This document provides details on the deluge sprinkler system for transformer rooms at the Al-Zour New Refinery Project. It includes a table listing 7 buildings/areas with their dimensions, covered areas, minimum and actual water application rates, and minimum and actual required water flows. It also notes the sprinkler design specifications and assumptions used, such as the K-factor of 2.82, minimum application rate of 0.25 gpm/sqft, and actual rate of 0.30 gpm/sqft. For each building, it calculates the number of nozzles needed, flow per nozzle, total final flow, and minimum pressure required.

Uploaded by

haseeb parkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views2 pages

Deluge System Data Sheet

This document provides details on the deluge sprinkler system for transformer rooms at the Al-Zour New Refinery Project. It includes a table listing 7 buildings/areas with their dimensions, covered areas, minimum and actual water application rates, and minimum and actual required water flows. It also notes the sprinkler design specifications and assumptions used, such as the K-factor of 2.82, minimum application rate of 0.25 gpm/sqft, and actual rate of 0.30 gpm/sqft. For each building, it calculates the number of nozzles needed, flow per nozzle, total final flow, and minimum pressure required.

Uploaded by

haseeb parkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

AL-ZOUR NEW REFINERY PROJECT - DELUGE SYSTEM FOR TRANSFO

SL.NO Building Name Length Width Area Area Minimum Actual Minimum Actual Flow
(m) (m) (m²) (ft²) Application Application Flow (gpm)
Rate Rate Required
(gpm/ft2) (gpm/ft2) (gpm

1 Training Center 5.5 13.09 72.00 774.95 0.25 0.30 193.74 232.49
2 Mosque 6.74 4.97 33.50 360.57 0.25 0.30 90.14 108.17
3 Laboratory 8.00 11.38 91.04 979.95 0.25 0.30 244.99 293.99
4 Fire Station 9.94 15.00 149.10 1604.91 0.25 0.30 401.23 481.47
Safety Complex

5 Cafeteria 8.70 5.23 45.50 489.77 0.25 0.30 122.44 146.93


6 Admin Building 6.00 15.77 94.62 1018.49 0.25 0.30 254.62 305.55
6.00 12.00 72.00 775.01 0.25 0.30 193.75 232.50
7 CCR-OTS Building 18.21 7.80 142.04 1528.90 0.25 0.30 382.23 458.67
Notes:
. K factor = 2.82 (As per NFPA 15, Page No : 9; 5.2.3.3.2)(Sprinkler Data sheet from manufacturer also attached )
. Minimum Application Rate = 0.25 (Minimum Application Rate also attached)
. Actual Application Rate = 0.30 ( As per NFPA 15, Page No: 20; 7.3.3)
. Nozzle Distance max = 3000mm (As per NFPA 15, Page No: 19; 7.1.8)
. Maximum velocity = 20ft/sec (6.1 m/s) ( As per NFPA 15, Page No: 52, A.8.5.1.2)
EM FOR TRANSFORMER ROOMS
No. of Nozzle Flow Per Final Flow Minimum Default
Nozzle (gpm) Pressure Sprinkler K
(gpm) Required Factor
(psi)

8 29.06 232.5 20 2.82


6 18.03 108.2 20 2.82
12 24.50 294.0 20 2.82
20 24.07 481.5 20 2.82

6 24.49 146.9 20 2.82


10 30.55 305.5 20 2.82
8 29.06 232.5 20 2.82
18 25.48 458.7 20 2.82