Rab Pek AC
Rab Pek AC
Rab Pek AC
I. RUANG OPERASI 1 - 5
1 Unit AC Costum AHU Sesuai Pemenkes set
Kap : 10 PK
2 Instalasi
A Instalasi lengkap dengan pemipaan
1 Pipa Refrigerant 11/8"+1/2" c/w isolasi & fittings m1 150,00 m1
2 Pipa Drain c/w isolasi m1 60,00 m1
3 Filter Driyer & Sigh glass set 5,00 set
B Pekerjaan Ducting bahan polyurethane tebal 20mm density 52 kg/m3
1 Ducting supply dan return m2
2 Ducting Plenum di isolasi dalam aeroflex tebal 1/2"+glassclotch m2
3 RAG alluminium powder coating bh
4 FAG alluminium powder coating termasuk rain hood dan filter udara bh
C Motorizet Damper bh
D Pekerjaan Filter
1 Pre FILTER set
2 Medium FILTER set
3 HEPA FILTER set
4 Housing FILTER set
5 Electric heater set
E Kontrol PLC dan Sensor - Sensor set
termasuk RH control
-Touchscreen Control 10" & PLC
-box panel
-RH controler + sensor
-Heater 3 step
-Thermistor
-Instalasi
F Kabel kontrol dari outdoor ke indoor nyy 4 x 2,5 mm2 +2x2,5mm2 set
G Kabel Power NYY set
H Kabel Kontrol NYYHY set
I Panel Kontrol (termasuk inverter) set
J Support unit AC Indoor & Outdoor unit
K Testing & Commissioning Termasuk Pengisian Freon R 410A set
L Transportasi & accomodasi material dan tenaga kerja ls
V. RUANG DOKTER
1 unit AC AC SPLIT WALL set
Kap. : 2 PK
2 Instalasi
A Instalasi lengkap dengan pemipaan
1 Pipa Refrigerant c/w isolasi & fittings Set 2,00 Set
2 Pipa Drain c/w isolasi Set 2,00 Set
B Tansportasi & accomodasi material dan tenaga kerja ls