CONCRETE CALCULATION NOTE FOR Contractor Identification Code

FOUNDATION OF PROCESS STRUCTURE 141C-


083118C-C00-CN-1732-02008
STR-200, BLOCK C
B4 PROJECT – EPC PACKAGE 2
LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet 1 of 25 Rev. Q
Contract No. 4700000897 MOVE TO NEXT LINE
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge) Updated
141-CC-403-02008
and/or its client. Use of this information is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaimany and all liabilitiesfor any changes or modificationsto this document which are made
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietaryinformation of the applicableentity

CONCRETE CALCULATION NOTE FOR FOUNDATION OF PROCESS


STRUCTURE 141C-STR-200, BLOCK C

COMPANY DOCUMENT CLASSIFICATION CODE: 2

Updated
by any person other than the entity that issued the document under the applicable client contract.

APPROVED FOR CONSTRUCTION (ISSUED FOR CONSTRUCTION)

A. HAJARE S. SATTUR/ G.PIERI /


Q 28-Mar-23 ISSUED FOR CONSTRUCTION P. CICALA
M.MACERA A.FERRANTINI
ISSUED FOR COMPANY REVIEW A. HAJARE T. OAK/ G.PIERI /
L 13-Jan-23 P. CICALA
( ISSUED FOR REVIEW) M.MACERA A.FERRANTINI
Approved/ Authorized
Rev. Date Reason for Issue – Revision Description Prepared Checked
Disc. Proj.

TECHNIP ENERGIES FRANCE ABU DHABI – TARGET ENGINEERING CONSTRUCTION Co. CONSORTIUM
TECHNIP ENERGIES FRANCE – ABU DHABI TARGET ENGINEERING CONSTRUCTION COMPANY L.L.C.
Guardian tower, Sheikh Sultan Bin Zayed First and Dhafeer Street, - Abu Dhabi Capital Center, Al Badie Commercial Tower, ,Al Khaleej Al Arabi Street - Abu Dhabi
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008

INDEX
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

Page:

1 INTRODUCTION 4
1.1 Scope 4
1.2 Reference Documents 4
1.2.1 Codes 4
1.2.2 Specifications and standard 4
1.2.3 Reference Concrete Drawings 4
1.2.4 Unit Plot plan 4
1.2.5 Reference Equipment Mechanical Drawing 4
1.2.6 Piping Load Document 4
1.3 Unit of measures 4
1.4 Materials 5
1.4.1 Concrete 5
1.4.2 Reinforcing Steel 5
1.4.3 Anchor Bolts 5

2 GEOMETRY OF THE STRUCTURE 6


2.1 Description of the structure 6
2.2 Calculation software and Coordinates System 6
2.3 3D ModelCalculation
View Model Schemes 7
2.4 Calculation Structural Scheme 7
2.5 PLAN Layout (Base plates Node numbers) 8

3 LOAD ANALYSIS AND LOADING COMBINATIONS 8


3.1 Basic Loads 8
3.2 Dead Load ( DL ) 9
3.3 Live Load ( LL ) 10
3.4 Piping Load ( EE\EO\ET\TL\TA ) 10
3.5 Equipment Load (EE/EO/ET/WL/TL/ML) 10
3.6 Wind load ( WL ) 10
3.7 Earthquake load ( EQ ) 12
3.8 Load Combinations used in Mat-3D & STAAD.Pro software 14

4.3 Second Order Drift to First order Drift Ratio 26

5 FOUNDATION AND PEDESTAL DESIGN SUMMARY 21


5.1 Foundation Type-1 (5.9 X 3.0 X 0.65 m) 21
5.2 Foundation Type-1 (2.8X 2.8 X 0.6 m) 22
5.3 Pedestal Design Summary 24
applicable client contract.
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the
applicable client contract.

E
D
C
B
A

B.1
A.1
ATTACHMENTS

STAAD File

PIPING LOADS

EQUIPMENT DATA - MDS


DESIGN OF FOUNDATION

Footing and Pedestal design


LOCATION :
RUWAIS - U.A.E.

ANCHOR BOLT, BASE PLATE AND SHEAR KEY DESIGN


(ETHANE CRACKER)

Abu Dhabi Polymers Company Ltd. (Borouge)


Contract No. 4700000897

Design of Base Plate, Anchor Bolt and shear key for Top Mounted Steel Structure
B4 PROJECT – EPC PACKAGE 2
PROCESS STRUCTURE 141C-STR-200, BLOCK C
CONCRETE CALCULATION NOTE FOR FOUNDATION OF

Sheet

141-CC-403-02008
Company Identification Code
Contractor Identification Code

Rev.

25
25
25
25
25
25
083118C-C00-CN-1732-02008

Q
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

1 INTRODUCTION

1.1 Scope

The aim of this calculation report is the load evaluation, foundation analysis, reinforcement design and safety check for in-situ concrete
foundation system for structure 141C-STR-200, Block C, “B4 Project - EPC Package 2 (Ethane Cracker)" (BOROUGE) located in
Ruwais - U.A.E.

1.2 Reference Documents

The following documents are to be considered as integral part of this specification.

1.2.1 Codes

Loads Combinations and Wind Load Definitions


ASCE/SEI 7-16 ASCE - Minimum Design Loads and Associated Criteria for Buildings and Other
Structures

Seismic Load Definition


ADIBC 2013 Abu Dhabi International Building Code

Design of Concrete Structures and Foundations


ACI 318-14 Building Codes Requirements for Reinforced Concrete

1.2.2 Specifications and standard

141-CC-457-00004 Job Design Specification for Foundations and Structures


141-CC-457-00002 Cracker Unit EPC Phase Geotechnical Report
BGS-CU-044 Foundation Design
BGS-CU-002 Structural Engineering Design Criteria
141-CC-251-01003 General Notes for Cast-in-Situ concrete works
141-CC-251-00002 Construction standards for concrete works

1.2.3 Reference Concrete Drawings

141-CC-271-02008 Concrete drawings for foundation and elevation of Structure 141C-STR-200, Block C

1.2.4 Unit Plot plan

141-LG-203-30001 Equipment Layout (Block C) Zone 1 Quench Water Tower & Dilution Steam Area

1.2.5 Reference Equipment Mechanical Drawing

DS-141-572-HE-320 Water Stripper Reboiler


DS-141-572-VV-320 Water Stripper Reboiler Condensate Drum

1.2.6 Piping Load Document


Updated
083118C-C00-NM-1350-00041 Piping Load on Structure 141C-STR-200
SHIFT TO NEXT PAGE

1.3 Unit of measures

Calculation and drawings for all works covered shall carried out using International System of Units (S.I.).
applicable client contract.

In particular, the following units shall be used:

Length: meter [m]


millimeter [mm]
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

Area: square meter [m²]


square millimeter [mm²]
Force: newton [N]
kilonewton [kN]
Mass: kilogram [kg]
Pressure: kilopascal [kPa] = [kN/m²]
Pressure and stress: Megapascal [MPa] = [N/mm²]
Density: kilogram per cubic meter [kg/m³]
Specific Weight: kilonewton per cubic meter [kN/m³]
Temperature: degree Celsius [°C]

1.4 Materials

1.4.1 Concrete

As per doc. 141-CC-457-00004, material quality for reinforced concrete is in accordance with ACI 318-14 “Building Code Requirements for
reinforced concrete”.
The specified compressive strength of concrete according to ASTM C39, determined by cylinder test at 28 days, shall be minimum as
follows::

Blinding concrete Grade 20; f'c = 20 Mpa

Screed on Roof Slab, density not exceeding 19kN/m 3 Grade 20L; f'c = 20 Mpa
( " L " - Designates Low Density Concrete)

For equipment foundations, reinforced concrete structures and Grade 32; f'c = 32 Mpa
their foundation
Pipe sleepers, Pits and Basins

Paving, Slabs, Walls Grade 30F; f'c = 30 Mpa


( "F" - Designates Concrete containing Fibers)

1.4.2 Reinforcing Steel

Reinforcement details not shown on standard drawings shall be carried out in accordance with the requirements of ACI 315 "Details and
Detailing of concrete Reinforcement".

Steel for main and secondary reinforcement shall be deformed high yield bars and shall comply with BS 4449 Grade 500B minimum yield
strength 500Mpa or equivalent.
Welded wire fabric shall be made from cold reduced steel wire complying with BS 4482 and shall have a minimum specified yield strength Re
= 500 MPa. Welded wire fabric shall be supplied in flat sheets.

All bars arrangement such as spacing, lapping, anchorage, concrete cover shall be carried out according to 141-CC-251-01003 General
Notes for Cast-in-situ Concrete Works.

1.4.3 Anchor Bolts

All anchor bolts fabrication, coating and installation shall be as per 141-CC-251-00002 -Construction standards for cast-in-situ concrete works
and as per clause 14.1 of BGS-CU-010 - Concrete Construction, Formworks and Coatings
All anchor bolts shall be conform to ASTM A307 Gr. A up to dia16 mm (included) and ASTM A36 grade 4.6 for dia equal or greater
than 20 mm.

Anchor bolts to be hot dip galvanized as specified in BGS-MX-002


client contract.

The anchor bolts design shall be in accordance with ACI 318-14 and the recommendation of ASCE guidelines for Wind Loads and Anchor
Bolt Design for Petrochemical Facilities.
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

2 GEOMETRY OF THE STRUCTURE

2.1 Description of the structure

Structure 141C-STR-200, located North-South in the Block C from alignment row “A” to “B”, and on longitudinal grids "1" "2" and "3".
This structure is 10.00 m long (along east west) and 6.00m wide (along north south). It has three floors at EL. 106.100 , EL. 109.900 and
EL.114.300 respectively.

141C-STR-200

On the elevation we have two levels.


EL. 106.100 - Used for supporting pipes and equipment tag. 141-VV-320
EL. 114.300 - Used for supporting pipes and equipment tag. 141-HE-320

The structure is steel structure. All longitudinal beams in N-S direction are simply supported and stability is provided by providing vertical
braces in N-S direction and Moment resisting frame in transverse (E-W) direction.

All secondary intermediate beams are having shear connections. Steel to concrete connection at base plate level is pinned type.

2.2 Calculation software and Coordinates System

The structural software used for the project is STAAD.Pro version CONNECT Edition.
The “zero” Reference point location (X, Y & Z) is located on the lower North-West corner of the structure.
Y
· X axis: Horizontal East Direction X (East)
· Z axis: Horizontal South Direction
· Y axis: Vertical upward
Mat-3D software is used to design and analyze the foundation and pedestal. Z (South)

In-house excel sheet is used to design the base plate, anchor bolt and shear key.
applicable client contract.

ADD MAT3D AXIS

Updated
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the
applicable client contract.

2.4
2.3 View
3D ModelCalculation

A
Calculation Structural Scheme
3D view of process structure shown below.
LOCATION :

Model Schemes
RUWAIS - U.A.E.

STAAD 3-D VIEW


3-D VIEW

10000
2
(ETHANE CRACKER)

Abu Dhabi Polymers Company Ltd. (Borouge)


Contract No. 4700000897
B4 PROJECT – EPC PACKAGE 2
PROCESS STRUCTURE 141C-STR-200, BLOCK C
CONCRETE CALCULATION NOTE FOR FOUNDATION OF

3
Sheet

TOS EL. 114.300

TOS EL. 109.900


141-CC-403-02008
Company Identification Code
Contractor Identification Code

Rev.
083118C-C00-CN-1732-02008

Q
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

2.5 PLAN Layout (Base plates Node numbers)

Updated

SHOW PLAN LAYOUT WITH GRID NOS

3 LOAD ANALYSIS AND LOADING COMBINATIONS

3.1 Basic Loads

The following loads shall be considered in the design


Dead Load (DL)
Equipment/Piping Empty Load (DLempty)
Equipment/Piping Test Load (Test)
Equipment/Piping Operating Load (DLop)
Live Load (LL)
Live Roof (LR)
Thermal Loads (TL/ TA / TF)
Wind Load (WL)
Earthquake Load (EQ)
Maintenance Load (ML)
Equipment/Piping Erection Load (ER)
Crane Load (CR)
Dynamic Load (DY)
Earth and Water Pressure (HY)
client contract.
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

3.2 Dead Load ( DL )

Dead load of the structure is automatically calculated by the program with the following density of materials:

• Reinforced Concrete: 25.0 kN/m


3

• Structural Steel: 78.50 kN/m


3

Self-weight of main steel structure is automatically calculated by STAAD.Pro program, taking into account
transversal dimensions and lengths of elements with a self-weight multiplier equal to -1 for concrete and
1.1 for steel.

Dead loads of secondary steel element (gratings, handrails), are directly applied at each
elevation, on 3D structural model, considering an appropriate value of their influence area as per following intensities
• Self-weight of grating: 0.55 kN/m
2
Applied as area load
• Handrails 0.30 kN/m Applied as uniform load
• Cable tray Load
Cable tray Empty load (EE) = 0.15 kN/m (Cl.no. 5.3.3 of 08311BC-000-WI-1700-001)
Cable tray Operating load (EO/ET) = 1.50 kN/m (Cl.no. 5.3.3 of 08311BC-000-WI-1700-001)

Horizontal Cable Tray

Number of cable Trays = 2.00 nos


Spacing between 2 cable trays considered = 3.00 m
Empty Point load of cable tray (EE) = 0.90 kN
Operting Point load of cable tray (EO/ET) = 9.00 kN

Vertical Cable Tray

Number of cable Trays = 2.00 nos


Spacing between 2 cable trays considered = 2.00 m
Empty Point load of cable tray (EE) = 0.60 kN
Operting Point load of cable tray (EO/ET) = 6.00 kN

• Dead Load on staircase bracket.

For 3.8m floor to floor height


Weight of Stringer = 1.10 kN
Weight of midlanding = 0.70 kN
length of stringer = 6.00 m
length of midlanding = 1.00 m
No of steps = 19.00 nos
Step with grating load = 0.16 kN
slope handrail = 0.5 kN/m

Hence, load due to stringer on Bracket = 13.84 /2


6.92 kN
client contract.
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable

For 1.4m floor to floor height


Weight of Stringer = 1.10 kN
length of stringer = 2.50 m
No of steps = 8.00 nos
Step with grating load = 0.16 kN
slope handrail = 0.5 kN/m

Hence, load due to stringer on Bracket = 5.28 /2


2.64 kN

3.3 Live Load ( LL )

2
Live load on operating areas and platforms = 5 kN/m Ref. BGS-CU-002, Cl. 10.4

Live Load on staircase bracket


For 3.8m floor to floor height
length of landing = 0.28 m
No of steps = 19.00 nos
Width of staircase = 0.80 kN

Hence, load due to stringer on Bracket = 21.28 /4


5.32 kN

For 1.4m floor to floor height


length of landing = 0.28 m
No of steps = 8.00 nos
Width of staircase = 0.80 kN

Hence, load due to stringer on Bracket = 8.96 /4


2.24 kN

3.4 Piping Load ( EE\EO\ET\TL\TA )

Piping loads are supplied by “Piping Department” (refer to att. D).


Concentrated and uniform piping loads are directly applied at each elevation on 3D structural model elements.

3.5 Equipment Load (EE/EO/ET/WL/TL/ML)

Equipment loads are supplied by “Mechanical Department” (refer to att. E).


Concentrated equipments loads are directly applied at each elevation on 3D structural model elements.

3.6 Wind load ( WL )

3.6.1 General

Wind load pressure is calculated according to 141-CC-457-00004 "Job Design Specification for Foundations and Structures" &
ASCE 7-16
No reduction shall be made for the shielding effect of vessels or structures adjacent to the structure being designed.

3.6.2 Velocity Pressure

(As per ASCE 7-16 eq.26.10-1)

Basic Wind Speed: V = 56.3 m/s 141-CC-457-00004


client contract.

Ground Elevation factor (Table 26.9-1): Ke = 1


Topographic factor (para. 26.8.2): Kzt = 1
Velocity Pressure Exposure coefficient (Table 26.10-1): Kz
Wind Directionality factor (Table 26.6-1): Kd
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

141-CC-457-00004
Risk Category II 083118C-000-JSD-1700-0001
Exposure Category C BGS-CU-002_B14
Basic Wind Speed V = 56.3 [m/s] BGS-CU-002_B14

Velocity Pressure ASCE 7-16 (Eq.26.10-1)


Ground Elevation factor Ke = 1 ASCE 7-16 (Table 26.9-1)
Topographic factor Kzt = 1 ASCE 7-16 (para. 26.8-2)
Open Frame
Wind Directionality factor Kd = 0.85 ASCE 7-16 (Table 26.6-1)
Building

Velocity Pressure Exposure coefficient Kz = 2.01(z/z g )2/α 4.6 ≤ z ≤ z g ASCE 7-16 (Table 26.10-1)
2.01(4.6/z g )2/α z < 4.6
zg = 274.32 m ASCE 7-16 (Table 26.11-1)
α = 9.50 ASCE 7-16 (Table 26.11-1)

Velocity Pressure qz (Kd = 0.85) ASCE 7-16


50.00

45.00

40.00

35.00

30.00
z [m]

25.00

20.00

15.00

10.00

5.00

0.00
1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2.0 2.1 2.2 2.3 2.4 2.5
qz [kPa]

3.6.3 Design Wind Pressure

Calculated values of wind pressure (including Gust-Effect factor G factor) are shown in the following table.
The values shall be updated considering the Force coefficient Cf in accordance with ASCE 7-16.
Elevation values are referred to origin. The values shall be updated into the following table and STAAD.Pro with
the correct reference point (HPP).
Design Wind Pr q z (K d = 0.85; G = 0.85)
z [m] Kz (z) qz [kPa] G qz [kPa]
0 0.85 1.4 1.19
2 0.85 1.4 1.19
4.6 0.85 1.4 1.19
6 0.9 1.48 1.26
8 0.95 1.58 1.34
10 1 1.65 1.41
12 1.04 1.72 1.46
14 1.07 1.77 1.51
16 1.11 1.83 1.55
18 1.13 1.87 1.59
20 1.16 1.91 1.63
22 1.18 1.95 1.66
24 1.2 1.99 1.69
26 1.22 2.02 1.72
28 1.24 2.05 1.75
30 1.26 2.08 1.77
32 1.28 2.11 1.8
34 1.3 2.14 1.82 Cf considered for various element
36 1.31 2.16 1.84 Type Cf
38 1.33 2.19 1.86 Structure 2
40 1.34 2.21 1.88 Pipes 0.8
45 1.37 2.27 1.93 Vessels 1.8
client contract.

50 1.4 2.32 1.97


55 1.43 2.37 2.01
60 1.46 2.41 2.05
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

3.6.4 Wind Load on Cable Tray

Wind load on cable tray ssupport IB, LA3, TA1 & IC is applied as per 141-CS-251-00001 page no 201/195/186/206 respectively.

3.6.5 Wind Load on Pipes

For Pipe racks wider than 4m

Wp= 0.8 𝑞ℎ (𝐷1 + 𝐷2 + 𝐷3 + 𝐷4)


(As per BGS-CU-002 cl.10.6.9)

Where:

Wp = Unit design wind load on piping, (kN)


qh = Velocity pressure determined at piping elevation, h (kN/m2)
Dn = Diameter of pipe (m)

Pressure coefficient, Cf = 0.80

Sr. contributary wind load (kN) Number of column load on each


Elevation Cf D1 D2 D3 D4 qh kN/m2
no. width (m) Wp nos. column
1 104.6 0.8 0.205 0.21 0.15 0.15 6 1.19 4.05552 4 1.5
2 106.1 0.8 0.205 0.21 0.15 0.15 6 1.19 4.05552 6 1
3 109.9 0.8 0.205 0.21 0.15 0.15 6 1.34 4.56672 6 1
4 114.3 0.8 0.61 0.61 0.15 0.15 6 1.46 10.65216 4 2.7
5 118.245 0.8 0.6 0 0 0 6 1.63 4.6944 1 4.7
6 118.245 0.8 0.205 0 0 0 6 1.63 1.60392 1 1.6

3.7 Earthquake load ( EQ )

Earthquake loads evaluation according to “141-CC-457-00004 Job Design Specification for


Foundations and Structures”.
The Elastic Design Response Spectrum shall be in accordance with ASCE 7-16 Para 11.4.6

Site Class C Geotechnical Report


Spectral Response Acceleration Parameter at short periods SS [g]= 0.45 BGS-CU-002_B14
Spectral Response Acceleration Parameter at 1s period S1 [g]= 0.13 BGS-CU-002_B14

Short-Period Site Coefficient Fa = 1.3 ASCE 7-16 - Table 11.4-1


Long-Period Site Coefficient FV = 1.5 ASCE 7-16 - Table 11.4-2
Spectral Response Acceleration Parameter adjusted for site class effect F a∙SS = SMS [g]= 0.59 ASCE 7-16 Eq.11.4-1
Spectral Response Acceleration Parameter at 1s period adjusted for site class effect F V∙S1 = SM1 [g]= 0.20 ASCE 7-16 Eq.11.4-2

Design Spectral Acceleration Parameter at short period 2/3∙S MS = SDS [g]= 0.39 ASCE 7-16 Eq.11.4-3
Design Spectral Acceleration Parameter at 1s period 2/3∙S M1 = SD1 [g]= 0.13 ASCE 7-16 Eq.11.4-4
Start of plateu 0.2 SD1/SDS = T0 [s]= 0.07 ASCE 7-16 Para 11.4.6
End of plateu SD1/SDS = TS [s]= 0.33 ASCE 7-16 Para 11.4.6
Long-period transition period TL [s]= 8.00 ADIBC 2013 - Figure 1613.5(2)

Occupancy Category II 083118C-000-JSD-1700-0001


Importance Factors Ie = 1.00 ASCE 7-16 Tab.1.5-2

Seismic Design Category based on short-period response acceleration C ASCE 7-16 - Table 11.6-1
Seismic Design Category based on 1s period response acceleration C ASCE 7-16 - Table 11.6-2
client contract.
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

3.7.1 Seismic Design Category

In accordance with Table.11.6-1 and Table 11.6-2 of ASCE 7-16 for S 1 less than 0.75, structures shall
be assigned a Seismic Design Category based on Occupancy Category and on Design Spectral Response
Acceleration parameters SDS and SD1:

Occupancy Category: II
SDS: 0.39 g
SD1: 0.133 g
applicable client contract.

R Response modification coefficient 3.0 (As per 141-CC-457-00004 Cl. 5.4.5)


Ω0 Overstrength factor 3.0 (As per 141-CC-457-00004 Cl. 5.4.5)
Cd Deflection amplification factor 3.0 (As per 141-CC-457-00004 Cl. 5.4.5)
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

3.8 Load Combinations used in Mat-3D & STAAD.Pro software

Loading combinations are according to ASCE 7-16 and 141-CC-457-00004.


Allowable Stress Design method (ASD Method) shall be used for foundation geotechnical & stability checks.

Strength Design Method (LRFD Method) shall be used for foundations reinforcement.
Foundations shall be designed for the relevant load combinations during erection, hydraulic test, operation
and maintenance conditions.

STRENGTH DESIGN METHOD

3.8.1 Erection

RCDC COMB Mat-3D


STAAD LOAD COMBINATION
COMB
LOAD 2000 1.4DL+1.4EE 1 1
LOAD 2001 1.2DL+1.2EE+1.60LL +0.50LR +1.60ER 2 2
LOAD 2002 1.2DL+1.2EE+1.00LL +1.60LR +1.00ER 3 3
LOAD 2003 1.2DL+1.2EE+1.60LR +0.50WLX 4 4
LOAD 2004 1.2DL+1.2EE+1.60LR -0.50WLXN 5 5
LOAD 2005 1.2DL+1.2EE+1.60LR +0.50WLZ 6 6
LOAD 2006 1.2DL+1.2EE+1.60LR -0.50WLZN 7 7
LOAD 2007 1.2DL+1.2EE+1.00LL +0.50LR +0.50WLX+1.00ER 8 8
LOAD 2008 1.2DL+1.2EE+1.00LL +0.50LR -0.50WLXN+1.00ER 9 9
LOAD 2009 1.2DL+1.2EE+1.00LL +0.50LR +0.50WLZ+1.00ER 10 10
LOAD 2010 1.2DL+1.2EE+1.00LL +0.50LR -0.50WLZN+1.00ER 11 11
LOAD 2011 0.9DL+0.9EE+1.0 WLX 12 12
LOAD 2012 0.9DL+0.9EE-1.0 WLXN 13 13
LOAD 2013 0.9DL+0.9EE+1.0 WLZ 14 14
LOAD 2014 0.9DL+0.9EE-1.0 WLZN 15 15
LOAD 2015 1.2DL+1.2EE+1.00LL +1.00EEQX +0.30EEQZ +1.00ER 16 16
LOAD 2016 1.2DL+1.2EE+1.00LL +1.00EEQX -0.30EEQZ +1.00ER 17 17
LOAD 2017 1.2DL+1.2EE+1.00LL -1.00EEQX +0.30EEQZ +1.00ER 18 18
LOAD 2018 1.2DL+1.2EE+1.00LL -1.00EEQX -0.30EEQZ +1.00ER 19 19
LOAD 2019 1.2DL+1.2EE+1.00LL +0.30EEQX +1.00EEQZ +1.00ER 20 20
LOAD 2020 1.2DL+1.2EE+1.00LL -0.30EEQX +1.00EEQZ +1.00ER 21 21
LOAD 2021 1.2DL+1.2EE+1.00LL +0.30EEQX -1.00EEQZ +1.00ER 22 22
LOAD 2022 1.2DL+1.2EE+1.00LL -0.30EEQX -1.00EEQZ +1.00ER 23 23
LOAD 2023 0.9DL+0.9EE+1.00EEQX +0.30EEQZ 24 24
LOAD 2024 0.9DL+0.9EE+1.00EEQX -0.30EEQZ 25 25
LOAD 2025 0.9DL+0.9EE-1.00EEQX +0.30EEQZ 26 26
LOAD 2026 0.9DL+0.9EE-1.00EEQX -0.30EEQZ 27 27
LOAD 2027 0.9DL+0.9EE+0.30EEQX +1.00EEQZ 28 28
LOAD 2028 0.9DL+0.9EE-0.30EEQX +1.00EEQZ 29 29
LOAD 2029 0.9DL+0.9EE+0.30EEQX -1.00EEQZ 30 30
LOAD 2030 0.9DL+0.9EE-0.30EEQX -1.00EEQZ 31 31

3.8.2 Operation

LOAD 2100 1.4DL+1.40EO 32 32


LOAD 2101 1.4DL+1.40EO+1.20TA+1.20TL 33 33
LOAD 2102 1.4DL+1.40EO-1.20TA+1.20TL 34 34
LOAD 2103 1.4DL+1.40EO+1.20TA-1.20TL 35 35
LOAD 2104 1.4DL+1.40EO-1.20TA-1.20TL 36 36
applicable client contract.

LOAD 2105 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA+1.00TL 37 37


LOAD 2106 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA+1.00TL 38 38
LOAD 2107 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA-1.00TL 39 39
LOAD 2108 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA-1.00TL 40 40
LOAD 2109 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA+1.60CR 41 41
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

LOAD 2110 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA+1.60CR 42 42


LOAD 2111 1.2DL+1.20EO+1.00LL +1.60LR +1.20TA 43 43
LOAD 2112 1.2DL+1.20EO+1.00LL +1.60LR -1.20TA 44 44
LOAD 2113 1.2DL+1.20EO+1.60LR +1.20TA+0.50WLX 45 45
LOAD 2114 1.2DL+1.20EO+1.60LR +1.20TA-0.50WLXN 46 46
LOAD 2115 1.2DL+1.20EO+1.60LR +1.20TA+0.50WLZ 47 47
LOAD 2116 1.2DL+1.20EO+1.60LR +1.20TA-0.50WLZN 48 48
LOAD 2117 1.2DL+1.20EO+1.60LR -1.20TA+0.50WLX 49 49
LOAD 2118 1.2DL+1.20EO+1.60LR -1.20TA-0.50WLXN 50 50
LOAD 2119 1.2DL+1.20EO+1.60LR -1.20TA+0.50WLZ 51 51
LOAD 2120 1.2DL+1.20EO+1.60LR -1.20TA-0.50WLZN 52 52
LOAD 2121 1.2DL+1.20EO+1.00LL +0.50LR +1.20TA+1.00WLX 53 53
LOAD 2122 1.2DL+1.20EO+1.00LL +0.50LR +1.20TA-1.00WLXN 54 54
LOAD 2123 1.2DL+1.20EO+1.00LL +0.50LR +1.20TA+1.00WLZ 55 55
LOAD 2124 1.2DL+1.20EO+1.00LL +0.50LR +1.20TA-1.00WLZN 56 56
LOAD 2125 1.2DL+1.20EO+1.00LL +0.50LR -1.20TA+1.00WLX 57 57
LOAD 2126 1.2DL+1.20EO+1.00LL +0.50LR -1.20TA-1.00WLXN 58 58
LOAD 2127 1.2DL+1.20EO+1.00LL +0.50LR -1.20TA+1.00WLZ 59 59
LOAD 2128 1.2DL+1.20EO+1.00LL +0.50LR -1.20TA-1.00WLZN 60 60
LOAD 2129 0.9DL+0.90EO+1.00TA+1.00WLX 61 61
LOAD 2130 0.9DL+0.90EO+1.00TA-1.00WLXN 62 62
LOAD 2131 0.9DL+0.90EO+1.00TA+1.00WLZ 63 63
LOAD 2132 0.9DL+0.90EO+1.00TA-1.00WLZN 64 64
LOAD 2133 0.9DL+0.90EO-1.00TA+1.00WLX 65 65
LOAD 2134 0.9DL+0.90EO-1.00TA-1.00WLXN 66 66
LOAD 2135 0.9DL+0.90EO-1.00TA+1.00WLZ 67 67
LOAD 2136 0.9DL+0.90EO-1.00TA-1.00WLZN 68 68
LOAD 2137 1.2DL+1.20EO+1.00LL +1.20TA+1.00EQX +0.30EQZ 69 69
LOAD 2138 1.2DL+1.20EO+1.00LL +1.20TA+1.00EQX -0.30EQZ 70 70
LOAD 2139 1.2DL+1.20EO+1.00LL +1.20TA-1.00EQX +0.30EQZ 71 71
LOAD 2140 1.2DL+1.20EO+1.00LL +1.20TA-1.00EQX -0.30EQZ 72 72
LOAD 2141 1.2DL+1.20EO+1.00LL -1.20TA+1.00EQX +0.30EQZ 73 73
LOAD 2142 1.2DL+1.20EO+1.00LL -1.20TA+1.00EQX -0.30EQZ 74 74
LOAD 2143 1.2DL+1.20EO+1.00LL -1.20TA-1.00EQX +0.30EQZ 75 75
LOAD 2144 1.2DL+1.20EO+1.00LL -1.20TA-1.00EQX -0.30EQZ 76 76
LOAD 2145 1.2DL+1.20EO+1.00LL +1.20TA+0.30EQX +1.00EQZ 77 77
LOAD 2146 1.2DL+1.20EO+1.00LL +1.20TA-0.30EQX +1.00EQZ 78 78
LOAD 2147 1.2DL+1.20EO+1.00LL +1.20TA+0.30EQX -1.00EQZ 79 79
LOAD 2148 1.2DL+1.20EO+1.00LL +1.20TA-0.30EQX -1.00EQZ 80 80
LOAD 2149 1.2DL+1.20EO+1.00LL -1.20TA+0.30EQX +1.00EQZ 81 81
LOAD 2150 1.2DL+1.20EO+1.00LL -1.20TA-0.30EQX +1.00EQZ 82 82
LOAD 2151 1.2DL+1.20EO+1.00LL -1.20TA+0.30EQX -1.00EQZ 83 83
LOAD 2152 1.2DL+1.20EO+1.00LL -1.20TA-0.30EQX -1.00EQZ 84 84
LOAD 2153 0.9DL+0.90EO+1.00TA+1.00EQX +0.30EQZ 85 85
LOAD 2154 0.9DL+0.90EO+1.00TA+1.00EQX -0.30EQZ 86 86
LOAD 2155 0.9DL+0.90EO+1.00TA-1.00EQX +0.30EQZ 87 87
LOAD 2156 0.9DL+0.90EO+1.00TA-1.00EQX -0.30EQZ 88 88
LOAD 2157 0.9DL+0.90EO-1.00TA+1.00EQX +0.30EQZ 89 89
LOAD 2158 0.9DL+0.90EO-1.00TA+1.00EQX -0.30EQZ 90 90
LOAD 2159 0.9DL+0.90EO-1.00TA-1.00EQX +0.30EQZ 91 91
LOAD 2160 0.9DL+0.90EO-1.00TA-1.00EQX -0.30EQZ 92 92
LOAD 2161 0.9DL+0.90EO+1.00TA+0.30EQX +1.00EQZ 93 93
LOAD 2162 0.9DL+0.90EO+1.00TA-0.30EQX +1.00EQZ 94 94
LOAD 2163 0.9DL+0.90EO+1.00TA+0.30EQX -1.00EQZ 95 95
LOAD 2164 0.9DL+0.90EO+1.00TA-0.30EQX -1.00EQZ 96 96
LOAD 2165 0.9DL+0.90EO-1.00TA+0.30EQX +1.00EQZ 97 97
applicable client contract.

LOAD 2166 0.9DL+0.90EO-1.00TA-0.30EQX +1.00EQZ 98 98


LOAD 2167 0.9DL+0.90EO-1.00TA+0.30EQX -1.00EQZ 99 99
LOAD 2168 0.9DL+0.90EO-1.00TA-0.30EQX -1.00EQZ 100 100
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

3.8.3 Test
LOAD 2200 1.4DL+1.4ET 101 101
LOAD 2201 1.2DL+1.2ET+1.60LL +0.50LR +1.60CR 102 102
LOAD 2202 1.2DL+1.2ET+1.00LL +1.60LR +1.00CR 103 103
LOAD 2203 1.2DL+1.2ET+1.60LR +0.50WLX 104 104
LOAD 2204 1.2DL+1.2ET+1.60LR -0.50WLXN 105 105
LOAD 2205 1.2DL+1.2ET+1.60LR +0.50WLZ 106 106
LOAD 2206 1.2DL+1.2ET+1.60LR -0.50WLZN 107 107
LOAD 2207 1.2DL+1.2ET+1.00LL +0.50LR +0.50WLX+1.00CR 108 108
LOAD 2208 1.2DL+1.2ET+1.00LL +0.50LR -0.50WLXN+1.00CR 109 109
LOAD 2209 1.2DL+1.2ET+1.00LL +0.50LR +0.50WLZ+1.00CR 110 110
LOAD 2210 1.2DL+1.2ET+1.00LL +0.50LR -0.50WLZN+1.00CR 111 111
LOAD 2211 0.9DL+0.9ET+0.50WLX 112 112
LOAD 2212 0.9DL+0.9ET-0.50WLXN 113 113
LOAD 2213 0.9DL+0.9ET+0.50WLZ 114 114
LOAD 2214 0.9DL+0.9ET-0.50WLZN 115 115

3.8.4 Maintenance
LOAD 2300 1.2DL+1.2EE+1.60LL +1.00CR+1.00ML 116 116
LOAD 2301 1.2DL+1.2EE+1.00LL +1.60CR+1.60ML 117 117

3.8.5 Operation – Seismic provisions ACI 318-14 for Concrete Beams


LOAD 2500 1.2DL+1.20EO+1.00LL +1.20TA+2.00EQX +0.60EQZ 118
LOAD 2501 1.2DL+1.20EO+1.00LL +1.20TA+2.00EQX -0.60EQZ 119
LOAD 2502 1.2DL+1.20EO+1.00LL +1.20TA-2.00EQX +0.60EQZ 120
LOAD 2503 1.2DL+1.20EO+1.00LL +1.20TA-2.00EQX -0.60EQZ 121
LOAD 2504 1.2DL+1.20EO+1.00LL -1.20TA+2.00EQX +0.60EQZ 122
LOAD 2505 1.2DL+1.20EO+1.00LL -1.20TA+2.00EQX -0.60EQZ 123
LOAD 2506 1.2DL+1.20EO+1.00LL -1.20TA-2.00EQX +0.60EQZ 124 N.A
LOAD 2507 1.2DL+1.20EO+1.00LL -1.20TA-2.00EQX -0.60EQZ 125
LOAD 2508 1.2DL+1.20EO+1.00LL +1.20TA+0.60EQX +2.00EQZ 126
LOAD 2509 1.2DL+1.20EO+1.00LL +1.20TA-0.60EQX +2.00EQZ 127
LOAD 2510 1.2DL+1.20EO+1.00LL +1.20TA+0.60EQX -2.00EQZ 128
LOAD 2511 1.2DL+1.20EO+1.00LL +1.20TA-0.60EQX -2.00EQZ 129
LOAD 2512 1.2DL+1.20EO+1.00LL -1.20TA+0.60EQX +2.00EQZ 130
LOAD 2513 1.2DL+1.20EO+1.00LL -1.20TA-0.60EQX +2.00EQZ 131
LOAD 2514 1.2DL+1.20EO+1.00LL -1.20TA+0.60EQX -2.00EQZ 132
LOAD 2515 1.2DL+1.20EO+1.00LL -1.20TA-0.60EQX -2.00EQZ 133
LOAD 2516 0.9DL+0.90EO+1.00TA+2.00EQX +0.60EQZ 134
LOAD 2517 0.9DL+0.90EO+1.00TA+2.00EQX -0.60EQZ 135
LOAD 2518 0.9DL+0.90EO+1.00TA-2.00EQX +0.60EQZ 136
LOAD 2519 0.9DL+0.90EO+1.00TA-2.00EQX -0.60EQZ 137
LOAD 2520 0.9DL+0.90EO-1.00TA+2.00EQX +0.60EQZ 138
LOAD 2521 0.9DL+0.90EO-1.00TA+2.00EQX -0.60EQZ 139
LOAD 2522 0.9DL+0.90EO-1.00TA-2.00EQX +0.60EQZ 140 N.A
LOAD 2523 0.9DL+0.90EO-1.00TA-2.00EQX -0.60EQZ 141
LOAD 2524 0.9DL+0.90EO+1.00TA+0.60EQX +2.00EQZ 142
LOAD 2525 0.9DL+0.90EO+1.00TA-0.60EQX +2.00EQZ 143
LOAD 2526 0.9DL+0.90EO+1.00TA+0.60EQX -2.00EQZ 144
LOAD 2527 0.9DL+0.90EO+1.00TA-0.60EQX -2.00EQZ 145
LOAD 2528 0.9DL+0.90EO-1.00TA+0.60EQX +2.00EQZ 146
LOAD 2529 0.9DL+0.90EO-1.00TA-0.60EQX +2.00EQZ 147
LOAD 2530 0.9DL+0.90EO-1.00TA+0.60EQX -2.00EQZ 148
LOAD 2531 0.9DL+0.90EO-1.00TA-0.60EQX -2.00EQZ 149
client contract.
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

3.8.6 Operation – Seismic provisions ACI 318-14 for Concrete Columns

LOAD 2550 1.2DL+1.20EO+1.00LL +1.20TA+3.00EQX +0.90EQZ 150


LOAD 2551 1.2DL+1.20EO+1.00LL +1.20TA+3.00EQX -0.90EQZ 151
LOAD 2552 1.2DL+1.20EO+1.00LL +1.20TA-3.00EQX +0.90EQZ 152
LOAD 2553 1.2DL+1.20EO+1.00LL +1.20TA-3.00EQX -0.90EQZ 153
LOAD 2554 1.2DL+1.20EO+1.00LL -1.20TA+3.00EQX +0.90EQZ 154
LOAD 2555 1.2DL+1.20EO+1.00LL -1.20TA+3.00EQX -0.90EQZ 155
LOAD 2556 1.2DL+1.20EO+1.00LL -1.20TA-3.00EQX +0.90EQZ 156
LOAD 2557 1.2DL+1.20EO+1.00LL -1.20TA-3.00EQX -0.90EQZ 157
LOAD 2558 1.2DL+1.20EO+1.00LL +1.20TA+0.90EQX +3.00EQZ 158
LOAD 2559 1.2DL+1.20EO+1.00LL +1.20TA-0.90EQX +3.00EQZ 159
LOAD 2560 1.2DL+1.20EO+1.00LL +1.20TA+0.90EQX -3.00EQZ 160
LOAD 2561 1.2DL+1.20EO+1.00LL +1.20TA-0.90EQX -3.00EQZ 161
LOAD 2562 1.2DL+1.20EO+1.00LL -1.20TA+0.90EQX +3.00EQZ 162
LOAD 2563 1.2DL+1.20EO+1.00LL -1.20TA-0.90EQX +3.00EQZ 163
LOAD 2564 1.2DL+1.20EO+1.00LL -1.20TA+0.90EQX -3.00EQZ 164
LOAD 2565 1.2DL+1.20EO+1.00LL -1.20TA-0.90EQX -3.00EQZ 165
N.A
LOAD 2566 0.9DL+0.90EO+1.00TA+3.00EQX +0.90EQZ 166
LOAD 2567 0.9DL+0.90EO+1.00TA+3.00EQX -0.90EQZ 167
LOAD 2568 0.9DL+0.90EO+1.00TA-3.00EQX +0.90EQZ 168
LOAD 2569 0.9DL+0.90EO+1.00TA-3.00EQX -0.90EQZ 169
LOAD 2570 0.9DL+0.90EO-1.00TA+3.00EQX +0.90EQZ 170
LOAD 2571 0.9DL+0.90EO-1.00TA+3.00EQX -0.90EQZ 171
LOAD 2572 0.9DL+0.90EO-1.00TA-3.00EQX +0.90EQZ 172
LOAD 2573 0.9DL+0.90EO-1.00TA-3.00EQX -0.90EQZ 173
LOAD 2574 0.9DL+0.90EO+1.00TA+0.90EQX +3.00EQZ 174
LOAD 2575 0.9DL+0.90EO+1.00TA-0.90EQX +3.00EQZ 175
LOAD 2576 0.9DL+0.90EO+1.00TA+0.90EQX -3.00EQZ 176
LOAD 2577 0.9DL+0.90EO+1.00TA-0.90EQX -3.00EQZ 177
LOAD 2578 0.9DL+0.90EO-1.00TA+0.90EQX +3.00EQZ 178
LOAD 2579 0.9DL+0.90EO-1.00TA-0.90EQX +3.00EQZ 179
LOAD 2580 0.9DL+0.90EO-1.00TA+0.90EQX -3.00EQZ 180
LOAD 2581 0.9DL+0.90EO-1.00TA-0.90EQX -3.00EQZ 181

3.8.7 Local Steel Beam Checks


LOAD 2400 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA+2.00TF+1.20CT+1.20CO_local 182
LOAD 2401 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA+2.00TF-1.20CT+1.20CO_local 183
N.A
LOAD 2402 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA-2.00TF+1.20CT+1.20CO_local 184
LOAD 2403 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA-2.00TF-1.20CT+1.20CO_local 185

3.8.8 Local Concrete Beam Checks

LOAD 2404 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA+1.00TF+1.20CT+1.20CO_local 186


LOAD 2405 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA+1.00TF-1.20CT+1.20CO_local 187
N.A
LOAD 2406 1.2DL+1.20EO+1.60LL +0.50LR +1.20TA-1.00TF+1.20CT+1.20CO_local 188
LOAD 2407 1.2DL+1.20EO+1.60LL +0.50LR -1.20TA-1.00TF-1.20CT+1.20CO_local 189

ALLOWABLE STRESS METHOD

3.8.9 Erection
190 1
LOAD 1000 1.0DL+1.0EE+1.00ER 191 2
LOAD 1001 1.0DL+1.0EE+1.00LL +1.00ER 192 3
applicable client contract.

LOAD 1002 1.0DL+1.0EE+1.00LR +1.00ER 193 4


LOAD 1003 1.0DL+1.0EE+0.75LL +0.75LR +1.00ER 194 5
LOAD 1004 1.0DL+1.0EE+0.30WLX+1.00ER 195 6
LOAD 1005 1.0DL+1.0EE-0.30WLXN+1.00ER 196 7
LOAD 1006 1.0DL+1.0EE+0.30WLZ+1.00ER 197 8
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

LOAD 1007 1.0DL+1.0EE-0.30WLZN+1.00ER 198 9


LOAD 1008 0.9DL+0.9EE+0.60WLX+0.90ER 199 10
LOAD 1009 0.9DL+0.9EE-0.60WLXN+0.90ER 200 11
LOAD 1010 0.9DL+0.9EE+0.60WLZ+0.90ER 201 12
LOAD 1011 0.9DL+0.9EE-0.60WLZN+0.90ER 202 13
LOAD 1012 1.0DL+1.0EE+0.70EEQX +0.21EEQZ +1.00ER 203 14
LOAD 1013 1.0DL+1.0EE+0.70EEQX -0.21EEQZ +1.00ER 204 15
LOAD 1014 1.0DL+1.0EE-0.70EEQX +0.21EEQZ +1.00ER 205 16
LOAD 1015 1.0DL+1.0EE-0.70EEQX -0.21EEQZ +1.00ER 206 17
LOAD 1016 1.0DL+1.0EE+0.21EEQX +0.70EEQZ +1.00ER 207 18
LOAD 1017 1.0DL+1.0EE-0.21EEQX +0.70EEQZ +1.00ER 208 19
LOAD 1018 1.0DL+1.0EE+0.21EEQX -0.70EEQZ +1.00ER 209 20
LOAD 1019 1.0DL+1.0EE-0.21EEQX -0.70EEQZ +1.00ER 210 21
LOAD 1020 0.9DL+0.9EE+0.70EEQX +0.21EEQZ +0.90ER 211 22
LOAD 1021 0.9DL+0.9EE+0.70EEQX -0.21EEQZ +0.90ER 212 23
LOAD 1022 0.9DL+0.9EE-0.70EEQX +0.21EEQZ +0.90ER 213 24
LOAD 1023 0.9DL+0.9EE-0.70EEQX -0.21EEQZ +0.90ER 214 25
LOAD 1024 0.9DL+0.9EE+0.21EEQX +0.70EEQZ +0.90ER 215 26
LOAD 1025 0.9DL+0.9EE-0.21EEQX +0.70EEQZ +0.90ER 216 27
LOAD 1026 0.9DL+0.9EE+0.21EEQX -0.70EEQZ +0.90ER 217 28
LOAD 1027 0.9DL+0.9EE-0.21EEQX -0.70EEQZ +0.90ER

3.8.10 Operation

LOAD 1100 1.0DL+1.00EO 218 29


LOAD 1101 1.0DL+1.00EO+1.00TA+1.00TL 219 30
LOAD 1102 1.0DL+1.00EO+1.00TA-1.00TL 220 31
LOAD 1103 1.0DL+1.00EO-1.00TA+1.00TL 221 32

LOAD 1104 1.0DL+1.00EO-1.00TA-1.00TL 222 33


LOAD 1105 1.0DL+1.00EO+1.00LL +1.00TA+1.00TL+1.00CR 223 34
LOAD 1106 1.0DL+1.00EO+1.00LL +1.00TA-1.00TL+1.00CR 224 35
LOAD 1107 1.0DL+1.00EO+1.00LL -1.00TA+1.00TL+1.00CR 225 36
LOAD 1108 1.0DL+1.00EO+1.00LL -1.00TA-1.00TL+1.00CR 226 37
LOAD 1109 1.0DL+1.00EO+1.00LR 227 38
LOAD 1110 1.0DL+1.00EO+0.75LL +0.75LR +1.00TA+0.75TL+0.75CR 228 39
LOAD 1111 1.0DL+1.00EO+0.75LL +0.75LR +1.00TA-0.75TL+0.75CR 229 40
LOAD 1112 1.0DL+1.00EO+0.75LL +0.75LR -1.00TA+0.75TL+0.75CR 230 41
LOAD 1113 1.0DL+1.00EO+0.75LL +0.75LR -1.00TA-0.75TL+0.75CR 231 42
LOAD 1114 1.0DL+1.00EO+1.00TA+0.60WLX 232 43
LOAD 1115 1.0DL+1.00EO+1.00TA-0.60WLXN 233 44
LOAD 1116 1.0DL+1.00EO+1.00TA+0.60WLZ 234 45
LOAD 1117 1.0DL+1.00EO+1.00TA-0.60WLZN 235 46
LOAD 1118 1.0DL+1.00EO-1.00TA+0.60WLX 236 47
LOAD 1119 1.0DL+1.00EO-1.00TA-0.60WLXN 237 48
LOAD 1120 1.0DL+1.00EO-1.00TA+0.60WLZ 238 49
LOAD 1121 1.0DL+1.00EO-1.00TA-0.60WLZN 239 50
LOAD 1122 1.0DL+1.00EO+0.75LL +0.75LR +1.00TA+0.45WLX 240 51
LOAD 1123 1.0DL+1.00EO+0.75LL +0.75LR +1.00TA-0.45WLXN 241 52
LOAD 1124 1.0DL+1.00EO+0.75LL +0.75LR +1.00TA+0.45WLZ 242 53
LOAD 1125 1.0DL+1.00EO+0.75LL +0.75LR +1.00TA-0.45WLZN 243 54
LOAD 1126 1.0DL+1.00EO+0.75LL +0.75LR -1.00TA+0.45WLX 244 55
LOAD 1127 1.0DL+1.00EO+0.75LL +0.75LR -1.00TA-0.45WLXN 245 56
LOAD 1128 1.0DL+1.00EO+0.75LL +0.75LR -1.00TA+0.45WLZ 246 57
LOAD 1129 1.0DL+1.00EO+0.75LL +0.75LR -1.00TA-0.45WLZN 247 58
applicable client contract.

LOAD 1130 0.9DL+0.90EO+1.00TA+0.60WLX 248 59


LOAD 1131 0.9DL+0.90EO+1.00TA-0.60WLXN 249 60
LOAD 1132 0.9DL+0.90EO+1.00TA+0.60WLZ 250 61
LOAD 1133 0.9DL+0.90EO+1.00TA-0.60WLZN 251 62
LOAD 1134 0.9DL+0.90EO-1.00TA+0.60WLX 252 63
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

LOAD 1135 0.9DL+0.90EO-1.00TA-0.60WLXN 253 64


LOAD 1136 0.9DL+0.90EO-1.00TA+0.60WLZ 254 65
LOAD 1137 0.9DL+0.90EO-1.00TA-0.60WLZN 255 66
LOAD 1138 1.0DL+1.00EO+1.00TA+0.70EQX +0.21EQZ 256 67
LOAD 1139 1.0DL+1.00EO+1.00TA+0.70EQX -0.21EQZ 257 68
LOAD 1140 1.0DL+1.00EO+1.00TA-0.70EQX +0.21EQZ 258 69
LOAD 1141 1.0DL+1.00EO+1.00TA-0.70EQX -0.21EQZ 259 70
LOAD 1142 1.0DL+1.00EO+1.00TA+0.21EQX +0.70EQZ 260 71
LOAD 1143 1.0DL+1.00EO+1.00TA-0.21EQX +0.70EQZ 261 72
LOAD 1144 1.0DL+1.00EO+1.00TA+0.21EQX -0.70EQZ 262 73
LOAD 1145 1.0DL+1.00EO+1.00TA-0.21EQX -0.70EQZ 263 74
LOAD 1146 1.0DL+1.00EO-1.00TA+0.70EQX +0.21EQZ 264 75
LOAD 1147 1.0DL+1.00EO-1.00TA+0.70EQX -0.21EQZ 265 76
LOAD 1148 1.0DL+1.00EO-1.00TA-0.70EQX +0.21EQZ 266 77
LOAD 1149 1.0DL+1.00EO-1.00TA-0.70EQX -0.21EQZ 267 78
LOAD 1150 1.0DL+1.00EO-1.00TA+0.21EQX +0.70EQZ 268 79
LOAD 1151 1.0DL+1.00EO-1.00TA-0.21EQX +0.70EQZ 269 80
LOAD 1152 1.0DL+1.00EO-1.00TA+0.21EQX -0.70EQZ 270 81
LOAD 1153 1.0DL+1.00EO-1.00TA-0.21EQX -0.70EQZ 271 82
LOAD 1154 1.0DL+1.00EO+0.75LL +1.00TA+0.53EQX +0.16EQZ 272 83
LOAD 1155 1.0DL+1.00EO+0.75LL +1.00TA+0.53EQX -0.16EQZ 273 84
LOAD 1156 1.0DL+1.00EO+0.75LL +1.00TA-0.53EQX +0.16EQZ 274 85
LOAD 1157 1.0DL+1.00EO+0.75LL +1.00TA-0.53EQX -0.16EQZ 275 86
LOAD 1158 1.0DL+1.00EO+0.75LL +1.00TA+0.16EQX +0.53EQZ 276 87
LOAD 1159 1.0DL+1.00EO+0.75LL +1.00TA-0.16EQX +0.53EQZ 277 88
LOAD 1160 1.0DL+1.00EO+0.75LL +1.00TA+0.16EQX -0.53EQZ 278 89
LOAD 1161 1.0DL+1.00EO+0.75LL +1.00TA-0.16EQX -0.53EQZ 279 90
LOAD 1162 1.0DL+1.00EO+0.75LL -1.00TA+0.53EQX +0.16EQZ 280 91
LOAD 1163 1.0DL+1.00EO+0.75LL -1.00TA+0.53EQX -0.16EQZ 281 92
LOAD 1164 1.0DL+1.00EO+0.75LL -1.00TA-0.53EQX +0.16EQZ 282 93
LOAD 1165 1.0DL+1.00EO+0.75LL -1.00TA-0.53EQX -0.16EQZ 283 94
LOAD 1166 1.0DL+1.00EO+0.75LL -1.00TA+0.16EQX +0.53EQZ 284 95
LOAD 1167 1.0DL+1.00EO+0.75LL -1.00TA-0.16EQX +0.53EQZ 285 96
LOAD 1168 1.0DL+1.00EO+0.75LL -1.00TA+0.16EQX -0.53EQZ 286 97
LOAD 1169 1.0DL+1.00EO+0.75LL -1.00TA-0.16EQX -0.53EQZ 287 98
LOAD 1170 0.9DL+0.90EO+1.00TA+0.70EQX +0.21EQZ 288 99
LOAD 1171 0.9DL+0.90EO+1.00TA+0.70EQX -0.21EQZ 289 100
LOAD 1172 0.9DL+0.90EO+1.00TA-0.70EQX +0.21EQZ 290 101
LOAD 1173 0.9DL+0.90EO+1.00TA-0.70EQX -0.21EQZ 291 102
LOAD 1174 0.9DL+0.90EO+1.00TA+0.21EQX +0.70EQZ 292 103
LOAD 1175 0.9DL+0.90EO+1.00TA-0.21EQX +0.70EQZ 293 104
LOAD 1176 0.9DL+0.90EO+1.00TA+0.21EQX -0.70EQZ 294 105
LOAD 1177 0.9DL+0.90EO+1.00TA-0.21EQX -0.70EQZ 295 106
LOAD 1178 0.9DL+0.90EO-1.00TA+0.70EQX +0.21EQZ 296 107
LOAD 1179 0.9DL+0.90EO-1.00TA+0.70EQX -0.21EQZ 297 108
LOAD 1180 0.9DL+0.90EO-1.00TA-0.70EQX +0.21EQZ 298 109
LOAD 1181 0.9DL+0.90EO-1.00TA-0.70EQX -0.21EQZ 299 110
LOAD 1182 0.9DL+0.90EO-1.00TA+0.21EQX +0.70EQZ 300 111
LOAD 1183 0.9DL+0.90EO-1.00TA-0.21EQX +0.70EQZ 301 112
LOAD 1184 0.9DL+0.90EO-1.00TA+0.21EQX -0.70EQZ 302 113
LOAD 1185 0.9DL+0.90EO-1.00TA-0.21EQX -0.70EQZ 303 114

3.8.11 Test

LOAD 1200 1.0DL+1.0ET 304 115


applicable client contract.

LOAD 1201 1.0DL+1.0ET+1.00LL +1.00CR 305 116


LOAD 1202 1.0DL+1.0ET+1.00LR 306 117
LOAD 1203 1.0DL+1.0ET+0.75LL +0.75LR 307 118
LOAD 1204 1.0DL+1.0ET+0.30WLX 308 119
LOAD 1205 1.0DL+1.0ET-0.30WLXN 309 120
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

LOAD 1206 1.0DL+1.0ET+0.30WLZ 310 121


LOAD 1207 1.0DL+1.0ET-0.30WLZN 311 122
LOAD 1208 1.0DL+1.0ET+0.75LL +0.75LR +0.23WLX+0.75CR 312 123
LOAD 1209 1.0DL+1.0ET+0.75LL +0.75LR -0.23WLXN+0.75CR 313 124
LOAD 1210 1.0DL+1.0ET+0.75LL +0.75LR +0.23WLZ+0.75CR 314 125
LOAD 1211 1.0DL+1.0ET+0.75LL +0.75LR -0.23WLZN+0.75CR 315 126
LOAD 1212 0.9DL+0.9ET+0.30WLX 316 127
LOAD 1213 0.9DL+0.9ET-0.30WLXN 317 128
LOAD 1214 0.9DL+0.9ET+0.30WLZ 318 129
LOAD 1215 0.9DL+0.9ET-0.30WLZN 319 130

3.8.12 Maintenance

LOAD 1300 1.0DL+1.0EE+0.75LL +1.00CR+1.00ML 320 131


LOAD 1301 1.0DL+1.0EE+1.00LL +0.75CR+0.75ML 321 132

3.8.13 Local Beam Checks


LOAD 1400 1.0DL+1.00EO+1.00LL +1.00TA+1.00CT+1.00CO_local +1.00TL 322
LOAD 1401 1.0DL+1.00EO+1.00LL -1.00TA-1.00CT+1.00CO_local +1.00TL 323
N.A
LOAD 1402 1.0DL+1.00EO+1.00LL +1.00TA+1.00CT+1.00CO_local -1.00TL 324
LOAD 1403 1.0DL+1.00EO+1.00LL -1.00TA-1.00CT+1.00CO_local -1.00TL 325
N.A-NOT APPLICABLE

3.8.14 Foundation Settlement Check


ASD_STL_ 1DL+1EO+0.5LL 133

3.8.15 Crack width check


LOAD 1500 1.0DL+1.00EO+0.50LL +1.00TA 118
LOAD 1501 1.0DL+1.00EO+0.50LL -1.00TA 119

LOAD COMBINATIONS ENVELOPES


The envelopes of load combinations to be used for structural/displacement/deflection check are
defined in STAAD.Pro as follow:
applicable client contract.
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the

4 DISPLACEMENT CHECKS

4.1 Vertical Deflection check

Not Applicable

4.2 Lateral Displacement check

Not Applicable
Since the structure above plinth level is steel structure this part will be considered in steel calculation note.

4.3 Second Order Drift to First order Drift Ratio

Not Applicable
Since the structure above plinth level is steel structure this part will be considered in steel calculation note.

5 FOUNDATION AND PEDESTAL DESIGN SUMMARY


5.1 Foundation Type-1 (5.9 X 3.0 X 0.65 m) Staad Node - 6, 4 and 5,3.
applicable client contract.
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the
applicable client contract.

5.2
3
LOCATION :

Foundation Type-1 (2.8X 2.8 X 0.6 m)


RUWAIS - U.A.E.

Staad Node - 2

STAAD NODES - 1 & 2


(ETHANE CRACKER)

Abu Dhabi Polymers Company Ltd. (Borouge)


Contract No. 4700000897
B4 PROJECT – EPC PACKAGE 2
PROCESS STRUCTURE 141C-STR-200, BLOCK C

Updated
CONCRETE CALCULATION NOTE FOR FOUNDATION OF

Sheet

UPDATE REINF
141-CC-403-02008
Company Identification Code
Contractor Identification Code

Rev.
083118C-C00-CN-1732-02008

Updated
Q
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information
is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the
applicable client contract.

3
LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER)

Abu Dhabi Polymers Company Ltd. (Borouge)


Contract No. 4700000897
B4 PROJECT – EPC PACKAGE 2
PROCESS STRUCTURE 141C-STR-200, BLOCK C
CONCRETE CALCULATION NOTE FOR FOUNDATION OF

Sheet

141-CC-403-02008
Company Identification Code
Contractor Identification Code

Rev.
083118C-C00-CN-1732-02008

Q
Contractor Identification Code
CONCRETE CALCULATION NOTE FOR FOUNDATION OF
PROCESS STRUCTURE 141C-STR-200, BLOCK C 083118C-C00-CN-1732-02008

B4 PROJECT – EPC PACKAGE 2


LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilities for any changes or modifications to this document which are made by any person other than the entity that issued the document under the applicable
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the applicable entity and/or its client. Use of this information is

5.3 Pedestal Design Summary

Pedestal Design Summary

(A) Geometry

Pedestal Width L = 0.70 m


Pedestal Depth B = 0.70 m
Pedestal Height h = 1.70 m Updated
(B) Critical Load Combination
Actual Allowable
Allowable Allowable Actual
Actual Axial Moment X- Moment Z- Capacity
Load Combination Axial Load Moment X- Moment Z-
Load (KN) axis (KN- axis (KN- Ratio
(KN) axis (KN-m) axis (KN-m)
m) m)
53 - 1.2 100 DL + 1.2 120 EO +
140 LL + 0.5 150 LR + 1.2 160 TA 708.6902 2763.6967 123.9652 483.0568 148.7399 578.969 3.8925
+ 210 WLX

(C)Reinforcement Provided:
Main Longitudinal Bars: Provide Dia 16 Bars- 16 Nos

Ties: : Provide Dia 10 - 2 No Ties at 200 mm C/C


Updated
CHECK PED CAPACITY
client contract.
CONCRETE CALCULATION NOTE FOR Contractor Identification Code

FOUNDATION OF PROCESS STRUCTURE 141C-


083118C-C00-CN-1732-02008
STR-200, BLOCK C
B4 PROJECT – EPC PACKAGE 2
LOCATION :
RUWAIS - U.A.E.
(ETHANE CRACKER) Sheet 25 of 25 Rev. Q
Contract No. 4700000897
Company Identification Code
Abu Dhabi Polymers Company Ltd. (Borouge)
141-CC-403-02008
applicableentity and/or its client. Use of this information is restricted in accordance with conditions specified by the contract No. 4700000897. Technip France Abu Dhabi and TARGET EC CO. and their respective affiliates disclaim any and all liabilitiesfor any changes or modifications to this
Information contained in this document is the work product of one or both legal entities forming the TETG CONSORTIUM (i.e. Technip France Abu Dhabi and TARGET ENGINEERING CONSTRUCTION Co.) and their affiliates; it embodies confidential and proprietary information of the

ATTACHMENTS
Concrete design of pedestal and footing has been carried out using MAT3D software and in house developed excel
sheet. Design of base plate and anchor bolt has been carried out using in house developed excels sheets.
Calculation of these are provided below. Check for enhanced shear for beams and columns is performed as per
requirements of ACI 318-14 par 18 with enhanced eq factor of 2 for beams and overstrength factor = 3 for columns
as per C.18.4.2 and CI. 18.4.3 of ACI respectively.
Updated
ATTACH IN PDF & NOT IN EXCEL.
SEE OTHER CN
A ANCHOR BOLT, BASE PLATE AND SHEAR KEY DESIGN

A.1 Design of Base Plate, Anchor Bolt and shear key for Top Mounted Steel Structure

ATTACH PDF
BP1
Base Plate_Anchor Base Plate_Anchor
Bolt and Shear Key Bolt and Shear Key
BP2 Design_P1.xlsx Design-_P2.xlsx

B DESIGN OF FOUNDATION

B.1 Footing and Pedestal design

MAT3D REPORTS 141C-STR-200 141C-STR-200 141C-STR-200


LINEAR LINEAR REDUCED
ALLOWABLE.xlsx ULTIMATE.xlsx AREA.xlsx

C STAAD File
8340B570.STD
document which are made by any person other than the entity that issued the document under the applicable client contract.

ATTACH WORD FILE BY


PIPING
D PIPING LOADS

82312EBE.pdf
D.1 Piping Load

E EQUIPMENT DATA - MDS


FA7C3FB7.pdf 640D39DD.pdf
E.1 Water Stripper Reboiler

E.2 Water Stripper Reboiler Condensate Drum