IE8693 - Production Planning and Control (Ripped From Amazon Kindle Ebooks by Sai Seena)
IE8693 - Production Planning and Control (Ripped From Amazon Kindle Ebooks by Sai Seena)
IE8693 - Production Planning and Control (Ripped From Amazon Kindle Ebooks by Sai Seena)
Anna University
Semester - VIII (Mechanical Engineering) (Elective IV)
Subhash L. Gadhave
Ph.D (Pursuing), M.E. Mech. (Mechatronics),
Asst. Prof. in Mechanical Engg. Dept.
Zeal College of Engg. & Research, Pune.
® TM
ISBN 978-93-332-1367-7
TECHNICAL
PUBLICATIONS
An Up-Thrust for Knowledge 9 789333 213677
(i)
Production Planning & Control
Semester - VIII (Mechanical Engineering) (Elective IV)
All publishing rights (printed and ebook version) reserved with Technical Publications. No part of this book
should be reproduced in any form, Electronic, Mechanical, Photocopy or any information storage and
retrieval system without prior permission in writing, from Technical Publications, Pune.
Published
®
by : TM
Amit Residency, Office No.1, 412, Shaniwar Peth, Pune - 411030, M.S. INDIA.
TECHNICAL Ph.: +91-020-24495496/97, Telefax : +91-020-24495497
Email : [email protected] Website : www.technicalpublications.org
PUBLICATIONS
ISBN 978-93-332-1367-7
9 7 8 9 3 3 3 2 1 3 6 7 7
AU 13
Feedback
Input
Men Output
Material Company
Production objectives
Machines Goods and
system
Energy Services
Information
Modify plan
Inputs Transformation Outputs
process
Men Goods
Machines Design Services
Materials Planning
Energy Control
Money Maintenance
Information
Comparison of
actual and
desired Feedback
Types of production system
No continuous flow
of same size GoldSmith Tailor
Production is on a
Food industry Fuel industry
large scale
Features of continuous production system
Product Functional
development design
Product
design
Product Package
research design
Creation
Product
Enhancement development Innovation
Improvement
Continuous
Innovation of improvement of
4500 a
re
Total revenue fit a
4000 Pro
BEP(sales)
Cost and revenue (In Rs.)
Variable expenses
2500
2000
1500
Fixed expenses
ea
1000 ar
s
Los
500
Fixed Cost
Contribution
Contribution
Sales
Fixed Cost
P / V Ratio
Fixed Cost Profit
Contribution
Total fixed cost
Contribution Unit
40000
8
Fixed cost
P V ratio
s v 10 2
P V ratio
s 10
40000
0.8
Fixed costs profit 40000 30000
Contribution Unit 8
4000
1000
7000
1000
s v 7 4
s 7
Fixed cost
Selling price Variable per unit
F 1200
s v 7 4
s v
s
20 14
20
7,92,000
0.3
60,000
50 %
60,000
50 %
60,000
100
180
, ,000
0
3333
. %
60,000
3333
. %
76,000 100
100
190
, ,000
60,000
40 %
16000
40 %
33 13
F Rs.60,000
P 33 13 percent
Ratio
V
F 60,000
S–V 12 – 8
Profit 20000
contribution (per unit) 12 – 8
FC 60,000
SP – VC 13 – 8
Fixed cost
Selling price per unit – Variable cost per unit
72,000
24 – 15
Fixed cost + Profit
Selling price per unit – Variable cost per unit
72,000 + 90,000 1,62,000
24 – 15 9
2 9
Contribution
100
Sales
3
100
12
Fixed expenses
P V ratio
5,40,000 100
25
Change in contribution
100
Change in sales
20,000
100
2,00,000
10
7,00,000
100
Fixed cost
P V ratio
8,00,000
100
Fixedcost + DesiredProfit
P V ratio
80,000 + 40,000
10%
1,20,000 100
10
P2 + FC + S
2 P1 2 Q2 FC – S
Q2
P2 > P1
P2 – P1 0
2 Q 2 FC S) ( 1 Q1 FC)
( 2 Q2 1 Q1 S 0)
P
1- V
ratio for old design
P
- ratio for new design
V
Q1 S
1+ D
Q2 P1 FC
P1
Q1
P V ratio for old design 1.00
P V ratio for new design 1.15
1,10,000
2
Q2 S
1+ D
Q1 P1 FC
55,000
1+ 0.8695
55,000 + 2,00,000
Q2 Q1
1st
P2 P1 10 % S
10
60,000 + 110
, ,000
100
P2
Q2 S + P2 FC
D
Q1 P1 FC
P2
Q2 S + P2 FC
D
Q1 P1 FC
Q2
Q1
Q2
Q2
Select
Record
1 2 3
Process Path of movement Work place
Outline process chart Flow diagrams Multiple activity in chart
Flow process chart String diagrams Therbligs
Two handed process charts Form to chart Simo charts
Chronocyclagrophs
Activity relation charts
Critical examination
Develop + Define
Install + Maintain
Part No. : R.35 X X
Part Name : Rivetted plate Assembly.
Location : Assembly Shop
Method : Present
Charted by : A. K. Chavan
Approved by : L. M. Krishna
2 rivets Plate 2 : Cold worked steel Plate : 1 Cold worked steel strip
3 10 long strip 30 wide 4 thick 30 wide 4 thick
6 Locate plate
1 on top of 2
7 Insert rivets
1 Unspent
D
Left hand Both hands Right hand
Tighten screw
Travel chart
Flow diagram - Exiting method
Scale :
Drill Mill
Shaper Slotting
D
La the Inspection
stores
String diagram
Job : Study of movement of a machinist
prepared by Date
Scale :
Inspection Toilet
Tool
room
Stores Supervisor
(a) Cycle graph (b) Chronocycle graph
Time Study
Synthesis
Method
Analytical
Estimation
Predetermined
Motion Time
System [PMTS]
B
0
9 1
30
25 5
20 10
8 15
2
7 3
6 4
5
Stop watch
holding device
Normal time Observed time Rating factor
DEFINE
The elements, break the job into elements convenient for timing
EXTEND
Observed time into normal time (Basic time)
MEASURE
Time duration for each element and assess the rating
COMPUTE
Standard time for the operation for defined job
DETERMINE
Relaxation and personal allowances
Standard time Normal time + Allowances
Observed performance
Normal performance
Observed time Performance rating
100
110
8 8 1.10
100
( 2 . 0 85 / 100) 1. 7
Normal time 12.92 min.
10
Personal Allowance 12 .92
100
1 . 292 min.
4
Contingency allowances 12.92 0 .0516 min
100
Standard time / piece Normal time Personal allowance Contingency allowance
12 .92 1.292 0 .0516
1/ 8
10
2 .81 2 .81
100
1.0781
Total standard time with contingency allowance of 3 %
3
1.0781 0 .964 1.0781 0 .994
100
2 . 0721 min
1 / 100
1 / 100
7%
Standard time 4 . 59
(8 60) – 450
480 – 450
30 min
30
% Allowance 100
450
480
4.267
66 . 37 %
20 + 01 +13 + 84 + 03
Average time 0 .242
5(100)
4[1 – P]
N
A2 P
N
R
m
To
Duration of study in min
To
Number of pieces produced
Te
Tn
Ts
Ts Normal time Allowance
P (1 – P)
AP 2
N
Number of observations
P Activity percentage
Total Number of observations
To
02 08 60 960 min
960
To 9 .6 min
100
Te
Te Overall time per piece ( To ) production activity
Number of observations
(To )
TotalNumber of observations
Number of observations
(To )
Number of observations +Number of idle observations
3100
9.6
3100 +90
Te 9 .33 min
Tn
Tn Effective time / piece performance rating
85
Te Peformance rating 9 .33
100
Tn 7 .93 min
Ts
10
Ts Normal time (Tn ) Allowance (Normal time) 7 .93 7 .93
100
Ts 8.72 min
P (1– P)
A.P. 2
N
P
Number of idle observations 90
TotalNumber of observations 3190
P (1– P)
A.P. 2
N
(0.02) (1– 0 .02)
A(0.02)
3190
0 .0194
A(0.02)
3190
A(0.02) 2 . 46 10 –3
A 0.1234 or 12.34 %
3:1
To
Duration of study (min) 60 60
To 30 min
Number of parts produced 120
To 30 min
Te
Number of observations 2200
Te Overall time per piece 30
TotalNumber of observations 2800
Te 23 .57 24 min
Tm
1
Tm 24 6 min
4
Th
3
Th 24 18 min
4
Tm [Th R] 6 [18 0. 90]
Th 22 .2 min
Ts 25.53 min
To
Total time worked (min) 5 8 10 60
To
Number of units produced 5500
To 4 .36 min
Te
Number of observations
Te To
TotalNumber of observations
(200 +185 +165 +160 +190) 900
4 .36 4 .36
(210 +220 +190 180 +220) 1020
Te 3 .85 min
Ts 5.08 min
Process planning
Analyse
part requirements
Determine
operation sequence
Select
equipment
Calculate
processing times
Document
process plan
Communicate
mfg.engr. shop
Production design and
Organizational development request
planning
system
Part list Connected data
CAD
Geometry
data
MRP
Parts master files
material resource
planning CAPP
capacity planning Process plans
U W
–1 –1
tan p tan d V
O
Tp Tc Tp Time(T)
Tc
Tp
Tp
Tp d
Tc p
Q
U W
–1
tan p'
–1
tan d
O'
V'
–1
tan p
O
Tp V" T V Time(T)
T p
Tc
Q0
Q0
Q0
Q0
Tc Tp Ts
Ts
Tp
Tp
:
Tc
Q0 d
Q p
S
Q
1
Tc (Q Q 0 )
2
Tc
Q Q0
I Tc
2
Tc
1
2d
Tc
BQ
d
S I BQ
C Q
Q 2d d
S Q BQ
C
Q 2d d
Minimum
total cost
Holding cost
curve
S
Q
I(1 ) 2
2d
dY
dQ
–S
K
Q2
S 2ds
Qm
K I(1 + ) + 2B
Qm
S
KQ m
Qm
S
Xm C+ KQ m
Qm
S S
C+
Qm Qm
2S
Xm C+
Qm
I(1 + ) + 2B
Xm C + 2KQ m C+ Qm
2d
(Q m )
(Q m )
Demand rate d
Production rate p
500 1
2500 5
13
per year
100
13 1
4 10 –4 per day
100 325
4 10 –4 355
Q min
2S
Xm C+
Qm
2 5000
355 +
4995
Xm
Xm Qm
Qm
Tp
Qm
Demand rate d
Production rate p
50
130
13
per year
100
13 1
4.33 10 –4 per day
100 300
10 4
Qm
2ds 2 50 3000
Qm
I(1 ) 2B 0.091 (1 0.38) 2 0.025
Qm
Tp
Qm 1307
Tp
P 130
2S 2 3000
Xm C 210
Qm 1307
Xm
Xm Qm
Machining time PC Batch size
Machine cost hour
60
12 1000 60
45 45 400
60 60
4 1000 90
120 120 2000
60 60
12 1000 3 60
45 45 400
60 60
4 1000 3 90
120 120 2000
60 60
Order Weeks
Product Quantity
No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
42 L/14
42 M/163
42 A/16
42 M/60
43 L/16
43 L/15
43 M/111
44 L/13
44 L/25
Form wires
Fabricate end
caps
Heater element
assembly
Output (unit per hour)
Qth
t (min)
60
Q th units hour
t
Components added at each station
Work carrier or
base part in Work Finished
flow assembly out
ASBY ASBY ASBY
MAN MAN MAN
Tej ne
Twc
ne
Twc Tej
j=1
Tsi
n ne
Tsi Tej
i =1 j=1
(Tc )
Tc E / Rp
nTc – Twc
d
nTc
50 sec. 16 sec. 14 sec. 17 sec.
A B C F
17 sec.
13 sec. 14 sec.
17 sec.
55 sec. 20 sec. G
J K
H
D E
17 sec.
I
(Production Time Per Day) (60 sec. 420 min.)
Cycle Time
(Output Per Day) ( 420 bicyles )
25,200
60 sec.
420
3 .97 4 (rounded)
(Sum of All Task Times)
Efficiency
(ActualNo.of Work Stations) (Cycle Time)
(250)
(60)
(5)
0.83 or 83 %
5 min.
7 min.
6 min. H 7 min.
G
6 min. L
C
2 min. K
12 min. 6 min. D 1 min.
A B 4 min.
2 min. I
J
E
12 min.
4.67 5 (rounded)
(Sum of All Task Times)
Efficiency
(ActualNo.of Work Stations) (Cycle Time)
( 70)
(15)
(6)
0.778 or 77.78%
70 sec 10 sec 60 sec 25 sec
a d g j
40
1750
1500
1250
Output of products y
2000
1750
Stage V
1500
Stage III
Output of product B
1250
St
ag
1000 Stag
(units/ day)
e
II
e
I
750 3
500 2
St
ag
250 e
IV
1
0
250 500 750 1000 1250 1500 1750 2000 x
Output of product x (units/ day)
xP xQ xR
60 80 25
xP xQ xR
75 50 25
Product Q
7 80
Process I
70
60
2 50
40
30
5 20 4
10 Process II
1 6
Product P
10
0 10 20 30 40 50 60 70 80
20
30
3
40
50
8
60
70
80
R
uct
od
Pr
a 1x 1 a 2 x 2 a 3x 3 .......... a n x n P
b1x 1 b2 x 2 b3 x 3 .......... bn x n Q
c 1x 1 c 2 x 2 c3x 3 .......... c n x n R
x1
x2
x3
xn
Forward
scheduling
Start by scheduling
raw material and work
Required
due date
1 2 3 4 5 6 7 8 9 10 11 12
Yes
Load Schedule
chart chart
Day
Monday Tuesday Wednesday Thursday Friday
Work centre
Processing
Now
(p i ) (d i ) (F i (F i – 1 ) p i ) (Li (F i – d i
Fi d i
(p i ) (d i ) (F i (F i – 1 ) p i ) (Li (F i – d i
Fi d i
(p i ) (d i ) (F i (F i – 1 ) p i ) (Li (F i – d i
Fi d i
M2
M1 M2
M1 M 2
M1
M2
M2 C
B C
B A C
B A E C
B A E D C
M1 B A E D C Idle
Idle
B A E D C
4 8 12 16 20 24 28 32 36
M1
a d e b c g f
8 18 38 62 92 110 132
Idle
MI a d e b c g f
Idle
Idle
MII a d e b Idle c g Idle f
6 22 35 38 62 82 92 112 118 132 134
Job A B C D E
I 2 3 1 3 0
II 2 0 5 2 1
III 2 1 0 1 2
IV 5 0 2 1 1
V 0 3 1 0 2
Machine
Job A B C D E
I 1 3 0 2 0
II 1 0 4 1 1
III 2 2 0 1 3
IV 4 0 1 0 1
V 0 4 1 0 3
Machine
Job A B C D E
I 2 3 1 3 0
II 2 0 5 2 1
III 2 1 0 1 2
IV 5 0 2 1 1
V 0 3 1 0 2
Machine
Job A B C D E
I 1 3 0 2 0
II 1 0 4 1 1
III 2 2 0 1 3
IV 4 0 1 0 1
V 0 4 1 0 3
M1 M 2 Mm M1 M 2 M 3 Mm Tij
i th jth
M1 Mm M 1M m
Ai Ei
(B i , C i , D i )
Ei (B i , D i ) Ai Ci
Gi Ai Bi Ci Di Hi Bi Ci Di Ei
2 Annual demand setup cost / batch
Inventory carrying cost per unit per year
(Machine hours inventory +(Total Available
for all items) Machine hours)
Machine hours requirements forecasted for all the items
(1) (2) (3) (4) (5)
Assemb. March March
Invent time forec. Invent. forec.
on-hand req'd. dem. on-hand dem.
Bicycle (Units) (Hr/Units) (Units) (Hours) (Hours)
Razer 100 .3 400 30 120
Splicer 600 .2 900 120 180
Tracker 500 .6 1,500 300 900
HiLander 200 .1 500 20 50
(1)×(2) (2)×(4) Total 470 1,250
( S )(TS max ) N
BD 100 %
( S ) (TS max )
3
C
5
1 E
A
4
D
2
B
30 25 20 15 10 5 0
240
210
180
Cumulative of units
150
120
90
60
30
MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB
240
210
180
150
120
90
60
30
1 2 3 4 5
240
210
180
150
120 LOB
90
60
30
MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB 1 2 3 4 5
M2
M3
A F D B C E,
Inventory
consists of...
Total cost
cost
Holding cost
Order cost
Order quantity Q
C Purchase or manufacturing cost of an item.
C0 The ordering cost per order.
Ch Inventory holding cost of an item per unit per time unit
Cs Shortage cost per unit short per time.
D Demand rate of an item.
Q Order quantity (a decision variable)
T Cycle time (a decision variable)
ROL
L Lead – Time
N Number of orders per time unit
T Production time period
P Production rate at which quantity is produced.
PC Total purchase cost.
IHC Total inventory holding cost per time unit
SC Total shortage cost per time unit
OC Ordering cost per order
TC Total inventory cost per time unit
TVC Total variable inventory cost per time unit
Ch
Inventory
level Maximum inventory level
Order
placed
Reorder level (or point)
ROL
Order
quantity, Q
0 LT LT Time (year)
Lead I = Q/D
Order points
time
Reorder cycle
Q D t
Total Variable Inventory Cost Annual carrying cost Annual ordering cost
{(Avg.Inventory level) (Carrying cost / Unit / Year)}
{Number of order placed per year
(Ordering Cost / Order)
I max I min D Q D
TVC .C h .C C .C
2 Q 0 2 h Q 0
Cost
Total cost t
c os
TVC*
ing
rry
Ca
Ord
erin Purchase cost
gc
ost
D Q 2DC 0
C C or Q 2
Q 0 2 h Ch
Q * (EOQ)
t*
Q Annual demand Reorder cycle time = D.t
Q 1 2DC 0 2C 0
t*
D D Ch DC h
Annualdemand D 1 DC h
N* D
Optimalorder quantity Q 2DC 0 / C h 2C 0
TVC
D Q
TVC C0 C
Q 2 h
1 Ch
D C0 + 2DC 0 / C h 2DC 0C h
2DC 0 / C h 2
TC D C TVC
2DC 0
Q
Ch
2 3500 35
3.6
Q 260 . 87 kg / order
Q
r
D
260 . 87
t 0 . 0745 Year
3500
TC TVC DC
158 . 87 (3500 12)
42158 . 87 / year
t 1 ,t 2 ,t 3 ......,t n D1 ,D 2 ,D 3 ......D n
T t 1 , t 2 , t 3 , ...... +, t n
Inventory
level Maximum inventory level
1 1 1
2 qt1 2 qt2 2 qtn
0 t1 t2 t2
Time
n D / q,
1 1 1
Carrying cost qt C q t 2C h ... q t n C h
2 1 h 2 2
1 1
q C h ( t1 t 2 ... t n ) q Ch T
2 2
D
Ordering cost C
q 0
1 D
TVC q Ch T + C0
2 q
1 D
qC T C
2 h q 0
D 10000 Units
Ch 2.5 0.09 = 0 . 225
Cc 0 . 09
2DC 0 2 10000 35
Q EOQ
Ch 0.225
Q 3111.11 Units
D 10000
N 5 .728
Q 3111.11
TC 400
D 3500 Units
Ch 1. 5 / unit / annum
C0 80 / order
2DC 0 2 80 3500
Q EOQ
Ch 1.5
Q 611.01 Units
D 3500
N 5 .728
Q 611.01
TVC 2DC 0C h
TVC 916 . 51
1 1
t
N 5
t 0.2 Years
2DC o 2 80 3600
Q
Ch 1.2
Q 692.82 693Units.
D 3600
5.196 6
Q 692.82
EOQ 693 12
t
D 3600
CS
Max. inventory
Quantity
Q
Q–S
t1 t2
T Time
2DC 0 (C s C h )
Q
Ch Cs
2DC 0 Cs
S
C h (C s + C h )
Cs
Q S 1–
(C h + C s )
Cs
T 2DC 0C h
Cs + Ch
D 9000 items
Ch 10 0.15 1.5
2DC 0 2 9000 30
Q
Ch 1.5
Q 600
D 9500 Units
Ch 20 % of
C0 125 /order
Q 513 Units
D 9500
N 18 . 51 19 orders
Q 513
D C0 D
TC (C D) + C
Q 2 h
9500 125 513
TC (45 9500) + 9
513 2
2C 0 DP 2 96 12000 60
Q EOQ 2400
C h (P – D) 1.2 (60 – 40)
Q 2400 Units
Annaual consumption
Frequency of production run
EOQ
D 12000
N 5
Q 2400
N 5
Q 2400
Production time Tp
P 60
Tp
2DC 0 2 80 3600
Q EOQ
Ch 1.20
D 3600
N 5 .194 5 orders
Q 513
TVC 2DC 0C h
TVC 813 . 38
9831 . 38 / year
Reorder points
EOQ
Inventory
level
693 Units/order
Time
D 10000
C0 50,
Ch 5 per unit
2DC 0 2 50 10000
Q EOQ
Ch 5
2C 0D 2 12 .5 10,00,000
Q EOQ 2581 . 98
Ch 3.75
2DC 0 2 2800 36
Q3
iC h 0.2 4.60
Q3 b1 Q1 c1
2 2800 36
Q1
0.2 5
Q1 b1 Tc (b1 ) Tc (b 2 )
Tc (b 3 )
D Q
Ch H D Ch
Q 2
2800 449
Tc (Q1 = 449) 36 (0.2 5) [2800 5]
449 2
Tc(Q1 = 449)
2800 500
Tc(b1 = 500) 36 (0.2 4.8) [2800 4.8]
500 2
Tc(b1 = 500)
2800 1250
Tc(b 2 = 1250) 36 (0.2 4.6) [2800 4.6]
1250 2
Tc(b 2 = 1250)
Q b2
Empty Empty
bin bin
Plant Inventory Supplier
floor Full Full
bin bin
100%
90%
80%
Percent of total usage value
70%
60%
50%
40%
30%
20%
10%
0%
20% 40% 60% 80% 100%
Percent of total items
36
68
80
88
96
97.4
98.4
99.36
99.36
100
Stampling Welding
Business planning
Production planning
Master production
scheduling
Material requirements
planning
Capacity requirements
planning
Realistic?
No
Yes
Go ahead
Package evaluation
Project planning
Implementation
Testing End-user training
team training
Going alive
Post implementation
phase
Value of the material consumed
Value of average inventory