Final Documentation Dossier Index: Arabian Gulf Oil Co - Agoco

This document provides an index of final documentation for a project to install trunklines, flowlines, and manifolds for an oil field. The index lists reports and certifications for civil works, piping and welding procedures. It includes items like concrete mix designs, welding qualification records, pipe logs, radiographic reports, coating reports and pre-commissioning checklists. The documentation is separated by discipline and provides the document number and volume for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
225 views11 pages

Final Documentation Dossier Index: Arabian Gulf Oil Co - Agoco

This document provides an index of final documentation for a project to install trunklines, flowlines, and manifolds for an oil field. The index lists reports and certifications for civil works, piping and welding procedures. It includes items like concrete mix designs, welding qualification records, pipe logs, radiographic reports, coating reports and pre-commissioning checklists. The documentation is separated by discipline and provides the document number and volume for each item.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

ARABIAN GULF OIL CO - AGOCO

INSTALLATION OF TRUNKLINE, FLOWLINES


AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


1 CIVIL

1.1 General 1 of 11
1.1.1 Civil - Inspection and Test Plan 1 of 11
1.1.2 Concrete Mix Design 1 of 11
1.1.3 Calibration of Concrete Batching Plan 1 of 11
1.1.4 Laboratory Test of Aggregats 1 of 11
1.1.5 Reinforcing Bars Certificate of Conformity 1 of 11
1.1.6 Test Report and Chemical Analysis of Cement 1 of 11

1.2 Civil - Reports 1 of 11


1.2.1 Concrete Preplacement Report 1 of 11
1.2.2 Concrete Strenght Test Result 1 of 11

1.3 Pre-commissioning 1 of 11
1.3.1 Civil / Structural - Pre-commissioning Check List 1 of 11

2 PIPING - FLOWLINES, TRUNKLINE, STATION PIPING

2.1 General 1 of 11
2.1.1 Piping - Inspection and Test Plan 1 of 11
Welding Procedure Specification (WPS) and
2.1.2 1 of 11
Welding Procedure Qualification Record (PQR)
2.1.2.1 API 1104 Procedure No. 3981-B 1 of 11
2.1.2.2 API 1104 Procedure No. 3982-B 1 of 11
2.1.2.3 API 1104 Procedure No. 3981-D 1 of 11
2.1.2.4 ASME IX Procedure No. 3910-14 1 of 11
2.1.2.5 ASME IX Procedure No. 3906-01 1 of 11
2.1.2.6 ASME IX Procedure No. 3906-03 1 of 11
2.1.3 LIST OF QUALIFIED WELDERS / WELDERS QUALIFICATION CERTIFICATES 1 of 11
2.1.3.1 List of Qualified Weldes - 2010 1 of 11
2.1.3.1.1 API 1104 - WQ Certificates 1 of 11
2.1.3.1.2 ASME IX - WQ Certificates 1 of 11
2.1.3.2 List of Qualified Weldes - 2012/2013 1 of 11
2.1.3.2.1 API 1104 - WQ Certificates 1 of 11
2.1.3.2.2 ASME IX - WQ Certificates 1 of 11
2.1.3.3 List of Qualified Weldes - 2015 1 of 11
2.1.3.3.1 API 1104 - WQ Certificates 1 of 11
2.1.3.3.2 ASME IX - WQ Certificates 1 of 11

2.2 Flowline VV-01 - Construction Reports 1 of 11


2.2.1 Pipe Book - Flowline 1 of 11
2.2.2 Pipe Log Book - Wellhead / Manifold 1 of 11
2.2.3 Radiographic Report 1 of 11
2.2.4 Coating Report 1 of 11
2.2.5 Holiday Test Report 1 of 11
2.2.6 Release for Backfilling 1 of 11

2.3 Flowline VV-02 - Construction Reports 1 of 11


2.3.1 Pipe Book - Flowline 1 of 11
2.3.2 Pipe Log Book - Wellhead / Manifold 1 of 11
2.3.3 Radiographic Report 1 of 11
2.3.4 Coating Report 1 of 11

Page 1
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


2.3.5 Holiday Test Report 1 of 11
2.3.6 Release for Backfilling 1 of 11

2.4 Flowline VV-03 - Construction Reports 1 of 11


2.4.1 Pipe Book - Flowline 1 of 11
2.4.2 Pipe Log Book - Wellhead / Manifold 1 of 11
2.4.3 Radiographic Report 1 of 11
2.4.4 Coating Report 1 of 11
2.4.5 Holiday Test Report 1 of 11
2.4.6 Release for Backfilling 1 of 11

2.5 Flowline VV-04 - Construction Reports 2 of 11


2.5.1 Pipe Book - Flowline 2 of 11
2.5.2 Pipe Log Book - Wellhead / Manifold 2 of 11
2.5.3 Radiographic Report 2 of 11
2.5.4 Coating Report 2 of 11
2.5.5 Holiday Test Report 2 of 11
2.5.6 Release for Backfilling 2 of 11

2.6 Flowline VV-05 - Construction Reports 2 of 11


2.6.1 Pipe Book - Flowline 2 of 11
2.6.2 Pipe Log Book - Wellhead / Manifold 2 of 11
2.6.3 Radiographic Report 2 of 11
2.6.4 Coating Report 2 of 11
2.6.5 Holiday Test Report 2 of 11
2.6.6 Release for Backfilling 2 of 11

2.7 VV - Station Interconnecting Piping - Construction Reports 2 of 11


2.7.1 Piping Logbook 2 of 11
2.7.2 Radiographic Report 2 of 11
2.7.3 Coating Report 2 of 11
2.7.4 Holiday Test Report 2 of 11
2.7.5 Release for Backfilling 2 of 11

2.8 16" Trunkline VV Station to GC-8 Station - Constr. Reports 2 of 11


2.8.1 Piping Logbook 2 of 11
2.8.2 Pipe Stringing & Welding Report 2 of 11
2.8.3 Radiographic Report 2 of 11
2.8.4 Coating Report 2 of 11
2.8.5 Holiday Test Report 2 of 11
2.8.6 Release for Backfilling 2 of 11

2.9 GC-8 - Station Interconnecting Piping - Constuction Reports 3 of 11


2.9.1 Piping Logbook 3 of 11
2.9.2 Radiographic Report 3 of 11
2.9.3 Coating Report 3 of 11
2.9.4 Holiday Test Report 3 of 11
2.9.5 Release for Backfilling 3 of 11

2.10 FLOWLINE VV-01 3 of 11


2.10.1 Hydrotest Package 01 3 of 11
2.10.1.1 Hydrotest Procedure 3 of 11
2.10.1.2 ISO Drawings, P & ID 3 of 11

Page 2
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


2.10.1.3 Pipe Book 3 of 11
2.10.1.4 NDE Test Records 3 of 11
2.10.1.5 Pipe Work Pre-Test Check list 3 of 11
2.10.1.6 Internal Pipe Cleaning / Drying Report 3 of 11
2.10.1.7 Construction Punch List 3 of 11
2.10.1.8 Pressure / Leak Test Record 3 of 11
2.10.2 Hydrotest Package 01A 3 of 11
2.10.2.1 ISO Drawings, P & ID 3 of 11
2.10.2.2 Pipe Book 3 of 11
2.10.2.3 NDE Test Records 3 of 11
2.10.2.4 Pipe Work Pre-Test Check list 3 of 11
2.10.2.5 Internal Pipe Cleaning / Drying Report 3 of 11
2.10.2.6 Construction Punch List 3 of 11
2.10.2.7 Pressure / Leak Test Record 3 of 11

2.11 FLOWLINE VV-02 3 of 11


2.11.1 Hydrotest Package 03 3 of 11
2.11.1.1 Hydrotest Procedure 3 of 11
2.11.1.2 ISO Drawings, P & ID 3 of 11
2.11.1.3 Pipe Book 3 of 11
2.11.1.4 NDE Test Records 3 of 11
2.11.1.5 Pipe Work Pre-Test Check list 3 of 11
2.11.1.6 Internal Pipe Cleaning / Drying Report 3 of 11
2.11.1.7 Construction Punch List 3 of 11
2.11.1.8 Pressure / Leak Test Record 3 of 11
2.11.2 Hydrotest Package 03A 3 of 11
2.11.2.1 ISO Drawings, P & ID 3 of 11
2.11.2.2 Pipe Book 3 of 11
2.11.2.3 NDE Test Records 3 of 11
2.11.2.4 Pipe Work Pre-Test Check list 3 of 11
2.11.2.5 Internal Pipe Cleaning / Drying Report 3 of 11
2.11.2.6 Construction Punch List 3 of 11
2.11.2.7 Pressure / Leak Test Record 3 of 11

2.12 FLOWLINE VV-03 3 of 11


2.12.1 Hydrotest Package 02 3 of 11
2.12.1.1 Hydrotest Procedure 3 of 11
2.12.1.2 ISO Drawings, P & ID 3 of 11
2.12.1.3 Pipe Book 3 of 11
2.12.1.4 NDE Test Records 3 of 11
2.12.1.5 Pipe Work Pre-Test Check list 3 of 11
2.12.1.6 Internal Pipe Cleaning / Drying Report 3 of 11
2.12.1.7 Construction Punch List 3 of 11
2.12.1.8 Pressure / Leak Test Record 3 of 11
2.12.2 Hydrotest Package 02A 3 of 11
2.12.2.1 ISO Drawings, P & ID 3 of 11
2.12.2.2 Pipe Book 3 of 11
2.12.2.3 NDE Test Records 3 of 11
2.12.2.4 Pipe Work Pre-Test Check list 3 of 11
2.12.2.5 Internal Pipe Cleaning / Drying Report 3 of 11
2.12.2.6 Construction Punch List 3 of 11
2.12.2.7 Pressure / Leak Test Record 3 of 11

Page 3
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


2.13 FLOWLINE VV-04 3 of 11
2.13.1 Hydrotest Package 05 3 of 11
2.13.1.1 Hydrotest Procedure 3 of 11
2.13.1.2 ISO Drawings, P & ID 3 of 11
2.13.1.3 Pipe Book 3 of 11
2.13.1.4 NDE Test Records 3 of 11
2.13.1.5 Pipe Work Pre-Test Check list 3 of 11
2.13.1.6 Internal Pipe Cleaning / Drying Report 3 of 11
2.13.1.7 Construction Punch List 3 of 11
2.13.1.8 Pressure / Leak Test Record 3 of 11
2.13.2 Hydrotest Package 05A 4 of 11
2.13.2.1 ISO Drawings, P & ID 4 of 11
2.13.2.2 Pipe Book 4 of 11
2.13.2.3 NDE Test Records 4 of 11
2.13.2.4 Pipe Work Pre-Test Check list 4 of 11
2.13.2.5 Internal Pipe Cleaning / Drying Report 4 of 11
2.13.2.6 Construction Punch List 4 of 11
2.13.2.7 Pressure / Leak Test Record 4 of 11

2.14 FLOWLINE VV-05 4 of 11


2.14.1 Hydrotest Package 04 4 of 11
2.14.1.1 Hydrotest Procedure 4 of 11
2.14.1.2 ISO Drawings, P & ID 4 of 11
2.14.1.3 Pipe Book 4 of 11
2.14.1.4 NDE Test Records 4 of 11
2.14.1.5 Pipe Work Pre-Test Check list 4 of 11
2.14.1.6 Internal Pipe Cleaning / Drying Report 4 of 11
2.14.1.7 Construction Punch List 4 of 11
2.14.1.8 Pressure / Leak Test Record 4 of 11
2.14.2 Hydrotest Package 04A 4 of 11
2.14.2.1 ISO Drawings, P & ID 4 of 11
2.14.2.2 Pipe Book 4 of 11
2.14.2.3 NDE Test Records 4 of 11
2.14.2.4 Pipe Work Pre-Test Check list 4 of 11
2.14.2.5 Internal Pipe Cleaning / Drying Report 4 of 11
2.14.2.6 Construction Punch List 4 of 11
2.14.2.7 Pressure / Leak Test Record 4 of 11

2.15 16" Line form VV Manifold to VV Launcher 4 of 11


2.15.1 Hydrotest Package 06 4 of 11
2.15.1.1 Hydrotest Procedure 4 of 11
2.15.1.2 ISO Drawings, P & ID 4 of 11
2.15.1.3 Pipe Book 4 of 11
2.15.1.4 NDE Test Records 4 of 11
2.15.1.5 Pipe Work Pre-Test Check list 4 of 11
2.15.1.6 Internal Pipe Cleaning / Drying Report 4 of 11
2.15.1.7 Construction Punch List 4 of 11
2.15.1.8 Pressure / Leak Test Record 4 of 11

2.16 4" Line from VV Multiphase Meter to VV Manifold 4 of 11


2.16.1 Hydrotest Package 08 4 of 11
2.16.1.1 Hydrotest Procedure 4 of 11
2.16.1.2 ISO Drawings, P & ID 4 of 11

Page 4
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


2.16.1.3 Pipe Book 4 of 11
2.16.1.4 NDE Test Records 4 of 11
2.16.1.5 Pipe Work Pre-Test Check list 4 of 11
2.16.1.6 Internal Pipe Cleaning / Drying Report 4 of 11
2.16.1.7 Construction Punch List 4 of 11
2.16.1.8 Pressure / Leak Test Record 4 of 11

2.17 16" Trunkline from VV Field to GC-8 Station 4 of 11


2.17.1 Hydrotest Package 07 4 of 11
2.17.1.1 Hydrotest Procedure 4 of 11
2.17.1.2 ISO Drawings, P & ID 4 of 11
2.17.1.3 Pipe Book 4 of 11
2.17.1.4 NDE Test Records 4 of 11
2.17.1.5 Pipe Work Pre-Test Check list 5 of 11
2.17.1.6 Internal Pipe Cleaning / Drying Report 5 of 11
2.17.1.7 Construction Punch List 5 of 11
2.17.1.8 Pressure / Leak Test Record 5 of 11
2.17.1.9 Trunkline Piging / Calibration Report 5 of 11

2.18 16" Line from GC-8 Receiver to GC-8 Manifold 5 of 11


2.18.1 Hydrotest Package 09 5 of 11
2.18.1.1 Hydrotest Procedure 5 of 11
2.18.1.2 ISO Drawings, P & ID 5 of 11
2.18.1.3 Pipe Book 5 of 11
2.18.1.4 NDE Test Records 5 of 11
2.18.1.5 Pipe Work Pre-Test Check list 5 of 11
2.18.1.6 Internal Pipe Cleaning / Drying Report 5 of 11
2.18.1.7 Construction Punch List 5 of 11
2.18.1.8 Pressure / Leak Test Record 5 of 11

2.19 VV Manifold (Factory Test Report) 5 of 11


2.19.1 P&ID Drawing 5 of 11
2.19.2 Hydrostatic Test Report 5 of 11

2.20 Pre-commissioning 5 of 11
2.20.1 Mechanical / Piping - Pre-commissioning Check List 5 of 11
2.20.2 Manifold (Agoco supply) - Pre-commissioning Check List 5 of 11
2.20.3 Launcher & Receiver - Pre-commissioning Check List 5 of 11
2.20.4 Valves installed - Pre-commissioning Check List 5 of 11

3 ELECTRICAL / INSTRUMENT (E/I)

3.1 General 5 of 11
3.1.1 E/I - Inspection and Test Plan 5 of 11
3.1.2 General Inspection Reports 5 of 11
3.1.3 Cable Test Reports 5 of 11
3.1.4 Release for backfilling 5 of 11
3.1.5 List of Instruments Installed 5 of 11
3.1.5.1 Instrument Calibration Records 5 of 11

3.2 Pre-commissioning - Commissioning 5 of 11


3.2.1 Pre-commissioning 5 of 11
3.2.1.1 Multi Phase Metering Unit - Pre-commissioning Check List 5 of 11

Page 5
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


3.2.1.2 Chemical Injection Skid - Pre-commissioning Check List 5 of 11
3.2.1.3 Solar Energy Power Container - Pre-commissioning Check List 5 of 11
3.2.1.4 Cathodic Protection System - Pre-commissioning Check List 5 of 11
3.2.1.5 Fire Extinguisher - Pre-commissioning Check List 5 of 11
3.2.2 Commissioning 5 of 11
3.2.2.1 Multi Phase Metering Unit - Commissioning Report 5 of 11
3.2.2.2 Chemical Injection Skid - Commissioning Report 5 of 11
3.2.2.3 Solar Energy Power Container - Commissioning Report 5 of 11
3.2.2.4 Cathodic Protection System - Commissioning Report 5 of 11

4 AS-BUILT DRAWINGS

4.1 LAYOUT Drawings 5 of 11


4.1.1 General Foundation Layout at Satellite VV CS-1-DR-MFO-015 5 of 11
4.1.2 General Layout Plan 16" Trunkline & 6" Flowlines at VV Field CS-1-DR-MFO-016 5 of 11
4.1.3 General Foundation Layout at GC-8 "Tie-in Area" CS-1-DR-MFO-017 5 of 11
4.1.4 Piping Layout at Satellite VV Plot Plan PP-1-DR-MFO-003 5 of 11
4.1.5 Piping Layout of new 16" Trunkline at GC-8 Plot Plan PP-1-DR-MFO-004 5 of 11
4.1.6 Earthing Layout at Satelite VV EL-1-DR-MFO-004 5 of 11
4.1.7 Earthing Layout at Tie-in Area in GC-8 EL-1-DR-MFO-005 5 of 11
4.1.8 Overall Layout Plan Location of Test Station CP System EL-1-DR-MFO-007 5 of 11

4.2 CIVIL AND STEEL STRUCTURE DRAWINGS / DOCUMENTS 5 of 11


4.2.1 Typical Bundwall at Wall Area CS-1-DR-MFO-001 5 of 11
Typical Anchor Block and Type "H" Pipe Support Detail for
4.2.2 CS-1-DR-MFO-002 5 of 11
6" Flowlines
4.2.3 16" Pipe Anchor Block Details for Trunklines CS-1-DR-MFO-003 5 of 11
4.2.4 Valve Box Detail for Ø 6" Flowlines Foundation Details CS-1-DR-MFO-004 5 of 11
4.2.5 Valve Box for 16" Trunkline CS-1-DR-MFO-005 5 of 11
4.2.6 Manifold Pile Foundation for 20 Ø Header CS-1-DR-MFO-006 5 of 11
4.2.7 Fire Extinguisher Foundation Details CS-1-DR-MFO-007 5 of 11
4.2.8 Topographical Plan & Cross Section Profile Details CS-1-DR-MFO-008 5 of 11
4.2.9 Alignment Sheets CS-1-DR-MFO-009 5 of 11
4.2.10 Perimeter Fence Layout at Satellite VV CS-1-DR-MFO-010 5 of 11
4.2.11 Perimeter Fence and 6.3 Meters wide Double Leaf Gate Details CS-1-DR-MFO-011 5 of 11
20"x16" PIG Launcher Concrete Pad at Satellite VV -
4.2.12 CS-1-DR-MFO-012 5 of 11
Reinforcement & Formwork Detail
20"x16" PIG Receiver Concrete Pad (to Zawiah Pipeline Tie-in)
4.2.13 CS-1-DR-MFO-013 5 of 11
at Satellite VV - Reinforcement & Formwork Detail
4.2.14 Chemical Injection Unit Foundation Details CS-1-DR-MFO-014 5 of 11
4.2.15 Sump Pit (Type 2) for Satellite VV Tie-in Area CS-1-DR-MFO-018 5 of 11
Typical Pipeline Marker (Trunkline) Formwork & Reinforcement
4.2.16 CS-1-DR-MFO-019 5 of 11
Details
Typical Pipeline Marker (Flowline) Formwork & Reinforcement
4.2.17 CS-1-DR-MFO-020 5 of 11
Details
4.2.18 Concrete Pipe Sleeper Type 1, 2, & 3 CS-1-DR-MFO-021 5 of 11
16" Ø Pipe Support (Type 1) & 16" Ø Valve Support (Type 2), 6"
4.2.19 Ø Pipe Support (Type 3) & 8" Ø Pipe Support (Type 4) CS-1-DR-MFO-022 5 of 11
Reinforcement & Formwork Details
Solar Energy Power System - Electrical Container Foundation
4.2.20 CS-1-DR-MFO-023 5 of 11
Details
4.2.21 Solar Energy Power System - Electrical Container Stair Details CS-1-DR-MFO-024 5 of 11

4.2.22 Existing manifold - VV arrea - Additional Stair Details CS-1-DR-MFO-025 5 of 11

Page 6
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


4.2.23 Multiphase Meter 2600 - Skid & Meter Equipment assembly CS-1-DR-MFO-026 5 of 11
Method Statement for fabrication of 2 pcs Anchor Blocks for 16"
4.2.24 5 of 11
trunkline
4.2.25 Design Calculation for 16" Pipe Anchor Block for Trunkline CS-4-CA-MFO-001 5 of 11
4.2.26 Calculation for 20"x16" Pig Launcher Concrete Pad CS-4-CA-MFO-002 6 of 11
4.2.27 Calculation for 20"x16" Pig Receiver Concrete Pad CS-4-CA-MFO-003 6 of 11
Solar Energy Power System - Sun Panel Container
4.2.28 CS-4-CA-MFO-004 6 of 11
Foundation Calculation

4.3 PIPING ISOMETRICS AND PIPE SUPORTS DRAWINGS 6 of 11


4.3.1 Piping & Instrumentation Diagram (P&ID) - Flowline PC-1-PP-MFO-001 6 of 11
4.3.2 Piping & Instrumentation Diagram (P&ID) - Trunkline & Manifold PC-1-PP-MFO-002 6 of 11
4.3.3 Wellhead Tie-in VV-01 (Isometrric Layout) PP-1-IS-MFO-001-1 6 of 11
4.3.4 Wellhead Tie-in VV-02 (Isometrric Layout) PP-1-IS-MFO-001-2 6 of 11
4.3.5 Wellhead Tie-in VV-03 (Isometrric Layout) PP-1-IS-MFO-001-3 6 of 11
4.3.6 Wellhead Tie-in VV-04 (Isometrric Layout) PP-1-IS-MFO-001-4 6 of 11
4.3.7 Wellhead Tie-in VV-05 (Isometrric Layout) PP-1-IS-MFO-001-5 6 of 11
4.3.8 16" Line to existing Manifold Tie-in 16"-CO-TKO15-LC1 PP-1-IS-MFO-002 6 of 11
4.3.9 16" Trunkline from VV-Field to Receiver 16"-CO-TKO15-LC2 PP-1-IS-MFO-003 6 of 11
4.3.10 2" Equalizing Line at Pig Receiver 2"-CO-23-LC1 PP-1-IS-MFO-004 6 of 11
4.3.11 16" Trunkline @ Scraper Launcher 16"-CO-TKO15-LC2 PP-1-IS-MFO-005 6 of 11
4.3.12 4" Drain Line @ Scraper Receiver @ GC-8 4"-CO-DO24-LC1 PP-1-IS-MFO-006 6 of 11
4.3.13 16" Line from Manifold to Scraper Launcher 16"-CO-TKO15-LC1 PP-1-IS-MFO-007 6 of 11
4.3.14 4" Drain Line @ Scraper Launcher 4"-CO-DO16-LC1 PP-1-IS-MFO-008 6 of 11
4.3.15 2" Equalizing Line at Pig Launcher 2"-CO-19-LC1 PP-1-IS-MFO-009 6 of 11
4.3.16 6" Line from Manifold to Sump pit PP-1-IS-MFO-010 6 of 11
4.3.17 4" Line from Multi-phase to 6" Test Header 4"-CO-013-LC1 PP-1-IS-MFO-011 6 of 11
Loop Pipe Supports (PS-01, PS-02, PS-03 & PS-04)
4.3.18 PP-1-DR-MFO-001 6 of 11
at VV Manifold
4.3.19 Pipe Support Detail Drawing PP-1-DR-MFO-002 6 of 11
4.3.20 MANIFOLD Manual 6 Slots - VV Satellite - AGOCO Supply 6 of 11
4.3.20.1 General view Drawing 394-3-00-001 6 of 11
4.3.20.2 P&I Diagram 394-3-20-001 6 of 11
4.3.20.3 General Layout - Piping 394-3-30-001/006 6 of 11
4.3.20.4 General Layout - Steel Structure 394-3-50-001/006 6 of 11
4.3.21 20"x16" LAUNCHER & RECEIVER - AGOCO Supply 6 of 11
4.3.21.1 20"x16" Launcher for Satellite Station VV CP10A1358-G-GA-1006 6 of 11
4.3.21.2 20"x16" Receiver for GC-8 Station CP10A1358-G-GA-1005 6 of 11

4.4 ELECTRICAL / INSTRUMENTATION DRAWINGS / DOCUMENTS 6 of 11


4.4.1 Cathodic Protection Layout Plan at Satellite VV EL-1-DR-MFO-001 6 of 11
4.4.2 Cathodic Protection Layout Plan at GC-8 Station EL-1-DR-MFO-002 6 of 11
4.4.3 Typical Installation Details of Test Station for CP Works EL-3-DR-MFO-003 6 of 11
4.4.4 Earthing Layout at Satellite VV EL-1-DR-MFO-004 6 of 11
4.4.5 Earthing Layout at Tie-in Area in GC-8 Station EL-1-DR-MFO-005 6 of 11
4.4.6 Typical Installation Details for Earthing Works EL-3-DR-MFO-006 6 of 11
4.4.7 Overall Layout Plan Location of Test Station CP System EL-1-DR-MFO-007 6 of 11
4.4.8 Power Supply Layout at Satellite VV EL-1-DR-MFO-008 6 of 11
Solar Energy Power System Equipment Layout, Sections
4.4.9 EL-1-DR-MFO-017 6 of 11
and Details
Solar Energy Power System Electrical Layout, Sections
4.4.10 EL-1-DR-MFO-018 6 of 11
and Details
Solar Energy Power System Panel Installation Details and
4.4.11 EL-1-DR-MFO-019 6 of 11
Electrical Diagram
Page 7
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


Solar Energy Power System Electrical Container External
4.4.12 EL-1-DR-MFO-020 6 of 11
Layout
4.4.13 Pramac Generator - Wiring Diagram SM5W411006 6 of 11
4.4.14 Site Commissioning Procedure EL-4-PR-MFO-001 6 of 11
4.4.15 Technical Specification for Solar Energy Power System EL-4-SP-MFO-001 6 of 11

5 VENDOR ENGINEERING PACKAGE

"SPECIAL SYSTEM J.S.C"


5.1 6 of 11
Solar Energy Power System
5.1.1 Equipment Layout, Section and Details EL-1-DR-MFO-017 6 of 11
5.1.2 Electrical Layout, Section and Details EL-1-DR-MFO-018 6 of 11
5.1.3 Wiring Diagram EL-1-DR-MFO-019 6 of 11
5.1.4 Electrical Container external Layout EL-1-DR-MFO-020 6 of 11
5.1.5 Back-up Generator (Pramac GSW10P) 6 of 11
5.1.6 GNB Industrial Batteries 7 of 11
5.1.7 Batfuse (DC fuse for Sunny Island) 7 of 11
5.1.8 Sunny Island Installation Manual SI30M-44M-60H-80H-IA 7 of 11
Sunny Island 3.0M / 4.4M / 6.0H / 8.0H and
5.1.9 SI30M-44M-60H-80H-BE 7 of 11
Sunny Remote Control Operating Manual
5.1.10 Sunny Island Application and Technical Data 7 of 11
5.1.11 Installation Manual SMA Power Control Module (PWCMOD) PCONTROLMOD-IA 7 of 11
Sunny Boy 3000TL / 3600TL / 4000TL / 5000TL
5.1.12 SB30-50TL-21-BE 8 of 11
Operating Manual
Sunny Boy 3000TL / 3600TL / 4000TL / 5000TL
5.1.13 8 of 11
Technical Data
5.1.14 Certificate of Compliance / Suitability 8 of 11
5.1.15 Solar Module 250 / 255 / 260 WP POLY - Technical data 8 of 11
5.1.16 Daewoo Split Airconditioning System 8 of 11
5.1.17 Conventional Hydrogen Gas Detection Panel 8 of 11
5.1.18 Earth Leakage Relay Dossena DER3-1D 8 of 11
5.1.19 Electrical Measuring Instrument Nemo D4-L 8 of 11
5.1.20 Siemens SITOP Modular 6EP1333-3BA00 8 of 11

"EMERSON - ROXAR"
5.2 8 of 11
Roxar Multiphase Meter 2600
5.2.1 USER MANUAL 8 of 11
5.2.1.1 USER MANUAL - INTRODUCTION / SHEQ ROX000230195/AA 8 of 11
5.2.1.2 USER MANUAL - TECHNICAL INFORMATION 8 of 11
5.2.1.2.1 Instrument Data Sheet 228698 8 of 11
5.2.1.2.2 Process Data Sheet 8 of 11
5.2.1.2.3 Functional Description 091980 8 of 11
5.2.1.2.4 Design Codes & Standards for MPFM 2600 158231 8 of 11
5.2.1.3 Hazardous Area Certificates 8 of 11
5.2.1.3.1 MPFM 2600 Electronics 103979 8 of 11
5.2.1.3.2 Transmitter 185660 8 of 11
5.2.1.3.3 Barriers 039074 8 of 11
5.2.1.3.4 EXD Flow Computer Enclosure 089930 8 of 11
5.2.1.4 Drawings 8 of 11

Page 8
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


5.2.1.4.1 General arrangement (GA) Meter Unit 230189 8 of 11
5.2.1.4.2 Name Plate Drawing 240652 8 of 11
5.2.1.4.3 Field Wiring 195817 8 of 11
5.2.1.4.4 Block Diagram 238851 8 of 11
5.2.1.4.5 External Enclosure 238850 8 of 11
5.2.1.5 USER MANUAL - PRODUCT INSTRUCTIONS 8 of 11
5.2.1.5.1 Communication Protokol / Modbus address mapping 000355 / 000356 8 of 11
5.2.1.5.2 Preservation, Packing and Transportation Procedure 104064 8 of 11
5.2.1.5.3 Installation & Commissioning Instructions 091982 8 of 11
5.2.1.5.4 Operating Instructions (Service Console Manual) 091983 8 of 11
5.2.1.5.5 Field Display User guide 106425 8 of 11
5.2.1.5.6 Maintenance Instructions 091985 8 of 11
5.2.1.5.7 Replacement Instructiond for Secondary Venturi 104730 8 of 11
5.2.1.5.8 Spare Parts List (SPIR) 091989 8 of 11
5.2.2 MANUFACTURING RECORD BOOK ROX000230194/AA 9 of 11
5.2.2.1 MANUFACTURING RECORD BOOK - SCOPE OF SUPPLY 9 of 11
5.2.2.1.1 Instrument Data Sheet (IDS) Roxar MPFM 2600 9 of 11
5.2.2.1.2 Quality Control test and Inspection Plan (QCTIP) 9 of 11
5.2.2.1.3 General Arrrangement (GA) Drawing Roxar MPFM 2600 9 of 11
General Arrrangement (GA) Drawing Flow Computer
5.2.2.1.4 9 of 11
Enclosure External
5.2.2.1.5 User Manual - Table of Content (UM ToC) 9 of 11
5.2.2.2 MANUFACTURING RECORD BOOK - CERTIFICATES 9 of 11
5.2.2.2.1 Declaration of Conformity (DoC) 9 of 11
5.2.2.2.2 Certificate of Conformity (CoC) 9 of 11
5.2.2.2.3 Material Certificate Trace List 9 of 11
5.2.2.2.4 Material Certificates and NDE Reports 9 of 11
5.2.2.2.5 Hazardous Area Certificates 9 of 11
5.2.2.2.6 Calibration Certificates 9 of 11
5.2.2.2.7 Lifting Lug Certificate 9 of 11
5.2.2.3 MANUFACTURING RECORD BOOK - LIST OF PROCEDURES 9 of 11
5.2.2.3.1 Supplier Master Document Register (SMDR) 9 of 11
5.2.2.4 MANUFACTURING RECORD BOOK - REPORTS 9 of 11
5.2.2.4.1 Hydrostatic Pressure Test Report 9 of 11
5.2.2.4.2 Factory Acceptance Test Procedure / Report - Static Test 9 of 11
5.2.2.4.3 Factory Acceptance Test Procedure / Report - Dinamic Test 9 of 11
5.2.2.4.4 Non Conformance / Technical Query 9 of 11
5.2.2.4.5 Equiment Punch List and Release Note 9 of 11
5.2.2.4.6 Surface Treatment / Coating Report 9 of 11
5.2.2.4.7 Weight Report 9 of 11

"TBA Thies GmbH & Co. KG"


5.3 9 of 11
Chemical Injection Unit
5.3.1 INTRODUCTION 9 of 11
5.3.1.1 CI Unit - Operation narratives 9 of 11
5.3.1.2 CI Unit - Instruction for Erection 9 of 11
5.3.1.3 CI Unit - Diagram to interpolate the Volume Flow 9 of 11
5.3.2 DRAWINGS 9 of 11
5.3.2.1 CI Unit - General Arrangement 00313-001 9 of 11
5.3.2.2 CI Unit - Tank 00313-T-0001 9 of 11
5.3.2.3 CI Unit - P&IDiagram 00313-01 9 of 11
5.3.2.4 CI Unit - Flow & Layout Drawing PF-3-PI-000-616-01 9 of 11
5.3.2.5 CI Unit - Flow Gauge / Indicator Drawing BT-0004-FSA-145-20 9 of 11
5.3.2.6 CI Unit - Level Gauge / Indicator Drawing BT-0003-FSA-1500-20 9 of 11
Page 9
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


5.3.2.7 CI Unit - Control / Wiring System Drawing 9 of 11
5.3.2.8 CI Unit - Static Calculation 9 of 11
5.3.2.9 VV Satellite - Earthing Layout EL-1-DR-MFO-004 9 of 11
5.3.2.10 Typical Installation Details for Earthing Work EL-3-DR-MFO-006 9 of 11
5.3.2.11 VV Satellite - Power Supply Layout EL-1-DR-MFO-008 9 of 11
5.3.3 CONTROL PANEL 9 of 11
5.3.3.1 Control Panel - Material Specification / Datas 142433 9 of 11
5.3.3.2 Control Panel - Arangement Drawing & Labels 043858-00-13-M 9 of 11
5.3.4 OPERATING INSTRUCTIONS / MANUALS 9 of 11
5.3.4.1 Control and Distribution Operating Instructions 9 of 11
5.3.4.2 Switching Repeater Operating Instructions 9 of 11
5.3.4.3 Mixer/Agitator Instruction Manual (Installation, Operating, Maintenance) 9 of 11
5.3.4.4 Dosing Pump Instruction Manual (Installation, Operating, Maintenance) 9 of 11
5.3.4.5 Magnetic Level Switch - Mounting and Operating Instruction 9 of 11
5.3.4.6 Pulsation Damper - Instructions for Pre-charging and Control 9 of 11
5.3.4.7 Pressure Gauge - Operating Instructions 9 of 11
5.3.4.8 Pressure Relief Valve - Data Sheets 9 of 11
5.3.4.9 Ball Valves - Data Sheets 9 of 11
5.3.4.10 Check Valves - Data Sheets 9 of 11
5.3.5 MATERIAL CERTIFICATES / TEST REPORTS 9 of 11
5.3.5.1 Tank - Material Certificate 9 of 11
5.3.5.2 Dosing Pump - Test Report 9 of 11
5.3.5.3 Level Switch - Data Sheet / Material Certificate 9 of 11
5.3.5.4 Filter - Test Report 9 of 11
5.3.5.5 Pressure Safety / Control Valve - Material Certificate 9 of 11
5.3.5.6 Ball Valves - Material Cetificates 9 of 11
5.3.5.7 Check Valves - Material Certificates 10 of 11
5.3.5.8 Pressure Gauge - Material Certificates 10 of 11

"GERMAN CATHODIC PROTECTION"


5.4 10 of 11
Cathodic Protection System
5.4.1 Open Hole Deep Well Groundbed 105008-CP-CD-001 10 of 11
5.4.1.1 Material Specs: Upvc Borehole Casing 105008-CP-MS-002 10 of 11
5.4.1.2 Material Specs: Magnetite Anode Assembly 105008-CP-MS-003 10 of 11
5.4.1.3 Material Specs: Wellhead Assembly 105008-CP-MS-004 10 of 11
5.4.1.4 Material Specs: Anode Junction Box (AJB) 105008-CP-MS-005 10 of 11
5.4.1.5 Material Specs: Negative Junction Box (NJB) 105008-CP-MS-006 10 of 11
5.4.1.6 Material Specs: Flange Insulation Kit 105008-CP-MS-007 10 of 11
5.4.1.7 Material Specs: Spark Gap 105008-CP-MS-008 10 of 11
5.4.1.8 Material Specs: Cable Splice Kit 105008-CP-MS-009 10 of 11
5.4.1.9 Material Specs: XLPE/PVC/SWA/PVC Cables 105008-CP-MS-010 10 of 11
5.4.1.10 Material Specs: XLPE/PVC Cables 105008-CP-MS-011 10 of 11
5.4.1.11 Material Specs: Crash Barrier 105008-CP-MS-012 10 of 11
5.4.1.12 Material Specs: Cable Route Marker 105008-CP-MS-013 10 of 11
5.4.1.13 Material Specs: Cable to Pipe Connection 105008-CP-MS-015 10 of 11
5.4.1.14 Material Specs: Test Stations 105008-CP-MS-016 10 of 11
5.4.1.15 Material Specs: PVC/PVC Cables 105008-CP-MS-017 10 of 11
5.4.1.16 Material Specs: Cable Warning Tape 105008-CP-MS-018 10 of 11
5.4.1.17 Construction Specs: Upvc Borehole Casing 105008-CP-CS-002 10 of 11
5.4.1.18 Construction Specs: Magnetite Anode Assembly 105008-CP-CS-003 10 of 11
5.4.1.19 Construction Specs: Wellhead Assembly 105008-CP-CS-004 10 of 11
5.4.1.20 Construction Specs: Anode Junction Box (AJB/NJB) 105008-CP-CS-005 10 of 11

Page 10
ARABIAN GULF OIL CO - AGOCO
INSTALLATION OF TRUNKLINE, FLOWLINES
AND MANIFOLD FOR VV FIELD, CONCESSION-65
AGOCO Project No. FIAL Job No.
MTC-29/2009 520 10 30617

Rev. Sheet:
FINAL DOCUMENTATION DOSSIER INDEX 01

Register Discipline Document No. Volume / File


5.4.1.21 Construction Specs: Flange Insulation Kit 105008-CP-CS-006 10 of 11
5.4.1.22 Construction Specs: Spark Gap 105008-CP-CS-007 10 of 11
5.4.1.23 Construction Specs: Cable Splice Kit 105008-CP-CS-008 10 of 11
5.4.1.24 Construction Specs: Cables and Cable Warning Tape 105008-CP-CS-009 10 of 11
5.4.1.25 Construction Specs: Test Station 105008-CP-CS-010 10 of 11
5.4.1.26 Construction Specs: Crash Barrier 105008-CP-CS-011 10 of 11
5.4.1.27 Construction Specs: Cable Route Marker 105008-CP-CS-012 10 of 11
5.4.1.28 Cathodic Protection Layout: Upvc Borrehole Casing 105008-CP-MD-002 10 of 11
5.4.1.29 Cathodic Protection Layout: Magnetite Anode Assembly 105008-CP-MD-003 10 of 11
5.4.1.30 Cathodic Protection Layout: Wellhead Assembly 105008-CP-MD-004 10 of 11
5.4.1.31 Cathodic Protection Layout: Anode Junction Box Type B 105008-CP-MD-005 10 of 11
5.4.1.32 Cathodic Protection Layout: Negative Junction Box 105008-CP-MD-006 10 of 11
5.4.1.33 Cathodic Protection Layout: Flange Insulation Kit 105008-CP-MD-007 10 of 11
5.4.1.34 Cathodic Protection Layout: Crash Barrier for Wellhead 105008-CP-MD-008 10 of 11
5.4.1.35 Cathodic Protection Layout: Cable Route Marker 105008-CP-MD-009 10 of 11
5.4.1.36 Cathodic Protection Layout: Test Station 105008-CP-MD-010 10 of 11
TRANSFORMER RECTIFIER UNIT
5.4.2
Operation / Maintenance Instuction
5.4.2.1 Manual Operation / Maintenance GCP-16300015-MO-01 10 of 11
5.4.2.2 Wiring Diagram GCP-16300015 10 of 11
5.4.2.3 PC Contrroler - Operation Manual Edition-04-gcp/2015 10 of 11

6 MATERIAL CETIFICATES

6.1 Valves 11 of 11
6.2 Pipes 11 of 11
6.3 Fittings (Flanges, Elbows, Bolts & Nuts) 11 of 11
6.4 Gaskets 11 of 11
6.5 Isolating Flanges Kits 11 of 11
6.6 Electodes 11 of 11