Ppa MCQ
Ppa MCQ
project.
(A) Project
(B) Process
(C) Project management
(D) Project cycle
2-Resources refers to
(A) Manpower
(B) Machinery
(C) Materials
(D) All of the above
(A) Process
(B) Project
(C) Scope
(D) All of the above
6-Following are the phases of Project Management Life Cycle. Arrange them in correct order
(A) 3-2-1-4
(B) 1-2-3-4
(C) 2-3-1-4
(D) 4-3-2-17
(A) Time
(B) Cost
(C) Quality
(D) All of the above
9-Five dimensions that must be managed on a project
10-Resorce requirement in project becomes constant while the project is in its _____ progress stage.
(A) 40 to 55%
(B) 55 to 70%
(C) 70 to 80%
(D) 80 to 95%
11-The probability of completing the project can be estimated based upon the ____ .
12-In the initial stage of the project the probability of completing the project is ___ .
(A) Zero
(B) High
(C) Low
(D) Any of the above
13-The entire process of a project may be considered to be made up on number of sub process placed in
different stage called the
14-Tool used for comparison of the proposed project to complete projects of a similar nature whose costs are
known.
15-Each component of the software product is separately estimated and the results aggregated to produce an
estimate for the overall job.
19. The strategy used to correct resource over-allocations by balancing demand for resources and the available
supply is known as
(A) resource assignment
(B) resource leveling
(C) resource splitting
(D) resource scheduling
20. A horizontal bar chart that shows project tasks against a calendar is called
(A) milestone
(B) goal
(C) Gantt chart
(D) PERT chart
21. The statistical tool that depicts a project’s tasks and the relationships between those tasks is known as
(A) milestone
(B) goal
(C) Gantt chart
(D) PERT chart
22. If any one factor of a project changes, _____ other factor(s) is/are likely to be affected.
(A) all
(B) one
(A) 5
(B) 7
(C) 9
(D) 11
24. Which of the following statement(s) is/are true about a Project?
I. It brings change
(A) I only
(B) II only
(A) initiating
(B) monitoring
(C) closing
(A) permanent
(B) temporary
27. A process that involves continuously improving and detailing a plan as more detail become available is
termed as
(A) plans
(A) I only
(B) II only
(A) 5
(B) 7
(C) 9
(D) 11