SECTION 2

FOUNDATION BASE GEOMETRY


AND
CHECKING FOR ECCENTRICITY
HPGC.2x300 MW Deenbandhu
Analysis and Design of Mill Foundation Chhotu Ram Thermal Power
Project, Yamunanagar

SECTION - 2 :

MILL FOUNDATION BASE AREA & ECCENTRICITY

1.531 0.362 0.252 0.0

3.7
Z

4744

Co-ordinate ( 0,0 ) 0 1037 2620 1087 0

X 2
610 4 0
Y
3
2940 1 5 6 7 4160 4660

7010
610 8 500
9
10 170

11 13 12 2180 2350

14
872 0
520 1960 520

Doc No. - REL-DCRTP-CES-308-R-562


Sheet 2 of 7
REV-b
HPGC.2x300 MW Deenbandhu
Analysis and Design of Mill Foundation Chhotu Ram Thermal Power
Project, Yamunanagar

Depth of Mill Foundation = 3.7 M

Doc No. - REL-DCRTP-CES-308-R-562


Sheet 3 of 7
REV-b
HPGC.2x300 MW Deenbandhu
Analysis and Design of Mill Foundation Chhotu Ram Thermal Power
Project, Yamunanagar

CALCULATION OF CG OF FOUNDATION AREA AND MASS

Co-Ordinate of AREA Co-Ordinate of


Co-Ordinate of C.G
C.G MASS C.G
ZONE LENGTH WIDTH AREA DEPTH MASS Xi Yi Xi Yi Xi Yi
M M M2 M kN M M M M M M
1 0 4.66 0 3.7 0 0 2.33
2 4.744 0 0 3.7 0 2.372 0
3 0 4.66 0 3.7 0 4.744 2.33
4 2.62 0.61 1.5982 3.7 147.8335 2.372 0.305
5 1.037 4.16 4.31392 5.231 564.1529 0.5185 2.08
6 2.62 2.94 7.7028 4.062 782.2193 2.372 2.08
7 1.087 4.16 4.52192 5.231 591.3541 4.2005 2.08
2.381345 3.1774883 2.3834 3.05812
8 2.62 0.61 1.5982 3.7 147.8335 2.372 3.855
9 4.744 0.5 2.372 3.7 219.41 2.372 4.41
10 3 0.17 0.51 3.7 47.175 2.372 4.745
11 0.52 2.18 1.1336 3.7 104.858 1.132 5.92
12 0.52 2.18 1.1336 3.7 104.858 3.612 5.92
13 1.96 2.18 4.2728 3.952 422.1526 2.372 5.92
14 3 0 0 3.7 0 2.372 7.01
29.15704 3131.847

CALCULATION OF CG OF MACHINE MASS

Co-ordinate of C.G
PARTS Co-ordinate of C.G of total mass
OF M/C MASS Xi Yi Xi Yi
kN M M M M
Mill Ped1 453.59 0.5185 2.08
Mill Ped2 453.59 4.2005 2.08
2.35749 2.343569
Gear Box 266.43 2.347 2.08
Motor 66.6 2.372 5.92
Total 1240.21

Mass of foundation should be greater than 2.5 times the total weight of the machine
Refer Note No. - 4 of Dwg N0. K3922 (Page 3 of 5) [ Vendor Drawing]
Ratio of mass of foundation to mass of machine = 2.525255 Hence, O.K

Doc No. - REL-DCRTP-CES-308-R-562


Sheet 4 of 7
REV-b
HPGC.2x300 MW Deenbandhu
Analysis and Design of Mill Foundation Chhotu Ram Thermal Power
Project, Yamunanagar

CHECKING FOR ECCENTRICITY

Checking as per
From Pile Group Clause 5.4.4.2 IS
Design 2974 (Part I) - 1982
CO-ordinate of C.G ECCENTRICITY of cg ECCENTRICITY of cg
of whole system (i.e of whole system with CO-ordinate of of whole system with
FDN CO-ordinate of M/C CO-ordinate of m/c comb C.G of machine C.G of Pile
base area cg of pile group
MASS MASS C.G MASS MASS C.G and fdn) Group

Xi Yi Xi Yi Xi Yi Xi Yi Xi Yi Xi Yi
kN M M kN M M M M M M M M M M
3131.847 2.38338 3.058 1240.21 2.357 2.344 2.376033 2.855425 0.0053 0.3220631 2.372 3.2 0.00403 0.3445748
O.K O.K
As per Clause 5.4.4.2 of IS 2974 (Part - I) - 1982 tolerable values of eccentricities are 5% of the length of foundation to the concerned direction
In X - direction = 0.2372 M
In Y - direction = 0.3505 M

Calculated values of eccentricities are


In X - direction = 0.00403 M Hence , O.K
In Y - direction = 0.344575 M Hence , O.K

Doc No. - REL-DCRTP-CES-308-R-562


Sheet 5 of 7
REV-b
HPGC.2x300 MW Deenbandhu Chhotu
Design Calculation for Mill Foundation Ram Thermal Power Project, Yamunanagar

MILL FOUNDATION PILE ARRANGEMENT

X
(+ve) Mx

Y
(+ve) My
1.372 2 1.372

0.8 1.572 1.572 0.8

x
0.5
1.83

1.83
0.5

0.17
0.98 Y

1.2

0.5 2 0.5

Static Load of Mill = 117.3 MT


Dynamic Load of Mill = 185.9 MT
Mass of Foundation = 313.1847 MT

Total Vertical Load P = Static load + Dynamic Load of Mill + Foundation mass
= 616.3847 MT

Doc No. - REL-DCRTP-CES-308-R-562 2


REV-b
HPGC.2x300 MW Deenbandhu Chhotu
Design Calculation for Mill Foundation Ram Thermal Power Project, Yamunanagar

P 616.385 T
Mx 80.65 TM
My 0 TM
Dia of Pile 600 MM
Pile Capacity 115 T 80% OF PILECAPACITY = 92 T

C.G. OF PILE GROUP AND PILE REACTION CALCULATION

Pile group= 8 PC

Pile No. Xi Yi Xi-X0 Yi-Y0 MX0 YX0 Ix Iy xi Yi P/N Mx/Zx My/Zy Rmax Rmin Rmax/0.8C Remarks
1 0.800 0.5 0.000 0 0 0 0.596 4.84 0.772 2.200 77.048 2.84 0 79.885 74.211 0.86831511 R<80%of pile capacity ,OK
1 0.800 2.33 0.000 1.83 0 1.83 0.596 0.1369 0.772 0.370 77.048 2.84 0 79.885 74.211 0.86831511 R<80%of pile capacity ,OK
1 0.800 4.16 0.000 3.66 0 3.66 0.596 2.1316 0.772 1.460 77.048 2.84 0 79.885 74.211 0.86831511 R<80%of pile capacity ,OK
1 3.944 0.5 3.144 0 3.144 0 5.6264 4.84 2.372 2.200 77.048 8.72 0 85.765 68.332 0.93222371 R<80%of pile capacity ,OK
1 3.944 2.33 3.144 1.83 3.144 1.83 5.6264 0.1369 2.372 0.370 77.048 8.72 0 85.765 68.332 0.93222371 R<80%of pile capacity ,OK
1 3.944 4.16 3.144 3.66 3.144 3.66 5.6264 2.1316 2.372 1.460 77.048 8.72 0 85.765 68.332 0.93222371 R<80%of pile capacity ,OK
1 1.372 5.81 0.572 5.31 0.572 5.31 0.04 9.6721 0.200 3.110 77.048 0.73 0 77.783 76.313 0.84546778 R<80%of pile capacity ,OK
1 3.372 5.81 2.572 5.31 2.572 5.31 3.24 9.6721 1.800 3.110 77.048 6.61 0 83.663 70.434 0.90937638 R<80%of pile capacity ,OK

8 12.576 21.6 21.947 33.561

Total no of pile å Pile = 8.000


å Xi-X0 = 12.576
å Yi-Y0 = 21.600

CG of Pile Group, Xcg = å Xi-X0/å Pile = 1.572 m


CG of Pile Group, Ycg = å Yi-Y0/å Pile = 2.70 m