After Activity Link-ups next step is to connect Project work-Packages to make Complete Project
connected so that Primavera p6 will develop Real Project Critical Path.
Progress-Over-Ride : Under this option scheduling of your work after during execution will be more
flexible towards activity relationship
Actual dates : the most Flexible in Execution phase and adjust planning-execution accordingly
Once It is done
Press Schedule button on window and get your work plan on p6 with defined duration and critical &
non-Critical path.
• Layouts
Primavera P6 Provides multiple layout feature to easily switch in required one on single click.
Now you want such templates with different project information so that whenever your project
manager is asking for a certain layout how you can present
Step-01 : Add required columns & Change timescale as per requirement (if any)
1. Activities screen
2. Project screen
3. WBS screen
4. Resource Assignments screen
5. Tracking layout screen
• Filters
After you’ve created your Primavera P6 schedule, there may be times when you want to
view only a selection of the activities in it; particularly if it is a large schedule.
Primavera P6 have dynamic feature of filter by.
Parameter
Condition
Range/Values
To Process your requirement
Once you Develop Project Schedule you need to extract Weekly/Monthly Most
near future plans to Site Team and consultant to have more realistic execution.
Such plans are called Look ahead Plans.
We can filter our data within required range of Timeline using Filter by Option.