380 Battery
380 Battery
M.I
Y.M
CHK'D
S.S
ISSUE FOR APPROVAL
DESCRIPTION
22/05/2023
DATE
NO.
00
REVISIONS
DRAWN
BY:- M.SAFWAT
DATE:- 22/05/2023
CHECKED
BY:- S.Sayed
DATE:- 22/05/2023
OPRG. DEPT
BY
DATE:- 22/05/2023
ENG'G. DEPT.
BY:- M.ISMAEL
DATE:- 22/05/2023
CERTIFIED.
BY:-
M.I
Y.M
S.S
PART -1
A PREAMBLE
The station DC auxiliary power supply shall consist of two (2) 100% rated 125V DC battery
bank and two (2) 100% rated battery float/boost chargers each rated capacity.
B REFERENCE DOCUMENTS
C DC SYSTEM PARTICULARS
Battery type : Lead Acid
Nominal DC system voltage : 125 V DC
End of discharge voltage : 1.75 V
Maximum equalizing voltage : 2.33 V
Allowable minimum system DC voltage : 101.5 V
Allowable maximum system DC voltage : 135.14 V
Float charging voltage per cell : 2.25 V
Lowest permissible voltage
No. of Battery cells =
End cell voltage
= 101.5 / 1.75= 58 cells
No. of cells : 58 nos.
D CALCULATIONS
1 Continuous Loads:
Continuous Load duration is considered for 10 hours as per cl. 4.5.2 of TES-P-103-02/Rev 01
Total Continuous load = 36290.0 W (Ref. Annex-1)
= 358.0 A
M.S
BY
22/05/2023
DATE
2 Momentary Load
2.a Momentary Load at the beginning of cycle :
Worst contingency case for assessing momentary loads taken into consideration.
NO.
00
REVISIONS 1. Simultan. Trip. Of (11) Nos. of feeder in the 380KV sys =4 A X 11 feeders X 3 phases X 2 Trip coil
DRAWN Trip coil current of 380kV CB (Trip coil-1&2) = 264 A (4 A/ph for each CB)
BY:- M.SAFWAT [As per Attachment - 1]
DATE:- 22/05/2023
DATE:- 22/05/2023 Total Momentary load (at beginning of load cycle) = 291.5 A
ENG'G. DEPT.
BY:- M.ISMAEL
DATE:- 22/05/2023
CERTIFIED.
BY:-
M.I
Y.M
S.S
Restoration of the Substation Loads is considered at the end of the duty cycle
Under normal situation, closing sequence of breakers will be done manually in sequential order selecting one
breaker at a time. The normal motor running time is approx. 120 sec, Even if it is assumed that the mechanism of one breaker fails, the second
breaker will be closed after the failure of the first. The total momentary load will be one after another and will not be for more than one minute
Worst contingency case for assessing the Maximum Momentary Closing load of the system is to consider the following:
a Closing load of (2) 380kV Circuit Breakers [As per Attachment - 1] =2 X 4.0 = 8 A
b Tripping load of (2) 380kV Circuit Breaker [As per Attachment - 1] =2 X (4+4) = 16 A
c Starting load of (2) DS/ES Switch [As per Attachment - 1] =2 x 60 = 120 A
d Running load of (2) DS/ES Switch [As per Attachment - 1] =2 x 10.0 = 20 A
Starting load is considered as 5 times of running load as per TES-P-103.02/Rev 01, cl.no. 2.5
# Starting load considered as per Manufacturer requirement
Restoration Time Momentary Load=a+b+c+d = 164.0 A
ISSUE FOR APPROVAL
DESCRIPTION
3 Emergency Loads
As per Appendix-II, cl. 2.7 of TES-P-103.02/Rev 01, only lighting loads are to be considered as emergency
loads for 3 hours. A maximum of * 20 fittings of 60 W each are assumed to be
on at any time.
4 Summary of Loads :
Annex-I Summary of continuous DC loads.
Annex-II Component wise load break up for panels and CBs.
6 Load Summary
L1 Continuous Load for 10 hours = 358.0 A
L2 Momentary Load (Trip) 1 min. = 291.5 A
L3 Emergency Load 3 hours = 11.8 A
M.S
BY
00
REVISIONS
DRAWN
DATE:- 22/05/2023
CERTIFIED.
BY:-
M.I
Y.M
S.S
1 PREAMBLE
125V D.C. system shall have two (2) nos. 100% rated battery bank and two (2) nos. battery float/boost
charger units, each rated to 100% capacity.
2 CALCULATION
= 838.17 A
22/05/2023
DATE
NO.
00
BY:-
650
LOAD CURRENT IN A
522 A
370A
358A 358A
M1 M2 M3 M4 M5
Section 2 total =
Section 3 - First Three Periods Only - If A4 is greater than A3 ,go to section 4 .
1 A1= 650 A1-0 650 M1= 1 T = M1+M2+M3 = 360 6.18 4014.077 0.000
2 A2= 358 A2-A1 -292 M2= 179 T =M2+M3 = 359 6.17 0.000 -1798.722
3
3 A3= 370 A3-A2 11.8 M3= 180 T = M3 = 180 3.88 45.872 0.000
Section 4 total =
Section 4 - First Five Periods Only .
1 A1= 650 A1-0 649.53 M1= 1 T = M1+M2+M3+M4+M5 = 600 9.17 5956.163 0.000
2 A2= 358 A2-A1 -291.53 M2= 179 T =M2+M3+M4+M5 = 599 9.16 0.000 -2670.388
5 3 A3= 370 A3-A2 11.82 M3= 180 T = M3+M4+M5 = 420 6.93 81.931 0.000
4 A4= 358 A4-A3 -11.82 M4= 239 T = M4+M5 = 240 4.66 0.000 -55.094
5 A5= 522 A5-A4 164.00 M5= 1 T = M5 = 1 1.70 278.800 0.000
So selected capacity of Battery Bank =2 x 3227.11 = 6454.22 AH (Two sets, Two strings)