All aggregate blending。。。。
All aggregate blending。。。。
WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING AVERAGE
SIEVE
RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % PASSING %
25.0mm 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 100.0
19.0mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
12.5 mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
9.5mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
4.75mm 1 0.1 99.9 5.0 0.4 99.6 5 0.4 99.6 2.0 0.2 99.8 0 0.0 100.0 0.0 0.0 100.0 99.8
2.36mm 208 11.0 88.9 189 9.0 90.6 122 5.8 93.7 125 5.9 93.9 74 6.2 93.8 79 6.5 93.5 92.4
1.18mm 519 27.4 61.6 580 27.6 63.0 483 23.1 70.6 486 23.0 71.0 264 22.2 71.6 265 21.7 71.8 68.2
0.600mm 488 25.8 35.8 539 25.7 37.3 467 22.4 48.3 467 22.1 48.9 260 21.9 49.7 272 22.3 49.5 44.9
0.300mm 335 17.7 18.1 364 17.3 20.0 347 16.6 31.7 373 17.6 31.3 242 20.4 29.4 232 19.0 30.4 26.8
0.150mm 211 11.1 7.0 255 12.1 7.8 355 17.0 14.7 357 16.9 14.4 218 18.3 11.0 231 18.9 11.5 11.1
0.075mm 97 5.1 1.9 127 6.0 1.8 230 11.0 3.6 221 10.4 3.9 109 9.2 1.9 118 9.7 1.8 2.5
pan 29 26 30 38 15 12
Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Senior Pavement Engineer
PROJECT: MELLODONI JUNCTION-MANDA-BURE ROAD PROJECT
EMPLOYER: ETHIOPIAN ROADS ADMINISTRATION
CONSULTANT: SMEC INTERNATIONAL WITH VALUE ENGINEERING PLC.
CONTRACTOR: SHANDONG LUQIAO GROUPS CO. LTD ETHIOPIA BRANCH
SIEVE ANALYSIS OF FINE AND COARSE AGGRAGATE
AASHTO T27
Source K44 Crusher
WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING AVERAGE
SIEVE
RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % PASSING %
25.0mm 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 100.0
19.0mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
12.5 mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
9.5mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
4.75mm 310 12.8 87.2 335.0 13.1 86.9 227 9.2 90.8 207.0 8.5 91.5 277 14.9 85.1 309.0 16.0 84.0 87.6
2.36mm 2014 83.2 4.0 2113 82.9 4.0 1971 80.0 10.8 1950 80.2 11.3 1515 81.8 3.3 1564 81.0 3.1 6.1
1.18mm 59 2.4 1.5 65 2.6 1.4 185 7.5 3.2 189 7.8 3.5 33 1.8 1.5 35 1.8 1.2 2.1
0.600mm 14 0.6 1.0 15 0.6 0.8 33 1.3 1.9 38 1.6 1.9 8 0.4 1.1 9 0.5 0.8 1.2
0.300mm 7 0.3 0.7 7 0.3 0.5 12 0.5 1.4 13 0.5 1.4 6 0.3 0.8 6 0.3 0.5 0.9
0.150mm 4 0.2 0.5 4 0.2 0.4 10 0.4 1.0 11 0.5 0.9 5 0.3 0.5 5 0.3 0.2 0.6
0.075mm 3 0.1 0.4 3 0.1 0.3 6 0.2 0.8 8 0.3 0.6 2 0.1 0.4 4 0.2 0.0 0.4
pan 6 4 10 4 3 0
Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Senior Pavement Engineer
PROJECT: MELLODONI JUNCTION-MANDA-BURE ROAD PROJECT
EMPLOYER: ETHIOPIAN ROADS ADMINISTRATION
CONSULTANT: SMEC INTERNATIONAL WITH VALUE ENGINEERING PLC.
CONTRACTOR: SHANDONG LUQIAO GROUPS CO. LTD ETHIOPIA BRANCH
SIEVE ANALYSIS OF FINE AND COARSE AGGRAGATE
AASHTO T27
Source K44 Crusher
WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING AVERAGE
SIEVE
RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % PASSING %
25.0mm 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 100.0
19.0mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
12.5 mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
9.5mm 321 9.3 90.7 348.0 9.7 90.3 307 8.9 91.1 286.0 8.7 91.3 237 10.5 89.5 265.0 10.7 89.3 90.4
4.75mm 3081 89.6 1.1 3221.0 89.3 1.0 3073 88.8 2.3 2920.0 88.7 2.6 1997 88.8 0.7 2199.0 88.5 0.8 1.4
2.36mm 26 0.8 0.3 28.0 0.8 0.2 65 1.9 0.5 73 2.2 0.4 15 0.7 0.0 18 0.7 0.1 0.3
1.18mm 2 0.1 0.3 2 0.1 0.2 4 0.1 0.3 5 0.2 0.2 0 0.0 0.0 0 0.0 0.1 0.2
0.600mm 1 0.0 0.2 1 0.0 0.2 1 0.0 0.3 1 0.0 0.2 0 0.0 0.0 0 0.0 0.1 0.2
0.300mm 1 0.0 0.2 1 0.0 0.1 1 0.0 0.3 1 0.0 0.2 0 0.0 0.0 0 0.0 0.1 0.2
0.150mm 1 0.0 0.2 1 0.0 0.1 1 0.0 0.3 0 0.0 0.2 0 0.0 0.0 0 0.0 0.1 0.1
0.075mm 1 0.0 0.1 1 0.0 0.1 1 0.0 0.2 0 0.0 0.2 0 0.0 0.0 0 0.0 0.1 0.1
pan 2 0 4 0 0 1
Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Senior Pavement Engineer
PROJECT: MELLODONI JUNCTION-MANDA-BURE ROAD PROJECT
EMPLOYER: ETHIOPIAN ROADS ADMINISTRATION
CONSULTANT: SMEC INTERNATIONAL WITH VALUE ENGINEERING PLC.
CONTRACTOR: SHANDONG LUQIAO GROUPS CO. LTD ETHIOPIA BRANCH
SIEVE ANALYSIS OF FINE AND COARSE AGGRAGATE
AASHTO T27
Source K44 Crusher
WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING AVERAGE
SIEVE
RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % PASSING %
25.0mm 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 100.0
19.0mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
12.5 mm 1694 34.8 65.2 1926.0 38.9 61.1 1357 37.1 62.9 1344.0 37.6 62.4 1988 41.7 58.3 1903.0 40.1 59.9 61.6
9.5mm 3050 62.6 2.6 2927.0 59.0 2.1 2201 60.2 2.7 2145.0 60.1 2.3 2701 56.7 1.6 2791.0 58.8 1.0 2.0
4.75mm 101 2.1 0.5 79.0 1.6 0.5 85 2.3 0.4 74.0 2.1 0.2 72 1.5 0.1 38.0 0.8 0.2 0.3
2.36mm 10 0.2 0.3 11 0.2 0.3 4 0.1 0.2 3 0.1 0.1 3 0.1 0.0 4 0.1 0.1 0.2
1.18mm 3 0.1 0.2 3 0.1 0.2 1 0.0 0.2 1 0.0 0.1 1 0.0 0.0 1 0.0 0.1 0.2
0.600mm 1 0.0 0.2 2 0.0 0.2 1 0.0 0.2 1 0.0 0.1 0 0.0 0.0 0 0.0 0.1 0.1
0.300mm 1 0.0 0.2 1 0.0 0.2 1 0.0 0.2 0 0.0 0.1 0 0.0 0.0 0 0.0 0.1 0.1
0.150mm 1 0.0 0.2 1 0.0 0.1 0 0.0 0.2 0 0.0 0.1 0 0.0 0.0 1 0.0 0.1 0.1
0.075mm 2 0.0 0.1 2 0.0 0.1 0 0.0 0.2 1 0.0 0.1 1 0.0 0.0 1 0.0 0.1 0.1
pan 3 1 6 2 0 0
Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Senior Pavement Engineer
PROJECT: MELLODONI JUNCTION-MANDA-BURE ROAD PROJECT
EMPLOYER: ETHIOPIAN ROADS ADMINISTRATION
CONSULTANT: SMEC INTERNATIONAL WITH VALUE ENGINEERING PLC.
CONTRACTOR: SHANDONG LUQIAO GROUPS CO. LTD ETHIOPIA BRANCH
SIEVE ANALYSIS OF FINE AND COARSE AGGRAGATE
AASHTO T27
Source K44 Crusher
WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING AVERAGE
SIEVE
RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % PASSING %
25.0mm 0 0.0 100.0 0 0.0 100.00 0 0.0 100.0 0 0.0 100.00 0 0.0 100.0 0 0.0 100.00 100.0
19.0mm 451 7.0 93.0 600.0 9.0 91.0 797 16.3 83.7 604.0 12.6 87.4 350 6.5 93.5 379.0 7.4 92.6 90.2
12.5 mm 5992 92.4 0.6 6008.0 90.0 1.0 4080 83.4 0.3 4138.0 86.6 0.8 5014 92.9 0.6 4712.0 91.7 1.0 0.7
9.5mm 18 0.3 0.4 42.0 0.6 0.4 7 0.1 0.2 19.0 0.4 0.4 16 0.3 0.3 27.0 0.5 0.4 0.3
4.75mm 14 0.2 0.1 14.0 0.2 0.2 3 0.1 0.1 3.0 0.1 0.3 11 0.2 0.1 9.0 0.2 0.3 0.2
2.36mm 2 0.0 0.1 3 0.0 0.1 0 0.0 0.1 0 0.0 0.3 2 0.0 0.1 2 0.0 0.2 0.2
1.18mm 1 0.0 0.1 1 0.0 0.1 0 0.0 0.1 0 0.0 0.3 1 0.0 0.1 1 0.0 0.2 0.1
0.600mm 1 0.0 0.1 1 0.0 0.1 0 0.0 0.1 0 0.0 0.3 0 0.0 0.1 0 0.0 0.2 0.1
0.300mm 1 0.0 0.1 1 0.0 0.1 0 0.0 0.1 0 0.0 0.3 0 0.0 0.1 0 0.0 0.2 0.1
0.150mm 1 0.0 0.0 1 0.0 0.1 0 0.0 0.1 0 0.0 0.3 0 0.0 0.1 0 0.0 0.2 0.1
0.075mm 1 0.0 0.0 2 0.0 0.1 0 0.0 0.1 0 0.0 0.3 0 0.0 0.1 0 0.0 0.2 0.1
pan 1 1 0 0 0 7
Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Senior Pavement Engineer
PROJECT: MELLODONI JUNCTION-MANDA-BURE ROAD PROJECT
EMPLOYER: ETHIOPIAN ROADS ADMINISTRATION
CONSULTANT: SMEC INTERNATIONAL WITH VALUE ENGINEERING PLC.
CONTRACTOR: SHANDONG LUQIAO GROUPS CO. LTD ETHIOPIA BRANCH
SIEVE ANALYSIS OF FINE AND COARSE AGGRAGATE
AASHTO T27
Source K44 Crusher
WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING WEIGHT OF RETAINE PASSING WEIGHT OF RETAINED PASSING AVERAGE
SIEVE
RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % RETAINED D% % RETAINED % % PASSING %
25.0mm 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 0 0 100.0 0 0.0 100.00 100.0
19.0mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
12.5 mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
9.5mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
4.75mm 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 0 0.0 100.0 0.0 0.0 100.0 100.0
2.36mm 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 100.0
1.18mm 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 100.0
0.600mm 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 100.0
0.300mm 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 100.0
0.150mm 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 0 0.0 100.0 100.0
0.075mm 36.7 7.3 92.7 43.1 8.6 91.4 23.2 4.6 95.4 25.3 5.1 94.9 32.4 6.5 93.5 27.7 5.5 94.5 93.7
pan 97.1 110.7 46 82 74.2 46.9
Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Lab Technician Material Engineer Lab Technician Senior Pavement Engineer
集料组成设计正规计算表
A B D E F G H I
1 Sieve Size
Sieve Size 25 19 12.5 9.5 4.75 2.36
2
Raised to 0.45 power 4.2566996 3.7621761 3.1160865 2.7540741 2.016100254 1.47166988
3 Aggregate # % passing
4 1# 0-3mm 100.00 100.0 100.0 100.0 99.8 92.4
5 2# 3-5mm 100.00 100.0 100.0 100.0 87.6 6.1
6 3# 5-10mm 100.00 100.0 100.0 90.4 1.4 0.3
7 4# 10-15mm 100.00 100.0 61.6 2.0 0.3 0.2
8 5# 15-25mm 100.00 90.2 0.7 0.3 0.2 0.2
9 Filler 100.00 100.0 100.0 100.0 100.0 100.0
10 Specified Up Limit 100.0 98.0 80.0 70.0 50.0 34.6
11 Specified Mediam 100.0 96.0 70.0 60.5 43.0 30.8
12 Specified Low Limit 100.0 94.0 60.0 51.0 36.0 27.0
13 Target Grading 100.0 96.0 73.6 65.0 46.0 40.0
3 3.5 4 4.5
19
Adjusted
Proportion%
29.13 27.2
15.94 8.4
18.49 22
10.93 16
22.55 24.4
3.00 -0.03 2.0
100.03 100.0
1# 2# 3# 4# 5#
Aggregate # Filler
0-3mm 3-5mm 5-10mm 10-15mm 15-25mm
Spec. Spec. Spec. JMF JMF Blending 1 Blending 2 Blending 3
Blending 1 27.0 18.5 16.5 11.5 24.8 1.7 Low
Up Limit Medium Low Limit Up Limit up mid low
Limit
Blending 2 25.4 15.4 17.8 10.5 28.4 2.5
Blending 3 26.5 11.9 17.4 9.8 32.5 1.9
Sieve Raised to
Size 0.45 power % passing
25 4.2567 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
19 3.7622 100.0 100.0 100.0 100.0 90.2 100.0 94.0 98.0 96.0 94.0 98.0 97.6 97.2 96.8
12.5 3.1161 100.0 100.0 100.0 61.6 0.7 100.0 60.0 80.0 70.0 68.4 78.4 71.0 67.8 63.9
9.5 2.7541 100.0 100.0 90.4 2.0 0.3 100.0 51.0 70.0 60.5 60.1 70.0 62.4 59.7 56.3
4.75 2.0161 99.8 87.6 1.4 0.3 0.2 100.0 36.0 50.0 43.0 42.4 50.0 45.2 41.7 39.1
2.36 1.4717 92.4 6.1 0.3 0.2 0.2 100.0 27.0 34.6 30.8 27.0 34.6 27.9 27.0 27.2
1.18 1.0773 68.2 2.1 0.2 0.2 0.1 100.0 18.0 22.0 20.0 19.3 22.0 20.6 20.2 20.3
0.6 0.7946 44.9 1.2 0.2 0.1 0.1 100.0 12.0 16.7 14.4 12.4 16.7 14.1 14.2 14.0
0.3 0.5817 26.8 0.9 0.2 0.1 0.1 100.0 7.0 14.0 10.5 8.0 14.0 9.2 9.5 9.2
0.15 0.4258 11.1 0.6 0.1 0.1 0.1 100.0 4.0 10.0 7.0 4.4 8.4 4.9 5.5 5.0
0.075 0.3117 2.5 0.4 0.1 0.1 0.1 93.7 2.0 7.0 4.5 2.0 5.7 2.4 3.1 2.6
90
80
70
60
50
40
30
20
10
0
0.0% 50.0%
0.075 0.3 0.6 100.0%
1.18 2.36
150.0% 200.0%
4.75
250.0%
9.5
300.0%
12.5
350.0%
19
400.0%
25
450.0% 500.0%
mineral filler
2.806
2.806
Result Low Up
0.12
he adjusted
en 3.5%-6%
preparation specimen
sieve % pass jmf % retained jmf weight retained
Gyratory MTD
25 100.00 0.00 0.0 0.0 Adjusted
19 96.47 3.53 159.0 84.6 Proportion
12.5 74.92 21.55 970.2 516.1 %
9.5 65.51 9.41 423.5 225.3 1# 0-3mm 28.89
4.75 43.00 22.52 1013.9 539.3 2# 3-5mm 9.35
2.36 28.90 14.10 634.9 337.7 3# 5-10mm 21.37
1.18 20.59 8.31 374.1 199.0 4# 10-15mm 13.55
0.6 13.92 6.67 300.2 159.7 5# 15-25mm 24.89
0.3 9.16 4.76 214.3 114.0 Filler 1.95
0.15 6.11 3.05 137.2 73.0 sum 100.00
0.075 3.54 2.58 116.0 61.7
Filler 3.54 159.4 84.8
total aggregate 4502.6 2395
Bitumen 4.2% 197.4 105
Total 4700 2500