Melaka Costing
Melaka Costing
Melaka Costing
Preliminery
1 Mobilisation And Demobilisation LS 1 10,000.00 10,000.00
2 Site Office And Storage LS By Main Con
3 Worker Safety PPE (Helmet, Vest & Shoe only) nos included
4 Project Manager mth 3 9,500.00
5 Site Supervisor mth 3 6,500.00 40,000.00
6 Outstation Allowance mth 3 5,000.00
2.50 6,860.00
7 Supply labour only to level and compact backfill area m2 2744
26 Supply labour and small tools Only Fabricate And kg 609318 0.47 286,379.46
Install Reinforcement Steel Bar
27 Supply labour and snall tools Only To Lay BRC m2 15398 2.00 30,796.00
10,000.00
40,000.00
2.50 6,860.00
2.50 6,860.00
0.50 2,684.00
2 12.00 24.00 0 -
42 12.00 504.00 4.63 6,861.66
4 12.00 48.00 9.25 564.25
1.00 18,900.00
5.00 500.00
5.00 1,000.00
1.20 18,477.60
12.00 35,340.00
12.00 35,340.00
92,480.00 736,800.45
829,280.45
482,794.41
Quotation For RC Work Contract
Item Description Unit Quantity Rate Amount
Preliminery
1 Mobilisation And Demobilisation LS 1 10,000.00 10,000.00
2 Site Office And Storage LS By Main Con
3 Worker Safety PPE (Helmet, Vest & Shoe only) nos included
4 Project Manager mth 3 9,500.00
5 Site Supervisor mth 3 6,500.00 40,000.00
6 Outstation Allowance mth 3 5,000.00
2.50 6,860.00
7 Supply labour only to level and compact backfill area m2 2744
26 Supply labour and small tools Only Fabricate And kg 609318 0.47 286,379.46
Install Reinforcement Steel Bar
27 Supply labour and snall tools Only To Lay BRC m2 15398 2.00 30,796.00
19,168 12,936 82,940 31,467 123,078 10,347 315,199 4,993 6,588 606,713
3.16% 2.13% 13.67% 5.19% 20.29% 1.71% 51.95% 0.82% 1.09%
A8 A9 A10 B8 B10
10470 28 9573 3827 4819 28717
10,000.00
40,000.00
2.50 6,860.00
2.50 6,860.00
0.50 2,684.00
2 12.00 24.00 0 -
42 12.00 504.00 4.63 6,861.66
4 12.00 48.00 9.25 564.25
1.00 18,900.00
5.00 500.00
5.00 1,000.00
1.20 18,477.60
12.00 35,340.00
12.00 35,340.00
92,480.00 736,800.45
829,280.45
482,794.41
Project Overall Status
Preliminery
3 Mob & Demob 10,000.00 10,000.00
4 Staff 30,000.00 30,000.00
5 Outstation 10,000.00 10,000.00
Sub-Con
6 Backfill Earth 6,860.00 6,860.00
7 Lay Lean Con 6,860.00 6,860.00
8 Lay Polysthren 4,294.40 2,684.00
9 Formwork 793,675.00 409,763.91
10 Spray Curing Compound 18,900.00 18,900.00
11 Water Stop 800.00 500.00
12 Construction Joint 1,600.00 1,000.00
13 Reinfircement Bar 286,379.46 201,074.94
14 BRC 30,796.00 18,477.60
15 Cast Concrete 111,910.00 70,680.00
Material
16 Plywood And imber 19,920.00
17 Hollow Section 9,960.00
Machinery
18 Reinfircement Bar 12,600.00
19 Profit 482,794.41
1,312,074.86 1,312,074.86
-
2020 Total
Jan Feb Mar
Amount Cert Amount Cert Amount
PO Vs DO Vs Invoice
CB00032771 12/5/2019 1
5
5
200
7
6
D0-13308 1500
CB00032982
VTC/19/12-37 1/2/2020 600 1/2/2020 12709 600
2 2
CB00033187 14305
CB00033187 14308
Plywood Timber
600
8
600
2
Tools Transfer To Site
2 bundles
300 pieces
60 pieces
98 pieces
1 set
1 set
1 set
476 pieces
Balance On Site
Qty
#REF!
### #REF!
#REF!
### #REF!
1 Insurance
2 Perforcemance Bond
3 Stamp Duty Of Contract
4 CIDB Levy
5 Quality Standard - Standard / Qlastic / Conquest
6 Location of Site
7 Comencement Date
8 Construction Duration
9 Payment Term
10 Retention
11 LAD
12 DLP
13 First (1st) Release Of 2.5% Retention
14 CPC On Structural Only / Overall Project
15 Authority Issue
16 Working Day
17 Working Hours
60 Concrete Spacer
61 Construction Joint (Material)
60 Inspection Form
61 Progress Report
62 Daily Site Records
65 Project Manager
66 Site Supervisor
67 Safety Supervisor (Yellow Book)
68 Site Quantity Surveyor
69 Admin Cum Store Keeper
77 Water Pump
78 Compactor for Backfilling
79 PE Sheet
Reinforcement Bar
84 Steel Bar
85 BRC
86 Bar Bending Machine
87 Bar Cutting Machine
Concrete Supply
88 Static Concrete Pump + Piping
89 Concrete Bucket
90 Mortar Bin
91 Vibrator Pocker
92 Hyrib Mesh
93 Water Stop
94 Curing Compound
To Be Confirm
Melaka
6th December
To Be Confirm
30 days from Subcon Claim
Max 5%
To Be Confirm
To Be Confirm
To Be Confirm
To Be Confirm
To Be Confirm
To Be Confirm
To Be Confirm
1 Insurance
2 Perforcemance Bond
3 Stamp Duty Of Contract
4 CIDB Levy
5 Quality Standard - Standard / Qlastic / Conquest To Be Confirm
6 Location of Site
7 Comencement Date To Be Confirm
8 Construction Duration To Be Confirm
9 Payment Term 30 days from Subcon Claim
10 Retention Max 5%
11 LAD To Be Confirm
12 DLP To Be Confirm
13 First (1st) Release Of 2.5% Retention To Be Confirm
14 CPC On Structural Only / Overall Project To Be Confirm
15 Authority Issue
16 Working Day
17 Working Hours
60 Concrete Spacer
61 Construction Joint (Material)
60 Inspection Form
61 Progress Report
62 Daily Site Records
65 Project Manager
66 Site Supervisor
67 Safety Supervisor (Yellow Book)
68 Site Quantity Surveyor
69 Admin Cum Store Keeper