0% found this document useful (0 votes)
2K views2 pages

Scope of Work Template For Aircon

The document outlines the scope of work for various preventative maintenance and repair tasks for HVAC systems. It describes standard preventative maintenance procedures such as checking for noise and vibration, cleaning coils and filters, and testing electrical components. It also provides details for more involved tasks like pull down cleaning of evaporator coils, leak testing and reprocessing systems, replacing defective parts or circuit breakers, and replacing drain lines and u-traps. The overall purpose is to maintain and repair HVAC equipment through scheduled inspections and repairs when needed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views2 pages

Scope of Work Template For Aircon

The document outlines the scope of work for various preventative maintenance and repair tasks for HVAC systems. It describes standard preventative maintenance procedures such as checking for noise and vibration, cleaning coils and filters, and testing electrical components. It also provides details for more involved tasks like pull down cleaning of evaporator coils, leak testing and reprocessing systems, replacing defective parts or circuit breakers, and replacing drain lines and u-traps. The overall purpose is to maintain and repair HVAC equipment through scheduled inspections and repairs when needed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SCOPE OF WORK TEMPLATE

STANDARD PREVENTIVE MAINTENANCE

 Mobilization
 Check Unit for Noise and Vibration
 General Cleaning of Filter, Evaporator & Condenser Coil
 Flushing and Vacuuming of Drain Line
 Checking of PCB and Other Electrical Devices
 Tightening of Bolts and Screw
 Test operation and commissioning, Data Gathering

PULL DOWN CLEANING

• Mobilization
• Releasing of refrigerant charge
• Dismantling of evaporator coil
• Application of coil cleaner
• Cleaning of FCU and ACCU until thoroughly cleaned
• Installation of evaporator coil
• System flushing, leak testing, vacuuming and charging Freon
• Test operation and commissioning
• Observation

STANDARD LEAK TESTING AND SYSTEM REPROCESS

 Mobilization

 Releasing of existing refrigerant charged

 Pressurize system using Nitrogen

 Leak Testing, Leak repair with brazing

 System Flushing, Leak Testing, vacuuming and charging Freon

 Test operation and commissioning

 Data Gathering and Observation


REPLACEMENT OF PARTS

 MOBILIZATION
 DISMANTLING OF DEFECTIVE PART
 INSTALLATION OF NEW PART
 TEST OPERATION AND COMMISSIONING
REPLACEMENT OF PARTS W/ BRAZING

 Mobilization
 Releasing of refrigerant charge
 Dismantling of defective parts with brazing
 Installation of new parts
 System flushing leak testing vacuuming and charging of refrigerant
 Check all wirings connection
 Test operation and commissioning
 Observation

REPLACEMENT OF CIRCUIT BREAKER

 SCOPE OF WORK
 MOBILIZATION
 DISMANTLING OF EXISTING CIRCUIT BREAKER
 CHECKING OF WIRING CONNECTIONS
 INSTALLATION OF NEW CIRCUIT BREAKER
 TEST OPERATION AND COMMISSIONING
 OBSERVATION

REPLACEMENT OF BREAKER AND U-TRAP

 Mobilization
 Dismantling of Drain line
 Layout of New drain line topping at nearest main drain
 (Optional hahanapin pa saan pwede naka embedded existing drain line )
 Installation of U-trap
 Water flow testing
 Test operation and commissioning
 Observation