1.

FOR THE EQUIPMENT AND INSTRUMENT SYMBOLS


REFER TO RA-635150-001/002.
PUMP HOUSE
SWITCHGEAR ROOM
2. CAPACITY OF THE SEA WATER INLET SCREEN
961-A113
SHALL BE BASED ON WORST CASE SCENARIO
OF 3 COOLING PUMPS AND 1 BALLAST PUMP
TO OPERATE AT ITS FULL CAPACITIES.

3. THE PUMPHOUSE CONTROL SYSTEMS SHALL


INTERFACE TO SCADA/PMS FOR MONITORING
AND ALARM PURPOSES ONLY. THE PUMPHOUSE
CONTROL SYSTEMS SHALL SHARE ALL HMI
SCREENS TO BE DISPLAYED ON THE
SCADA/PMS NETWORK. CONTROL ACTIONS VIA
THIS INTERFACE IS NOT APPLICABLE.

4. SIGNAL DETAILS FOR PUMP AND MOV, REFER


DETAIL IN RA-617120-001.

5. ALL INSTRUMENT TAGES ARE PREFIXED WITH


-1 TO 55 barg 961-A113.
HH SET @ HH
00 13.5 bara PI o
PI H
6. SUBMERSIBLE PUMP WITH INBUILT FLOAT TYPE
H SET @ 0014 0014
13.0 bara LEVEL SWITCH ARRANGEMENT FOR ON / OFF
2oo2
OPERATION BASED ON PUMP HOUSE
ZC WASTEWATER SUMP LEVEL.
0006
NOTE-4 7. ALL CONTROL SIGNALS SHALL BE CONNECTED
PIT PIT TO PUMP HOUSE CONTROL PANEL.
DETAIL-A
0014 0015
8. THE PUMP HOUSE CONTROL SYSTEM WILL BE
MOV PROVIDED WITH HMI FOR MONITORING AND
0011 1 1
00 CONTROL OF PUMP HOUSE OPERATIONS.
M 12" 12"
TO COOLING WATER 16"-SW-0020-20FE0U 16"x10"
9. PUMP HOUSE WASTEWATER SUMP PUMP
-
16" NOTE-3,11,12 LOCATION AND QUANTITY WITHIN DRY DOCK #2
NETWORK H H H
0
H 00 H H AS FOLLOWS:
P

P
S
13

NOTE-13 0 S S

13 S b o @ a

13
I

I
E

0
18 00 E E
.5

0
.5 ET ar

.5
T T
H

H .0

H
6

3
13

13

13
b

@ @
S

L NOTE-4

S
b

b
o
ar
E ba o
.0o

E ba
ar @

ar @
.0
MOV MOV
SR. TAG LS
T r

o
L

T r
S
a
L

a
E

12

12
o
MOV
@ a
12

S
T
0013 0015
LOCATION
S

E ba
.0

.0
E ba
.0

NO.

NO
DETAIL-A NUMBER TAG NO.

T r
@
T r

a o

a
0017
o
o

TE
@ a

ar
N 0 PI 00 MOV

-3
10 0 P 10 NO 0 PI 10 O 0 H WINCH ROOM IN ENTRANCE 961-G-4411A LS-0041
NO 0 I N 0 T 4 H

,1
M D H M D H M D 3 H 0024 1
" H " O 2 H " E E

1,
E TE 18 E TE 6 H ANTI-FOULING
T H T T T -4 WORK A113-2 (1 NOS)

12
A -3 A E -3 A PDI
IL IL - ,1 L 0 Z
IL L 0 ZC ANODES 961-U-4401
-A ,1 L
1, 0 ZC -A 4 1, -A 0 M WINCH ROOM IN PUMP
10 12 0 1" 10 12 0 C 10
0
6
0041
SEA WATER INLET 2 961-G-4411B LS-0042
0

1"
0
1"

20"-32" 32"-40" 40" HOUSE A113-1 (1 NOS)


" NO 6 " 6 " P
IT
T P P 0 -
IT NOTE-4 IT 0 PUMP HOUSE SWITCHGEAR
10

E 0 P

o
3 961-G-4411C LS-0043

10
-4 0 0 P 4 0 I 40"-SW-0011-10FE0U
0 3
"-

2 I 0 NOTE-4
10

0 NOTE-4 ROOM (1 NOS)

"-
18 0 6 4
P

0
S

0 MOV
"-

S
2

o
I

2 -2.5 TO 2.5 BAR

-A
19
W

1 961-U-4450
SW

W
7 1
-0

-A
1

-0
1 2" 0025 4 DRAIN / CONTAMINATED

IL
00
-0

.8 S ar @
2" H SET @ 0.5 BAR
1

1
961-G-4411D LS-0044
0

1 " NOTE-4

IL

A
MOV MOV

0
02

11
1

2"

b T a
1
PDI
2

T
2" PUMP ROOM (1 NOS)

2
2

a @

A
.9 SE
2"
2
4

E
N

T
b
0021 0023
-2

20"

D
0041

-2
O
-2

E
N

E
ar
L
M
T

D
O DETAIL-A
0

I
0

P
E
F

44 G M T T

6
F
44 G M
F

0 L
E

-4 E 10. PRESSURE SENSORS SHALL BE PROVIDED IN 2

I
E 44

3
L
E
NOTE-3
E

P
D

0 ZC
D
0

0
-4

G
10 -4

M
0
16

5
0

E 16 E 10 16 P
U

961-U-4402

3
NOTE-4

0
M
U

0
U

0 ZC
10

D
OUT OF 2 CONFIGURATION.

0
C T

3
"x

5
B A NOTE-4

12

"
00

0
A S

E
S "x

0
3

8
A

0
"x "

0
IL 5 P

T
P

2
IL

1,
5

0
0
S
" -2 8

A
DETAIL-A 5 -2 -E "

,1
-E

IT
2

IL

L
Z
" PDIT

o
-2

-3
0 0 DETAIL-A

7
1, LL
0

IT
11. INSTRUMENT RANGE FOR THE INSTRUMENTS

-E

1
"
2 18

0 PI
L
2

3
0
M M L

7
TE
0041

P
0

3
0

1
L

3
2"

2
16
6
M

0 I

0
U

3
P
SHOWN ON THIS P&ID IS AS PER BELOW

0
NO

1
1
0
Z 0

3
Z

0
C 1" IN E

9
0 C

1
NO
0 0 MOV
IN TABLE.
9

F
9

0
6 DU
0 U

o
,

1"
MOV 0 0

3
6

0 0
6

1-
0

C
0

TE
0 0 PI A A

-
(A 6 -1
1-

1- S
6 6 0026 E R

TE
S S S R

G
0012 0 PI 0

(
S F

-3
NO

I
TO BALLAST WATER P P P D
G

(A D

1
14

2"
P
G IST

-4 )
2 0

7
S

.9 SE N O
M -2 -2 0 -2
-4

-4

1
20"
9

3
,1
-1 INSTRUMENT TAG NO. RANGE UNIT
S

1
IS TE

2"
2 0

4
T

.8 S ar @

0
M
NETWORK

1,
0 0 0
4

1
-0

0
4
-3 L L

16
Y
T
12

a
T
12
19 17 15
16

16
) P

a @
o

A
0 L W

A
0 I , L 0

b
-

15
C

NO L 11

"
S

o
B

T
)
-0

18
P

0 ZC

0 ZC
2 L

E
"-

ar
"
5

L
5
00 0 I ,1

4
12

18
TE 1 P 12 0 W

0
PI-0032/0036 0 TO 1 BARG

"x
12 8

b
-4
24" 0 I 2 2 S

0
DRY DOCK #2

0 L
"x 2

"x
-3 L 0 "x 9
0 ZC

8
"-

L
"x 2

G
L
o

2
8

8
5 8 0 00
12

,1

1-
L 8

12
NOTE-14 " 8

2
L 0

L .9
0 " 2
1, 00 13
12

" 00

)
6
"-

6
-4

"-

Y
0 0

11
Z

0
12 L NOTE-4 PIT-0033/0037 -1 TO 2.1 BARG

-E

-E
S

S ba

9
P

0 0 L 0

T
0
S

"-

C
0 ZC

S
E

E
I

2 L 0 P

0
E -2

U
T 6

T ra
W

.8 S

W
1

IL

IL
0 L .9
S

IT

-2
0

(D
0 T
-0

-0
L E
W

.8 S @ P P

A
0 b b T 0 P O

P
-0

1 0 IT S

T
2

T
6 E M
0

.9 SE ar 0 I

0
ar 0 N

S
1
PI-0030/0034 0 TO 10 BARG

M
b T 9

E
a @
2

0 0

19
" L P
0

T P ar a

D
2 2
3

L 0 I
a @
2

b IT
2

5 8
-1

-1
S ar @ 0 0
1-

1
0

E 0 2 1
0

0
T a
.8

4 2"
10

2 0 1 B
F

F
1 1 1
PIT-0031/0035 -1 TO 10.3 BARG
PI

0 N 15 )
1 2"
E

E
F
b

@ 2 2" O

12

14
ar
0

0
1
E

0 1
T 4 T
U

U
0

N
a

-4 IS
2"

0
D

44 GM

M
E
U

PI
O

-2

-2
1 E

B
G
-4

0
1 G S

15

15
T T PI-0020/0024/0028 0 TO 1 BARG
1- S

3
M

P
D E A

0 ZC
H

44
0
6 (A

S
E
2

-4 IL H

I
0
"

P
0
T

4
D M -A 9

0
A

3
E

0 ZC

"
IL

0
T PIT-0021/0025/0029 -1 TO 55 BARG

14
MOV

H
M

0
A -A

0
" H
IT

"x
IL

0
N I

H
0018

L
12

P
1"

1
MOV
1"

1
P

2"

4
-A

14
3
O 1"

1
IT

2
1
"
12

"x
0
PI-0019/0027/0042 0 TO 14 BARG

,1
MOV 0016 P

0
E

5
1
"

1
2"
4
0
-4

-3 00 I

3
1

L
NOTE-4

5
P
12

1
0014

0
o
U

0
L 0 ET ar @ E-
0
"

12
E PIT-0018/0026/0043 -1 TO 55 BARG

. S b T T
F

1,
I
H 5 SE NO

1
2"
P

o
6

,1
-1

1
3
0
a
20"-SW-0018-10FE0U

0
15

1
2"
I
TE

P
.0 SE ar @

5
T ra @

1
0

a
12. FOR ALARM SET POINTS, REFER CAUSE &

3
6 H

NO

0
00 -0

0
ar @

H .5 SE
.

b
W EFFECT DIAGRAM OF DRY DOCK # 2.

.0 SE ar @
.0 SE ba
T
S

a
6 H
"-

H
U
-1 TO 10.3 barg

ar @
4

b
NOTE-4

a
2

T
E
5
HH HH SET @ " NOTE-4 13. FOR DISTRIBUTION NETWORK OF COOLING WATER,

b
4

6
-A
PI H PI 6.5 bara 00 2

-1

L
REFER COOLING WATER DISTRIBUTION LAYOUT

IL
o
H SET @ 00

5
-A
13
0016 0016

"
4
A
DRAWING NUMBER RA-635613 SHEET 001 & 005.

2
6.0 bara

IL
E

-0

A
D
MOV

T
W
2oo2

E
S

D
0020 MOV 14. FOR DISTRIBUTION NETWORK OF BALLAST WATER,

"-
ZC

4
2
0005 0022 REFER BALLAST WATER DISTRIBUTION LAYOUT

M
DRAWING NUMBER RA-635513 SHEET 001 & 002.
PIT PIT IN

M
15. THE DIFFERENTIAL HEAD FOR WASTEWATER SUMP

1"
IN A

1"
"
A R

4
0016 0017 R D PUMP 961-G-4411A/B/C/D IS 6.4/4.9/8.2/20.9 M.
2

"
D

4
2
1 1
12" 12"
REFERENCE DRAWINGS
NOTE-3,12 24"-SW-0013-16FE0U EQUIPMENT AND INSTRUMENT SYMBOLS RA-635150-001/002
LEGEND INST AND CONTROL RA-617120-001

BALLAST AND COOLING


PUMP ROOM
961-A113

THIS PID IS FOR DRY DOCK #2


ITEM NAME STOPLOG

TAG 961-U-4450 NTS

SIZE 1.2 M x 1.2 M


00

TYPE MANUAL OPERATION 25-00053-0004-333

X
CONFIGURATION DUTY
JD UFA
08/16/20 08/16/20

PUMP HOUSE WASTEWATER SUMP 00 08/16/20 ISSUED FOR CONSTRUCTION


ITEM NAME SEA WATER BALLASTING PUMP ITEM NAME SEA WATER COOLING PUMP ITEM NAME STRAINER FOR SEA WATER COOLING PUMPS ITEM NAME SEA WATER INTAKE SCREEN ITEM NAME
PUMP (NOTE 9)

25-00053-0004
TAG 961-G-4415A/B TAG 961-G-4416A/B/C TAG 961-U-4402 TAG 961-U-4401 TAG 961-G-4411A/B/C/D

CAPACITY 2500
3
M /HR @ 50 M, 35 oC CAPACITY 350
3
M /HR @ 120 M, 35 oC CAPACITY 1050 M /HR, 3
3
MM SIZE CAPACITY 3550 M /HR
3
(NOTE 2) CAPACITY 7.2
3
M /HR @ (NOTE 15), 35 oC PIPING & INSTRUMENTATION DIAGRAM PID
BALLAST & COOLING WATER PUMP ROOM
TYPE HORIZONTAL SPLIT CASE CENTRIFUGAL TYPE HORIZONTAL SPLIT CASE CENTRIFUGAL PUMP TYPE MULTI BASKET TYPE TRASH SCREEN TYPE SUBMERSIBLE WITH INTEGRAL FLOAT MAINTENANCE, REPAIR & OVERHAUL
PUMP SWITCH
RAS AL KHAIR
CONFIGURATION DUTY / ASSIST CONFIGURATION DUTY / ASSIST / ASSIST CONFIGURATION DUTY CONFIGURATION DUTY CONFIGURATION DUTY