KZ63 - 400 KV TS Transco Dindi Site Status

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

KZ63_400KV DIND

SITE STATUS REPORT


Ring Remote Interlocks
BCU I/Os
SL. NO. BAY BAY NAME Formation Operations Testing

1 B 407 YTPP-1 Not Completed Not Completed Not Completed Not Completed

2 B 410 YTPP-2 Not Completed Not Completed Not Completed Not Completed
3_400KV DINDI S/S TSTRANSCO

BCU Auto
Signal Testing METERING SYNCH CHECK RELAY TESTING
Reclosure

Not Completed Not Completed Not Completed Not Completed Not Completed

Not Completed Not Completed Not Completed Not Completed Not Completed
Gateway Testing Analog Inputs REMARKS
ST-LC Fiber Optic Cable 3 Mtrs 2
nos Required For ABB Relay, DB
9-pin Connector 2nos Required
Not Completed Not Completed For Energy Meter. Kindly Please
Arrange This material.

Not Completed Not Completed