assess the Risk Impact, using the information in the Risk Impact
section, which describes the Risk Business and Project Impact Level Descriptions
The Second Step is to determine the Likelihood of Occurrence for the risk
The third step is to generate a Risk Summary Status using the Impact and
Likelihood data
Critical Risks require immediate attention and escalation to Senior
Management, as there is risk of loss that is perceived to be both likely and
significant in terms of impact to the business.
High Risks require review and escalation to determine the appropriate
course of action, as incident or accumulation of incidents are perceived to be
sufficiently probable or sufficiently serious that some negative impact on the
business is anticipated without remediation.
Moderate risks should be monitored and mitigation or remediation strategies
considered, but an incident or accumulation of incidents are considered
possible (not probable) or generally are expected to have only a limited
impact on the business
Low risks are considered minimal such that, under existing controls, an
incident or accumulation of incidents is not expected to be so frequent or
significant so as to have an impact on the business.
Determining the Impact Level
Determining the impact of a risk depends on two factors (1) The type of risk with
associated potential impacts to the business or project and (2) The impact level- which can
range from minimal to no impact up to critical impact that must be addressed
immediately. The following tables define the impact level criteria for the various
categories of Risks:
Risk Acceptance
If a risk cannot be mitigated, or if the severity of a risk is not in line with the cost of
mitigation, that risk must be “Accepted” by the management of the organization.
Basically this means that either there is nothing we can do to mitigate the Risk or we don’t
want to spend the money required to control it. In essence, we are going to take our
chances this will not occur. In these cases, the Risks are documented centrally in the Risk
Register and presented to management, governance committees and impacted business
areas for acceptance.
The risk severity, impact and type will typically determine the signoffs required for risk
acceptance
In order to accept an Information Security Risk, there must be a serious evaluation of the
Risk by senior Information Security personnel. If you don’t have such people in house,
you should engage the appropriate consulting resources to evaluate the risk.
After the risk has been completely evaluated, a plan must be defined to remediate
the risk within a reasonable amount of time. The divisional CIO MUST support the
plan, its funding and the Risk during the specified period.
OR
The divisional CIO must explicitly request a permanent acceptance of the risk if
he/she is unwilling to fund the remediation AND any impacted business unit must
also accept the Risk. Both the CIO and Business Unit approvals must be received
in writing.
Risk Documentation
The Risk Register is the single repository for Risks. The Risks should all have
remediation plans, which will also be managed within the risk register. Tracking of the
risk progress will occur within this environment.
When you are developing the entry of a Risk for the Risk Register, the following
information should be collected:
Risk Status – one of the fields within the Risk Register is Risk Status. This defines the
state of the risk and can be either:
Being Assessed – A risk has been reported and is being tracked, however no
mitigation plan has been developed and the risk has not been accepted. This is the
initial stage of the Risk.
Open – Actions are underway to mitigate the risk. Action Plans will be formally
tracked in the Risk Register for risk mitigation activity.
Closed – the risk is no longer in existence. Risk Acceptance is mandatory when the
risk being closed has an associated Residual Severity.
A Risk item can be closed without “Acceptance” only when the Residual
Severity is zero or minimal
Residual Impact and Residual Frequency are mandatory fields when closing
risks
Accepted – the Risk is open with no actions underway. These risks may remain
open for a significant period of time.
Risk Reporting Process
Communications of IT Risks to management and other stakeholders should occur on a
scheduled basis
Critical, High, and Moderate accepted risks are reported on a weekly basis as part
of the management dashboard
Accepted risks are recorded centrally and reviewed by management, if appropriate,
as follows:
Critical Risks should be reviewed monthly when there is no active
remediation effort in flight
Critical, High, and Moderate risks should be reviewed monthly and when
the operating environment changes occur that could result in impact or
frequency
Low risks should be reviewed quarterly and when operating environment
changes occur that could result impact or frequency changes
Critical, High and Moderate risks are included in monthly company Risk reports
The following charts provide typical Risk Reporting slides that can be included in weekly
management reports.
The classic four quadrant Executive Summary defines a matrix that includes listings of
each type of Risk, quantity of that Risk, as well as accomplishments (mitigation
accomplishments) status of critical Risks and Actions (mitigation activities) planned for
the next reporting cycle.
This second Risk reporting chart provides a more focused view of Project Risks and drills
further down into the specific profile of each specific Risk, including a summary of the
business impact and mitigation plan for each.
A second table on this page articulates discussions that are open or in process and the
impact of not making those decisions.
There will be one of this page for each major project you are reporting on.
This final chart was developed to describe how the impact of a Risk will change over
time. In the early stages of a Risk the impact was moderate, however if the Risk was not
addressed, the impact becomes high or even critical over time. The message here (and to
the recipients of this report) is to address the Risk as early as possible.
Project Management
As an IT manager you will oversee a number of individual initiatives or projects. In some
cases these will be exclusively or almost exclusively an IT initiative, such as rolling out a
refresh to a desktop image, or upgrading PCs in mass. In other instances IT will be a
component of a much larger initiative, such as building and equipping a new headquarters
or other facility.
If you’re running an Infrastructure of any size, you will assign a member of your team, or
possibly you will bring in a resource with the specific skills, to lead a project initiative.
That person will be your Project Manager.
What should your Project Manager be like?
This role will be exceptionally critical to your success so choose carefully. What
characteristics should you focus on?
Your Project manager must be exceptionally organized, passionate about the project
and goal-oriented.
Project Managers are by definition change agents that are to a large extent driven
by the challenge of reshaping the business in such a way to seriously improve
results. You should look for someone whose nature is to identify how the business
and technology can be improved.
Managing a project is a high-pressure and high-stress role, so be sure the person
you select can demonstrably work well under pressure. You just cannot afford to
have someone in that role that cracks under pressure and reverts to a blame
everybody management philosophy.
Projects often suffer from changes to scope and schedule from the very top of the
company. You need to select someone that can be agile and effective during these
redefinition events. In addition, they should be capable of articulating the impact of
the change to the project minimally in terms of cost and schedule.
Much of the work that a Project Manager is responsible for involves interaction
with the project team members (and the managers of the organizations that those
resources come from), vendors, project stakeholders, the project sponsors and the
eventual users. To be successful, your Project Manager must have a well cultivated
set of people skills.
Your successful Project Manager must have developed the ability to unwind a
complex project into a series of independent activities or workstreams and then into
tasks and sub-tasks that constitute those larger pieces of work. He/She must
understand how to monitor and control those individual tasks to ensure success at a
higher level and most importantly understand when it is necessary to adapt their
techniques for different types of projects.
A person that managers a number of projects that are all associated or related in
some fashion is referred to as the Program Manager. A portfolio manager
is responsible for selection, prioritization and alignment of projects and programs
with an organization’s strategy.
Project Management Responsibilities
Project
Activity
Phase
Strategic Influencing
Business Partnering
Project Initiation
Planning and Defining Scope
Time Estimating
Developing a Budget
Resource Planning
Organizing
Identify services to be provided by external companies
Controlling Quality
You will find you are at greater risk when significant portions of the project are outside of
your direct control. This makes definition of roles and responsibilities on a project even
more important. Where your work is dependent on something that someone else is
responsible for, you must define that dependency as well as the date that that dependency
impacts what you are doing. Recognize that YOU will be at risk if the project goes off the
rails – even if you are not the cause.
A business user, such as Finance, wants to move to a new financial application. You, as
the infrastructure manager, are responsible for delivering the entire environment to them,
server, storage, network, application installation, and any client side pieces.
Unfortunately, the project was poorly defined on day 1. The net results are changes to the
requirements, schedule delays and increased costs both on the capital equipment side and
also for extensions to consulting engagements. User trials are delayed and when they
eventually happen it becomes clear that the environment would not deliver the required
functionality in its current form and configuration. The project is cancelled; however a
huge amount of money has been spent. The business attributes this result to failure of IT
(that would be you) to deliver the environment on schedule in a form that met the goals of
the project.
Ouch! How did this happen? Was it really YOUR fault? How can you address this?
I cannot emphasize enough the need to have a paper trail for virtually everything you do.
In the example above the failure will immediately slip into the “blame IT” storyline, one
that every IT manager knows well.
Frankly, every IT manager will get burned during their career with a bad project that sticks
to him or her. What you need to do is to ensure that you communicate extensively with
the other project team members and the stakeholders to minimize the chances of a project
going bad AND make certain that you have a comprehensive paper trail of everything you
said and everything you did. If you can point to the reporting you did to the world and the
warnings you gave about risks turning into unmitigated issues, you will at least come out
of it as a competent individual.
“We don’t need to bury each other in paper, let’s handle things face to face, talking to each
other. More talking and less EMAILs. That’s the best way to develop a strong team
working relationship.”
Hear the alarm bells go off, hear them loud, watch for warning flares, because this guy is
setting you up to take whatever fall there may be coming. Never, ever, ever believe
someone that tells you this and always interpret his or her words as proof positive that the
person is a political game player. At this point, document everything, including every
discussion you have with him or her in a meeting, in the hallway or on a street corner
because you’re gonna need it. Also, consider copying the next level up in management on
at least the more important communications. Finally, think through everything you say to
this person; they will surely attempt to twist your every word to his or her advantage.
For projects that span organizations there are a few pieces of collateral material that are
essential to develop.
Project Charter
Communications Plan
Project Schedule
Project Budget
Weekly Reporting Dashboard
The Project Charter
Possibly the most important document for larger cross-functional projects is the Project
Charter. This document defines:
The benefit to the organization is usually a bit tricky. I have seen lots of justifications
where the benefit is defined as “this will save 15 minutes of time per employee per day”.
OK, that’s great, but what does that mean to the company? These people aren’t going to
get paid for 15 minutes less time and it’s unlikely that this will result in a reduction in
headcount, so this becomes a big “so what?”
Well, if that same 15 minutes of less time means that a customer gets an answer 15
minutes sooner, resulting in a projection of closing a predictable increase in deals, OR,
that a customer service agent can support 10% more call volume, now you have something
that management can get excited about.
Going back to our Cisco upgrade example, if the reason that you need to upgrade the
Cisco environment is because support for the current environment is no longer available,
your justification would be the end of security fixes and updates, exposing the company to
a data breach, or potential for extended periods of down-time, resulting from outages that
the manufacturer won’t support.
Justifications always work best when they are framed in dollars.
“The business estimates this workflow automation will increase deal closure by
10% which will result in between $10 million and $20 million dollars of additional
revenue per quarter.”
“This project will reduce our business error rate by 15%, which currently represents
losses of $5 million per year”
“Without this upgrade our systems will be exposed to an external data breach. Our
research has shown that data breaches for similar size companies in our industry
typically cost in excess of $20 million to fix, and would result in our needing to
upgrade the equipment anyway.”
The final part of the justification is the impact to the company if the project is not done.
The data breach example pretty much has the benefit and impact in that one statement,
however for some of the others you may need to look to the broader industry for the
answer.
For the deal closure example – “We have seen that our direct competition
(companies A & B) are currently ahead of us in automating their workflow and
will capture some of our market share if this is not done”
For the business error rate example – “We’ve charted our error rates and they have
been growing by 10% per year, due to increased reliance on this business function.
If we don’t complete this project, we will reach $10 million dollars in losses
annually within X-years.”
The justification can be framed around a number of different business benefits. Here are
some of the categories you should consider when developing yours:
Strategic Match – The project aligns with the business strategic goals
Competitive Advantage - The investment will provide a strategic advantage to the
company. You also can define how significant it is in measurable terms
Management Information – The project gives management more visibility into the
organization and control over it. Again, this must be framed in resulting dollars,
market share increases, avoidance of losses, etc.
Strategic Architecture – How well does it align with the IT standards, policies and
enterprise architecture? Your IT upgrades will fall into this general class – likely
driven by policies for ensuring the network security is ensured through timely
application of updates and patches.
High Level Project Risk Assessment
A component of the Project Charter will be the results of a high-level risk assessment. At
the very beginning of the project this can obviously only touch on macro-level items.
Here are the types of questions you should answer:
I won’t know the answer to time, cost and risk questions until I’m in a position to
develop a work breakdown structure that goes at least three layers deep.
I’d rather not provide a SWAG (scientific wild-ass guess) because of the rule of
corporate numbers, which states that any number uttered within the distance of
anyone else’s hearing is immediately chiseled into a slab of granite, there to be
enshrined forever as an absolute commitment.
I also need to know whether my estimate should include or exclude an allowance
for contingencies.
Project Planning
We’ve talked through the concept of a Project Charter, what it is, why it is needed and
how you will go about creating one. Let’s assume at this point you created a Project
Charter and have been SO incredibly successful with it that the project is now approved
and you are moving forward.
I spent a good amount of time looking at the literature out there online that focuses on
project planning and frankly came away shaking my head. Like so many subjects we are
covering in this book, if you strip away the information on project planning available
online that are really nothing more than a thinly veiled sales pitches for a particular tool,
there are only a few basic articles on project planning whose content is copied over and
over again.
So what do we mean by Project Planning here? This is the real meat and potatoes segment
of a project where you structure everything that will be done. The components you need
to focus on are:
Schedule – This part I will best describe as a compilation of tasks and milestones
that you will arrange in the proper time sequence, along with connected
dependencies.
Resource Plan – This defines the resources that you will be using on your project
and the percentage of their time that they will spend devoted to this project
specifically. The goal here is to ensure (1) that you have the necessary resources
identified and (2) that you do not commit the resources to more than 100% of their
available time.
Budget – We talked about this previously. This defines the actual funding you will
receive for the project. It’s your job to either meet this budget or come in under
budget
Risk Assessment – A review of the Risks that can derail your project and how you
plan to address them. There is an entire section on Risk assessment and
management in this book.
Project Communications Plan – This defines how you will be communicating to
the world about your project.
These four components will provide you with the tools you need to manage a project
successfully. Notice I wasn’t prescriptive (yet) about how any of these items will be
created and managed. That’s because there are just so many tools available to address
these areas. As an example, if you’re in a small company running a small to medium size
project then you may manage everything start to finish using a combination of Microsoft
Project, Excel and Word. On the other hand, if you work in a giant bank, you may be
using Enterprise Class Project Management tools that are designed to integrate the status
of all projects into management reports. I will not be spending any time on the latter, as
you would most likely receive specialized training at you place of employment.
I also want to point out that, although I recommend that you have all four of these pieces
in place for your projects, that’s not a requirement. For very small projects, or projects
completely bound within your group, a Project Communication Plan may be overkill.
Taking our example of a new office buildout and migration, the network component of
that schedule might look something like the diagram below in a simplified form:
In this example, the black diagrams are the Milestones, The blue lines are the task
durations and the green arrow depicts that the Integration and testing phase of the project
is dependent on the completion of Provisioning Services on the Circuits.
Microsoft Project will display your schedule in the form of a Gantt chart if desired. Using
this tool allows you to calculate and display the critical path of the project.
While Microsoft Project is a spectacular tool for setting up your project schedule, it’s a
bear to use on a daily basis when managing tasks day to day. In order to more simply
manage tasks on a day-to-day basis, many project managers export the task list into Excel
and manage them in a more simplistic environment.
The exact form of spreadsheets used to manage project tasks vary wildly. Some project
managers utilize very simple sheets that just compile tasks and projected end dates. Other
project managers utilize much more complex spreadsheets that calculate upcoming task
completions, tasks behind schedule, etc.
Project Execution
The Project Execution phase of the project lifecycle is where you will actually execute the
plans that were developed for the project. In the standard Project Management Institute
lifecycle this phase is referred to as Project Execution and Control.
When entering this phase of the project, all of the up-front planning has been completed.
The project definition, schedule, budget and resources are all in place. The project team
and specifically the Project Manager’s focus now shifts from planning the project efforts
to participating in, observing, and analyzing the work being done.
The actual work that is happening to complete the project is being done within your
technology organizations and often by additional outside groups. Whether you are reading
this from the perspective of the Head of Infrastructure or as the Project Manager of one or
more projects, your role is more focused on the control aspects of the project.
Time Management
Cost Management
Quality Management
Change Management
Risk Management
Issue Management
Procurement Management
Acceptance Management
Communications Management
Put most simply, during this Project Execution phase your job as a senior IT Infrastructure
leader is to ensure that the project goals are attained on time (as per the project schedule)
and on budget (or better yet, under budget).
The majority of the pages in each of the dashboards I produce utilize the same underlying
template. That template includes the following components or sections on the page:
Program Description – This section is the initial description of what a specific page in the
dashboard is about and how it relates to the overall Project.
Key Deliverables – This section tracks progress against various task related items.
Progress is tracked on a 10 cell graphical bar. I color each block in the bar (using the
PowerPoint fill) green when we have reached that point in the task – in other words, if the
task is 40% complete, I fill in the first four boxes. When I reach completion of the task
(100%), I change the background color to Blue. Those are my color choices; you choose
the fill colors that are best for you.
Required Decisions – This block on a Dashboard page lists the outstanding decisions for
that particular workstream. These entries are consolidated on the Risk / Decision page of
the Dashboard (to be described shortly)
Key Accomplishments This Period – Pretty straightforward, what has been accomplished
since the last Dashboard report was issued?
Key tasks Next 30 Days – In this section you define those tasks and milestones that the
plan says will be completed within the next 30 days. If there are any challenges to
achieving those goals, you can also mention that here too.
Status – At the top of the slide in the Header line is an indicator of the overall status of the
workstream. It consists of the word Status with a colored arrow to the right. That colored
arrow is designed to provide that top-level status indication of the workstream, using the
standard Red/Amber/Green (RAG) indicators. Where
Red = workstream status is bad or negative
Yellow = Workstream is trending negatively from good to bad and needs additional
attention
Green = Workstream is on track, meeting all goals
The template for the Workstream Dashboard is shown on the next page.
Network
Systems
Storage
End User Support
Etc.
Project Portfolio Management
Project Scoring & Prioritization for Maximum Results
The growing challenge for IT management and PMOs is contending with increasing
project demands while keeping the selected initiatives aligned with overall business
objectives. Maintenance projects need to be balanced with strategic initiatives and all
while focusing on driving the business forward and delivering value.
As the number of projects within the IT department increase, it soon becomes apparent
that you will be asked to undertake more projects than you will have either the time or the
resources to complete. We’ve already discussed the need to say “no” to requests. You
will be asked to start projects that clearly should not exist, either because the clearly have
no inherent value or they violate some IT or Business Process or rule.
Saying no to the obvious ones will leave you will a group of projects that do make sense at
some level, but that pile may just get too big for you to complete successfully. The
obvious answer is to define a process (yes we need one more) that allows you to rank the
various projects in terms of relative benefit to the company.
Your job in managing the IT Organization is to deliver the maximum possible value to the
company for the investments that are made. Looking at that responsibility from a project
perspective, you will be looking to apply the following types of criteria to project
selection:
Projects that directly drive the business goals and align with the overall business
objectives should be the highest priority for your team.
Eliminating the tendency to prioritize work requests based on politically-driven
decision-making
Freeing resources from low-payback / low-value work, thereby optimizing
resources for high-priority strategic projects
When I have reviewed how companies prioritize their projects I have found a number of
really bad ranking criteria:
In some cases I have found projects were prioritized and accepted based on the
seniority of the requestor. A project that is requested by senior management should
not automatically qualify for acceptance. They should meet the same
implementation criteria as a project from anyone else.
Projects that are fully within the bounds of IT often get automatically green-
lighted. Whatever the value of the IT project, it should be evaluated within the mix
of all projects, in order to provide an assurance that IT has the broad view of
business value and takes the needs of the customer base seriously.
Categorizing Potential Projects
While the potential for a strong financial payback would be great criteria for ranking
potential projects, determining the correct financial benefit is very difficult. In addition, if
that was the only or chief deciding factor, many projects that are mostly technical
improvements (such as infrastructure upgrades) would not make the cut. These projects
may be needed, however, to scale the company upward. A better solution is to utilize a
criteria scale for making decisions such as Gartner, Inc.’s five-perspective methodology.
1. Strategic alignment – How well does the IT investment strategy align with the
long-term goals of the business?
2. Business process impact – How much would the initiative force the company to
change existing business processes?
3. Technical architecture – How scalable, resilient, and simple to integrate with
existing technology are the databases, operating systems, applications, and
networks that would be implemented?
4. Direct payback – What benefits does the initiative have in terms of cost savings,
access to increased information, or other advantages?
5. Risk – How likely is it that the initiative will fail to meet expectations, and what are
the costs involved
Building Project Scoring Models
In addition to determining criteria for categorizing projects, you will need to determine a
methodology for scoring. There are several models to choose from:
1. Binary (No range and unweighted) - Under this model, a project either meets a
specific criteria or it does not. It will receive one point for each criterion met, and
projects will be chosen based on the total number of points. In this model, all
criteria are assumed to be of equal importance. This isn’t the best way to rank
projects because it does not allow companies to determine to what extent criteria
points are met.
2. Range and unweighted – In this methodology, the project is scored on a range (i.e.,
from one to five). This option provides a more detailed analysis of how projects fit
with corporate goals.
3. Weighted scoring - In addition to scoring criteria within a range, this option
provides a weighted score for each criterion to determine how important each
consideration is to the organization overall. This scoring model provides a more
comprehensive look at how well a project fits the company’s priorities. When
creating weighted scoring models, companies can break down the importance of the
top priorities of the business to determine how much value to assign to each one,
adding up to a total of 100 percent. More simplistically he weighting can also be in
a range of say 1 to 5.
As a company refocuses its objectives over time, the weighting calculations may be
modified to fit with the organization’s current goals. In determining a ranking score for
each criterion, businesses can build charts that clearly define each numerical value’s role,
from zero (“does not meet objectives”) to the highest value (i.e., five or 10), which is
reserved for projects that closely align with the company’s goals.
All this said, I put together a super fast spreadsheet to calculate the [value] scores for three
fictitious projects. Here is what that looks like:
Another example Matrix using the Gartner Criteria:
Prioritize Projects Based on Plotted Scores
After you have determined a scoring methodology and taken the time to rate potential
projects according to a set of criteria and their weighted values, you then can prioritize
upcoming projects based on values such as the project’s relevance to overall strategy,
potential return on investment, and the amount of risk involved.
High-strategy, high-return, low-risk projects will generally be viewed as high priority. As
the scores in individual categories goes down, you may find it more difficult to identify
clear winners. In this situation, it may be helpful to use visual modeling tools.
Several visual modeling options include:
When a proposed project receives a score below a cut-off number, you should just reject
that project, or shut it down if it is something in process. Remember, the goal is to spend
your available budget dollars on those activities that will provide the most value to the
organization.
It’s crucial for company leaders to revisit the scoring values and criteria on a regular basis
to ensure
Operational Management
Daily Operational management consists primarily of a series of processes or activities that
are designed to provide non-stop IT availability. As with any activity that drives the value
to the business, the availability of the systems and the level of customer satisfaction, the
processes need to be well defined and rigorously enforced.
In this book we will define a few more common processes that you should consider
implementing in your organization:
Daily System Checks
There is usually a number of activities that take place overnight in an organization’s IT
department. These will range from systems back-up to patching servers and workstations
to changes to network configurations, and so on. While these changes are usually well
understood and hopefully tested before being deployed into production environments, the
overnight processes sometimes will break something. It’s important that each of the key
system environments is checked for operation before the time the users start arriving each
day to ensure nothing has been broken overnight, and if they have, the issue is corrected
before the staff starts using the systems.
All defined security and event logs should be reviewed for anomalies and
unauthorized systems changes
Check VoIP Communications Manager Systems are free of alarms.
Check all VoIP Session Manager Servers are free of alarms; SIP links are up and
replication for all Session Managers are synchronized.
Check Web Filters are working as expected and all appliances health status is
good. Test by attempting to browse a blocked website and a regular site.
Check Primary and failover Voice Recording servers are operational. Check both
primary and secondary servers for recent recordings.
Check that no RSA tokens expiring in the next month and replication between
servers are working.
Review overnight EMAIL and Management System alerts and take action if
necessary.
Login to Turret Management systems and check for alerts
Check that all Firewall gateway status is good.
Check Fiber DWDM nodes are free of alarms.
Ensure any and all anomaly events have been entered into Ticketing System for
investigation and resolution
Systems Administration Checklist:
Check that all scheduled and rescheduled backups completed successfully. Note
remaining capacity of backup systems
Schedule all failed backup jobs for review
Ensure all shares are mounted and accessible
Ensure Unix servers are up and operational
Review file activity notifications for suspicious activity
Check that all virus signatures are up to date
Review overnight alerts and take actions as required
Verify Message Archiving succeeded
Review certificate expiration report for expiring certificates
Review SAN weekly report for performance issues
Review DHCP Report for any issues
Review Disk Space Report for any utilization issues
Check versions for all critical software
In Change Management, all changes to the IT infrastructure and its components are
authorized and documented, in order to ensure that service interruptions to the
environment are kept to a minimum. The implementation steps are planned and
communicated, in order to recognize potential impacts to the systems as early as possible.
A Change Management process has a person that is assigned the task of collecting, and
managing any changes that are proposed – the Change Manager. The Change Manager
has this responsibility throughout the lifecycle of the change. In large companies, the
Change Manager may be a full-time position. In smaller companies the role may be
assigned to one of the more senior managers.
The Change Manager and the Change Advisory Board bear the responsibility for
reviewing all changes and providing the approval to move forward. Typically, a Change
Management Meeting is held on a weekly basis where the person who is requesting the
change, along with any significant stakeholders meet with the Change Management Board
to review their change and answer questions.
What could possibly go wrong with this process? Well, you should know by now that lots
of things can and will go wrong.
1. First, you will have those folks that just do not buy into this change management
thing. You will ALWAYS hear from them about a change that has to go in tonight
because (1) the company will implode if that doesn’t happen (2) They just found
out about this themselves and all life as we know it depends on this going in tonight
(3) They can’t wait for the process to work because their key guy is going on
vacation starting this Friday for three weeks and there are 1 million five hundred
and sixty-two items that will be happening between now and when he gets back
that completely depend on this change. You know, of course, that in all cases that
person is full of crap.
2. There will be the person that honestly is trying to go through the process but finds
that there was some form of error in their submission package and they cannot wait
for the next scheduled meeting. Unless this person ALWAYS does this, you should
work with him/her to get it on the schedule.
3. Truly urgent changes can come up that should go through the process but cannot
afford the time of a standard change cycle.
Clearly, you will need to define a special procedure for emergencies to deal with these
urgent changes. Also, have a method in place to deal with the fallout when you have to
reject either someone’s fake emergency requests or changes that get rejected for good
reason. If the Change Management Process falls into YOUR scope of responsibilities, you
absolutely will be designated by the change requester as the person standing in the way of
success. Document all rejected changes including the reasons for rejection. More on this
in the Politics of IT section.
Information Technology Metrics – A Critical Component of
Your Toolbox
As the expression goes “You Can’t Fix What You Don’t Measure!” For Information
Technology the number of activities that are constantly in process can only be understood
by measuring activities, correlating them to understand trends and chart them over time to
measure performance and improvement.
The Case for Developing an In-Depth Metrics Program
I have never seen an IT shop that didn’t push back when a metrics program was started.
The reaction is always the same – “We know what’s going on and nobody is going to read
this stuff anyway”. It is a universal and completely predictable reaction. So universal
that, YES, even I had that exact response the first time I was asked to start down this path.
I can tell you that I couldn’t have been more wrong when I resisted implementing a
metrics program. By starting simple and focusing efforts on those metrics that could have
the biggest impact on operations, we were able to achieve a huge improvement in systems
availability and the corresponding improvements in Customer Satisfaction.
I am going to present quite a bit of information and proposed metrics in this section. It
can be a bit overwhelming if you’re looking at this sort of program for the first time. The
key to success is to think incrementally. Start with some basic metrics and build from
there. You should start in two areas – Customer Satisfaction and Help-Desk / End User
Support performance.
Benchmarking is important when developing a metrics program. Before you start any
measurements, you should send a survey to all of the employees to understand their
assessment of your team. Within this section of the book I will present the ongoing
customer satisfaction survey that my team used in one of my more substantial IT
Transformation efforts. Variations of these questions will be fine as a component of your
initial survey, but you need to go deeper. Ask questions about the entire suite of services
your team provides, the equipment the staff is using, policies and procedures they must
follow, etc.
Your biggest fear when you start to develop this survey is that you are going to be
hammered by the staff’s responses. If this is the first time they have ever been asked for
their opinion, you are probably correct. Don’t be afraid of this result, in fact, unless
you’ve been running IT in this company for a long time, a bad first result is exactly what
you need. THAT is the baseline against which all improvements will be measured. If
customer satisfaction comes back at 95% satisfied (and you know you need to fix lots of
things), it will be hard to quantify the improvement to your management. On the other
hand, if satisfaction is around 20%, go out and start looking for the red and blue tights
with a big “S” on the chest!
As your program moves on to additional areas of measurement you will need to take a
benchmark reading of your team’s results before any mitigation work begins. You will
always need that baseline to compare against.
By the time you are finished developing your monthly reporting program you will find
you are measuring virtually every area of services and technology you manage. There is
good reason to take the program to this point:
You can’t fix what you don’t measure – At the core of any metrics program is the
goal of improving the performance of the systems and staff. The metrics you
collect will absolutely lead you to those issues that most need your attention. They
will also tell your management the story of how your management of your group is
improving the results.
You need documentation when you or your organization is attacked – You can be
absolutely sure that you and your team will be attacked on an ongoing basis. You
will see some of these types of attacks articulated in the “Politics of IT” section of
this book. Sometimes the attacks are just based on a person’s individual
experience, which they then generalize as your group’s overall performance.
Sometimes the attacks are by a person that is using IT to explain their failures.
Other times you are being attacked by someone that wants to take over some or all
of your responsibility. In all of these cases a good set of metrics that can
unequivocally communicate the reality of your group’s performance will be the tool
you need to address the attack.
You need to chart and communicate improvements you have led your organization
to achieve – Metrics should be part of your communications plan to the
organization as a whole. Everyone should know how hard your team is working
and how much you all are achieving. This shuts down criticism and can be
invaluable when bonus time comes around.
This book will present a very large number of IT Metrics that are focused on the
Infrastructure itself and the services provided to support that infrastructure. Some of the
knowledge a good metrics program will provide include:
If the user that gave the “Extremely Dissatisfied” response included any detail in the
survey response that was included in a section of the Metrics Dashboard.
The Dashboard Metrics pages for the Customer Satisfaction Sections are shown below:
Note that the responses are broken down by location, with the Regional Offices, which by
and large are smaller offices, collected into a single category.
A Second page was devoted to the second group of two questions. The analysis methods
and presentation was the same as for the first group.
Finally, the last question that drilled down into the overall quality of the service delivered
is analyzed in more depth than the previous questions, primarily due to the greater
importance of this result.
It is also important to track the response rate to your surveys. You will never get 100%
returns, however if the response rate is too low, you may need to do some additional
communications to the user community to explain the importance of the survey, why they
are important and how their responses are being used.
We also found that, in those situations where we had some work to do mitigating issues in
an environment that the response rate for the surveys first peaked and then started to drop
off – the users were getting tired of filling out the surveys, no matter how short they were.
In those situations we backed off and would only send one survey every two weeks to a
single user.
Here is a chart we used to track the user response rate.
Metrics for Analyzing What Is Driving Support Calls
The next most important component of your Metrics program will be to use the
information you collected during the incident reporting and resolution process to gain
insight into what is happening in your environment.
For our
sample set of metrics pages we start with a summary page such as the following one:
You will see that the types of calls are broken down by location and then into two broad
categories of Break/Fix and Service.
If you find that the vast majority of activities are in the Break/fix category, you definitely
need to drill down and find out what is happening!
Break Fix Drill Down
The next chart in our sample package drills down into the Break Fix Category. Note that
this no longer is broken down by site. The Level 2 Categorizations are now further broken
down into a Level 3 – the underlying items that are consuming the staff’s time. This gives
you a good window to identify recurring issues and address them permanently.
As an example of that below, If you looked at the Hardware category you will see that
Printer (145 calls), laptop (132 calls) and Peripherals (127 calls) are the big consumers of
tech time. At this point you should pull the call records for each of those categories and
see if there is a common theme. Printers may just be cartridge replacements, or it could
point to an out of date driver that the techs are updating on a one-off basis when they get a
call about it. It sure would be easier to push an update to all of the machines if that’s what
you find. Problem solved – next month watch that category drop to the bottom of the list.
This exact methodology has worked for me a number of times and has resulted in
significant reductions in call volume and significant increases in customer satisfaction.
Call Trending
In order to see how any mitigation or transformation work is going, it’s useful to graph the
trend of issue and ticket volume over time. To do this we look at how the overall number
of calls is trending, but also how the severity of the calls is trending. The obvious goal is
to ensure that both the quantity and severity of the issues and service requests goes down
over time.
In this first chart the total number of calls by location is trended over time.
This second trending chart focuses on the number of calls by Severity and the
performance against the service level goals that have been set up for that severity. The
dotted line on each chart represents the resolution time goal.
Finally, taking the location out of the analysis, this chart maps the call resolution time
across the business over time. Each of the key severity levels is represented by a different
colored line.
Call Aging Metrics
Under the general heading of “Call Aging” I typically would have charts that cover
the organization both broadly (all incidents and trouble ticket calls) and also
drilling down by location and technical area. So, in the realm of one of my larger
Infrastructure roles, my Call Aging Metrics included charts that covered the
following
Global – All calls for all sites and all types of incidents
Staffed Locations – Focuses on all calls for sites that had onsite IT support.
Remote Locations – Focuses on sites that did not have any onsite IT group.
Help Desk –Focuses on calls & incidents that are 100% completed at the
Help-Desk.
Messaging Services –Focuses on Messaging Services related incidents and
service requests
Technical Services by Location – Three charts focused on major sites (New
York, Chicago, And Regional Offices collectively)
Network Services by Major Site - Three charts focused on major sites (New
York, Chicago, And Regional Offices collectively)
The “Key” to the various colors in each pie chart is shown in the center box, along with
the designated closure goal of 95% adherence to any SLA for that Severity level. Each
quadrant also contains an information box explaining how many total calls in that severity
were generated during the report period (in this case one month) and the percent of those
calls that were resolved within the SLA commitment.
Automatic Call Distribution Metrics
As the size of the organization gets larger, the support staff naturally grows. You will
eventually reach a point where you will have peaks and valleys of calls to the Help Desk
that need to be understood and managed. At this point you may be large enough to justify
the investment in an Automatic Call Distribution (ACD) System.
An ACD provides a large number of benefits. Most simply, it will distribute calls in
whatever fashion it is configured to do so. Most importantly, it will provide Metrics on
what is happening – how many calls came in overall; how many calls by hour of the day;
How many calls were serviced; Average and peak call wait time (Time to answer calls),
Call Duration and Abandoned calls.
Note in the chart above, that some key characteristics of the call are displayed on an
hourly basis for the month. Each hour interval is the average of the calls for that hour
across the month. In addition, the chart also provides a graph of the average staffing
during each hourly interval across the month. This gives you the ability to understand
peak times and the associated staffing in place. If the call wait times and abandoned calls
increase dramatically during peak times, you can adjust the amount of staff assigned
during those hours.
In the chart below, call volume, answered calls, abandoned calls, abandonment rate and
average wait time is plotted year to year to show overall growth in help desk volume.
This is essential to demonstrate any performance improvements and also to demonstrate
that the growth will require additional staffing.
Volume of Tickets / Call Closure
Beyond all of the deep statistics related to user incidents and call closure, there is a need to
view what is happening at a very high-level. This chart presents the total volume of
tickets that were closed by the Help Desk across multiple years. It further breaks down
this aggregate number into those that arrived via the ACD, resulting in a phone call; those
that arrived via an EMAIL to the Help Desk; and those that were received by the user
leaving a voice mail on the help desk line.
Usage Statistics
Another area of reporting is the size of the environment being supported. The number of
users is one good indication, however in many types of companies many of the users can
have more than one workstation – Financial Traders may have two or more computers at
their desk. Many employees have both desktops at the office and a laptop for at home and
on the road. This makes reporting on the number of workstations a more accurate
indicator of the size of the environment that End User Support and the Help Desk is
supporting.
Remote Access Services
Remote Access Services – Another measure of the services being delivered is the number
of users that are entitled to attach to the systems remotely. In addition, the number of
active sessions over the preceding reporting period would also be a helpful measure.
Messaging Services
Messaging has become one of the most critical IT services being delivered to the users.
Understanding the activity and how that activity is growing is critical to delivering a
reliable environment. This chart provides usage statistics over the preceding reporting
period. It breaks the message activity down into Internal (user to user), external (between
internal user and an outside account), text messages, and Fax messages.
Messaging Usage Trended over 3 years – Again, this chart provides a trend of the TOTAL
message usage over three years and is used for capacity planning and resourcing purposes.
Messaging Usage Trended over 3 years – This chart presents message volume by message
type over three years and is also used for capacity planning and resourcing purposes
Messaging usage by site – This chart presents the total message activity by site and further
averaged in those sites by user. It is used for capacity planning purposes.
Server Availability
Clearly one of the key metrics that needs to be accumulated and reported on is the
availability of the various technology environments. Server Availability by type is one
such measure. In this chart the various types of servers have their availability statistics
reported on. It is important to note that the tools that accumulate server availability
statistics should also provide alerting in the event a server is not responding. This chart
does not define the reasons for “unavailability”, just the overall statistics of availability.
Storage Availability
Storage Availability is designed to look at how much Storage space is still available for
the environment. This is used primarily for capacity planning purposes. A well designed
storage monitoring facility will monitor the overall storage availability, as well as the
availability of storage allocated to the individual servers.
Network Availability
Similar to Storage Availability, Network Availability will provide the overall statistics on
any downtime that was experienced over the last reporting period. Ideally, this availability
measurement should be presented for each circuit individually. Along with Network
Availability come measurements of Network Utilization. Again for capacity planning
purposes it is important to understand how much of the available bandwidth is being
consumed. This will help you address any future capacity issues before utilization goes
too high. It will also allow you to understand if you have oversized circuits in place that
can be downsized to save money.
Mobile Devices
The final area of metrics tracking that will be examined is the Mobile Device
environment. While there are many different metrics that we can develop for this area, we
will simply define a chart that measure the absolute number of devices.
Developing your IT Strategy
This book has focused mostly on the tactical or operational aspects of running an IT
Infrastructure organization. In order to ensure you are providing maximum long-term
value to the business you must break from viewing your organization in a tactical day-by-
day fashion and instead look at how your portion of IT is creating long-term value to the
business. This is the realm of the IT Strategy.
This subject of IT strategy is huge and is the subject of many very large books (and
countless thousands of articles). This book will provide an introduction to the subject in
an effort to get your thinking to expand into the more long-range end-state goals.
What is an IT Strategy?
In one article I read the author started with the statement “Hope is not a strategy”. He hit
the nail on the head with that thought. Too many IT shops operate without a defined,
written IT Strategy that links the investments IT makes and the activities IT performs to
the goals of the business. They “Hope” they are doing the right things.
An IT Strategy is a comprehensive plan that the IT Management team uses to guide their
organizations. It is a document that clarifies what the IT organization and technical
environment is today and what it will become. It is a forward looking plan that often
focuses on or defines the end state of a transformation effort, the ultimate goal being
alignment of IT with the goals of the business. It is not a static plan, but evolves along
with the business – it is a process, not a point in time.
The IT Strategy is often crafted either in partnership with the business, or with substantial
business guidance and approval. The most successful IT Strategy is where the capabilities
of both the business and IT drive each other – rather than the business driving IT with
nothing happening in the other direction. It should have demonstrable and measurable
links to the business strategy.
The IT Strategy sets the direction for the IT function in an organization. It ensures that the
greatest number of IT dollars is spent on activities that create maximum value for the
business
Most new IT managers have a difficult time adjusting to the strategic thinking required in
their new role. If you recall in the section discussing issues which can derail you in your
new job, an inability to think strategically is one of the items on the list.
Again, you become the person that must ensure the technology you deploy is well aligned
with the long-term goals of the organization. Those long-term company goals drive your
definition of the long-term target architecture for your environment. You must ensure that
your organizations activities are all designed to evolve the technical environment into that
long-term vision.
The Process of Defining an IT Strategy
Before you can start down the path of defining an IT Strategy, you need a good
understanding of the current state of IT. You need to complete your IT assessment first,
understanding the strengths and weaknesses of the organization, the current state of
customer satisfaction, etc.
You also need to clearly understand the goals of the business and what they need to get
there. Once you understand what your team is providing and what the business needs you
will most likely realize two things: (1) Your group is not providing everything the business
needs to meet the business goals and (2) The business does not fully understand how to
leverage IT to get the maximum value for the business.
From a process standpoint, creating your IT Strategy consists of following a few well-
defined steps:
Two examples I will give of such an environment is Quicken Loans and Credit Card
companies.
Quicken loans has a fully exposed digitized workflow platform onto which all documents
and decisions flow. Applications and other necessary documents are completed via their
web site; supporting documents are uploaded to their web site and communications
between customers and Quicken staff occurs within the site. Inside the company, the
approval process uses the platform to provide workflow across the various approval steps.
While the company might not be completely out of business without this environment, its
ability to respond almost instantly to customer applications provides a huge competitive
advantage. It is, in fact, the value proposition and differentiator that Quicken Loans
advertises to its potential customers.
Credit card companies have evolved from what started as transaction switches between the
vendors and the issuing banks and have evolved over time to deliver a wide range of
services to their customers, who for the credit card companies (as in MasterCard and Visa)
are the Banks, not the individual consumer. Consumers and Merchants are the customers
of the Banks that issues the cards and provide the merchant accounts. In the case of the
credit card companies, while the main product is moving transactions between vendors
and banks through the transaction switch (as well as brand marketing, of course), key
products include Analytics – they are wide and they are deep.
In both of these cases the monumental level of success could not have been achieved
without a very close alliance between the business and IT.
Ideally, IT will be a partner in the definition of the business strategy since that is how the
company will derive the greatest value from IT. Whether or not that is true in your
company, as an IT leader your goal will be to engage with the business to understand what
products and services you can deliver to maximize the value of IT to that organization.
Part of the process of partnering with the business includes ensuring that he business
considers itself as having a voice in the actual initiatives that IT undertakes. The most
successfully way of achieving this is to have an IT steering committee that provides
guidance to Information Technology’s direction. This group should consist of senior
business leaders from across the business.
When developing your IT strategy, your discussions with the individual business units
should not be about technology solutions, but instead about business needs, opportunities,
and challenges. From your perspective as an IT leader, IT should be tasked with
identifying the solutions to the business unit’s needs, once there has been a clear definition
of what those needs are.
Once discussions with the business units are complete, the next step is to develop a list of
initiatives that will provide the support for the business unit goals.
As an example of this process, let’s take the example of the credit card company that
decides it wants to begin offering analyses of the transaction data that is flowing through
the transaction switch. This capability becomes one of IT’s Strategic Goals.
If the company is new to analytics, there are a number of initiatives that will be required to
make this goal a reality. First, the underlying infrastructure will need to be put into place
to create a data repository. This will include sourcing the data (extraction), transforming
the data into some standardized format (transformation) and loading the data into a
database (loading) or ETL. There will obviously need to be the infrastructure for the data
warehouse itself and then systems to slice and dice the data and deliver the reports that
will be the actual products that will be offered to the clients. Depending on the analyses
and reports, there may be a need for eternal data feeds and historical information.
In order to deliver this environment it becomes clear that there are a number of specialized
skills that do not currently exist within your organization. In addition, there are a number
of IT tools that would be needed and the storage environment is far too small to support
the quantities of data that this new initiative will produce. Implementing this may require
expansion to data center space, and the need for additional network capabilities.
This business need will be clearly represented within the IT Strategy. This does not mean
that you represent this project in the next year’s budget as a line-item that costs $3
million. Instead this means that within your IT strategy it is represented as a multi-year
initiative that defines an end-point based on the current understanding. It defines
incremental steps that will each provide incremental business value along the way.
The representation in the business strategy will define what the gap is between what is
needed to be successful at this initiative and where you are today. It will be represented in
the Human Capital Management, Hardware and Software sections of the Strategy
document.
Since you will be performing this alignment process with each of the business units you
will likely end up with many potential initiatives that the business’ would request or
require. This is where you will utilize the Project Prioritization process that was outlined
earlier in the book. Using this process you will calculate a comparative value of each
project to the business itself, based upon a common framework of criteria.
Assuming you have started your new job (or at any time after reading this book) with an
extensive review of your organization, you will have the information to conduct this
analysis. Put most simply, this SWOT analysis will expose the gaps between where you
need to be and where you are now. It will also expose risks that can derail your projects.
Taking a look at each of the components of a SWOT analysis, you should think of them in
terms of an initiative you will be adding to your IT Strategic Plan.
Strengths
What advantages does your organization have? (skills, agility, well-defined
processes, platform, cost management)
What do you do better than anyone else? (customer satisfaction, data center
convergence)
What unique resources can you draw upon to be successful at the initiative?
What do people in your company see as your strengths?
What technology is in place that will make you successful?
What are your organization’s unique skills or organizational strengths that make
your potential for success likely?
Weaknesses
What needs to be improved? (staff size, staff morale, technical processes, policy
compliance)
What should you avoid?
What are people in your company likely to see as weaknesses? (skill sets, IT
communications, technology platform, etc.)
What factors have resulted in past project failures?
Again, consider this from an internal and external basis: Do other people seem to perceive
weaknesses that you don’t see? Are your company’s competitors doing anything better
than you? It’s best to be realistic now, and face any unpleasant truths as soon as possible.
Opportunities
Are there any new or emerging technologies that can have a significant impact?
(Software Defined Networking?)
What interesting trends that you can leverage to improve IT services to the
business? (BYOD?)
Useful opportunities can come from such things as:
Changes in technology and markets on both a broad and narrow scale.
Changes in government policy related to your field.
Changes in social patterns, population profiles, lifestyle changes, and so on.
Local events
Threats
Increased Risks and exposures, such as Information Security issues, lack of
Disaster Recovery, etc.
Is changing technology threatening your position?
What obstacles do you face, such as lack of user awareness to Info Security?
What are your competitors doing? (technical leaps by competitors)
Are quality standards or specifications for your job, products or services changing?
Is there a lack of available budget to address issues
Could any of your weaknesses seriously threaten your business?
Some of the sections of the document you will need to think about are:
Mission Statement – The mission statement is designed to define the business of each
organization. If you are managing the IT Infrastructure organization, your mission
statement will be similar to:
“The mission of the IT Infrastructure group is to provide a reliable, flexible and agile IT
infrastructure environment to Business and Application Development groups.”
Vision Statement – The vision statement should not be a your classic “build an IT
organization to deliver the best services to the organization” statement – one that invokes
either laughter or frustration. It should instead be one that paints a clear picture of where
the IT organization is headed.
The Vision is a statement of the ideal way in which IT decisions will be made and the IT
organization will operate. It includes values statements that reflect the desired
organizational culture, management style, and client service perspectives.
Strategic Guiding Principles – These are statements that define the norms, ethics and
values that will guide your decision making process irrespective of the circumstances.
Some examples are:
Goals and Objectives – This section will define the goals that resulted from your
discussions with the business. You should define the overall goal, the objectives that
support achieving that goal and the Key performance Indicators that will provide the
measures of your progress toward achieving the goal. Ideally you can include a table that
looks like the following.
Drivers of the IT Strategic Plan – In this section you will define those aspects of the
business strategy and IT environment that drove the elements of the strategy. These will
most likely be business unit goals and needs and IT activities to improve efficiency and
effectiveness.
Strategic Gaps – This is similar to the Drivers section, however this is a broader
statement of what’s missing to achieve the Strategic Business and IT goals than a
definition of what you will be doing to fill those gaps.
____________________________
Theme 1
Theme 2
Theme 3
Theme 1
Goal
Strategy
Theme 2
Goal
Strategy
Theme 3
Goal
Strategy
____________________________
If you are a mid-level or lower level manager in IT, you may not need to develop a
comprehensive strategy or be asked to participate in the development of the overall IT
strategy, however you should still consider going through the process to clarify your
thinking on where you will take your department, what you will spend your budget on and
what resources you will need in the future to meet the overall goals that have cascaded
down to you.
Managing the Politics of IT Infrastructure
If you’re managing an Information Technology environment you will find yourself dealing
with political challenges almost on a daily basis. These almost always start with the
unspoken (and sometimes actually spoken) message that “I’m more important than you
are so I will tell you how we are going to handle this situation”
(2) Document everything – However any discussion goes make a note that describes what
was discussed and what your responses were. Follow-up the conversation with an EMAIL
to the person you had the discussion with clarifying the discussion. This is essential.
Political challenges almost always get escalated to more senior management and when
you’re dealing with a political player, you can almost always count on their NOT telling
the truth. Have that document trail to protect yourself and your organization.
Political challenges will come from so many places in so many forms it would be
impossible to list even a small fraction of them here, but some of the more standard ones
will include:
The Standards Rejecter
This is a person who, you guessed it, rejects the company standards you have put into
place. In the vast majority of the cases this is just someone who could easily have their
technology requirements fulfilled using the standard systems and applications you have
defined. It’s a power play short and simple. That said; hear the person out (rule 1). You
may find that there is actually a very specific need that cannot be fulfilled by the
standards. An example may be someone that does very specific types of image work.
That person may need a very specific piece of software that will need a more powerful
computer than your standards include.
The Resource Hog
This political situation will come in the form of a person that wants something you have –
your budget, your open headcount, some responsibility that your organization owns. In
order to defend against this type of attack you need to have a firm plan in place that
clearly defines how you are spending your budget and what you have been doing to fill
open headcount. If you have open headcount for six months and haven’t been
interviewing to fill the spots you deserve to lose it.
The CYA Finger Pointer
This is someone in the organization (usually on the business side) that hasn’t done their
job. When they get called on it, they blame the technology. This is, unfortunately, a
VERY common situation. An example is helpful here:
There was a Senior Vice president of one of the larger companies I worked for that went
on a trip to South Africa. While he was away he didn’t check his EMAIL or call in to the
office for almost a week. When he got back to the office his boss was just furious. This
guy – let’s call him Steve – simply said “I tried every day to use the EMAIL systems but
they just do not work in the South Africa office. Everyone down there was complaining
about the technology they hate it and have zero confidence in our technology group”. I, of
course, had messaging systems as one of the functions in my organization.
I ended up having to launch an investigation into what happened. I had to have people
from my team call every single one of the staff members in South Africa, go through a
general satisfaction survey that was designed for this review and get their attestation as to
the quality of the technology they were using. It wasn’t a huge office, but they are 7 hours
ahead of us in New York, so this essentially had to be done during the overnight hours,
while we were still managing all of our daily responsibilities. It took about a week to
complete.
In the end our technology was vindicated, but the cost to me and my team in terms of lost
hours and grief was immense. This event drove changes to our monthly metrics program.
Having the metrics in place that defined the availability statistics of the EMAIL servers
and the number of messages in and out of every office kept this sort of claim from
happening again. Metrics are immensely important to protecting yourself against false
claims.
The Complainer
A subset of the CYA Finger Pointer is the Complainer. This person may not have a huge
issue they need to cover up, just marginal to poor performance. “ It’s the computer”, “The
Printer doesn’t work”, “the network was down”, “I took 8 hours for someone to stop by
and fix whatever”. The list will be endless and you can’t let this stuff get out of hand.
You need to make sure your desktop people close calls immediately when they are done so
that you have accurate metrics of performance. Be able to go back to that person and say
“your call came in at xx AM, was responded to in 20 minutes and was resolved within 35
minutes of your first call”. Once that happens to a few people the rest will be careful not
to blame your team for their poor performance.
The Non-Team Player
It’s hard to know exactly what to call this type of person, but most everything I can come
up with doesn’t belong in print. This is the person that is part of a broader team and just
will not play nice with the other members of the team. Most recently this was a facility
manager on a new Headquarters buildout. In the distant past I also had a Telecom
Manager that just would not buy into being part of a consolidated IT Project team.
Whoever the non-team player is, they will make your life miserable and put the success of
the project at risk.
Some examples work here. In the headquarters build-out project, the Facilities manager
was the overall PM on the project. He was simply incompetent and a liar. He would not
share information and when he did, he would just give you what he felt you needed to
know. He is also the person I referred to that wanted all discussions and decisions to be
verbal agreements between the two of us, nothing written and distributed.
Naturally, the absolute first item we agreed to he reneged on and claimed there was no
such conversation. To address this we did two things (1) Escalate the issue and our
concerns about him to Senior Management and (2) document everything on the project an
order of magnitude more than we would document other activities. It quickly became
clear to Senior Management that this guy was a problem, but the opted to do nothing about
it during the project. The net result – a $40 million facility build-out became a $70
million build-out. Too bad. IT came in under-budget on this project.
My telecom situation was a difficult challenge too. The Telco manager (otherwise known
as the phone guy) just wouldn’t accept any collaboration with me. Here is one dialog I
will never forget; Me - “So when are the PRIs scheduled to be installed?” Him – “I don’t
know, when are the PRIs scheduled to be installed”. Me – “When do you expect your
equipment to be delivered?” Him – “I don’t know, when do I expect my equipment to be
delivered?” So it went. You can imagine the self-control I had to exhibit dealing with this
guy.
One night I had a huge delivery of IBM Mainframe equipment coming in. It was several
tractor trailer loads of equipment. The building was still under construction, so we needed
to bring the equipment up the outside of the building using the hoist (outside elevator). It
just so happened that on this very night the Elevator Operator’s Union decided to go on
strike. We paid the hoist operator a huge amount of money to help us get through the
night, but he would only work until 1 AM, which just might do it for my equipment. After
we started bringing in equipment for an hour or two, two additional tractor trailers show
up with telephone equipment. The Telco guy comes down in a huff and says, “I need to
get my stuff up to the data center floor”.
I finished what I had to get up first, and then started on his. Best I could do was get about
a quarter of it up to the data center floor and the rest we just moved onto an empty floor
since we were about to lose the hoist. The next morning when he came in and found his
equipment wasn’t all upstairs he was just FURIOUS. He went to my boss, my boss’s boss
and just said every terrible thing he could about me.
Luckily, I had documented all of his transgressions along the way, which just totally
explained the situation. I was able to explain this very simply – “Sorry, this is just the
TSS” (Tough-Sh!t Scenario).
Last-Minute and It’s YOUR Fault
This political situation involves that customer that just ignores the standard policies and
processes, fails as a result and then blames you for their failure. Think this is far-fetched?
If you do, you shouldn’t be running an IT Infrastructure group.
We reported to the same manager and were in staff meetings together and this initiative
never even came up. By pulling out all stops I was able to get him a server in three days –
pushing literally everything else aside, but he still missed his date to the business. He
simply told the business that I could not get the server to him on time (blaming me). The
Business now says that because of this slip (of a few days), they would be delayed by
three weeks in delivering the functionality they had promised.
So here is what I was up against. He didn’t put in a request for a server, but instead he
told people *I* didn’t do my job. The business used the opportunity to take this 3 day slip
in getting their server and using it to justify a 3-week slip in delivering the functionality to
their users. Unbelievable!
The sad fact is that this sort of thing is absolutely NOT an isolated situation. The saving
grace for me was that I had an online change management process that was the definitive
location where all requests were made. That said, everybody was upset with me and my
team that we didn’t cover their mistake.
Again, Document everything and have solid processes that you enforce to protect yourself
in these situations.
The Change Management Failure
When someone requests a change and the Change Management Process rejects the change
for whatever reason, the requestor will always point to YOU as the reason something did
not get done, Expect this person to scream loud and to anyone that will listen – how dare
you do your job!
The only way to address this situation is through documentation. The Change
Management process MUST capture the date/time when anything was done. When was
the change first requested? When was completed documentation received? Did the
request fit into the standard schedule windows or if not did it qualify for the Emergency
Change Process? If the change was rejected, what were the reasons for the rejection?
You must have that information at your fingertips and not need to dig through piles of
papers to find it. Don’t be afraid to let those to whom he has used you as an excuse know
what the reality of the situation is.
Some people are more equal than others
The policy that is most often published states that all user calls are handled equally on a
first-come/first-served basis. Now, I assume (and hope) that everyone reading this book
that is managing an infrastructure group understands clearly and unequivocally that that is
absolutely not true. Just as there is a hierarchy of event severity (technical severity), there
is a hierarchy of who get service when.
I am confident that this statement will invoke horror, dismay, and revulsion in the purists
that consult and teach how to manage an IT department – but never have actually done it
themselves. Any of you that have been in the hot seat will agree whole-heartedly with this
model.
1. Large Revenue Producers - Your first priority will usually be a person or group
that has real and substantial impact on revenue in a real time basis. I’m talking
Traders and likely Portfolio Managers here. This is someone where (1) an outage
of their workstation can cause a significant loss of a trade is not completed and (2)
cannot move to another workstation to do his/her work. I’m certain there are other
folks that will fall into this same category, but you get the picture
2. Senior Management – Assuming that there are no user issues in the first group,
when a senior manager calls, they automatically are moved to the head of the list
(or top of the pile of you prefer). In the organizations I managed, I have always
defined the senior management into a separate group. They are flagged for special
response. I have always designated one or two of the technicians as the people that
would support these individuals.
If a call came in from one of the senior managers, that issue would be immediately
assigned. The technician would be called on the telephone and would be instructed
to make the senior manager’s call the next one on the list. Also, depending on how
senior the person is, a member of the management team would meet the technician
at the senior manager’s office to ensure everything went smoothly and that any
questions or concerns were either immediately answered or taken back and
escalated to the Infrastructure management team to be answered or resolved.
Now you may find that your manager, or members of the senior management team,
may respond to your obvious over-the-top response with some humble statement
like “thanks for this incredible response, but I don’t want to be treated different
than everybody else.” Yeah, right! I will submit to you that this is absolutely no
different than your wife or girlfriend (or husband or boyfriend) telling you “I don’t
want you to do anything special for Valentine’s Day! Don’t spend a lot of money
on flowers, jewelry and chocolate”. Hopefully, you know to ignore what your
significant other says and you do actually show up with something … significant.
The same is true here! Try treating senior management like everybody else, and
then let us know how you like your next job.
3. Everybody Else – Yep, the last category is everybody else. This is where the actual
Help Desk process takes over and functions according to a First-Come/First-Served
in the context of the Severity assignments
Some people are not
This is the person that absolutely thinks he or she deserves special treatment and threatens
to cause you all sorts of agony if you don’t provide the special attention they demand.
These folks are often the assistants of Senior Managers. They are characterized by calling
the Head of Infrastructure or CTO for the simplest of Help Desk Calls. “My printer needs
a new cartridge” or “I don’t like the direction that my PC faces and want someone to move
it”. Usually you can slowly manage these folks into the mainstream of support, especially
if you are able to mention it to the person that they believe they derive their power from.
Sometimes you cannot.
As an example, I ran Infrastructure for a Global Financial Services Company where one of
the president’s direct reports had a secretary that I will call Karen. Karen wasn’t a
particularly exceptional person by any measure, but felt like she ruled the roost so to
speak. She would call me for every stupid issue that popped into her head. I tried to be as
helpful as possible but always said “Karen, I will have to call the Help Desk and ask them
to come by to help you. It would be so much quicker and more effective if you just call
them directly. I promise they will be exceptionally responsive” (especially since I would
tell the help desk I didn’t want them to give her any reason to call me and complain). Her
response was always the same: “Art, do you know who I am?”
At first I was annoyed, very annoyed, but I just gave in and said “fine, what do you
need?” After the calls went on for months this changed into mild resistance, at which
point I said “OK, I’ll get to this as soon as I can, but it would be so much quicker if you
called the Help Desk directly” Eventually I became tired of the calls so when she said
“Art, do you know who I am?” I responded by just taking the phone away from my ear
and saying loudly (to no one in particular) “Hey, do any of you guys know who Karen is?
She keeps forgetting!” I then told her to call the Help Desk. That of course, got her angry
and I dealt with it directly with her boss. She wasn’t with the firm much longer.
The moral of this story is to deal with these sorts of pain in the butt directly and quickly.
Don’t wait until you’re acting like a jerk too. Understand you need to be selective here.
In some companies the Assistant to the President is to a large measure a Senior Manager.
They will handle their bosses business when he or she is unavailable and are fully
empowered to make the required decisions. That person needs to be treated like a Senior
Manager.
Home Setups
Home setups have just become a way of life for Infrastructure Managers. Again, I am not
going to discuss the technology, or even the policies in this part of the book. I am going to
discuss the political aspect of providing home setups.
What is considered a Home Setup can vary across the spectrum. At one end of the
spectrum it can be as simple as a user’s machine that can connect into the business
network with certain controls. At the far other end of the spectrum it can be a complete
home system, including desktop workstation, printer, etc.
There are two aspects of how this is impacted by the politics of the situation.
1. First, there is the issue of who you give these units to. You will be expected to
provide support for any in-home units, so think through any policies or decisions
well.
2. The bigger political landmine is the interaction with whoever is at home when your
technician arrives. Since most of these full setups go to the more senior
management I will assume you know to send your most professional technician to
the home. The technician needs to dress properly and conservatively and be ultra-
polite. (yes sir or madam)
You will need your technician to completely prepare for the visit. Anything that
they feel they may need should be brought along for the visit. As an example, in
one situation one of the most senior managers at a company I worked for had a
home setup. He purchased a printer himself to add to the computer. The request
was simply to install the printer.
When the technician arrived he found that there was no cable to attach the printer
to the computer included in the printer box. He needed to schedule another visit to
come back with a cable. The manager’s wife (who was there to supervise the visit)
turned into one of the most abusive individuals we ever had to deal with. She
insulted our technician; she called the office to insult me and my entire team and
then called her husband to complain. Remember, we were asked to install
something that he had purchased personally. We considered this visit a favor to the
senior manager. All this being said, this issue could have been avoided if our
technician had slipped a few cables into his bag before he went to the manager’s
house.
Your people also need to leave their work area in absolutely immaculate condition
when they complete a home visit. Any packaging should be consolidated and
removed. If it cannot be thrown out in the trash at the home, they should take it
with them.
Beyond these two issues you will undoubtedly need to contend with home setups being
used primarily for home purposes. This means everything from benign surfing on the part
of family members to online gaming and other uses that will clearly leave all sorts of
Viruses and Malware on the machine. These should be addressed in your policies
(appropriate use policies) as well as by having the most substantial local protection
utilities on the machine.
Final Words
Well, we sure did cover quite a number of items in this book, frankly far more than was
originally planned. That’s how it is when managing infrastructure, you think you have a
clear view of everything that needs to be done, but then find there is some corporate or
compliance requirement that dramatically expands the size of the effort.
Within the chapters of this book we discussed a plan for how to approach starting a new
position.
That plan started by gathering as much information about the current state of the
department as possible, staff info, budgets, outstanding issues, major projects or other
activities in flight, etc.
Following that information gathering you will perform a deep dive assessment of the
organization, including the technologies, policies, processes, customer relationships and so
on. This provides your baseline against which any improvements are measured.
From that assessment you will derive the list of transformations you will need to make to
create a first-rate IT Organization. That list will drive both your IT Strategy and the
Roadmap you define that will get you from your current state to your desired Strategic end
point.
We focused quite a bit on the major activities and management processes you need to
ensure exist in a form that meets your objectives. These include such areas as Asset
Management, Risk Management, Technology Management, Project Management, Vendor
Management and Operational Management. Remember that in most all of these
management domains there is a wide continuum of the size or scope of the
implementations. You need to choose how complete or complex a process fits the
company you work for. All of these major processes should be represented in your IT
strategy.
Being a successful Head of IT Infrastructure is so much more than getting the Technology
and Processes right – so much of it depends on your ability to navigate the attacks and
company politics and we’ve talked about that too.
Throughout this book I’ve sprinkled some of the cynical “real-world” issues that you will
face. I’ve read countless books on IT and IT management and most can put me to sleep
from 50 feet away. An easy observation is that I have never seen a single book or article
address these real-world situations – and that’s a problem.
Over the years quite a few new or junior managers have come to me and asked how to
handle a problem situation they are dealing with. In most of those cases the answer was
clear and simple to me, but that’s only because I’ve been doing this for such a very long
time. When I started down this path I was completely clueless – however learning IT
management in the financial services industry is the definition of Baptism by Fire.
That’s one of my big messages here, it does get easier, much easier, as time goes on. As I
have said throughout this book, one of the more important keys to success is to develop
the ability to know who is your friend and who is not. Who is a liar and who tells the
truth. Who is competent and who is not. Most importantly, you must understand how to
react in each of those situations.
Develop the necessary competencies to run a first-rate IT shop. Be strong, be confident,
don’t take a lot of abuse, but don’t be an arrogant jerk either. You will be astounded how
quickly people come to respect confident success.
I hope you have enjoyed reading this book and most importantly that you have gotten
some real value from it. Don’t forget to complete a review of the book on Amazon. You
can submit you review at the following link:
http://www.amazon.com/review/create-review/ref=cm_cr_dp_no_rvw_e?
ie=UTF8&asin=B01DIF7I9E&channel=detail-
glance&nodeID=133140011&store=digital-text
Remember – 5 stars and feel free to sprinkle the work “Genius” in your written review!
Appendix A
Items You Need To Have In Place