F21 - Manual
F21 - Manual
Water Pressure A minium of 0.2 Mpa of water pressure is required for valve to operate effectively.
Existing Plumbing Condition of existing plumbing should be free from any deposit such as lime and
iron build up. Piping that is clogged heavily with these deposit should be cleaned in
time and connect according to plumbing codes.
CAUTION
②Add sand to fill the space around the central tube unit it is 20 mm above the bottom
distributor. The sand should be paved based on the graded particle size in order to
distribute the water. No need to fill the tank with sand if the diameter of the tank is less
than 500 mm.
③F ill the tank evenly with sand to the standard height then add 10% salt water until it
overflows the resin. Let resin fully expands. then take off the tape on the central tube
and keep it always in the middle of tank .
④To install the top distributor on the valve, then insert the central tube into valve
through top distributor, and carefully turns the valve clockwise until it screws tightly
on the tank .( Pay attention: valve and tank mouth, top distributor and valve、central
tube, buttom distributor and central tube must be sealed, in case of the resin leakage;
central tube and valve must be sealed, other wise the water will leak).
01
General Installation Check List
3. Pipe Connection
①To connect the in-outlet pipe according to the valve's dimension (water supply pipe
should not less than inlet pipe for keeping sufficient flow).
②The manual valve should be installed on the in-outlet pipe, the bypass valve should be
installed between in-outlet pipe, the sampling valve should be installed before the
outlet pipe, the Y filter is recommended to installed on the inlet pipe; in case of the
deposit in the pipe would clog the valve and make the system can't work well.
④The length of the pipe for brine water should be less than 2 meters, keep the pipes
sealed in good condition, other wise it may influence the regeneration effect.
4 . S ystem Adjustment
① Wash the deposit away from the pipe. To set the bypass valve in bypass position, wash
the deposit away from the pipe until the water runs clean. Then close the inlet-outlet
valve, and set the bypaass valve to ser vice position.
② To set the valve on the ser vice position, open the inlet valve,to refill the water into the
resin tank until the water stop flowing. Open the outlet valve to clean up the air and
deposit of the resin tank .
③ To set the valve on backwash position, and the water outflow from drainage for 3-4
minutes. Keep draining off the water until the water is clean.
④ To set the valve on the brine position,and suck the water from brine tank until stop.
⑤ To set the valve on refill postion, refill the salt and water into the tank until exceed the
air check valve. Note: keep the salt water for 6 hours.
⑥ To set the valve on ser vice postion, check if the bypass valve is in ser vice postion and
the out water is qualified.
02
Valve Start-up Procedure
NOTE: the 24 hour gear would stop running when power fails, it needs to reset the time of day
when the power switched on.
24 Hour Gear
Time Indication
1. Model timer
Manual
Regeneration Knob
24 Hour Gear Regeneration Timer Pointer Screw
Gap
Red pointer
TI
M
EO
TI
M
FD
EO
AY
FD
AY
Time Indication
Mechanical valve was defaut set the regeneration time at 2:00 AM before leave factor y, it means after
setting time of day, the regeneration starts when 2:00AM on the 24 hour gear and time indication arrow
in same point.
03
Valve Start-up Procedure
1.1.How to adjust the regeneration time
①Disconnect the power source .
②Locate the three screws behind the manual regeneration knob by pushing the red button in and rotating
the 24 hour dial until each screw appear in the cut out portion of the manual regeneration knob.
③Loosen each screw slightly to release the pressure on the time plate from the 24 hour gear.
④Locate the generation time pointer on the inside of 24 hour dial in the cut out.
⑤Turn the time plate so the desired regeneration time aligns next to the raised arrow .
⑥Push the red button in and rotate the 24 hours dial . Tighten each of the three screws .
⑦Push the red button and locate the pointer one more time to ensure the desired regeneration time is
correct.
⑧Reset the time of day and restore power to the unit.
NOTE: the 24 hour gear would stop running when power off, it should be reset when the power switched on.
2. M odel Meter
Program wheel
TI
M
EO
FD
AY
NOTE: Immediate regeneration times do not have 24 hours gear, no time of day can be set. And they have
same way to set the regeneration.
04
Valve Start-up Procedure
NOTE: Don't rotate the manual regeneration knob before the motor stop. If the program wheel and
piston on the valve runs in different position, please cut the power and check the valve position first,
then rotate the manual regeneration knob to corresponding position, then apply the power again.
Pin Storage
Brine &Rinse Section
Program Wheel
( 2 Min. Per Hole)
① The regeneration cycle program on your water conditioner has been factor y preset, however,
portions of the cycle or program may be lengthened or shortened in time to suit local conditions.
② To expose cycle program wheel , grasp timer in upper left - hand corner and pull, releasing snap
retainer and swinging timer to the right.
To change the regeneration cycle program the program wheel must be removed. Grasp program
wheel and squeeze protruding lugs towards center, lift program wheel off timer.(Switch arms may
require movement to facilitate removal.)
Return timer to closed positions engaging snap retainer in back plate. Make certain all electrical
wires locate above snap retainer post.
05
Valve Start-up Procedure
06
Dimensional Drawing
F15
07
Dimensional Drawing
F21
08
Dimensional Drawing
F31
09
Dimensional Drawing
F41
10
Dimensional Drawing
F61
11
Timer Assembly
12
Timer Assembly
13
Timer Assembly
14
Timer Assembly
15
Timer Assembly
16
Timer Assembly
17
Control Drive Assembly
F15、F21、F31 upper
18
Control Drive Assembly
F15、F21、F31 upper
19
Control Drive Assembly
F31 lower
20
Control Drive Assembly
F31 lower
21
Control Drive Assembly
F41、F61 upper
22
Control Drive Assembly
F41、F61 upper
23
Control Drive Assembly
F61 lower
24
Control Drive Assembly
F61 lower
25
Valve Body Assembly
F15
Filter
No Hard Water
26
Valve Body Assembly
F15
27
Valve Body Assembly
F21
Filter
No Hard Water
28
Valve Body Assembly
F21
29
Valve Body Assembly
F31
Hard Water
30
Valve Body Assembly
F31
31
Valve Body Assembly
F41
No Hard Water
Filter
32
Valve Body Assembly
F41
33
Valve Body Assembly
F61
Hard Water
34
Valve Body Assembly
F61
35
Brine System Assembly
36
Brine System Assembly
1700 series brine system assembly
37
Brine System Assembly
38
Meter Assembly
39
Meter Assembly
40
Meter Assembly
41
Meter Assembly
42
Wiring Diagram
F15/21
TM - Time Motor
VDM - Valve Drive Motor
43
Wiring Diagram
F31
TM - Time Motor
VDM - Valve Drive Motor
LDM - Lower Drive Motor
44
Wiring Diagram
F41
TM - Time Motor
VDM - Valve Drive Motor
45
Wiring Diagram
F61
TM - Time Motor
VDM - Valve Drive Motor
LDM - Lower Drive Motor
46
Trouble Shooting
47
NOTES
NOTES