Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
105 views
13 pages
Project Execution Plan - 0001
Uploaded by
Shady medhat
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save Project Execution Plan_0001 For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
105 views
13 pages
Project Execution Plan - 0001
Uploaded by
Shady medhat
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save Project Execution Plan_0001 For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save Project Execution Plan_0001 For Later
You are on page 1
/ 13
Search
Fullscreen
PROJECT EXECUTION PLAN APPROVAL SHEET Vamodh Alan geri PROJECT MANAGER 2/6/2023 DATE APPROVE: —_ a Date__| Rev. Description 05/03/2023| 1 [Project Execution Plan TABLE OF CONTENTS:1, PROJECT SUMMARY. 1.1. PROJECT PURPOSE. 1.2 PROJECT SCOPE: 1.3. PROJECT PROGRESS STATUS. 2. RISK MANAGEMENT. 3. CONTRACTING PLAN, 3.1 GENERAL... ae 3.2 PROCUREMENT ACTIVITIES. 33. _AS-BUILT DRAWINGS.. 34 PROJECT COMPLETION... 4, PROJECT COST AND FUNDING........ 41 ESTIMATED COST...... 5, PROJECT ORGANIZATION, LOGISTICS AND INTERFACI 6. BEST PRACTICES IMPLEMENTATION. ew 7. PROJECT SCHEDULE. 8. ATTACHMENTS... ATTACHMENT 1 - TECHNOLOGY BRIEF.. ATTACHMENT 2 ~ RAPID MATRIX... Boowwannnnnrsvvwuyto 4. PROJECT SUMMARY 1.1 PROJECT PURPOSE The objective of the deployment of vessel profilers is to resolve the corporate technical challenges, improve operations efficiency and maximize profitability of Saudi Aramco operations by deploying high impact innovative technologies. This Project Execution Plan (PEP) describes the execution for the "Transport, Install & Commission of Vessel Profilers for Qatif GOSP 1" under BI-10- 77797. 4.2 PROJECT SCOPE: The Project scope is to Transport Install & Commission of Vessel Profilers for Qatif GOSP 1 ‘The items mentioned in the Material Take Off lst will be available with Aramco Items not available in the Material Take Off list will be procured by TEC The supply installation testing and commissioning of DCS modifications will be coordinated by TEC with the DCS vendor. The supply of Density profiler source holder, sources, drywell etc. will be through the subcontract between VEGA and Aramco. TEC will take care of radioactive source transportation, receive the material at Airport, transport the material and store it at temporary site storage facility prepared by TEC. Installation, testing and commissioning of density profilers will be under the supervision/assistance of VEGA personnel. 1.3 PROJECT PROGRESS STATUS The contract for BI-10-77797 Transport Install & Commission of Vessel Profilers for Qatif GOSP 1 was signed on 19th January 2023 Kick off meeting was attended on 13% February 2023 2, RISK MANAGEMENT PURPOSE: The goals of risk management are, in order of priority, to protect the lives and health of TEC employees, and protect and minimize damage to company property in the event of an emergencyRESPONSABILITY Facility Management Evaluate the number and types of hazards expected based on past experience and general knowledge to plan and develop Emergency Response Plan specifics; Provide training to all employees for their roles in all emergency plans; Conduct drills to practice response to emergency situations; = Conduct an annual drill to practice confined-space rescue; All other activities necessary to the development and implementation of an effective Emergency RESPONSE PLAN + Make emergency response team assignments. Maintenance Manager + Maintain sufficient inventory of emergency response equipment; + Ensure maintenance and inspection of emergency response equipment; + Help train emergency response team members « Assist in the training of emergency response teams; + Assume active positions on the response teams + Safety manager Provides assistance in developing and carrying out emergency response plans. The company will provide copies of all emergency response plans to be kept in employee handbooks and operation manuals, and will post copies on employee bulletin boards. The company also will designate and train a sufficient number of employees to assist in the safe and orderly evacuation of employees and visitors. These employees will be trained and re-trained as needed. Training will cover: + Emergency reporting; + Evacuation routes; + Alarm systems; + Specific assigned duties. Periodic drills will be held to ensure that all employees know the appropriate action to take in case of an emergency. The company will provide additional training and frequent drills for employees with specific emergency-response duties; and invite local emergency service units to participate in training whenever possible ‘CONTRACTING PLAN 3.1. GENERAL This Technical Proposal is to descript Technology Experts Company services to receive, transfer, install, test and commission the vessel profilers on Qatif GOSP-1 dehydrators (D-106/D-107) in addition to provide a radioactive portable storage for the profiler. The objective of the deployment of vessel profilers is to resolve the corporate technical challenges, improveoperations efficiency and maximize profitability of Saudi Aramco operations by deploying high impact innovative technologies 3.2 PROCUREMENT ACTIVITIES * TECwill receive the Radiation sources, Source holder, Drywell, from VEGA and facilitate the transportation to site © The Instrument field cables from the Signal JB in field to DCS marshalling cabinet, tools and other material not available in the Material Take Off list will be procured © Allitems in the Material takeoff list will be available with ARAMCO © TEC will coordinate with DCS vendor to supply the DCS hardware, FTA assemblies and FTA cables. 3.3. AS-BUILT DRAWINGS TEC will maintain a record of all changes, modifications, and deviations from the design drawings during construction. Prepare three (3) complete sets of as built drawings upon completion of construction blue prints, and submit them to the ‘Saudi Aramco Representative for necessary action to incorporate the changes in the original drawings. These drawings shall be signed and concurred by the ‘SAUDI ARAMCO Representative. 3.4 PROJECT COMPLETION Project shall be complete upon financially close-out of Expenditure Releases created for 'BI-10-77797 Transport Install & Commission of Vessel Profilers for Qatif GOSP 1’ as detailed in GI-2.710. PROJECT COST AND FUNDING 4.1 ESTIMATED COST The estimated cost for this project is SAR 3,979,000 including taxes.5. PROJECT ORGANIZATION, LOGISTICS AND INTERFACE ‘The project responsibilities are outlined in the RAPID Matrix in Attachment 2. a Bae Grate oe AR hess srs etc ce Project Role Hierarchy Project Role hierarchy explains the various levels of management and the reporting person to which the job roles handled are to reviewed. like There is the Project department handling the site activi * Site storage preparation ‘* Installation , Testing & Commissioning * Transportation and storage of Radioactive material © Givil works * DCS Configuration* Site documentations like Work permits, BOQ, As built drawings, O&M Manual, ERP, safety plan, Work progress report etc. ‘There is Commerce department handling the commercial activities like © Quotation & Purchase Orders = Customs clearance © Procurement , material delivery to site and documentation * Material BOQ review 6. BEST PRACTICES IMPLEMENTATION The project will implement all the Value Improvement Practices requirements of SAES-A-202 ‘SAES-J-902 'SAES-P-100, ‘SAES-J-003 ‘SAES-P-104 ‘SAES-J-005 SAES- -P-111 SAES-L109) 18- SAMSS-625 34-SAMSS-821 '34-SAMSS-€20 34-SAMSS-830 34-SAMSS-913, ‘SAEP-122 SAEP-334 ‘SAEP-370 G1-0006.012 ___G1-2.0100 1150.03 NEPA 70 7. PROJECT SCHEDULE The Milestone schedule for deployment of "Transport Install & Commission of Vessel Profilers for Qatif GOSP 1" is: BI-10-77797 Project Approval 04/2023 Finalized source Importation procedures 09/2023 Obtain Permits 07/2023 Temporary storage 07/2023 Site Preparation 12/2023 Installation 01/2024 Manufacturer attendance- VEGA 01/2024 DCS configuration & commissioning 01/2024 Testing 01/20248. ATTACHMENTS Attachment 1 ~ Technology Brief Attachment 2 - RAPID MatrixInstall & Comm ATTACHMENT 1 — TECHNOLOGY BRIEF Interface with Emul: in Layer ‘Tag # / Distance from Centerline (C/L) Fig 1.0 Multi-point Density Array Technology based on using radioactive sources and detectors in defining interfaces among multilayer of phases like crude oil is well known. There are different types of density profilers in the market that used this technology. The technology is based on radiation passing through certain media is attenuated in amount proportional on the density of this media, The radiation measured beyond the media can give indication on its density. With using multi sources and multi array of sensors along oil mixture, phase's boundaries can be determined. Vega produces Multi-Point Density Array (MDA) system provides data for real time process monitoring. The system is based on using cesium 137 mono energetic gamma radiation at 662 KeV and scintillation detectors. It has low maintenance because all detectors mount on the outside of the vessel and have no direct contact with the process. High-energy sources and a longer process path minimize the effects of buildup on source wells and vessel walls A continuous density output is provided from each detector’s measurement location, giving the operator information on the true density of the fluid at that horizontal location. As these outputs change on multiple detectors, the movement of the interface or the size of the emulsion layer can be determined, Fig 1.0 explains the Multi-Point Density Array (MDA) from Vega, where the sources are located inside tube that is inserted in separator vessel and detectors are located outside. The signals are received and presented as graphs on DCS graphics.Terra ution plan) Internal vessel dry well, is curved and mounts the source holder and contains small sources. May use existing vessel nozzles for insertion. Manufactured from various materials for process compatibility. Non-destructively and hydro-statically tested. Each dry well custom engineered for each application. All radioactive sources (Cs137) are located in dry well pipes, which can be in different, size and shape based on the vessels. Figure 2.0 curvature dry well shape 102. SHUM source hold ‘4. Dry well ‘Optional Equipment he process conditions 1 Visualzation deplay: provides the detector outputs to indicate 2 Xray interferonce detection sytern Fig 3.0 Components of MDA 3. Fanible detector ‘mounting bracket system 1. Minitrac 31 radiation-baced [density detectors Figure 3.0 show the components of MDA - Multi-point Density Array from Vega, Part no 3 show the detectors Mounting Bracket System. The main component of detecting system is MiniTrac 31 detectors as shown in figure as part no 1Electrical and Communication ‘qoisamTe103 @ [DCS Marshaling Cabinet | Q01-xDCS-101 F103 8 PB-2 a Control Room All detectors and Vega scan junction box will be powered by 24 VDC fromm Power distribution PJB's. All po: TBs will be fused type and negative TBs will have isolation knife switch. In this system all detectors from the field will be connected to DCS signal JB's through shielded 2 Pair 16AWG instrumentation cables. The DCS signal JB's are connected to DCS marshalling cabinet through OA Shielded 20 pair 18AWG instrumentation cable. The signals are further connected to DCS system cabinet controllers through FTA cables by DCS vendor. Existing graphics will be modified and new graphics will be generated accordingly by DCS vendor. "sh SEEN T Toca SaIBOIIHOM| TERRE S| Ted onadsar uaBSU| ‘Sau T wOTeIPR TREN We O| Some ANG sy| suonesedo [GOD WOREINBNIIOD SG] i g amore RETR) F WRISEIEG ® OOS - VOday TeTaTeA| i carson & SER DTTRTOT z eile le olf F | 2 i lolol Peelelielelzieleiild : Pl2lelelZlFl/2lelelzela lz aoa g e/2|F lai slelgeleiele taal eyeyeey ye yeqaye g g a XRLLVAI did Va ~ 2 LNSINHOVLLY zit 1 LOLLL:
You might also like
LLI Draft Report For Jafurah
PDF
No ratings yet
LLI Draft Report For Jafurah
31 pages
D12 - Workpack Challenge Rev.1
PDF
100% (5)
D12 - Workpack Challenge Rev.1
179 pages
Project Controls in A Capital Project Environment
PDF
100% (1)
Project Controls in A Capital Project Environment
30 pages
Standards Codes & Shell DEPs
PDF
67% (3)
Standards Codes & Shell DEPs
13 pages
MSA Deck and Bridge Familiarization
PDF
100% (1)
MSA Deck and Bridge Familiarization
282 pages
Epc-Project-Executionpdf - The Execution of A Complex Project Guided Tour
PDF
100% (2)
Epc-Project-Executionpdf - The Execution of A Complex Project Guided Tour
206 pages
Project Execution Plan Example
PDF
No ratings yet
Project Execution Plan Example
54 pages
2271 Aaa JSM 301 - B PDF
PDF
No ratings yet
2271 Aaa JSM 301 - B PDF
65 pages
Project Control Reporting On Lump Sum Project
PDF
No ratings yet
Project Control Reporting On Lump Sum Project
6 pages
PMT 10302
PDF
No ratings yet
PMT 10302
21 pages
DPR-HUBCO WSCW - Vajihar Pipeline Project (09-Aug-2021)
PDF
No ratings yet
DPR-HUBCO WSCW - Vajihar Pipeline Project (09-Aug-2021)
26 pages
Project Charter: Project Name: Project Number: Start Date: Revision Number
PDF
No ratings yet
Project Charter: Project Name: Project Number: Start Date: Revision Number
2 pages
DOE G 413.3-24 Planning and Scheduling
PDF
No ratings yet
DOE G 413.3-24 Planning and Scheduling
70 pages
Saep 12 PDF
PDF
No ratings yet
Saep 12 PDF
42 pages
Appendix D13 Contents of Project Close-Out Report
PDF
No ratings yet
Appendix D13 Contents of Project Close-Out Report
11 pages
18EngineeringProcurementConstruction BrandonParsons PDF
PDF
No ratings yet
18EngineeringProcurementConstruction BrandonParsons PDF
25 pages
The Bechtel Report - 2016 PDF
PDF
No ratings yet
The Bechtel Report - 2016 PDF
36 pages
Goldeneye Monthly Report - June
PDF
No ratings yet
Goldeneye Monthly Report - June
14 pages
LG - Technical Proposal - DTP 7500-320DV - 230922
PDF
No ratings yet
LG - Technical Proposal - DTP 7500-320DV - 230922
58 pages
Erns&Young Bim Measurement of Design Progress
PDF
No ratings yet
Erns&Young Bim Measurement of Design Progress
16 pages
1.3.1 Level 1 (Single Line) Barchart
PDF
No ratings yet
1.3.1 Level 1 (Single Line) Barchart
126 pages
AWP WFP презентация БРИКС
PDF
No ratings yet
AWP WFP презентация БРИКС
12 pages
Activity Productivity Rate
PDF
100% (1)
Activity Productivity Rate
21 pages
Qualif
PDF
No ratings yet
Qualif
72 pages
Planning Package Rev.B 210514
PDF
No ratings yet
Planning Package Rev.B 210514
377 pages
Saep 12
PDF
No ratings yet
Saep 12
35 pages
Front End Engineering Design or FEED (PDF) - What Is Piping - All About Piping Engineering
PDF
No ratings yet
Front End Engineering Design or FEED (PDF) - What Is Piping - All About Piping Engineering
11 pages
Latest Project Planning and Construction Schedule MGT in The Oil and Gas Sector
PDF
No ratings yet
Latest Project Planning and Construction Schedule MGT in The Oil and Gas Sector
81 pages
Book Review: Schedule For Sale: Workface Planning For Construction Projects by Geoff Ryan
PDF
No ratings yet
Book Review: Schedule For Sale: Workface Planning For Construction Projects by Geoff Ryan
10 pages
Project Control Procedure
PDF
No ratings yet
Project Control Procedure
12 pages
Lire KZHXQ PDF
PDF
No ratings yet
Lire KZHXQ PDF
1 page
Saih Rawl PS Level 3 Schedule
PDF
No ratings yet
Saih Rawl PS Level 3 Schedule
16 pages
Web Concepts Oct03 060104
PDF
No ratings yet
Web Concepts Oct03 060104
40 pages
Appendix 8 - Typical Project Execution Plan
PDF
No ratings yet
Appendix 8 - Typical Project Execution Plan
19 pages
Path of Construction Flow Diagram DRAFT
PDF
100% (2)
Path of Construction Flow Diagram DRAFT
2 pages
Ssg-Ng01012401-Gen-Ba-6066-00004 - C01 - Existing PQR S058
PDF
No ratings yet
Ssg-Ng01012401-Gen-Ba-6066-00004 - C01 - Existing PQR S058
15 pages
Estimate Kickoff Meeting KBR Management System - Offshore PM-GL-OFF-PC-201 Manage Project Controls Legend
PDF
No ratings yet
Estimate Kickoff Meeting KBR Management System - Offshore PM-GL-OFF-PC-201 Manage Project Controls Legend
4 pages
Engineering Procedure
PDF
No ratings yet
Engineering Procedure
34 pages
Plan Constructability Biddability Review - Major Projects
PDF
No ratings yet
Plan Constructability Biddability Review - Major Projects
19 pages
BI-10-01031 Basis of Schedule Rev.03
PDF
No ratings yet
BI-10-01031 Basis of Schedule Rev.03
13 pages
Cost Control Budget DOP3000-PRC-007!0!03
PDF
No ratings yet
Cost Control Budget DOP3000-PRC-007!0!03
6 pages
Level 3 - Project Schedule - Gambat South EWT Project
PDF
100% (1)
Level 3 - Project Schedule - Gambat South EWT Project
8 pages
STOD OTP PMT 0808 PM PRO 0001 Progress Measurement Procedure
PDF
No ratings yet
STOD OTP PMT 0808 PM PRO 0001 Progress Measurement Procedure
21 pages
2009-12 ProjExcPlan Mustang PDF
PDF
No ratings yet
2009-12 ProjExcPlan Mustang PDF
4 pages
Project Schedule Management: Outputs T & T Inputs Process
PDF
No ratings yet
Project Schedule Management: Outputs T & T Inputs Process
1 page
Long Intl Considerations For Successful Project Commissioning
PDF
No ratings yet
Long Intl Considerations For Successful Project Commissioning
15 pages
Advanced Work Packaging A Game Changer in Oil and Gas Project Management
PDF
No ratings yet
Advanced Work Packaging A Game Changer in Oil and Gas Project Management
22 pages
Fluor 2013 CW Case Study
PDF
No ratings yet
Fluor 2013 CW Case Study
6 pages
6272d1dc133297dd7395566a - Project Management Workflow HM Industrial EPC 2022
PDF
No ratings yet
6272d1dc133297dd7395566a - Project Management Workflow HM Industrial EPC 2022
1 page
Aramco Master Coding Library and Dictionaries (Activity Coding)
PDF
No ratings yet
Aramco Master Coding Library and Dictionaries (Activity Coding)
93 pages
Saep 14
PDF
No ratings yet
Saep 14
41 pages
Emexdis - PPT English - 01
PDF
No ratings yet
Emexdis - PPT English - 01
18 pages
Saep 360
PDF
No ratings yet
Saep 360
36 pages
NAME
PDF
No ratings yet
NAME
7 pages
A 4 Contractor List of Deliverables - (D10-Pmc-Drg-Epc)
PDF
No ratings yet
A 4 Contractor List of Deliverables - (D10-Pmc-Drg-Epc)
38 pages
Concept Selection Report 01.02.25
PDF
No ratings yet
Concept Selection Report 01.02.25
11 pages
Presentations From Member Companies of DSMA and NMM On Deep Sea Mining From Digital Seminar On March 16th 2022
PDF
No ratings yet
Presentations From Member Companies of DSMA and NMM On Deep Sea Mining From Digital Seminar On March 16th 2022
61 pages
DAR-SA-GESi-FDLI-152-01 - Project Risk Management (PRM) Report (Rev-B) - RPUOComments2
PDF
No ratings yet
DAR-SA-GESi-FDLI-152-01 - Project Risk Management (PRM) Report (Rev-B) - RPUOComments2
31 pages