SCOPE OF WORK TEMPLATE
STANDARD PREVENTIVE MAINTENANCE
Mobilization
Check Unit for Noise and Vibration
General Cleaning of Filter, Evaporator & Condenser Coil
Flushing and Vacuuming of Drain Line
Checking of PCB and Other Electrical Devices
Tightening of Bolts and Screw
Test operation and commissioning, Data Gathering
PULL DOWN CLEANING
• Mobilization
• Releasing of refrigerant charge
• Dismantling of evaporator coil
• Application of coil cleaner
• Cleaning of FCU and ACCU until thoroughly cleaned
• Installation of evaporator coil
• System flushing, leak testing, vacuuming and charging Freon
• Test operation and commissioning
• Observation
STANDARD LEAK TESTING AND SYSTEM REPROCESS
Mobilization
Releasing of existing refrigerant charged
Pressurize system using Nitrogen
Leak Testing, Leak repair with brazing
System Flushing, Leak Testing, vacuuming and charging Freon
Test operation and commissioning
Data Gathering and Observation
REPLACEMENT OF PARTS
MOBILIZATION
DISMANTLING OF DEFECTIVE PART
INSTALLATION OF NEW PART
TEST OPERATION AND COMMISSIONING
REPLACEMENT OF PARTS W/ BRAZING
Mobilization
Releasing of refrigerant charge
Dismantling of defective parts with brazing
Installation of new parts
System flushing leak testing vacuuming and charging of refrigerant
Check all wirings connection
Test operation and commissioning
Observation
REPLACEMENT OF CIRCUIT BREAKER
SCOPE OF WORK
MOBILIZATION
DISMANTLING OF EXISTING CIRCUIT BREAKER
CHECKING OF WIRING CONNECTIONS
INSTALLATION OF NEW CIRCUIT BREAKER
TEST OPERATION AND COMMISSIONING
OBSERVATION
REPLACEMENT OF BREAKER AND U-TRAP
Mobilization
Dismantling of Drain line
Layout of New drain line topping at nearest main drain
(Optional hahanapin pa saan pwede naka embedded existing drain line )
Installation of U-trap
Water flow testing
Test operation and commissioning
Observation