Tower-Process-Data-Sheet - Ex (Version 1)
Tower-Process-Data-Sheet - Ex (Version 1)
A.K.C.
TECHNOLOGY Job No: 1
TOWER PROCESS DATA SHEET
Date:
Item No: 1
Checked by: Job: chemistry engineering
Sheet __1__ of ___1__
Distribution: Tower Name:
NOTE: * indicates delete as necessary; ** indicates for other than Code reason
1 Section 1 Section 2 Section 3
2 Shell Diameters O.D. - I.D. 7.74 ft 7.74 ft 7.74 ft
Trays Type Sieve Sieve Bubble Cap
3 Number 5 12 13
Spacing 2.00 ft 2.00 ft 2.40 ft
4 Pressure psig Operating 352.3 352.8 352.9
5 *psig / Kscg Design 388
6 Temperature °F Operating -130 -94.88 -73.14
7 *oF / oC Design 140
8 Material Shell SS 304 SS 304 SS 304
9 Trays SS 304 SS 304 SS 304
10 Caps NA NA SS 304
11 Liner or Clad SS 304 SS 304 SS 304
12 Corrosion - Shell 0.12 in 0.12 in 0.12 in
13 Allowance Heads 0.12 in 0.12 in 0.12 in
14 Trays 0.12 in 0.12 in 0.12 in
16 Type of Liquid Flow
18 Joint Efficiency
19 Code Emergency Vac. Design Yes
20 Stress Relieved **Yes / No Radiography **Yes / No
21 Is vessel subject to mechanical vibration *Yes / No
22 Insulation Type: Celular glass
23 *Yes / No
24 Min. Base Elevation: Skirt length:
25 Weight Empty: Full:
26 Nozzles Mark No. Size Number Rating
27 Feed A- 10.00 in 3 400
B- 6.00 in 1 300
28
29 Over'd Vpr. C- 14.00 in .- 300
30
31
32 Bottoms D- 12.00 in 1 300
33 Reboiler Vpr E- 14.00 in 1 300
34 Reboiler liq D- 12.00 in 1 300
35
36
37 Thermocouple F- 300
by inst. Op.