Technical Proposal

Tech-6 : Curriculum Vitae (CV)


K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

FORM TECH-6 :
CURRICULUM VITAE (CV)

Position Title and No. K- 3b : Waste Water Engineer


Name of Expert Nitin Ramkrushna Nandandwar
Date of Birth: 14/12/1974
Country of Citizenship / Residence Indian

Education:
M. Tech, Environnemental Engineering, VNIT, Nagpur University, 2000
B.E. (Civil), Civil Engineering, Govt. Collège of Engineering Amravati University, 1998
Employment record relevant to the assignment:
Period Employing Country Summary of activities performed relevant
organization and to the assignment
your
title/position.
Contact info for
references
May 2016 to Employer: India, • Construction planning & preparation of
Till date WAPCOS Limited Ghana, construction schedule/ Monitoring of work
Tanzania, progress as per time schedule
Position Held: Kenya, • Conducting lab test and in-situ site
Sewage Treatment Lesotho, investigation for quality control
Plant Manager/ Mozambiqu • Formulate strategies for effective project
Project Coordinator e implementation. Construction Supervision,
Contract Management
Contact Address • Monitoring & Evaluation and Project
of Employer: Implementation, Site Safety measures, project
WAPCOS Ltd, 76- implementation of various components.
C, Sector-18,
Institutional Area,
Gurgaon, Haryana
– 122015 (INDIA)

Name: Sanjay
Singal, Sr.
Executive Director
(Rural & Urban
Development)
Tel No.: (+91 -
124)2399225
Email:
[email protected]
n
July 2014 to Employer: Galfar OMAN • Design and documentation for Sewage
May 2016 Engineering and Treatment Plant, sewer, storm water, water
Contracting SAOG and irrigation Network, preliminary, final and
construction issue design drawings
Position Held: • Continuous monitoring of Plan and
Design and Progressive construction, and External
Construction Co- services works
ordinator (MEP- • Preparing Co-ordination drawing and
CIVIL) Interface management for Civil Mech.,
Electrical and Instrumentation
• Managing the construction activities of STP
and Co-ordinating with Client with Consultant.
Oct. 2008 to Employer: Galfar OMAN • Developing Designs for Sewers manholes,
July 2014 Engineering and Pumping Stations from Specifications and
Contracting SAOG Concepts provided in Tender.

Page 1 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

• Preparing Master list of Material and


Position Held: managing the procurement.
Senior Design • Preparing GIS database and Planning and
Engineer Monitoring the Construction Activities of
Network on GIS Module
• Overall construction supervision of
Sewerage network works.
Dec. 2007 to Employer: Envirox India • Construction Supervision of Sewer network,
Sept. 2008 Protection Co. Pvt. STP and WTP project works.
Ltd • Checking and verifying the contractor’s
Position Held: monthly RA bills.
Proposal Engineer • Maintain and coordinate good relation
between Client, Consultant and contractor.
Effective support for execution of daily Works.
Jan. 2002 to Employer: Indian India • Managed complete project lifecycle from
Apr. 2007 Computer Graphics initial concept through construction
• Proposed innovative solutions and cost
Position Held: saving alternatives to meet clients’ objectives
Project Engineer and expectations and to establish win-win
relationships
• Facilitated smooth execution of projects by
attending regular progress meetings with
clients and visiting construction sites.
• Conceptualized, identified, and resolved
field problems quickly and diplomatically thus
saving time and money for both parties
• Preparation of Tender Document Drawing
for 44 MLD Sewage Treatment Plant,
Lalkhadi, Amravati
March, 2001 Employer: India • Evaluation of local site conditions and
to November, Visvesvaraya existing sewerage network system
2002 National Institute of • Assessment of Sewage demand
Technology (VNIT), • Preparation of Detail design of drainage
Nagpur system and Network modeling.
Position Held: • Proposed innovative solutions and cost
Senior Project saving alternatives to meet clients’ objectives
Fellow

Aug. 1998 to Employer: Govt. India


Jan. 1999 Polytechnic

Position Held:
Lecturer, Civil
Engineering.

Membership of Professional Associations and Publications:


Member of Institute of Engineers/Indian Water Works Association: Amravati Chapter, Maharashtra

Other Training:
PMP, Water Cad Vertion.6, Loop. V4, Arc GIS, Geomedia, AutoCAD/AutoCAD Civil 3D, ERDAS
Imagine (Remote Sensing), Microsoft Office, Microsoft Projects

Language Skills :
Speaking Reading Writing
Hindi Excellent Excellent Excellent
English Excellent Excellent Excellent

Page 2 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

Adequacy for the Assignment:

Detailed Tasks Assigned on Reference to Prior Work / Assignments that Best


Consultant’s Team of Experts Illustrates Capabiliy to Handle the Assigned Tasks
The Expert shall be responsible for the 1. Name of Assignment: Project Development &
preparation and submission of’ Management Consultant (PDMC) for Atal Mission for
following Deliverables; Rejuvenation and Urban Transformation (AMRUT)
D-1: Inception report Mission.
D-2: Report on Commissioning of Total Capacity of Sewage Treatment Plants: 300
works complete with Defects MLD
Total Sewerage Network Length: Over 2000 km.
Liability report
Year: Dec 2016 to till date
D-3: Operation and Maintenance Client: Directorate, Urban Administration &
Manual Development, Bhopal
D-4: Project Completion Report Location: Various cities in Madhya Pradesh
D-5: As Built Drawings Main Project Features:
D-6: Capacity Building This scheme launched by Prime Minister of India, the
Accomplishment Reports purpose of Atal Mission for Rejuvenation and Urban
Transformation (AMRUT) is to provide basic services
Provide the necessary guidance and (e.g. water supply, sewerage, urban transport) to
leadership to the project team households and build amenities in cities which will
Establish the office environment and improve the quality of life for all in mission mode. The
other logistics of the project main objectives of the mission are as follows (i) ensure
Initiate the data collection activities in that every household has access to a tap with assured
the field and review of existing supply of water and sewerage connection,
reports and documents augmentation of sewerage network (over 2000km
Responsible for communication and length), rehabilitation of Wastewater Treatment
reporting to all parties concerned Plants (Total Capacity of 300 MLD), additional
Responsible for the contract sewage treatment plant based on SBR (Sequential
supervision and administration batch technology) technology for 17 cities in Madhya
Responsible for the guidance of the Pradesh (ii) increase the amenity value of cities by
technical team members and expert developing greenery and well maintained open spaces
input to prepare final design (e.g. parks); and (iii) reduce pollution by switching to
documents public transport or constructing facilities for non-
Coordinate, control and monitor the motorized transport (e.g. walking and cycling).
activities of engineering team , Position Held: Resident Engineer
Sectoral studies team and other Activity Performed:
supporting staff  Construction planning & preparation of construction
Conduct trainings on procurement schedule/ Monitoring of work progress as per time
and contract management schedule
 Conducting lab test and in-situ site investigation for
quality control
 Formulate strategies for effective project
implementation. Construction Supervision, Contract
Management,
 Monitoring & Evaluation and Project Implementation,
Site Safety measures, project implementation of
various components.
2. Name of Assignment/job or project: Royal General Hospital project, Muscat, Oman.
Year: May 2016 – Nov. 2017
Location: Muscat Oman
Employer: Galfar Engineering and Contracting, SAOG
Main Project features: EPC Mega Hospital Project in Muscat Oman with High End Specifications
of 7-Star Construction Requirement.
Position Held: Sewage Treatment Plant Manager/ Construction Coordinator
Activities performed:
 Design coordination for External Development of 150 Acre New ROP General Hospital Project

Page 3 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

(460 Beds Hospital), and Main Hospital Building, Includes 10 MLD MBR-STP, Sewer Network,
Storm Water Drains, Irrigation Network, Underground Utilities for Electrical and ELV, Temporary
and Permanent Fire Fighting Execution Works. Solid Waste Management for Construction
 Planning for Activity’s refer to projects Milestones
 Design/Detailing and Procurement for STP equipment’s and Sewer Network. MBR
 Construction Supervision of Sewer network and STP
3. Name of Assignment/job or project: New Darsait Sewage Treatment Plant, Muscat Oman.
Year: July 2014- May 2016
Location: Muscat Oman
Employer: Galfar Engineering and Contracting, SAOG
Main Project features: 50 MLD MBR Treatment Plant with 100% odour control Facility , Fully
Covered STP
Position Held: Design and Construction Co-ordinator (MEP-CIVIL)
Activities performed:
 Design and documentation for Sewage Treatment Plant, sewer, storm water, water and irrigation
Network, preliminary, final and construction issue design drawings
 Continuous monitoring of Plan and Progressive construction, and External services works
 Preparing Co-ordination drawing and Interface management for Civil Mech., Electrical and
Instrumentation
 Managing the construction activities of STP and Co-ordinating with Client with Consultant.
4. Name of Assignment/job or project: A’Seeb Costal Strip Sewerage Network Using Vacuum
Collection Technology, Oman.
Year: Oct 2008 – July 2014
Location: Muscat- Oman
 Employer: Galfar Engineering and Contracting, SAOG
 Client: Oman Waste Water Company (Haya Water)
Main Project Features: The main project component included:
 11 vacuum stations and vacuum sewer network of total length 250 km
 Installations of 4037 Vacuum Valve chambers
 215 km of Rider/Gravity sewer
 43 km Sewage rising main/Recycled water mains
 More than7000 property connections.
Position Held: Senior Design and Construction Engineer
Activities Performed:
 Developing Designs for Sewers manholes, Pumping Stations from Specifications and Concepts
provided in Tender.
 Preparing Master list of Material and managing the procurement.
 Preparing GIS database and Planning and Monitoring the Construction Activities of Network on
GIS Module
 Overall construction supervision of Sewerage network works.
5. Name of Assignment or Project: Construction of 32 MLD STP at Mumbra and WTP at
Various locations in Maharashtra under Pune Municipal Corporation.
Period: Dec 2007 – Sept. 2008
Location: Mumbai
Employer: Envirox Protection Pvt Ltd.
Clients: Thane Municipal Corporation, STEM Water Authority, Municipal Corporation of Greater
Mumbai, Pune Municipal Corporation
Main Project Features: The various projects include:-Components of the project:
 32 MLD STP work at Mumbra (Thane). Construction of sewer network from 150mm SWD pipes
to 900mm RCC pipe. Micro tunnelling work of 2.1m diameter at highway crossing for execution
of drainage system.
 150 MLD water treatment plant (WTP) At Kalyan (Kalyan Dombivali Municipal Corporation). A
conventional Sewerage treatment plant.
 Water Audit, UFW Study & Leak Detection,Investment Plans for 24X7, for 1000 MLD
(Cantonment—273 MLD, Parvati- 470MLD, New Warje -100 MLD, Wadgaon-125 MLD.) Water
Supply Scheme of Pune Municipal Corporation, (In Association With Public Utility Board
Singapore (PUB) +Envirox)
 Shahad Temghar (STEM) Water Authority Consultancy Services for Augmentation of Water
Supply by 300 MLD

Page 4 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

Position Held: Construction Engineer


Activities Performed:
 Construction Supervision of Sewer network, STP and WTP project works.
 Checking and verifying the contractor’s monthly RA bills.
 Maintain and coordinate good relation between Client, Consultant and contractor.
 Effective support for execution of daily Works.
6. Name of Assignment or Project: Design and Construction projects of Sewerage and Water
supply Projects in Maharashtra:
1. Sewage Treatment Plant (STP), Lalkhadi, 44 MLD, Population 6 lakhs, Funding agency,
Central Govt., State Govt., Amravati Municipal Corporation.
2. Underground drainage scheme designed for Amravati City, Having Pumping Station, 4 no’s
and RCC Pipes of Dia 150 mm to 1800mm
3. Preparation of CDP and DPR FOR Amravati Municipal Corporation under UIDSSMT- Client
Municipal Corporation Amravati.
4. CAD and GIS Mapping and Modelling of Water Distribution System of Town Warud, Client MJP
Amravati.
5. CAD/GIS Mapping of Water Distribution System Network for Yeotmal City, Client MJP
Amravati. Maharashtra.
6. Trimbakeshwar city maps for Kumbhamela in the year 2003 Prepared GIS Maps for
Management of Pilgrims. Client MJP Nashik.
7. Phase II Water Supply Scheme (Rahatgaohn) Modelled for 24x7 Water supply Scheme (Tested
for 24x7 Operation) for Amravati City, Client MJP Amravati.
8. Amravati Narkher Railway line which includes Bridges (Detailing of Steel Bridges) To take out
Quantities of Steel and to prepare Fabrication Details of Steel Structures , R2V conversion of
Land plans, Project Sheets, L-Section, Index Plant, etc. in cad software., Client Superintending
Engineer ( Central Railway), Amravati Narked Railway.
9. Irrigation Scheme for 250 acre land at village Karla, District Amravati, Maharashtra.
10. Water Supply Scheme Including Providing The Estimates, Supervision of works, in Jalswaraj
and Swajaldhara Rural Water Supply Projects For Various Villages of population @ 10 -30
thousand at Amravati, Nagpur, Wardha, and Yeotmal districts. , Client: A local Body/
Grampanchayat / Zilhaparishad/NGO’s.
11. Architectural And Civil /Structural Consultancy for construction of Residential houses (80 No’s)
of G+1 and Residential/Commercial Apartments (20 No’s) of G+3 and G+4. Including
Supervision of Construction and Management of Contractors and Sub Contractors
Year: Jan 2002 – Apr 2007
Location: Maharashtra
Employer : Indian Computer Graphics
Client: Maharashtra Jivan Pradhikaran & Zilha Parishad, Amravati Municipal Corporation, NGO’s,
Local Body’s
Main Project Features: Providing The consultancy Services to Various Govt. Authority’s,
(Maharashtra Jiwan Pradhikaran (PHE), Municipal Corporation, Jilha Parishad, Etc)
Position Held: Assistant Resident Engineer
Activities Performed:
 Managed complete project lifecycle from initial concept through construction
 Proposed innovative solutions and cost saving alternatives to meet clients’ objectives and
expectations and to establish win-win relationships
 Facilitated smooth execution of projects by attending regular progress meetings with clients and
visiting construction sites.
 Conceptualized, identified, and resolved field problems quickly and diplomatically thus saving
time and money for both parties
 Preparation of Tender Document Drawing for 44 MLD Sewage Treatment Plant, Lalkhadi,
Amravati
7. Name of Assignment or Project: Design of Underground storm water drainage and
sewerage scheme for Silvassa in Union Territory of Dadara & Nagar Haveli, India
Year: March, 2001 to November, 2002
Location: Silvassa, Union Territory of Dadara & Nagar Haveli, India
Client: PWD, Administration of U.T. of Dadara Nagar Havali
Main project features:
The project area consists of Silvassa, capital of Dadra & Nagar Haveli amalgamated with Amli

Page 5 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

Village. There does not exists any comprehensive system for disposal of sewerage system and due
to heavy rainfall in the area the natural drains chock and the area remains flooded for hours. Total
17.55 sq. km area was covered under the drainage project. The cost of project is Rs.9.69 crores.
Positions Held: Drainage Engineer
Activities Performed:
 Evaluation of local site conditions and existing sewerage network system
 Assessment of Sewage demand
 Preparation of Detail design of drainage system and Network modeling.
 Proposed innovative solutions and cost saving alternatives to meet clients’ objectives

Expert’s Contact Information: E-mail: [email protected] , Tel No.:0091-124-2399225

Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience, and I am available, as and when necessary, to
undertake the assignment in case of an award. I understand that any misstatement or
misrepresentation described herein may lead to my disqualification or dismissal by the Client,
and/or sanctions by the Bank.

Nitin Ramkrushna Nandandwar

Name of Expert Signature Date: 04.02.2023

Mr. P K Madan, Project Manager


Name of authorized Date: 04.02.2023
Representative of the Consultant Signature
(the same who signs the Proposal)

Page 6 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

Page 7 of 8
Technical Proposal
Tech-6 : Curriculum Vitae (CV)
K-3b: Nitin Ramkrushna Nandandwar – Waste Water Engineer

Page 8 of 8