In each manufacturing industry, we find a special department that is always engaged in research and searching and creating new ways to improve the product and thus the company. This section is known as research and development. The department not only conducts research on various development issues, but also monitors the study and results
of the study. This section often uses a message format to maintain detailed information about the course study, with a clear mention of suggestions, topics, goals and research results. Next we tried to mention some of the very easy-to-create and supportive research overview templates you can download now: more than $ 200,000 ... Only 24-year 4
years Formatting: 229 kb-b/download when a research and development company manufacturing company company is a company The next step is the next step, which is already outdoor research, the next step is to formulate the research report. These include three main elements such as an introduction, basic texture and conclusions. This
appointment helps to implement the first idea to achieve the desired results and commitment time. The form is a Milgs market research report created by an advertising company or installation for a particular product. When the Production Department thinks of a new start, it must first work according to market requirements. This template helps to
explore the future product market. Templaratesfile Paper Formatting: 624 KbdownloadThs is a simple template where you can easily submit a test offer and explore and terminate contracts. This template is easily accessible and accessible in all simple formats, providing complete freedom to adapt to production needs and product needs. Formatting
Formatting Formatting Reporting Reporting Reporting Report. : 2 Survey message MBDOWNLOAD SAMPLETEETAILSFILE Formatism: 12 Mbdlejsjstore Standard Research Report.In every manufacturing industry we find a special department that is constantly busy researching, exploring and developing new ways to improve the product and thus
the company. This department is referred to as research and development. The department researches various developmental issues and pursues discussions and study results. This department usually uses a reporting format to pursue the details of the study and clearly shows the proposal, the topic, the purpose and the results of the study.
In the following we tried to mention some patterns of research reports that are very easy to create and maintain. The next step, the field of study has already been set, is the wording of this draft of a research report. It contains three main elements: introduction, main part and end. This distinction enables you to first get an idea of the desired results
and time costs that need to be achieved. Created by an advertising company or to bring a certain product onto the market. If a production unit is supposed to think about a new introduction, it must first work with the requirements of the market. This template helps to investigate the market for the future product. This model is easily accessible and
available in all simple formats, which gives you complete freedom in configuration in order to meet the production requirements and product demand on the market. : 2 MBSCAPE A sample report on the work of the detectors File size: 12 MBScape A standard report on file work -2 MBSSCaping A standard report on file work - : 906 KBScoFormat: 1
MBDATS Download Download Research Reportdets Formated: 213 KB Foods. You need to take the following special steps to create a well -designed research report.
After areas you have primary research on this topic online? After a critical thinking process, look at your research dissertation. Another important step is the organization of discovery and detailed information about them. These are the last steps to complete the study from the end results. What are the benefits of such messages?
The good structure of the research report has several benefits. These are: a study report based on scientific work. The best result is from the message. The course of the study was recorded by documents.
The message helps to understand the time you need. What tips can you talk about research messages? The first and most important key to the good study report is time. You have enough time to decide on the region and see detailed information about it. The whole study study should be simple and specific. Check and check your opinion again to click.
Decide what information collection tools you will use in your study. You can check the research message templates. Studies should always be improved. You need to be very careful to challenge the study report to create a flow flow. Model research reports were well structured, so you can be sure that you will help you achieve your goal with all these
things. If this article has problems with DMCA, contact us! Academia.edu uses cookies to customize content, apply ads and improve user experience. With our site, you can agree to collecting our information using cookies. For more information, see our Privacy Policy. 1. Industrial Education Project Report Jajeri Chandigarh, sent to CGC technical
town, partial technology license competence in the Engineering Society: 2014-2018. Year. Engineering Department CGC Janieri Technical City, Mohal (Punjab) India March 2018 2 TDI Infrateech Ltd Mhali, CGC. Janieri Technical City, Mohali Construction Department.B.Tech course (land engineering) I.K Gujral Punjab Technical University,
Karpurthala, Jalandhar sent by: - Posted by: - Name of the Construction Department: - Japjeet Singh industry: - Semester of land engineering: - serial number 8. Uniw.: -1446589 Series 3: -20818 Student statement here by I certify that I, Japjeet Singh B.Tech (Civil) 8th Semester Roll No. 1446589 Student, I completed the required industry training for
thirteen weeks of the project semester at TDI Infratech Ltd. I graduated from Jhanjeri College Chandigarh Group of College Jhanjeri with the title of land engineer and I received it as a real proof of work. In the event of any discrepancy as to the originality of this report, I may be held responsible. I did not copy previously sent reports from this or
other university. This is a purely original and authentic work. Japjeet Singh 4. Training certificate 5. I would like to express my deep gratitude Er.muhanprPreet Singh (construction engineer) for his generous tips, help, helpful suggestions and constant encouragement. I am prof. Rajneesh Talwar, Rector of College, Chandigarh Technical University,
Mohala (Pendjab) and management for their support and encouragement. AM Dr. Kishor Kulkarnia, Hod, CGCTC Jhanjeri, Mohala for valuable suggestions and motivation. I am also grateful to Sarabjit Singh & Sachin Sharma, managers for training and recruitment, Chandigarh Group of Colleges Technical University, Janjeri, Mohala, Pendjab for
enabling me to gain knowledge. Japjeet Singh 6. Table of contents 1. Table of contents 2. Information about developers 3. Features of an exclusive apartment 4. Characteristics 5. Details of the operational structure 6. Construction resistant to earthquakes 7. Real structural plans 8. Construction details of each villa of each villa 9. foundations 10.
foundations 10. Walls 11. Masonry brick tests 12. Steel rods 13. Characteristics of HSD rods 14. Steel specification in each villa 15. Cement concrete 16. CONTROL TEXTS 17. CULTING TASKS CULTER TASK Around the B.Tech rank at the Chandigarh Group of Colleges, Technical University, and Japjeet Singh, 13 weeks to complete in 2018. January
of January. I completed an industrial internship at TDI Infratech Ltd. Connaught residence, location. - April 2018. The report consists of a short test and description of the materials, equipment and processes usedConstruction site. The report contains my 13 -week experience in the host company. All content is widely explained and created on the basis
of the practical basics of the web. In the introductory content, I wrote myself in the background of society, including its mission. The content is written to provide detailed information about the company so that the reader can easily recognize it and get access to it.
In the second content, I explained my general knowledge with practice in recent months. This content is the main content I have seen and included the general work I did. 8. Information about TDI, Developer and ISO 9001: 2008 have been an elements of urban life on a sequential path for more than twenty years. Thanks to early completion and
standard quality of building statements, the company has developed integrated villages and business complexes in different parts of northern India. The ability to meet the specific requirements of the real estate market and its clients is based on strong professionalism. Each TDI project excels from others in terms of design and global design
aesthetics.
The passion of an excess of industrial scale is evident in its engineering value, its ability to reduce the project after the project and strengthen the best of conceptual innovation and advanced building technologies. TDI is the company of the group Punta Taneja. Since its foundation more than two decades ago, TDI has gained a breakthrough in the
growth and construction of real estate and its place in the construction industry.
The company creates quality indicators in the development of real estate by creating villages and world -class commercial buildings in key locations. The company's ability to meet the specific requirements of the real estate market and its clients is associated with strong reasons for professionalism, integrity and unrivaled knowledge. Currently, TDI
has 11 multifunctional multiplexes, 8 Ultra Mosper Office committees, 8 residential villages in Delhi, Kharian, Uttar Pradesh and Penjab (both in the operational and "work" part). Each TDI project differs from others in terms of design aesthetics and construction quality. TDI has left an indelible mark in the country's panorama and constantly creates
new quality indicators andConceptual innovations in combination with advanced construction technologies in both residential and commercial tanks. The TDI reflects high -quality standards for project planning and relationships, the proposal for both sides advantageous and honest business and the timely completion of the projects. 9. Independent
lifespan of the exclusive floors 74-A sector TDI violations in Mohal is another residence for the option for a premium accommodation to create the perfect home for Mohali. Connaugh's residence is not only a life address, but also a real way to create luxury in a closed complex. The Connaugh Residence in the most prestigious and convenient area of
Mohali is a top -class attractiveness of the city, which is equipped with all modern services that you can only imagine. Each part of the Connaurure is created, taking into account their aesthetic wishes and practical advantages with marginal accuracy. Connaugh speechcecy is an idea that revolutionizes the concept of a house at which the moment of
recovery and self -operations is every moment. Full natural light that entered carefully planned rooms and windows is not possible not to notice the beauty of your place of residence. Be surrounded by the beauty of nature. More space for every mood. Every independent floors that is connected to Connaurure arrives with a beautiful landscape look on
the balcony that is really fascinated. As a continuation of your living space, the open space also acts as a canvas for infinite inspiration. 10. The first life opportunities for the Connaugh Residency class are not only the residence speech, but also the real opportunity to create a luxury in a closed residential complex. The Connaugh Residence in the most
prestigious and convenient area of Mohali is a top -class attractiveness of the city, which is equipped with all modern services that you can only imagine. • Connaught Spezecy is independent of the built -up apartment, which is about 250 apartments. • The location is approximately 250 square meters. (209.03 m²) (33'x68 ') with G+2 with a superplate
form approx. 1750 m2. Feet 11. • Distribution on the ground next to the general floor streets. • Protected and closed community. 12. • Excellent design for maximum visibility and natural sunlight on every floor. • Implementing the concept of "intelligent cities". • An essential part of TDI City-I (approx. 300 acres) in sectors 74-A, 92, 117, 117, 118 and
119. • Comfort to make purchases in the immediate vicinity of Connaugh Plaza. 13. Project specifications • 2D floor 14. • 3D floor (first floor) 15. • Live/dining room • floors •Digital parquet styles (Somany, Orient, Kajaria, Hindware). â ¢ Wall  Pop pinning + acrylic emulsion paint. Pop popular ceilings with decorative lights.
Rooms with flooring - digital / wooden floor tiles (size 2'*2') (Somany, Orient, Kajaria, Hindware). â ¢ wall  pop pinning + emulsion acrylic painting. ¢ Modular cabinets with hydraulic knots. â ¢ porte d'intrée e  chowkhat with video from teak and teak door design. Integrated Doors - Dresplayers Roll with Sal. ¢ hoods - Sal with a teak and laminate
clothes comb.
â ¢ Kitchen ¢ Comptoir and © Vier  Granite counter, double stainless steel virgin with the highest quality and premium quality tiles. Floors - Excellent Quality Non Tile. â ¢ wall  greasy cranberry. Modular Kitchen with Hettich, sheet and chimney (Kaff or Quivale), Instant, RO/Aquaguard and Gas Pipeline. â ¢ Balconi ¢ Scarecrow-Fantasy/Designer
MS or Rot Iron. High quality anti-volid tile set. â ¢ Wall  Textured (Shepherd / Asia). â ¢ hallway / stairs, floor granite. â ¢ wall  greasy cranberry. Eighth rot with a wooden surface above the wooden surface. Bath. â ¢ Wall - Dinner Quality Cerema Tiles Full Height (Size 1 '*2'). ¢ Link CP - Jaguar or Grohe or equivalent. ¢ High Hindware or Duravit
or Equivalent Range Porcelain. ¢ False modular strop-cypsum (moisture resistant) + grid. ¢ Electrical ¢ Switches  ABB or Havells or Legrand. â ¢ Polikab or Havelo copper wires. â ¢ Divide AC 1.5 tons into living room, dining room and bedrooms (number 5). â ¢ Exterior ¢ Intemes / Paint / Paint / Hard texture on Mangalore tiles 16. Internet High
Speed Wi -fi ¢ Security Elements -Electronic Security -Promophones Plumbing ª Wooders -Moderiler -Modular Kitchen Compatibility with Feng Shui / Community Center Park / Green Bar ¢ Item - Great Parks and Lecker Green Zones - Closed Community and Safe Community - 24 x7 Video Surveillance of ChildrenAlso known as seismic teams or
horizontal teams. The horizontal walls of the belt in buildings have seismic bands made of reinforced concrete. What are the walls of the horizontal belt in buildings? The rod levels can be defined as a method of attaching wall buildings, thereby providing higher voltage resistance paths. It is activated in areas where two structural elements of the
building connect and function as a single entity. Horizontal bands can also be referred to as seismic bands, which are made of flat concrete reinforced for all external and internal wall elements. The location of the horizontal bars in buildings is used for the following levels: horizontal bar types of this building, based on the area where there is a
horizontal bar delivered on the level (i.e. doors and windows) follows. Dig. 1: Horizontal rod representation in a wall building, in which 1 time tape, 2 roof tape, 3 vertical reinforcement belt, four times, 5 windows, 6 garden rod, 7 the window another tape. This type of tape of this type of strand levels is important in areas where the soil constructed in
the building is weak. The soil is soft with irregular characteristics. This problem mainly occurs in uneven areas. If we have stronger ground and infrastructure, this group is not necessary. As can be seen from the words, these are horizontal stripes that are provided on an empty stomach. And it is delivered in almost all buildings. Under the influence
of an earthquake soil, a ligament path undergoing continuous bending and binding as shown in Fig. 1. 2. For this reason, the construction of the fast belt is done with special attention and control. 19. Figure 2: Recommendations for the design of horizontal bars under seismic activity of a horizontal belt are: 4326-1996 application code.
This applies to brick or concrete block walls, as well as buildings with RC flat-panel roofs. The size of the horizontal bar and reinforcement of parts depends on the length of the walls between the vertical cross walls. Details of the size of the gang and reinforcement detailsWall thicknesses for buildings with different functions are given in Table-1.
These recommendations apply to buildings in Zone 5 of the Indian Code. Table 1: Horizontal bar sizes for various buildings 20. Figure 3: For more information on horizontal bar reinforcement details, bar size and recommendations, refer to Indian Standards and IS 13828 (1993). The strips used can be wood or reinforced concrete. R. groups are the
best. Spacers of at least 75mm x 38mm and at least 50mm x 30mm are used for the rails as shown in Figure 4. 21. Current blueprint showing columns and seismic bands in TDI tier. Groups.
22.
Basic Detailed Plan 23. Beam Detail Plan 24. False Graduate Plan 6mm P.O.P Ceiling Operation 25.
Sanitary Planning Ground Floor Plan 26.
Ground Floor Plan 27. Furniture Planning: Floor28. 1750 Sq FT Carpet Area: 1460 Sq.ft.
Ft case: â ¢ Internal: 600mm x 600mm â ¢ External: 230mm x 230mm ¢ ¢ ¢ External: 20mm ppc0ās 20 steel: 3090kg • Frame construction • Masonry: • Internal: 4.5 (Java 1: 4 Mix) • Outside: 9 - 1:6 Mix) Â6mm P.O.P. Ceiling Print • Total P.O.P Area: 550 square meters. Height from floor to ceiling: 9A9 x 29. The base is the lower part of the building
structure that transfers the gravity load to the ground. Basically, foundations are divided into two categories: shallow foundations and deep foundations. A tall building must have a solid foundation to last. Types of Foundations: Flat foundations (sometimes referred to as "lined foundations") include pallet ("insulated foundations"), strip foundations,
and raft foundations. Deep foundations include piles, pile walls, diaphragm walls and caissons.
Insulated Base: We used an insulated base with beveled sides. Railway concrete columns are most commonly used on isolated foundations because they are the simplest and most economical. An insulated foundation is used to support the column. Pad footings are independent footings for each column. When using this type of substrate • the posts are
not close together. • The load on the sheets is lower. The safe bearing capacity of the soil is generally high. 30. Used for masonryBuildings and other buildings that use brick stone, stone blocks, blocks with different types of wall. Various types of bricks are used for masonry. ¢ General burned clay bricks. • Wapno -If (lime bricks) -technical bricks. •
Cement bricks. Avxical bricks. The bricks are classified as follows: first -class bricks: second -class bricks -a third -class class -a fiddled class on the walls, we used red bricks from the second class used in a black, Flemish combination.
Flemish connection: This binding has a stretcher between the heads and in the middle of the head above the wearing on the path below. Where the track begins with rotating extensions, the route usually ends with rotating elongated at the other end. The next course will start the quain title. At the second playground the morning of the queen is closer
to creating a wedge in custody. The third brick along Barell and is caused by a can - in the middle above the title below. So the second course lasts in pairs of changes and is tested until the last park is reached, and therefore the second and last queen is closer to the penultimate cube, reflection system at the beginning of the track and correctly
closing. 31. Some examples of Flemish connections contain colorful stretches and other evil. These effects are usually a product for brick head, and bricks are burned as part of the production process. Some front surfaces are exposed to wooden smoke, creating a gray color, while others are simply sown until they reach the deepest blue. Some heads
have a glass surface caused by the use of salt during filming. Sometimes Staffordshire blue bricks are used for head bricks. The wall, which seems to be the front and back of the Flemish, is a double connection of Flemanda, the front and rear reproduction of the model. If the wall is arranged so that the bricks at the back do not have such a pattern,
then the wall is spoken as a simple Flemish bond. The Flemish brick wall with a single brick is a repeated Barell model, immediately built at the front end of wearing, and then along the track. The bike (correct coincidence) creates a woman closer to each alternative playground: 32. Testing quality control is performed by various types of brick
tests.goals.
Brick tests are carried out both in the pipeline and in the laboratory. Bricks are the oldest and most important building materials for their resistance, reliability, sustainability and low cost. Types of brick tests for construction The bricks are tested to determine their ability for construction work. 1.
Absorption test 2.Test of compression resistance 3. Destructurete 4.Test of shape and size 5. Coulers 6. Awarllation 7.Structure of brick 8.Presence of soluble salts (Effoces test ) Compression resistance compression test or compression resistance test for brick compression, the resistance of a brick is determined by positioning the bricks in a
compression test computer. After placing the brick in the compression test machine, apply it until the brick breaks. He notes the value of the load broken and discovers the value of the destructive resistance of the brick. The minimum resistance to crushing bricks is 3.50 N/mm2. If it is less than 3.50 N/mm2, it is not useful for the building. The
minimum resistance to crushing/compression of brick plans is: (i) conventional construction bricks 35 kg/m2. CM, (II) second class 70 kg/m² bricks. M. CM, (III) First class 105 kg/m² bricks. See 33.
Brick test for brick n. 1 2 3 Moy/Brick Note (MMQ) 23.27 23.27 23.27 Maximum load at 300 350 350 14.32 Compression 12.89 15.04 15.04 Note: Limitation: AVG no less than 10.5 KN /mmk. Brick n. 1 2 3 Moy/Note Length (mm) 220 220 2225 Width (mm) 105 105 23275/1000 Height (mm) 75 75 75 23.75 area in (mmq) 23100 23100 23625 reinforced
concrete structures and armed masonry. It is generally made of carbon steel and equipped with ribs for better mechanical anchoring in concrete. It can also be qualified as reinforced reinforcement or steel. HSD steel bars (high resistance bar) used in our project. High resistance barneys: 1786-1985 are steel bars equipped with rings, ribs, projections
or surface deformations, and cold deformed bars are produced. These columns are widely used for reinforcement purposes in construction.
These steel bars, due to ribs or projections on the surface, reduce the sliding of concrete and increase the connection between the two materials, that is to say between cement concrete and steel bars. HSD specificationsenergy and welding power. â ¢ Superior Joint Strength: HSD Bars are known for their excellent joint strength when used with
concrete.
â ¢ Weldability: Because these belts contain less carbon, they have 100% weldability than conventional belts. ¢ High pull resistance: HSD bars have a high resistance to stretching. They offer great resources in a building process that requires a lot of flexibility and reduction. ¢ Wide range of applications: These straps have a wide range of applications,
e.g. B. Construction of residential, commercial and industrial buildings, bridges, etc. â ¢ Satisfactory elongation, minimum weight and maximum strength and suitable for both compression and tension reinforcement. 35. Connection resistance of the deformed auction, in addition, the calculated resistance of the deformed strips should be 40-80%
higher than normal round strips with nominal dimensions. Tor steel has 1.5 to 2.0 times the strength of steel in compression and tension while costing only 10% more than mild steel.
Deformed bar steel N/mm² at least 0.2% of the proven stress or impact stress. The stress detected is the stress when the infinite strain is 0.2% of the initial gauge length. Deformed steel bars are therefore very favorable for RCC work. A structural engineer recommends deformed cold bars (rib or gate auctions) as these are the best steel bars for
construction work. Specifications in steel in each villa: The Connaught residence in each villa contains 1152 kg of steel plates, 1864 kg of steel beams, 271 kg of steel stairs. Each villa has 10 columns and contains 629 kg of steel. There are 16mm diameter auctions and each column contains 25 8mm diameter rings. The gap size is 1 x 2. Steel TMT 520
is used. 36.
Concrete Concrete in its simplest form is a concrete mix of pasta and filler. A paste of portland cement and water coats the surface of the small and large. A chemical reaction called hydration hardens the noodles, requiring force to form a rock-like mass called concrete. This process is the key to the extraordinary properties of concrete: it is malleable
and malleable when just mixed, strong and resilient when hardened. The durability, relatively low strength and cost of concrete make it the foundation of buildings and infrastructure around the world, schools and hospitalsFor example, developing countries are increasingly becoming campuses, excessive weather conditions require more durable
building materials, and other infrastructure materials are steadily increasing.
Even construction experts sometimes use concrete and some terms incorrectly. Cement is actually a concrete component. It is a small powder that forms a scale-like mass known as cement after mixing with water, sand, and crushed gravel or stone (small, coarse aggregate). The concrete shapes are manufactured in four basic shapes with unique
applications and functionality. 1. Ready-mixed concrete, the most common form, nearly three-quarters of which form concrete. It was transported to local plants to deliver to trucks known for the rotating drum. 37. 2.
Collapsible concrete products are cast in factory settings. These products use rigorous quality control obtained in the manufacturing plant. Collapsible products include concrete bricks and parquet stones to overcome their radii, building components and wall panels. Other types of concrete made of concrete miracle may be known for the traditional
block of 8 Na-8 in 16 inches. Modern brick units can be formed into rich shapes, configurations, colors and textures to serve in an endless spectrum of building applications and architectural needs. 3. Cement-based materials refer to products that oppose the "concrete" label but share most of their properties. Traditional materials in this category are
boards, commissions, and lastrazo. Concrete and concrete "cousins" are used for cobblestones and dams. Other products in this category include flow stream and cement processing soles. 4. A new generation of advanced products, roof tiles, shocking areas, knees and stands to create special fibers and units. OPC (Conventional Portland Cement) is
used on page 38. Here are 6 conventional cement quality tests before and after launch on site. • Inheritance check before and after leaving the party object. ... • Compressive strength test. ... • Water permeability test. ... • A quick chloride penetration test. ...
• Water absorption test. ... • Start surface vacuum test. 39. withThe test evaluates whether the stress was performed correctly or not. The overall compressive strength of structural concrete ranges from 15 MPa (2,200 psi) to 30 MPa (4,400 psi) and higher for commercial and industrial structures. The compressive strength of concrete depends on
many factors, such as: B. Water-cement ratio, cement strength, quality of concrete material, quality control of concrete production, etc. The compressive strength test is performed on a cube or cylinder. Various standard codes recommend a concrete cylinder or a concrete cube as a standard specimen. Procedure: Cube test Cement cube compressive
strength test Two types of samples or one cube 15 cm x 15 cm x 15 cm or 10 cm x 10 cm depending on the size of the device. The most commonly used cubic shape in most works, 15cm x 15cm x 15cm. This concrete is poured into the form and properly cured to avoid voids. After 24 hours, these molds are removed and the samples are placed in water
to harden. The upper surface of these samples should be smooth and smooth. This is done by applying cement paste and gently spreading it over the entire area of the sample. This concrete is poured into the form and properly cured to avoid voids. After 24 hours, these molds are removed and the samples are 40. placed in water to harden. The upper
surface of these samples should be smooth and smooth. This is done by applying cement paste and gently spreading it over the entire area of the sample. Test Precautions. Water curing water should be checked every 7 days and water temperature should be 27+-2℃. 41.
Strength of concrete of all ages The compressive strength of concrete increases with age. The table shows the strength of concrete in different age groups compared to the strength 28 days after casting. Aging resistance Percentages 1 day 16% 3 days 40% 7 days 65% 14 days 90% 28 days 99% 42 Thickness (N/mm2) 28 days M15 10 15 m20 13.5 20
m25 17 25 m230 5 5 5 5 M40 27 40 M45 30 45 43. Cuban cast iron blade. mm) width (mm) height (mm) KN load force on KN resistance N/mmq. M. Average thickness N/mmq. M. Vid. Strogt H, n/mmq. M. 1 28 150 150 150 700 31.11 2 28 150 150 150 150 150 690 30.66 32.07 25 3 28 150150 775 34.44 conclusion: For the necessary power of 25
kn/mmsv, we are compression resistance 32.07 kn/fly. 44. Bibliography. Left: 1. The theory of Rammamrutam structures for the revision of literature using the Kani method. 2. The theory of 3. natural concrete structures A.K. Jain and B.C. Puntia for rats from rays, columns and ovens. 4.
Base of the structure of the concrete of weapons in the northern part. The books of the SINHA 1 code are 456-2000 books on the design of rays, columns and 2.P-16 panels for the design of the columns. The industrial training report on the preface in my industrial training in the last 4 months has been estimated on the basis of practical exams,
knowledge in the field of local processes and general knowledge about industry.
Mitraining advice sank the structure (PVT) Ltd and Isuru Engineering (PTE) Ltd. I am very happy to be able to send the relationship I received there. The time spent with Sanct Lanka as an experience as an intern was radically different from life in ICBT. However, in this short period I acquired vast experience in the field of soil engineering, I
recognized the value of the presence of sustainable theoretical and practical knowledge and I recognized the expected role of engineers in the sector. What I noticed in an organization, which I had as a practical experience and experience in the formation of myopia, are agglomerated in this relationship. For the first time, it describes my educational
institution (PVT) Ltd Andisuru Engineering (PTE) Ltd. The most important thing is what I received during the training period, all these things in this relationship. I developed what I did, what I saw and what I discovered at that moment. The position process, including memory procedures, safety functions and financial procedures, said she saw there.
The technical exams I received are described.
The functions and obligations I take, as well as technical and resolved social problems, have also been included. What I have received physically and mentally in the last 4 months, my approach to earnings and educational institutions, my overall evaluation of these meetings and my suggestions are also presented regarding improvement to guarantee
a more effective impact on future sites. HND/CV/MT/02/24 Upper domestic diploma Cyvil International College of Business and Technology Page 1 Learning theory.It doesn't lead to success. The apprentice program led by the ICBT Hill campus is highly valued because it was a great opportunity for me as a college student. At first I would like to thank
Mr. Gamini Rajakarun for spending a few minutes of his precious time to lead me and support me. the course of this project. He has always encouraged us to work on this module and appreciated our good work. He gave us great feedback and even more encouraged us to participate in this industrial training.
He paid great attention to industrial training and encouraged us to make the most of industrial training. I would also like to thank our administrator of Eng.anurudhdha. I would also like to thank project engineers Ing. Chapel Weeradinghe, engineer. HLN PRIYADHARSHANI, ENG. Samita Saparamad and all other project staff who gave me great
training and helped me in many ways. Finally, I thank my parents, family, colleagues and all who helped me train successfully. time. HND/CV/MT/02/2 24 Higher National Diploma in Civil Engineering International College of Business and Technology Page 2 Report on Industrial Education Contents Party Number… .... ¦â¦¦â¦â¦â¦â¦ ¦ 02 a) Project profile
... â | ……………………………………………………………………………………………………………………………………………………………………………………… ………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………… ………………… ………………………………………………………………… ... experience. .
……………………………………………………………………………… 24D). and | 54f). All problems and found solutions ……………………………………………… ā | ¦ …………………………………………………………………………………………………………………………………………………………………………… ………
………………………………………………………………………………………………………………………………………………. | ¦ …………………………………………………………………………………………………………………………………………………………………………… ………
……………………………………………………………………………………………………………………………………………………………………… ……… …………………………………………………………………………………………… 60 HND/CV/MT/02/24 National University Education in the field of engineering.