Boq Landscaping 2
Boq Landscaping 2
Boq Landscaping 2
PEKERJAAN :
LOKASI :
TAHUN : 2021
A Plating/Landscaping -
2,0 Shrubs -
Jumlah -
PPn 10% -
Jumlah -
Dibulatkan -
Jambi, 2021
Direktur
PEKERJAAN :
LOKASI :
TAHUN : 2021
A Plating/Landscaping
1 Tree 25 tree
1.1 Tabebuya (Yellow)-(Tabebuia aurea) 46 tree
1 Kamboja Bali (White)-(Plumeria rubra)
2,0 Shrubs
2.1 Hanjuang (Cordyline fruticosa) 21 tree
2.2 Palem Merah (Cyrtostachys lakka) 6 tree
2 Pisang Bedak (Calathea lutea) 335 tree
3,0 Bushes
3.1 Canna Presiden (Canna indica) 180 tree
3.2 Palem Wregu (Raphis humilis) 343 tree
3 Tradescantia (Tradescantia) 45 tree
4,0 Ground Cover
4.1 Lily Brazil (Dianella tasmanica) 189 tree
4.2 Lantana (Lantana camara) 166 tree
4.3 Bakung Lily (Hymenocalis littoralis) 604 tree
4 Rumput Gajah Mini (Pennisetum Purpureum) 490 m2
5,0 Vines
5.1 Ceguk Wudani (Combretum indicum) 18 tree
5.2 Lonicera Rambat (Lonicera japanica) 18 tree
5 Lee Kuan Yew (Vernonia eliptica) 34 tree
6,0 BOX PLANTER (G1) 106 unit 350,000.00 37,100,000.00
7,0 BOX PLANTER (G2) 3 unit 320,000.00 960,000.00
8,0 RAILING TANK & BRC 80 unit
Planting Media
1 Sand 23 m3 90,000.00 2,070,000.00
2 Gravel 110.4 m3 400,000.00 44,160,000.00
3 Fertile Soil 230.81 m3
4 Small Gravel 23.05 m3 450,000.00 10,372,500.00
5 Growth Subtrate 18,52 m3
PEKERJAAN :
LOKASI :
TAHUN :
A Plating/Landscaping
1 Tree
2 Tabebuya Kuning 25 tree
3 Kamboja Bali Putih 46
4 Shrubs
5 Hanjuang 21 tree
6 Palm Merah 6 tree
7 Pisang Bedak(Calatea) 335 tree
8 Bushes
9 Cana Presiden 180 tree
10 Palm Wregu 343 tree
11 Tradescantia 45 tree
12 Ground Cover
13 Lily Brazil 189 tree
14 Lamtana 166 tree
15 Bakung 604 tree
16 Rumput Gajah Mini 490 m2
17 Vines
18 Ceguk Wudani 18 tree
19 Lonicera Rambat 18 tree
20 Lee Kuan Yew 34 tree
21 BOX PLANTER (G1) 106 unit
22 BOX PLANTER (G2) 3 unit
23 RAILING TANK & BRC 80 unit
Planting Media
1 Sand 23 m3
2 Gravel 110.4 m3
3 Fertile Soil 230.81 m3
4 Small Gravel 23.05 m3
5 Growth Subtrate 18,52 m3
PP
AYA
Rp 150,000 3,750,000.00
Rp 500,000 23,000,000.00
-
Rp 15,000 315,000.00
Rp 170,000 1,020,000.00
Rp 25,000 8,375,000.00
-
Rp 25,000 4,500,000.00
Rp 110,000 37,730,000.00
15000 675,000.00
-
Rp 12,000 2,268,000.00
Rp 12,000 1,992,000.00
Rp 18,000 10,872,000.00
Rp 65,000 31,850,000.00
-
Rp 85,000 1,530,000.00
Rp 75,000 1,350,000.00
Rp 20,000 680,000.00
Rp 350,000 37,100,000.00
Rp 320,000 960,000.00
-
-
-
Rp 90,000 2,070,000.00
Rp 400,000 44,160,000.00
-
Rp 450,000 10,372,500.00
#VALUE!
-
Rp 850,000 3,876,000.00 154 17cmx17cm 1m=36
Rp 850,000 3,876,000.00
Rp 850,000 3,876,000.00
Rp 850,000 12,184,920.00 480
Jumlah 248,382,420.00
PPN 11% 27,322,066.20
Total 275,704,486.20
-
18,520.00
3,704.00
ANALISA HARGA SATUAN PEKERJAAN
Koefisien Tenaga Kerja & Koefisien Bahan
A.4.1.1.4 Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 Mpa (K.100), Slump (3-6) cm, w/c=0,87
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Batu OH 0.2000 130,000.00 26,000.00
Kepala Tukang OH 0.0200 145,000.00 2,900.00
Mandor OH 0.0600 135,000.00 8,100.00
JUMLAH TENAGA KERJA 145,000.00
B BAHAN
Semen Portlant Kg 230.0000 1,300.00 299,000.00
Pasir Beton Kg 893.0000 92.86 82,921.43
Kerikil (Maks. 30 mm) Kg 1,027.0000 250.00 256,750.00
Air Liter 200.0000 121.00 24,200.00
JUMLAH HARGA BAHAN 662,871.43
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 6 of 60
A.4.1.1.5a Membuat 1 M3 Beton mutu f'c = 14,5 Mpa (K.175), Slump (12 ± 2) cm, w/c=0,66
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Kepala Tukang OH 0.0280 145,000.00 4,060.00
Mandor OH 0.0830 135,000.00 11,205.00
JUMLAH TENAGA KERJA 199,515.00
B BAHAN
Semen Portlant Kg 326.0000 1,300.00 423,800.00
Pasir Beton Kg 760.0000 92.86 70,571.43
Split Kg 1,029.0000 250.00 257,250.00
Air Liter 215.0000 121.00 26,015.00
JUMLAH HARGA BAHAN 777,636.43
C PERALATAN
Molen 0,35 M3 Hari 0.200 250,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
A.4.1.1.6 Membuat 1 M3 Beton mutu f'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, w/c=0,61
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Kepala Tukang OH 0.0280 145,000.00 4,060.00
Mandor OH 0.0830 135,000.00 11,205.00
JUMLAH TENAGA KERJA 199,515.00
B BAHAN
Semen Portlant Kg 352.0000 1,300.00 457,600.00
Pasir Beton Kg 731.0000 92.86 67,878.57
Split Kg 1,031.0000 250.00 257,750.00
Air Liter 215.0000 121.00 26,015.00
JUMLAH HARGA BAHAN 809,243.57
C PERALATAN
Molen 0,35 M3 Hari 0.200 250,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
A.4.1.1.8 Membuat 1 M3 Beton mutu f'c = 21,7 Mpa (K.250), Slump (12 ± 2) cm, w/c=0,56
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Kepala Tukang OH 0.0280 145,000.00 4,060.00
Mandor OH 0.0830 135,000.00 11,205.00
JUMLAH TENAGA KERJA 199,515.00
B BAHAN
Semen Portlant Kg 384.0000 1,300.00 499,200.00
Pasir Beton Kg 692.0000 92.86 64,257.14
Split Kg 1,039.0000 250.00 259,750.00
Air Liter 215.0000 121.00 26,015.00
JUMLAH HARGA BAHAN 849,222.14
C PERALATAN
Molen 0,35 M3 Hari 0.200 250,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
Page 7 of 60
A.4.1.1.8b Membuat 1 M3 Beton mutu f'c = 21,7 Mpa (K.250), Slump (12 ± 2) cm, w/c=0,56 (Readymix)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Kepala Tukang OH 0.0280 145,000.00 4,060.00
Mandor OH 0.0830 135,000.00 11,205.00
JUMLAH TENAGA KERJA 199,515.00
B BAHAN
Semen Portlant Kg 384.0000 1,300.00 499,200.00
Pasir Beton Kg 692.0000 92.86 64,257.14
Split Kg 1,039.0000 250.00 259,750.00
Air Liter 215.0000 121.00 26,015.00
JUMLAH HARGA BAHAN 849,222.14
C PERALATAN
Con Pan Mixer (Batching Plan Mini) Jam 0.0926 649,119 60,103.62
Truck Mixer (Agitator) Jam 0.1759 625,396 110,035.05
Water Tank Jam 0.0382 281,591 10,743.43
Alat Bantu (Concrete Pump) Jam 1.0000 278,745 278,744.64
JUMLAH HARGA ALAT 459,626.74
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Kepala Tukang OH 0.0280 145,000.00 4,060.00
Mandor OH 0.0830 135,000.00 11,205.00
JUMLAH TENAGA KERJA 199,515.00
B BAHAN
Semen Portlant Kg 413.0000 1,300.00 536,900.00
Pasir Beton Kg 681.0000 92.86 63,235.71
Split Kg 1,021.0000 250.00 255,250.00
Air Liter 215.0000 121.00 26,015.00
JUMLAH HARGA BAHAN 881,400.71
C PERALATAN
Molen 0,35 M3 Hari 0.200 250,000.00 50,000.00
JUMLAH HARGA ALAT 50,000.00
Page 8 of 60
A.4.1.1.10b Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 (Readymix)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 90,000.00 148,500.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Kepala Tukang OH 0.0280 145,000.00 4,060.00
Mandor OH 0.0830 135,000.00 11,205.00
JUMLAH TENAGA KERJA 199,515.00
B BAHAN
Semen Portlant Kg 413.0000 1,300.00 536,900.00
Pasir Beton Kg 681.0000 92.86 63,235.71
Split Kg 1,021.0000 250.00 255,250.00
Air Liter 215.0000 121.00 26,015.00
JUMLAH HARGA BAHAN 881,400.71
C PERALATAN
Con Pan Mixer (Batching Plan Mini) Jam 0.0926 649,119 60,103.62
Truck Mixer (Agitator) Jam 0.1759 625,396 110,035.05
Water Tank Jam 0.0382 281,591 10,743.43
Alat Bantu (Concrete Pump) Jam 1.0000 278,745 278,744.64
JUMLAH HARGA ALAT 459,626.74
Page 9 of 60
A.4.1.1.20 Pemasangan 1 M2 Bekisting untuk pondasi
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.5200 90,000.00 46,800.00
Tukang Kayu OH 0.2600 130,000.00 33,800.00
Kepala Tukang OH 0.0260 145,000.00 3,770.00
Mandor OH 0.0260 135,000.00 3,510.00
JUMLAH TENAGA KERJA 87,880.00
B BAHAN
Kayu Klas III M3 0.0400 2,300,000.00 92,000.00
Paku Biasa 2"-5" Kg 0.3000 15,000.00 4,500.00
Minyak Bekisting Kg 0.1000 8,700.00 870.00
JUMLAH HARGA BAHAN 97,370.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 10 of 60
A.4.1.1.23 Pemasangan 1 M2 Bekisting untuk balok
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 130,000.00 42,900.00
Kepala Tukang OH 0.0330 145,000.00 4,785.00
Mandor OH 0.0330 135,000.00 4,455.00
JUMLAH TENAGA KERJA 111,540.00
B BAHAN
Kayu Klas III M3 0.0400 2,300,000.00 92,000.00
Paku Biasa 2"-5" Kg 0.4000 15,000.00 6,000.00
Minyak Bekisting Kg 0.2000 8,700.00 1,740.00
Balok Kayu Klas II M3 0.0180 3,500,000.00 63,000.00
Plywood Tebal 9 mm Lbr 0.3500 115,000.00 40,250.00
Kayu Dolken Ø 8-10 cm, P=400 cm Batang 2.0000 10,000.00 20,000.00
JUMLAH HARGA BAHAN 222,990.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 11 of 60
A.4.1.1.25 Pemasangan 1 M2 Bekisting untuk dinding
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 90,000.00 59,400.00
Tukang Kayu OH 0.3300 130,000.00 42,900.00
Kepala Tukang OH 0.0330 145,000.00 4,785.00
Mandor OH 0.0330 135,000.00 4,455.00
JUMLAH TENAGA KERJA 111,540.00
B BAHAN
Kayu Klas III M3 0.0300 2,300,000.00 69,000.00
Paku Biasa 2"-5" Kg 0.4000 15,000.00 6,000.00
Minyak Bekisting Kg 0.2000 8,700.00 1,740.00
Balok Kayu Klas II M3 0.0200 3,500,000.00 70,000.00
Plywood Tebal 9 mm Lbr 0.3500 115,000.00 40,250.00
Kayu Dolken Ø 8-10 cm, P=400 cm Batang 3.0000 10,000.00 30,000.00
JUMLAH HARGA BAHAN 216,990.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 12 of 60
A.4.1.1.28 Membuat 1 M3 pondasi beton bertulang (150 kg besi + bekisting)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.3000 90,000.00 477,000.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Tukang Kayu OH 1.3000 130,000.00 169,000.00
Tukang Besi OH 1.0500 130,000.00 136,500.00
Kepala Tukang OH 0.2620 145,000.00 37,990.00
Mandor OH 0.2650 135,000.00 35,775.00
JUMLAH TENAGA KERJA 892,015.00
B BAHAN
Kayu Klas III M3 0.2000 2,300,000.00 460,000.00
Paku Biasa 2"-5" Kg 1.5000 15,000.00 22,500.00
Minyak Bekisting Liter 0.4000 8,700.00 3,480.00
Besi Beton Kg 157.5000 14,000.00 2,205,000.00
Kawat Beton Kg 2.2500 20,000.00 45,000.00
Semen Portlant Kg 336.0000 1,300.00 436,800.00
Pasir Beton M3 0.5400 130,000.00 70,200.00
Kerikil M3 0.8100 450,000.00 364,500.00
JUMLAH HARGA BAHAN 3,607,480.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 13 of 60
A.4.1.1.31 Membuat 1 M3 balok beton bertulang (200 kg besi + bekisting)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.350 90,000.00 571,500.00
Tukang Batu OH 0.275 130,000.00 35,750.00
Tukang Kayu OH 1.650 130,000.00 214,500.00
Tukang Besi OH 1.400 130,000.00 182,000.00
Kepala Tukang OH 0.333 145,000.00 48,285.00
Mandor OH 0.318 135,000.00 42,930.00
JUMLAH TENAGA KERJA 1,094,965.00
B BAHAN
Kayu Klas III M3 0.3200 2,300,000.00 736,000.00
Paku Biasa 2"-5" Kg 3.2000 15,000.00 48,000.00
Minyak Bekisting Liter 1.6000 8,700.00 13,920.00
Besi Beton Kg 210.0000 14,000.00 2,940,000.00
Kawat Beton Kg 3.0000 20,000.00 60,000.00
Semen Portlant Kg 336.0000 1,300.00 436,800.00
Pasir Beton M3 0.5400 130,000.00 70,200.00
Kerikil M3 0.8100 450,000.00 364,500.00
Kayu kelas II balok M3 0.1400 3,500,000.00 490,000.00
Plywood 9 mm Lbr 2.8000 115,000.00 322,000.00
Dolken kayu Btg 16.0000 10,000.00 160,000.00
JUMLAH HARGA BAHAN 5,641,420.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 14 of 60
A.4.1.1.33 Membuat 1 M3 dinding beton bertulang (150 kg besi + bekisting)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.3000 90,000.00 477,000.00
Tukang Batu OH 0.2750 130,000.00 35,750.00
Tukang Kayu OH 1.3000 130,000.00 169,000.00
Tukang Besi OH 1.0500 130,000.00 136,500.00
Kepala Tukang OH 0.2620 145,000.00 37,990.00
Mandor OH 0.2650 135,000.00 35,775.00
JUMLAH TENAGA KERJA 892,015.00
B BAHAN
Kayu Klas III M3 0.2400 2,300,000.00 552,000.00
Paku Biasa 2"-5" Kg 3.2000 15,000.00 48,000.00
Minyak Bekisting Liter 1.6000 8,700.00 13,920.00
Besi Beton Kg 157.5000 14,000.00 2,205,000.00
Kawat Beton Kg 2.2500 20,000.00 45,000.00
Semen Portlant Kg 336.0000 1,300.00 436,800.00
Pasir Beton M3 0.5400 130,000.00 70,200.00
Kerikil M3 0.8100 450,000.00 364,500.00
Kayu kelas II balok M3 0.1600 3,500,000.00 560,000.00
Plywood 9 mm Lbr 2.8000 115,000.00 322,000.00
Dolken kayu Btg 24.0000 10,000.00 240,000.00
JUMLAH HARGA BAHAN 4,857,420.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 15 of 60
A.4.1.1.36 Membuat 1 M' ring balok beton bertulang (10 x 15) cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2970 90,000.00 26,730.00
Tukang Batu OH 0.0330 130,000.00 4,290.00
Tukang Kayu OH 0.0330 130,000.00 4,290.00
Tukang Besi OH 0.0330 130,000.00 4,290.00
Kepala Tukang OH 0.0100 145,000.00 1,450.00
Mandor OH 0.0150 135,000.00 2,025.00
JUMLAH TENAGA KERJA 43,075.00
B BAHAN
Kayu Klas III M3 0.0030 2,300,000.00 6,900.00
Paku Biasa 2"-5" Kg 0.0200 15,000.00 300.00
Minyak Bekisting Liter - 8,700.00 0.00
Besi Beton Polos Kg 3.6000 14,000.00 50,400.00
Kawat Beton Kg 0.0500 20,000.00 1,000.00
Semen Portlant Kg 5.5000 1,300.00 7,150.00
Pasir Beton M3 0.0090 130,000.00 1,170.00
Kerikil M3 0.0150 450,000.00 6,750.00
JUMLAH HARGA BAHAN 73,670.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
A.4.2.1.21 Pemasangan 1 M2 Rangka Pipa Hollow 4x4 cm, Modul 60x60 cm, Plafond
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 90,000.00 18,000.00
Tukang Besi OH 0.3000 130,000.00 39,000.00
Kepala Tukang OH 0.0300 145,000.00 4,350.00
Mandor OH 0.0100 135,000.00 1,350.00
JUMLAH TENAGA KERJA 62,700.00
B BAHAN
Rangka Metal Hollow 40.40.2mm M2 1.0500 150,000.00 157,500.00
JUMLAH HARGA BAHAN 157,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 16 of 60
A.4.4.1. PEKERJAAN PASANGAN DINDING
Page 17 of 60
A.4.4.1.7 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 2 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 130,000.00 13,000.00
Kepala Tukang OH 0.0100 145,000.00 1,450.00
Mandor OH 0.0150 135,000.00 2,025.00
JUMLAH TENAGA KERJA 43,475.00
B BAHAN
Bata Merah Buah 70.0000 500.00 35,000.00
Semen Portland Kg 18.9500 1,300.00 24,635.00
Pasir Pasang M3 0.0380 130,000.00 4,940.00
JUMLAH HARGA BAHAN 64,575.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
A.4.4.1.8 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 3 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 130,000.00 13,000.00
Kepala Tukang OH 0.0100 145,000.00 1,450.00
Mandor OH 0.0150 135,000.00 2,025.00
JUMLAH TENAGA KERJA 43,475.00
B BAHAN
Bata Merah Buah 70.0000 500.00 35,000.00
Semen Portland Kg 14.3700 1,300.00 18,681.00
Pasir Pasang M3 0.0400 130,000.00 5,200.00
JUMLAH HARGA BAHAN 58,881.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
A.4.4.1.9 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 4 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 90,000.00 27,000.00
Tukang Batu OH 0.1000 130,000.00 13,000.00
Kepala Tukang OH 0.0100 145,000.00 1,450.00
Mandor OH 0.0150 135,000.00 2,025.00
JUMLAH TENAGA KERJA 43,475.00
B BAHAN
Bata Merah Buah 70.0000 500.00 35,000.00
Semen Portland Kg 11.5000 1,300.00 14,950.00
Pasir Pasang M3 0.0430 130,000.00 5,590.00
JUMLAH HARGA BAHAN 55,540.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 18 of 60
A.4.4.2 PEKERJAAN PLESTERAN
Page 19 of 60
A.4.4.2.27 Pemasangan 1 M2 Acian
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 90,000.00 18,000.00
Tukang Batu OH 0.1000 130,000.00 13,000.00
Kepala Tukang OH 0.0100 145,000.00 1,450.00
Mandor OH 0.0100 135,000.00 1,350.00
JUMLAH TENAGA KERJA 33,800.00
B BAHAN
Semen Portland Kg 3.2500 1,300.00 4,225.00
JUMLAH HARGA BAHAN 4,225.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 21 of 60
A.4.4.3.36a Pemasangan 1 M2 Lantai keramik ukuran 25x25 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 90,000.00 63,000.00
Tukang Batu OH 0.3500 130,000.00 45,500.00
Kepala Tukang OH 0.0350 145,000.00 5,075.00
Mandor OH 0.0350 135,000.00 4,725.00
JUMLAH TENAGA KERJA 118,300.00
B BAHAN
Keramik 25x25 Bh 16.0000 4,250.00 68,000.00
Semen Portland Kg 10.4000 1,300.00 13,520.00
Pasir Pasang M3 0.0450 130,000.00 5,850.00
Semen Warna Kg 1.5000 17,000.00 25,500.00
JUMLAH HARGA BAHAN 112,870.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 22 of 60
A.4.4.3.39.2b Pemasangan 1 M' Plint granit ukuran 10x60 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 90,000.00 8,100.00
Tukang Batu OH 0.0900 130,000.00 11,700.00
Kepala Tukang OH 0.0090 145,000.00 1,305.00
Mandor OH 0.0050 135,000.00 675.00
JUMLAH TENAGA KERJA 21,780.00
B BAHAN
Plint Granit 10x60 cm Bh 1.7500 10,000.00 17,500.00
Semen Portland Kg 1.1400 1,300.00 1,482.00
Pasir Pasang M3 0.0030 130,000.00 390.00
Semen Warna Kg 0.0250 17,000.00 425.00
JUMLAH HARGA BAHAN 19,797.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 23 of 60
A.4.4.3.61 Pemasangan 1 M2 Floor hardener
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1200 90,000.00 10,800.00
Tukang Batu OH 0.1200 130,000.00 15,600.00
Kepala Tukang OH 0.0120 145,000.00 1,740.00
Mandor OH 0.0060 135,000.00 810.00
JUMLAH TENAGA KERJA 28,950.00
B BAHAN
Floor Hardener Kg 5.0000 45,000.00 225,000.00
JUMLAH HARGA BAHAN 225,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 24 of 60
JUMLAH HARGA BAHAN 106,750.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 25 of 60
A.4.5.1.7b Pemasangan 1 M2 langit-langit GRC board ukuran (120x240) mm, tebal 4 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 90,000.00 9,000.00
Tukang Kayu OH 0.0500 130,000.00 6,500.00
Kepala Tukang OH 0.0050 145,000.00 725.00
Mandor OH 0.0050 135,000.00 675.00
JUMLAH TENAGA KERJA 16,900.00
B BAHAN
GRC Board 4 mm Lbr 0.3640 77,000.00 28,028.00
Paku Skrup Kg 0.1100 55,000.00 6,050.00
JUMLAH HARGA BAHAN 34,078.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
A.4.6.1.2 Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela kayu klas I
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 7.0000 90,000.00 630,000.00
Tukang Kayu OH 21.0000 130,000.00 2,730,000.00
Kepala Tukang OH 2.1000 145,000.00 304,500.00
Mandor OH 0.3500 135,000.00 47,250.00
JUMLAH TENAGA KERJA 3,711,750.00
B BAHAN
Balok Kayu M3 1.1000 5,000,000.00 5,500,000.00
Paku 10 cm Kg 1.2500 15,000.00 18,750.00
Lem Kayu Kg 1.0000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 5,538,750.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 26 of 60
A.4.6.1.5 Pembuatan dan pemasangan 1 M2 daun pintu panel kayu klas I
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8000 90,000.00 72,000.00
Tukang Kayu OH 2.4000 130,000.00 312,000.00
Kepala Tukang OH 0.2400 145,000.00 34,800.00
Mandor OH 0.0400 135,000.00 5,400.00
JUMLAH TENAGA KERJA 424,200.00
B BAHAN
Papan Kayu kelas II M3 0.0240 5,000,000.00 120,000.00
Lem Kayu Kg 0.3000 20,000.00 6,000.00
JUMLAH HARGA BAHAN 126,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 27 of 60
A.4.6.2.5b pemasangan 1 buah Grendel pintu
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH - 90,000.00 0.00
Tukang Kayu OH 0.2500 130,000.00 32,500.00
Kepala Tukang OH 0.0250 145,000.00 3,625.00
Mandor OH - 135,000.00 0.00
JUMLAH TENAGA KERJA 36,125.00
B BAHAN
Grendel Pintu Bh 1.0000 25,000.00 25,000.00
JUMLAH HARGA BAHAN 25,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 28 of 60
A.4.6.2.19 Pemasangan 1 M2 kaca tebal 12 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0250 90,000.00 2,250.00
Tukang Kayu OH 0.2500 130,000.00 32,500.00
Kepala Tukang OH 0.0250 145,000.00 3,625.00
Mandor OH 0.0013 135,000.00 175.50
JUMLAH TENAGA KERJA 38,550.50
B BAHAN
Kaca polos 12 mm M2 1.1000 550,000.00 605,000.00
Sealant Kg 0.0700 25,800.00 1,806.00
A.4.7.1.4 Pengecatan 1 M2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0700 90,000.00 6,300.00
Tukang Cat OH 0.0900 130,000.00 11,700.00
Kepala Tukang OH 0.0600 145,000.00 8,700.00
Mandor OH 0.0250 135,000.00 3,375.00
JUMLAH TENAGA KERJA 30,075.00
B BAHAN
Cat Menie Kg 0.2000 25,000.00 5,000.00
Plamuur Kg 0.1500 45,000.00 6,750.00
Cat Dasar Kg 0.1700 62,000.00 10,540.00
Cat Penutup Kg 0.2600 62,000.00 16,120.00
Kuas Bh 0.0100 25,000.00 250.00
Pengencer Kg 0.0300 13,300.00 399.00
Amplas Lbr 0.2000 6,000.00 1,200.00
JUMLAH HARGA BAHAN 40,259.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 29 of 60
A.4.7.1.10 Pengecatan 1 M2 Tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0200 90,000.00 1,800.00
Tukang Cat OH 0.0630 130,000.00 8,190.00
Kepala Tukang OH 0.0060 145,000.00 870.00
Mandor OH 0.0030 135,000.00 405.00
JUMLAH TENAGA KERJA 11,265.00
B BAHAN
Plamuur Kg 0.1000 20,000.00 2,000.00
Cat Dasar Kg 0.1000 25,000.00 2,500.00
Cat Penutup Kg 0.2600 25,000.00 6,500.00
Amplas Lbr 0.5000 0.00
JUMLAH HARGA BAHAN 11,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 30 of 60
A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG
Page 31 of 60
A.5.1.1.5 Pemasangan 1 buah wastafel Meja
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.2000 90,000.00 108,000.00
Tukang Batu OH 1.4500 130,000.00 188,500.00
Kepala Tukang OH 0.1500 145,000.00 21,750.00
Mandor OH 0.0600 135,000.00 8,100.00
JUMLAH TENAGA KERJA 326,350.00
B BAHAN
Wastafel Unit 1.2000 1,500,000.00 1,800,000.00
Semen Portlant Kg 6.0000 1,300.00 1,300.00
Pasir Pasang M3 0.0100 130,000.00 130,000.00
JUMLAH HARGA BAHAN 1,931,300.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 32 of 60
Pemasangan 1 buah Kran Air 1/2''
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0100 90,000.00 900.00
Tukang Batu OH 0.1000 130,000.00 13,000.00
Kepala Tukang OH 0.0100 145,000.00 1,450.00
Mandor OH 0.0050 135,000.00 675.00
JUMLAH TENAGA KERJA 16,025.00
B BAHAN
kran air Bh 1.0000 21,000.00 21,000.00
seal tape Bh 0.0250 4,400.00 110.00
JUMLAH HARGA BAHAN 21,110.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 33 of 60
MEMASANG 1M' PIPA PVC TIPE AW DIAMETER 4''
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0810 90,000.00 7,290.00
Tukang Batu OH 0.1350 130,000.00 17,550.00
Kepala Tukang OH 0.0135 145,000.00 1,957.50
Mandor OH 0.0040 135,000.00 540.00
JUMLAH TENAGA KERJA 27,337.50
B BAHAN
Pipa pvc m' 1.2000 52,500.00 63,000.00
Perlengkapan Ls 0.3500 52,500.00 18,375.00
JUMLAH HARGA BAHAN 81,375.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00
Page 34 of 60
PERHITUNGAN VOLUME
NO URAIAN PEKERJAAN LEBAR TINGGI PJG LUAS jml VOL SAT JMLH SAT
(M) (M) m m2 TOTAL
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 935.75 935.75 M2
2 Pengukuran & pasang bouwplank 140.00 M'
3 Pagar pengaman proyek 156.00 M'
4 Pembuatan papan nama proyek/banner 1 1.00 Bh
5 Mobilisasi & Demobilisasi 1 1.00 Ls
6 Dokumentasi dan pelaporan 1 1.00 Ls
I PEKERJAAN PONDASI
1 Pondasi bore pile Ø 40 cm Beton Bertulang
- Pengeboran 2,197.00 M'
P1 13.00 128 1,664.00 M'
P2 13.00 30 390.00 M'
P3 13.00 11 143.00 M'
2,197.00 M'
- Pembesian Bor Pile
Besi Beton D16 27,752.00 Kg
P1 13.00 1024 13,312.00 M'
P2 13.00 240 3,120.00 M'
P3 13.00 88 1,144.00 M'
( 1.579 kg/m') 17,576.00 M'
0.00 Kg
Besi Beton Ø8 0.95 14647 13,914.33 M' 5,492.58 Kg
( 0.395 Kg/m') 5,492.58 Kg
- Pengecoran Beton K-250 (Site Mix) 276.19 M3
P1 13.00 0.13 128 209.19 M3
P2 13.00 0.13 30 49.03 M3
P3 13.00 0.13 11 17.98 M3
276.19 M3
Lantai kerja Beton K.100 Tebal 5 cm 1.35 0.05 1.60 2 0.22 0.32 M3
1.35 0.05 1.47 1 0.10
0.32
PEKERJAAN FINISHING
Acian lantai Existing Dibawah Parquet 912.61 M2
Pengecatan Lantai kayu/parquet 912.61 M2
1 Galian tanah untuk anaerobic equalization 2.00 1.50 3.00 9.00 M3 9.00 M3
2 Galian tanah pondasi 0.50 0.75 15.00 5.63 M3 5.63 M3
3 Lantai kerja beton K-100 tbl. 5 cm 0.50 0.05 15.00 0.38 M3 0.38 M3
4 Pas. Batu Belah 1:3 0.40 0.50 15.00 3.00 M3 3.00 M3
5 Urugan Sirtu tbl. 15 cm 2.00 0.15 5.50 1.65 M3 1.65 M3
6 Lantai kerja dudukan biofilter beton K-100 tbl. 5 cm 2.00 0.05 5.50 0.55 M3
0.55 M3
7 Besi Beton D13 152.88 Kg
5.50 13 73.33 M'
2.00 37 73.33 M'
146.67 M'
Berat Besi ( 1.042 kg/m') 152.88 Kg
8 Cor Beton K-200 tbl. 15 cm 2.00 0.15 5.50 1.65 M3 1.65 M3
9 Bekisting 0.15 15.00 2.25 M2 2.25 M2
10 Pondasi Rabat Pas. Bata 1:3 13.26 M2
0.30 17.40 5.22 M2
0.30 26.80 8.04 M2
13.26 M2
11 Urugan Pasir bawah lantai Tbl 5 cm 0.05 31.64 1.58 M3 1.58 M3
12 Cor Lantai Beton cor K-175 Tbl. 5cm 0.05 31.64 1.58 M3 1.58 M3
13 Acian Lantai 31.64 31.64 M2 31.64 M2
14 Bak Indikator Pas. Bata 1:3 0.50 6.00 3.00 M2 3.00 M2
15 Plasteran Bak Indikator 1 : 3 tbl. 1,5 Cm 3.00 2 6.00 M2 6.00 M2
16 Acian Bak Indikator 6.00 M2
17 Pagar BRC T. 90 cm 26.80 M'
18 Tiang Pagar Pipa Galvanis Ø 2" 1.30 14 18.20 M' 18.20 M'
19 Pondasi Tiang Pagar Cor Beton K-175 uk. 20x20x40 cm 0.20 0.40 0.20 13 0.21 M3 0.21 M3
20 Awning Penutup Konstruksi IPAL 3.30 6.80 22.44 M2 22.44 M2
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
II HARGA BAHAN
BAHAN LANTAI
2 Keramik 25 x 25 cm Bh 4,250.00
3 Keramik 30 x 30 cm Bh 3,681.82
4 Keramik 25 x 40 cm Bh 6,500.00
5 Keramik 40 x 40 cm Bh 11,700.00
5 Keramik Kasar 40 x 40 cm Bh 15,000.00
6 Plint Keramik 10 x 40 cm Bh 2,925.00
7 Keramik 50 x 50 cm Bh 60,000.00
8 Granit 60 x 60 cm Bh 60,000.00
9 Plint Granit 10 x 60 cm Bh 10,000.00
9 Lantai kayu/Parquet M2 514,000.00
9 Lantai Vynil Bh 28,000.00
9 Wallpaper M1 40,000.00
BAHAN DINDING
1 Batu bata Bh 500.00
BAHAN KAYU
1 Kayu balok klas I M3 5,000,000.00
2 Kayu balok klas II M3 3,500,000.00
3 Kayu balok klas III M3 2,300,000.00
4 Kayu papan klas I M3 5,000,000.00
5 Kayu papan klas II M3 5,000,000.00
6 Kayu papan klas III M3 5,000,000.00
2 Plywood 9 mm Lbr 115,000.00
7 Dolken kayu Ø 8-10/400 Cm Btg 10,000.00
BAHAN AULMUNIUM
1 Profil Kusen Alumunium 4" M' 137,500.00
2 Profil Kusen Alumunium 3" M' 70,000.00
3 Bingkai Pintu Alumunium Putih M' 93,500.00
4 Bingkai Alumunium 3" M' 65,000.00
5 Sealant Tube 25,800.00
6 Engsel pintu Kaca (top/bottom hinge) Bh 55,000.00
7 Engsel pintu Kaca (Stainless) Bh 35,000.00
8 Handel Pintu Stainless Set 350,000.00
9 Handel Pintu Aluminium Set 45,000.00
10 Handel Pintu Biasa Set 75,000.00
11 Kunci Slot Tanam Bh 55,000.00
12 Pintu Aluminium Lengkap + Accessories Unit 1,750,000.00
13 Kunci pintu 2 slaag biasa Bh 120,800.00
14 Kunci tanam biasa Bh 175,000.00
15 Engsel pintu Bh 35,500.00
16 Engsel Jendela Bh 13,800.00
17 Grendel pintu Bh 25,000.00
18 Grendel Jendela Bh 7,400.00
19 Hak Angin Bh 31,000.00
20 Handel Jendela Bh 15,000.00
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
BAHAN SANITARI
1 Closet Duduk (setara America Standart Lengkap) Bh 2,500,000.00
2 Kloset Jongkok Bh 300,000.00
3 Wastapel type LW 526J lengkap dgn kran Unit 823,800.00
4 Wastapel type LW 200J lengkap dgn kran Unit 1,500,000.00
5 Isolatif Bh 4,400.00
6 Urinoir Bh 750,000.00
7 Kran Air, uk. 1/2 & 3/4 Bh 21,000.00
8 Shower Stainless std. Hotel Bh 5,500,000.00
9 Floor drain Bh 100,000.00
10 Bak cuci piring stinless Bh 220,000.00
BAHAN FINISHING
1 Cat tembok Setara Dulux Kg 25,000.00
2 Cat kayu Kg 62,000.00
3 Cat dasar tembok Kg 82,500.00
4 Cat dasar kayu Kg 36,000.00
5 Minyak cat Ltr 13,300.00
6 Minyak bekisting Ltr 8,700.00
7 Meni Kg 25,000.00
8 Plamir tembok Kg 20,000.00
9 Amplas Lbr 6,000.00
10 Lem kayu Kg 20,000.00
10 Lem Kuning Kg 65,000.00
10 Lem Wallpaper Kg 75,000.00
11 Kuas Bh 25,000.00
12 Waterprofing Cement Base M2 45,000.00
12 Ultran Parquet Lack UPL-77E set 273,000.00
BAHAN KACA
1 Kaca Polos 5 mm M2 95,000.00
2 Kaca Panasap tbl. 8 mm M2 325,000.00
3 Kaca Polos tbl. 12 mm M2 550,000.00
4 Kaca Tempered tbl. 12 mm M2 1,850,000.00
5 Sticker Sandblast M2 375,000.00
6 Vertical Blind M2 225,000.00
Kaca cermin Uk. 210 x 70 Cm Unit 1,200,000.00
Kaca cermin Uk. 50 x 100 Cm Unit 520,000.00
BAHAN LAIN
1 BBM Premium Ltr 7,095.00
2 BBM Solar (Non Subsidi) Ltr 10,780.00
3 Minyak Pelumas Ltr 31,600.00
4 Rangka ACP Besi Hollow 36x36x1,8 mm M2 344,250.00
5 Dinding ACP PVDF M2 803,250.00
6 Ornamen Teralis Besi Hollow 16x36x1,8 mm Finish Cat M2 907,500.00
7 Curtain Wall Kaca Oneway 5 mm Rangka Aluminium M2 1,980,000.00
8 Aluminium Louvers Coating White M2 990,000.00
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
9 Huruf Timbul Akrilik + Lampu LED & Rangka T. 100 cm Bh 3,630,000.00
10 Waterproofing Membrane Bakar Atap Dak M2 242,000.00
11 Gapura Pintu Lift Finish Marmer Unit 16,644,000.00
12 Awning Balkon Depan M2 850,000.00
13 Pagar BRC uk. 150cmx6mm M' 195,000.00
14 Pagar BRC uk. 90 cmx6mm M' 125,000.00