Final Documentation Dossier Index: Arabian Gulf Oil Co - Agoco
Final Documentation Dossier Index: Arabian Gulf Oil Co - Agoco
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
1.1 General 1 of 11
1.1.1 Civil - Inspection and Test Plan 1 of 11
1.1.2 Concrete Mix Design 1 of 11
1.1.3 Calibration of Concrete Batching Plan 1 of 11
1.1.4 Laboratory Test of Aggregats 1 of 11
1.1.5 Reinforcing Bars Certificate of Conformity 1 of 11
1.1.6 Test Report and Chemical Analysis of Cement 1 of 11
1.3 Pre-commissioning 1 of 11
1.3.1 Civil / Structural - Pre-commissioning Check List 1 of 11
2.1 General 1 of 11
2.1.1 Piping - Inspection and Test Plan 1 of 11
Welding Procedure Specification (WPS) and
2.1.2 1 of 11
Welding Procedure Qualification Record (PQR)
2.1.2.1 API 1104 Procedure No. 3981-B 1 of 11
2.1.2.2 API 1104 Procedure No. 3982-B 1 of 11
2.1.2.3 API 1104 Procedure No. 3981-D 1 of 11
2.1.2.4 ASME IX Procedure No. 3910-14 1 of 11
2.1.2.5 ASME IX Procedure No. 3906-01 1 of 11
2.1.2.6 ASME IX Procedure No. 3906-03 1 of 11
2.1.3 LIST OF QUALIFIED WELDERS / WELDERS QUALIFICATION CERTIFICATES 1 of 11
2.1.3.1 List of Qualified Weldes - 2010 1 of 11
2.1.3.1.1 API 1104 - WQ Certificates 1 of 11
2.1.3.1.2 ASME IX - WQ Certificates 1 of 11
2.1.3.2 List of Qualified Weldes - 2012/2013 1 of 11
2.1.3.2.1 API 1104 - WQ Certificates 1 of 11
2.1.3.2.2 ASME IX - WQ Certificates 1 of 11
2.1.3.3 List of Qualified Weldes - 2015 1 of 11
2.1.3.3.1 API 1104 - WQ Certificates 1 of 11
2.1.3.3.2 ASME IX - WQ Certificates 1 of 11
Page 1
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
Page 2
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
Page 3
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
Page 4
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
2.20 Pre-commissioning 5 of 11
2.20.1 Mechanical / Piping - Pre-commissioning Check List 5 of 11
2.20.2 Manifold (Agoco supply) - Pre-commissioning Check List 5 of 11
2.20.3 Launcher & Receiver - Pre-commissioning Check List 5 of 11
2.20.4 Valves installed - Pre-commissioning Check List 5 of 11
3.1 General 5 of 11
3.1.1 E/I - Inspection and Test Plan 5 of 11
3.1.2 General Inspection Reports 5 of 11
3.1.3 Cable Test Reports 5 of 11
3.1.4 Release for backfilling 5 of 11
3.1.5 List of Instruments Installed 5 of 11
3.1.5.1 Instrument Calibration Records 5 of 11
Page 5
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
4 AS-BUILT DRAWINGS
Page 6
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
"EMERSON - ROXAR"
5.2 8 of 11
Roxar Multiphase Meter 2600
5.2.1 USER MANUAL 8 of 11
5.2.1.1 USER MANUAL - INTRODUCTION / SHEQ ROX000230195/AA 8 of 11
5.2.1.2 USER MANUAL - TECHNICAL INFORMATION 8 of 11
5.2.1.2.1 Instrument Data Sheet 228698 8 of 11
5.2.1.2.2 Process Data Sheet 8 of 11
5.2.1.2.3 Functional Description 091980 8 of 11
5.2.1.2.4 Design Codes & Standards for MPFM 2600 158231 8 of 11
5.2.1.3 Hazardous Area Certificates 8 of 11
5.2.1.3.1 MPFM 2600 Electronics 103979 8 of 11
5.2.1.3.2 Transmitter 185660 8 of 11
5.2.1.3.3 Barriers 039074 8 of 11
5.2.1.3.4 EXD Flow Computer Enclosure 089930 8 of 11
5.2.1.4 Drawings 8 of 11
Page 8
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
Page 10
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617
Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01
6 MATERIAL CETIFICATES
6.1 Valves 11 of 11
6.2 Pipes 11 of 11
6.3 Fittings (Flanges, Elbows, Bolts & Nuts) 11 of 11
6.4 Gaskets 11 of 11
6.5 Isolating Flanges Kits 11 of 11
6.6 Electodes 11 of 11
Page 11