2" DIA. G.I.

6000
PIPE SCH. 40
400 CONCRETE CLASS
2000 400 1200 400 2000

"A" 1:2:4

0.40MX0.40M PORTAL COLUMN

400 100

400 100
5 PCS.1 1/4" Ø CROSBY
CLIP. SPACED @ 450 mm PC-1 PC-1

34 50
1 1/4" Ø STEEL CENTERED CABLE

1250

1250
89
4
WIRE (STEEL IWRC 6X37 TYPE)

,91

3000

3000
3130

RC-1 RC-1

45
0
2 PCS. 25MM Ø X
500MM U-BOLT (FOR

45
0
DEADMAN MAIN CABLE)

45

800

800
0
0.40m.X0.40m
5130

1250 300 500 DEADMAN COLUMN

50 400

50 400
300
DC-1 DC-1
LATERAL TIES
400

FOOTING SCHEDULE
SCALE: 1: 400

2300
2000
617 617 617
4900
1600

550
COLUMN DETAILS
NOT TO SCALE
550
550
550

976,67
400

400

550
550
8730

5900

550

300
550
3000

3000

550
2600

2600

1
RB- 18 pcs. - 10 mmØ stirrups
total 36 pcs. - 10 mmØ stirrups
10 mmØ stirrups- 2@50mm, 3@100mm,
1000
816,54

4@150mm rest @200mm

RAMP COLUMN
2 (SEE DETAILS) RAMP DETAILS
600

600

600

600

710

SCALE: 1: 350

RAMP COLUMN FOOTING-2


100 400 1250 300 500 400 50 (SEE DETAILS)
400

3000

PROJECT TITLE: REVIEWED BY : APPROVED BY : REVISION : SHEET CONTENT : SHEET NO. :


Description : Date :
CONSTRUCTION OF CABLE BRIDGE AS SHOWN CE-5
ENGR. CYRIL A. ALEA ENGR. WILLIAM L. LUCERO ROLANDO C. DAPADAP
ACT- TECHNICAL FACILITATOR BRGY. POBLACION UNO, REAL QUEZON MUNICIPAL ENGINEER BDC-TWG CHAIRPERSON CE-11