Kal Rekapitulasi Blok-Blok Rehabilitasi Tahun 2019-2022

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 21

SGT 01

REKAPITULASI YPH BLOK-BLOK REHABILITASI

Year
No Divisi Blok Luas (Ha) Progeny Land Type
Planting
1 A03 2012 2.8 SOCFINDO PEAT
2 A04 2012 17.42 SOCFINDO PEAT
3 A05 2012 28.48 SOCFINDO PEAT
4 A06 2012 32.93 SOCFINDO PEAT
5 A07 2012 24.59 SOCFINDO PEAT
6 A08 2012 24.35 SOCFINDO PEAT
7 A09 2012 28.75 SOCFINDO PEAT
8 B01 2013 31.58 SOCFINDO PEAT
9 B02 2010 21.71 SOCFINDO PEAT
10 B03 2010 41.23 SOCFINDO PEAT
11 B04 2011 48.61 SOCFINDO PEAT
12 1 B05 2011 47.6 SOCFINDO PEAT
13 B06 2010 45.43 SOCFINDO PEAT
14 B07 2011 58.06 SOCFINDO PEAT
15 B08 2011 45.77 SOCFINDO PEAT
16 B09 2011 57.49 SOCFINDO PEAT
17 C03 2013 7.25 SOCFINDO RYP
18 C04 2013 35.09 SOCFINDO RYP
19 C05 2012 31.96 SOCFINDO RYP
20 C06 2012 33.32 SOCFINDO RYP
21 C07 2011 24.11 SOCFINDO RYP
22 C08 2011 27.4 SOCFINDO RYP
23 C09 2011 25.14 SOCFINDO RYP
24 A10 2011 21.61 SOCFINDO PEAT
25 A11 2011 6.05 SOCFINDO PEAT
26 A12 2011 4.34 SOCFINDO PEAT
27 A27 2011 6.47 SRIWIJAYA PEAT
28 B10 2011 49.01 SOCFINDO PEAT
29 B11 2011 50.72 SOCFINDO PEAT
30 B12 2011 52.65 SOCFINDO PEAT
31 B13 2011 49.57 SOCFINDO PEAT
32 B15 2011 49.6 SOCFINDO PEAT
33 B16 2011 37.58 SOCFINDO PEAT
34 B17 2011 43.86 SOCFINDO PEAT
35 2 B18 2011 38.34 SOCFINDO PEAT
36 B19 2011 33.2 SOCFINDO PEAT

Page 1
2
SGT 01
37 B20 2011 29.65 SOCFINDO PEAT
38 B21 2011 29.33 SOCFINDO PEAT
39 B23 2011 24.42 SOCFINDO PEAT
40 B24 2011 9.71 SOCFINDO PEAT
41 B26 2011 32.01 SOCFINDO PEAT
42 B27 2011 42.21 SOCFINDO PEAT
43 C10 2011 20.99 SOCFINDO PEAT
44 C12 2011 17.04 SOCFINDO PEAT
45 C13 2013 11.25 SOCFINDO RYP
46 C16 2013 7.5 SOCFINDO RYP
47 A28 2012 9.96 SRIWIJAYA PEAT
48 A29 2012 9.73 SRIWIJAYA PEAT
49 A30 2012 6.9 SRIWIJAYA PEAT
50 A31 2012 13.55 SRIWIJAYA PEAT
51 A32 2012 9.11 TOPAZ PEAT
52 A33 2012 18.12 TOPAZ PEAT
53 A34 2013 7.05 TOPAZ PEAT
54 B28 2012 45.08 SOCFINDO PEAT
55 B29 2012 46.41 SOCFINDO PEAT
56 B31 2012 53.58 SRIWIJAYA PEAT
57 3 B33 2012 16.36 SRIWIJAYA PEAT
58 C28 2012 15.97 SOCFINDO RYP
59 C30 2012 32.64 TOPAZ RYP
60 C31 2012 63.08 SRIWIJAYA RYP
61 C32 2012 40.76 SRIWIJAYA RYP
62 C33 2012 55.43 SOCFINDO RYP
63 C34 2012 56.71 SOCFINDO RYP
64 D29 2013 8.06 SOCFINDO RYP
65 D30 2012 24.05 SOCFINDO RYP
66 D31 2012 34.24 SOCFINDO RYP
67 D33 2012 38.33 SOCFINDO RYP

Page 2
SGT 01

OK-BLOK REHABILITASI 2020 S/D 2022 ESTATE SGT 01

2020 2021 2022


Ton Yield Ton Yield Ton Yield
63 22.66 65 23.29 58 20.82
426 24.46 454 26.08 504 28.95
651 23.14 698 24.51 578 20.31
618 18.78 657 19.94 585 17.76
488 19.84 575 23.37 492 20.03
504 20.68 505 20.75 442 18.14
449 15.63 537 18.68 457 15.91
664 21.03 669 21.17 708 22.41
582 26.82 568 26.15 658 30.33
1095 26.56 1092 26.50 843 20.44
1181 24.30 989 20.34 1093 22.48
1201 25.23 1078 22.66 1033 21.71
1176 25.89 1101 24.25 1070 23.56
1240 21.36 1227 21.14 1088 18.74
1259 27.50 1094 23.91 936 20.45
1354 23.56 1200 20.88 975 16.96
105 14.45 130 17.93 130 17.92
684 19.48 749 21.33 875 24.94
826 25.84 734 22.96 821 25.70
819 24.57 652 19.56 707 21.23
610 25.31 584 24.22 673 27.93
672 24.53 628 22.91 573 20.91
612 24.33 586 23.33 716 28.49
297 13.72 281 13.01 312 14.45
80 13.24 86 14.16 85 14.08
57 13.18 42 9.65 49 11.31
91 10.98 126 19.52 86 13.30
1069 21.81 1108 22.61 878 17.91
947 18.68 1077 21.24 856 16.89
1068 20.29 1038 19.71 937 17.81
916 18.49 898 18.11 901 18.17
804 16.21 798 16.08 846 17.06
576 15.32 556 14.80 617 16.43
805 18.35 788 17.97 744 16.95
508 13.25 559 14.58 637 16.62
511 15.38 616 18.56 590 17.78

Page 3
SGT 01
469 15.82 465 15.70 478 16.12
522 17.81 548 18.69 530 18.07
478 19.56 468 19.16 405 16.60
167 17.20 171 17.61 183 18.86
580 18.13 674 21.04 627 19.57
733 17.37 856 20.27 809 19.17
529 25.18 505 24.07 555 26.46
432 25.37 422 24.76 508 29.84
226 20.11 222 19.70 289 25.68
63 8.46 66 8.77 85 11.32
92 9.26 154 15.42 136 13.69
126 12.95 143 14.72 165 16.96
104 15.01 131 19.00 104 15.12
134 9.87 210 15.51 140 10.34
153 16.81 175 19.26 175 19.23
126 6.95 204 11.27 227 12.51
34 4.87 23 3.31 36 5.06
680 15.08 858 19.02 745 16.52
595 12.82 688 14.83 803 17.31
862 16.10 954 17.81 959 17.89
302 18.47 289 17.69 317 19.38
267 16.75 232 14.51 264 16.51
854 26.16 800 24.52 1022 31.32
1427 22.63 1255 19.89 1652 26.19
1018 24.98 1174 28.81 1259 30.88
1086 19.60 1184 21.36 1389 25.05
1269 22.37 1211 21.36 1251 22.06
74 9.15 98 12.21 53 6.60
132 5.51 188 7.80 213 8.87
916 26.76 773 22.58 978 28.57
1142 29.80 1008 26.29 1175 30.67

Page 4
SGT 01

01

Keterangan

Page 5
SGT 01

Page 6
REKAPITULASI YPH BLOK-BLOK REHABILITASI 2020 S/D 2022 ESTATE SGT 02

Year 2020 2021 2022


No Divisi Blok Luas (Ha) Progeny Land Type Keterangan
Planting Ton Yield Ton Yield Ton Yield
1 A35 2013 13.74 Socfindo Peat Soil 255 18.56 223 16.21 205 14.93
2 A36 2013 20.01 Socfindo Peat Soil 269 13.45 245 12.23 321 16.03
3 A37 2013 16.62 Socfindo Peat Soil 272 16.37 302 18.19 306 18.43
4 A38 2013 27.9 Socfindo Peat Soil 324 11.61 351 12.58 373 13.38
5 A39 2013 22.67 Socfindo Peat Soil 287 12.68 311 13.72 370 16.34
6 A40 2013 12.24 Socfindo Peat Soil 222 18.16 240 19.57 196 16.01
7 B35 2013 49.79 Sriwijaya Peat Soil 782 15.70 832 16.70 840 16.87
8 B36 2013 53.7 Sriwijaya Peat Soil 695 12.94 757 14.10 915 17.03
9 B37 2013 45.43 Sriwijaya Peat Soil 499 10.99 649 14.28 688 15.14
10 B38 2013 57.46 Sriwijaya Peat Soil 664 11.55 739 12.86 734 12.78
11 4 B39 2013 49.27 Sriwijaya Peat Soil 646 13.11 759 15.40 772 15.67
12 B40 2013 39.24 Topaz Peat Soil 495 12.62 628 16.01 749 19.08
13 C35 2012 51.05 Sriwijaya Peat Soil 949 18.58 893 17.49 1,017 19.93
14 C36 2012 48.8 Sriwijaya Peat Soil 782 16.03 882 18.07 982 20.12
15 C37 2012 47.21 Sriwijaya Peat Soil 755 15.99 785 16.63 843 17.85
16 C38 2012 49.43 Sriwijaya Peat Soil 827 16.73 910 18.41 1,004 20.32
17 C39 2012 50.06 Sriwijaya Peat Soil 1075 21.46 994 19.85 858 17.14
18 C40 2012 41.55 Sriwijaya Mineral Soil 1076 25.90 976 23.48 1,016 24.46
19 D35 2012 33.67 Socfindo Peat Soil 801 23.78 672 19.95 955 28.36
20 D36 2012 41.85 Sriwijaya Peat Soil 914 21.84 955 22.82 1,048 25.04
21 D37 2012 29.45 Sriwijaya Mineral Soil 757 25.72 711 24.16 945 32.08
22 C41 2012 41.88 Sriwijaya Mineral Soil 783 18.69 790 18.86 1,166 27.84
23 C42 2012 33.12 Sriwijaya Mineral Soil 668 20.17 641 19.34 923 27.88
24 C43 2012 24.2 Topaz Mineral Soil 487 20.14 457 18.87 579 23.94
25 C44 2012 11.78 Topaz Mineral Soil 313 27.70 299 25.37 344 29.17
26 C45 2012 2.25 Dami Mas Mineral Soil 60 26.52 47 20.99 67 29.95
27 A41 2013 34.19 Socfindo Peat Soil 455 13.30 444 12.97 590 17.26
28 A42 2013 34.26 Socfindo Peat Soil 408 13.07 459 13.40 542 15.83
29 A43 2013 24.3 Topaz Peat Soil 346 17.48 341 14.03 489 20.12
30 A44 2013 21.02 Topaz Peat Soil 245 28.20 182 8.65 215 10.25
31 A47 2013 17.63 Topaz Peat Soil 275 15.60 164 9.29 180 10.19
32 A48 2013 28.39 Topaz Peat Soil 211 7.44 235 8.29 268 9.45
33 A49 2013 20.64 Topaz Peat Soil 191 9.26 196 9.50 188 9.11
34 A50 2013 21.66 Marihat(Sawindo) Peat Soil 79 3.65 79 3.67
35 B41 2013 55.79 Sriwijaya Peat Soil 796 14.28 883 15.83 1,022 18.31
36 5 B42 2013 54.02 Sriwijaya Peat Soil 917 16.98 904 16.73 1,128 20.87
37 B43 2013 47.02 Sriwijaya Peat Soil 886 18.84 731 15.54 764 16.24
38 B44 2013 49.99 Topaz Peat Soil 732 14.64 828 16.56 857 17.15
39 B45 2013 49.46 Topaz Peat Soil 715 14.45 639 12.91 720 14.56
40 B46 2013 23 Socfindo Peat Soil 176 7.64 178 7.75
41 B47 2013 51.73 Socfindo Peat Soil 646 12.48 725 14.02 764 14.77
42 B48 2013 41 Socfindo Peat Soil 507 12.36 520 12.69 520 12.67
43 B49 2013 12.52 Topaz Peat Soil 102 8.17 105 8.41 134 10.67
44 B50 2013 11.12 Marihat(Sawindo) Peat Soil 75 6.70 64 5.71 45 4.07
45 L44 2017 2.79 Lonsum Peat Soil 7.182 4.52 10 3.63
46 L47 2017 20.26 Lonsum Peat Soil 87.069 4.30 71 3.51
47 L48 2017 10.69 Lonsum Peat Soil 23 2.14
48 L49 2013 17.62 Lonsum Peat Soil 31 1.73
49 L50 2013 17.7 Lonsum Peat Soil 44 2.47
50 A51 2013 23.72 Socfindo Peat Soil 179 7.53 162 6.82 215 9.06
51 A52 2013 28.47 Socfindo Peat Soil 183 6.44 182 6.38 216 7.60
52 A53 2013 33.54 Marihat(Sawindo) Peat Soil 304 9.07 311 9.26 375 11.18
53 A54 2013 31.65 Marihat(Sawindo) Peat Soil 287 9.47 406 12.82 403 12.74
54 A55 2013 24.33 Marihat(Sawindo) Peat Soil 244 11.10 356 14.63 341 14.01
55 B51 2013 8.31 Marihat(Sawindo) Peat Soil 27 3.19 48 5.73 55 6.67
56 B52 2013 5.96 Socfindo Peat Soil 24 4.06 44 7.34 80 13.39
57 B53 2013 10.98 Dami Mas Peat Soil 41 3.76 92 8.34 118 10.78
58 B54 2013 22.95 Dami Mas Peat Soil 133 5.80 191 8.32 204 8.88
59 B55 2013 21.49 Dami Mas Peat Soil 126 5.85 193 8.98 223 10.39
60 B56 2013 Socfindo Peat Soil 141 6.45 220 10.07 261 11.94
61 5 B57 2013 21.9 Socfindo Peat Soil 165 7.53 254 11.58 341 15.55
62 B58 2013 Dami Mas Peat Soil 20 6.33
63 B59 2013 Marihat(Sawindo) Peat Soil 18 6.21
64 B60 2013 Marihat(Sawindo) Peat Soil 19 2.90
65 B61 2013 Socfindo Peat Soil 15 3.76
66 B62 2013 Socfindo Peat Soil 12 2.67
67 L51 2013 3.22 Socfindo Peat Soil 31 9.69 59 18.24 66 20.65
68 L52 2013 8.14 Socfindo Peat Soil 78 9.57 92 11.30 104 12.74
69 L53 2013 10.96 Sriwijaya Peat Soil 92 8.37 130 11.85 145 13.19
70 L54 2013 13.51 Sriwijaya Peat Soil 121 8.96 194 14.35 212 15.66
71 L59 2013 14.61 Socfindo Peat Soil 86 5.87 100 6.83
72 L60 2013 7.63 Socfindo Peat Soil 80 10.53 85 11.13
MITRA

REKAPITULASI YPH BLOK-BLOK REHA

Year
No Divisi Blok Luas (Ha) Progeny Land Type
Planting
1 K05 2012 14.33 Socfindo Peat Soil
2 K06 2012 37.59 Socfindo Peat Soil
3 K07 2012 24.86 Socfindo Peat Soil
4 K08 2012 25.28 Socfindo Peat Soil
5 K09 2012 26.54 Socfindo Peat Soil
6 K10 2012 22.64 Socfindo Peat Soil
7 K28 2012 6.81 Sriwijaya Peat Soil
8 K29 2012 6.92 Sriwijaya Peat Soil
9 K30 2012 8.85 Sriwijaya Peat Soil
10 K31 2012 1.01 Sriwijaya Peat Soil
11 K32 2012 8.93 Topaz Peat Soil
12 7 K36 2013 11.40 Socfindo Peat Soil
13 K37 2013 10.13 Socfindo Peat Soil
14 K38 2013 28.00 Socfindo Peat Soil
15 K39 2013 14.55 Socfindo Peat Soil
16 K40 2013 6.10 Socfindo Peat Soil
17 K41 2013 26.29 Socfindo Peat Soil
18 K42 2013 11.77 Socfindo Peat Soil
19 K51 2013 9.43 Socfindo Peat Soil
20 K52 2013 11.76 Socfindo Peat Soil
21 K54 2013 18.14 Sriwijaya Peat Soil
22 K55 2013 17.22 Socfindo Peat Soil
23 K56 2013 15.93 Sriwijaya Peat Soil
24 E19 2013 9.42 Topaz Mineral Soil
25 F54 2011 10.22 Socfindo Peat Soil
26 F59 2011 10.42 Socfindo Peat Soil
27 G23 2013 26.88 Socfindo Peat Soil
28 G35 2013 20.72 Socfindo Mineral Soil
8
29 G49 2011 5.71 Socfindo Mineral Soil
30 G52 2010 7.47 Socfindo Mineral Soil
31 H32 2013 14.54 Socfindo Mineral Soil
32 H33 2013 12.88 Socfindo Mineral Soil
33 H35 2013 7.98 Socfindo Mineral Soil

Page 3
MITRA

YPH BLOK-BLOK REHABILITASI 2019 S/D 2022 ESTATE MITRA

2019 2020 2021 2022


Ton Yield Ton Yield Ton Yield Ton
122.78 8.57 148.64 10.37 186.40 13.01 212.64
305.15 8.12 400.10 10.64 415.40 11.05 473.38
222.81 8.96 302.36 12.16 332.53 13.38 366.31
208.04 8.23 326.22 12.90 321.18 12.70 321.26
216.37 8.15 338.64 12.76 388.46 14.64 339.53
202.95 8.96 306.35 13.53 384.19 16.97 308.95
74.94 6.19 86.24 12.66 101.77 14.94 96.90
119.87 5.76 78.96 11.41 101.82 14.71 105.97
157.98 10.93 116.85 13.20 137.07 15.49 115.52
132.98 3.87 20.53 7.41 26.34 9.51 32.69
146.77 6.86 103.65 11.53 122.66 13.64 116.22
0.00 0.00 89.35 8.38 119.44 11.20 92.99
0.00 0.00 97.49 8.76 108.55 9.75 119.74
175.35 5.23 198.65 7.09 258.11 9.22 204.68
168.37 6.84 111.28 7.47 150.82 10.12 143.98
54.91 8.67 51.99 8.21 59.08 9.33 64.81
174.63 6.06 176.06 6.11 209.19 7.26 247.83
109.99 8.49 105.01 8.11 106.35 8.21 101.12
84.30 8.94 73.17 7.76 67.43 7.15 82.36
128.50 5.81 127.70 5.77 163.93 7.41 175.25
170.90 7.97 141.32 6.59 152.69 7.12 181.66
178.18 10.32 154.45 8.95 143.23 8.30 173.00
147.48 8.99 126.84 7.73 131.83 8.03 151.39
136.23 14.46 83.32 8.85 108.85 11.56 126.08
169.96 16.63 93.80 9.18 148.88 14.57 146.98
58.04 4.67 37.36 3.01 36.76 2.96 67.38
353.78 13.16 518.58 19.29 531.16 19.76 397.73
41.54 1.73 32.69 1.58 50.26 2.43 200.37
17.71 5.06 20.49 3.59 22.67 3.97 36.12
65.40 10.03 73.31 9.81 67.71 9.06 67.38
77.87 5.36 129.14 8.88 157.57 10.84 217.14
92.55 7.19 161.26 12.52 185.91 14.43 144.67
70.53 20.68 73.70 9.24 80.63 10.10 74.02

Page 4
MITRA

2022
Keterangan
Yield
14.84
12.59
14.73
12.71
12.79
13.65
14.23
15.31
13.05
11.80
12.93
8.72
10.76
7.31
9.66
10.62
9.43
8.59
8.73
14.90
10.01
10.05
9.50
13.38
14.38
5.43
14.80
9.67
6.33
9.02
14.93
11.23
9.28

Page 5
GST 1

REKAPITULASI YPH BLOK-BLOK REHABILITASI 202

Year 2020
No Divisi Blok Luas (Ha) Progeny Land Type
Planting Ton
1 10 E21 2012 17.80 Sriwijaya Mineral
2 10 E22 2012 20.63 Sriwijaya Mineral
3 10 E23 2012 23.15 Socfindo Mineral
4 10 E24 2012 27.58 Socfindo Gambut
5 10 E25 2012 31.43 Socfindo Gambut
6 10 E26 2012 32.43 Socfindo Gambut
7 10 F21 2011 52.30 Socfindo Gambut 1,162
8 10 F22 2011 45.73 Socfindo Gambut 1,119
9 10 F23 2012 35.22 Socfindo Gambut
10 10 F24 2012 34.30 Socfindo Gambut
11 10 F25 2012 65.05 Socfindo Gambut 838
12 10 F26 2012 60.51 Socfindo Gambut 916
13 10 G21 2011 53.87 Socfindo Mineral 1,379
14 10 G22 2011 28.48 Socfindo Mineral 744
15 10 G23 2013 3.91 Socfindo Mineral 32
16 10 G24 2013 6.02 Sriwijaya Mineral 35
17 10 G25 2013 3.55 Socfindo Mineral 60
18 10 H21 2011 51.33 Sriwijaya Mineral 1,165
19 10 H22 2011 42.36 Socfindo Mineral 917
20 10 H23 2011 42.93 Socfindo Mineral 887
21 10 H24 2011 36.60 Socfindo Mineral 938
22 10 H25 2011 25.72 Socfindo Mineral 634
23 10 H26 2013 4.30 Socfindo Berpasir
Total 745.20 10,826
1 11 E27 2012 42.28 Socfindo Gambut
2 11 E28 2012 42.16 Socfindo Gambut
3 11 E29 2012 63.46 Socfindo Gambut
4 11 E30 2012 48.23 Socfindo Mineral
5 11 E35 2012 19.39 Socfindo Gambut
6 11 E36 2012 19.08 Socfindo Gambut
7 11 E37 2012 37.94 Sriwijaya Gambut
8 11 F27 2012 67.93 Sriwijaya Gambut
9 11 F28 2012 57.18 Sriwijaya Gambut
10 11 F29 2012 40.74 Sriwijaya Mineral
11 11 F30 2012 39.9 Sriwijaya Mineral
12 11 F32 2012 40.45 Sriwijaya Gambut

Page 6
GST 1
13 11 F33 2012 43.44 Sriwijaya Mineral
14 11 F34 2012 35.12 Sriwijaya Mineral
Total 597.30 0
1 12 G40 2011 43.33 Sriwijaya Mineral 771
2 12 G41 2011 31.26 Sriwijaya Mineral
3 12 G42 2011 24.67 Sriwijaya Mineral 544
4 12 G43 2011 20.84 Socfindo Mineral 336
5 12 G44 2011 15.94 Socfindo Mineral 291
6 12 G45 2011 13.64 Socfindo Mineral 217
7 12 G47 2011 19.13 Socfindo Mineral
8 12 H32 2012 17.35 Socfindo Mineral
9 12 H34 2011 27.29 Socfindo Mineral
10 12 H35 2011 41.7 Socfindo Mineral 843
11 12 H36 2011 49.23 Socfindo Mineral 1,015
12 12 H38 2011 46.74 Sriwijaya Mineral 936
13 12 H40 2011 43.66 Sriwijaya Mineral
14 12 H41 2011 23.04 Socfindo Mineral
15 12 H42 2011 17.95 Socfindo Mineral 425
16 12 H43 2011 12.05 Socfindo Mineral 311
17 12 H44 2011 6.8 Socfindo Mineral 158
18 12 I28 2012 17.87 Socfindo Mineral
19 12 I29 2012 11.3 Sriwijaya Mineral 118
20 12 I30 2012 10.91 Socfindo Mineral 140
21 12 I31 2012 9.36 Socfindo Mineral
Total 504.06 6,106
Grand Total 1,846.56 16,932

Page 7
GST 1

REHABILITASI 2020 S/D 2022 ESTATE GST 01

2020 2021 2022


Keterangan
Yield Ton Yield Ton Yield
350 19.66 492 27.65
554 26.86
409 17.66 411 17.77
505 18.32 584 21.19
506 16.09 617 19.65
616 19.00 683 21.06
22.22 1,241 23.73
24.46 1,058 23.13 1,164 25.46
560 15.90
622 18.12
12.89 967 14.87
15.14 1,014 16.76 807 13.34
25.59
26.14 685 24.06
8.26
5.73
16.83
22.70 1,256 24.47 1,132 22.05
21.65 792 18.70
20.66 987 22.98 763 17.78
25.62 1,031 28.17
24.65 688 26.76
92 21.47 82 19.15
19.47 9,340 20.42 11,330 21.02
954 22.55
908 21.55
1,368 21.55
1,164 24.13 1,225 25.40
567 29.22
614 32.16
844 22.24 938 24.73
1,468 21.60 1,422 20.94
1,104 19.31 1,171 20.49
978 24.00 952 23.37
1,224 30.68
1,004 24.83

Page 8
GST 1
939 21.61
778 22.15
0.00 8,787 22.12 10,834 25.05
17.80 938 21.65
679 21.73
22.05
16.14
18.24 310 19.48
15.92 223 16.34
406 21.21
265 15.30
609 22.33
20.23
20.62
20.02
707 16.19 931 21.33
473 20.53 620 26.91
23.69 395 22.02
25.85 300 24.90
23.30 158 23.21
359 20.10
10.41
12.84 182 16.66
132 14.07
19.01 4,990 19.84 2,698 21.17
12.82 23,118 20.79 24,862 22.41

Page 9
GST 02

REKAPITULASI YPH BLOK-BLOK REHABILITAS

Year
No Divisi Blok Luas (Ha) Progeny Land Type
Planting
1 D39 2012 20.83 Sriwijaya Mineral Soil
2 D41 2013 9.80 Sriwijaya Mineral Soil
3 13 D45 2012 12.32 Socfindo Mineral Soil
4 D46 2012 11.73 Socfindo Mineral Soil
5 D47 2012 14.22 Socfindo Peat Soil
6 D49 2012 13.62 Sriwijaya Peat Soil
7 D50 2012 28.94 Socfindo Peat Soil
8 D51 2012 43.60 Socfindo Peat Soil
9 D52 2012 41.87 Socfindo Peat Soil
10 D53 2012 37.80 Socfindo Peat Soil
14
11 D54 2012 49.05 Socfindo Peat Soil
12 E54 2011 43.57 Sriwijaya Sandy Soil
13 F51 2011 51.08 Socfindo Peat Soil
14 F53 2011 42.72 Socfindo Peat Soil
15 F54 2011 36.26 Socfindo Peat Soil
16 D55 2012 42.10 Socfindo Peat Soil
17 D56 2012 48.76 Socfindo Peat Soil
18 D57 2012 38.18 Socfindo Peat Soil
19 D58 2012 53.82 Socfindo Peat Soil
20 D59 2013 26.98 Socfindo Peat Soil
21 D60 2013 9.73 Socfindo Peat Soil
22 D61 2013 10.18 Socfindo Peat Soil
23 D62 2013 10.64 Sriwijaya Peat Soil
24 D63 2013 11.33 Sriwijaya Peat Soil
25 D64 2013 10.94 Socfindo Peat Soil
26 D65 2013 4.60 Socfindo Peat Soil
15
27 E58 2011 39.08 Socfindo Sandy Soil
28 E60 2011 33.75 Socfindo Sandy Soil
29 E61 2011 26.77 Socfindo Peat Soil
30 E62 2011 12.65 Socfindo Peat Soil
31 E63 2011 10.32 Socfindo Peat Soil
32 E64 2011 2.45 Socfindo Peat Soil

Page 10
GST 02
33 F55 2010 29.14 Socfindo Peat Soil
34 F56 2010 22.75 Socfindo Peat Soil
35 F57 2010 15.47 Socfindo Peat Soil
36 F58 2011 9.59 Socfindo Peat Soil
37 F59 2011 2.92 Socfindo Peat Soil

Page 11
GST 02

K-BLOK REHABILITASI 2020 S/D 2022 ESTATE GST 02

2020 2021 2022


Ton Yield Ton Yield Ton Yield
341.27 16.38 382.84 18.38 514.01 24.68
119.46 12.19 129.20 13.18 235.59 24.04
204.89 14.13 214.49 17.41 142.57 11.57
142.10 10.25 191.86 16.36 121.43 10.35
88.07 6.19 181.24 12.75 118.08 8.30
174.40 7.58 185.12 13.59 199.26 14.63
347.65 8.71 367.87 12.71 442.68 15.30
426.27 9.78 467.54 10.72 529.57 12.15
464.64 11.10 576.99 13.78 740.82 17.69
540.38 14.30 620.49 16.42 746.82 19.76
288.92 5.89 325.58 6.64 552.50 11.26
597.85 13.72 741.99 17.03 909.50 20.87
594.76 11.64 953.55 18.67 941.27 18.43
540.84 12.66 772.47 18.08 809.41 18.95
441.34 12.17 591.83 16.32 704.34 19.42
368.27 8.75 363.91 8.64 505.33 12.00
262.48 5.38 333.33 6.84 495.44 10.16
218.23 5.72 311.37 8.16 366.04 9.59
226.09 4.20 308.59 5.73 339.44 6.31
126.13 4.67 144.09 5.34 172.24 6.38
79.67 8.19 127.62 13.12 125.08 12.85
65.16 6.40 84.00 8.25 144.18 14.16
61.38 5.77 116.47 10.95 114.34 10.75
82.56 7.29 97.57 8.61 129.19 11.40
103.24 9.44 116.72 10.67 120.20 10.99
38.62 2.74 34.54 7.51 40.11 8.72
521.94 13.36 616.72 15.78 659.16 16.87
425.50 12.61 542.78 16.08 696.69 20.64
306.54 11.45 437.27 16.33 541.75 20.24
195.60 9.31 188.06 14.87 234.02 18.50
130.76 8.45 163.96 15.89 196.36 19.03
18.19 2.00 31.28 12.77 57.44 23.45

Page 12
GST 02
372.18 12.77 513.98 17.64 716.17 24.58
236.02 10.38 362.53 15.94 607.14 26.70
174.76 11.30 200.13 12.94 292.86 18.93
50.39 5.25 76.64 7.99 120.91 12.61
18.90 6.47 20.69 7.08 27.45 9.40

Page 13
GST 02

Keterangan

Page 14
GST 02

Page 15

You might also like